c. Hoist Removal.pdf

PDF 184 KB Posted

Attached to
Roofing Repair/Replacement & Minor Facility Construction Federal contract opportunity
Solicitation number
AG-04R3-S-09-0004
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

About this file

c. Hoist Removal

View the file

Other files for this federal contract opportunity

Other files attached to Roofing Repair/Replacement & Minor Facility Construction, newest first.
File Type Posted
d. Amended Specification.pdf PDF
a. Amendment_1.rtf RTF text file
b. Changes to Solicitation Amend No 1.doc DOC document
n.DB-WA_Wage_Determination_Res2.htm HTM file
s. SF24_Bid_Bond.pdf PDF
f.Oregon_Wage_Determination77-0079_sca.htm HTM file
l.DB_Oregon_Wage_Determination_Res3.htm HTM file
b.Solicitation.rtf RTF text file
k.DB_Oregon_Wage_Determination_Res2.htm HTM file
v.sf25b_Continuation_Sheet_Bonds.pdf PDF
u.Sf25a_Payment_Bond.pdf PDF
h.Idaho_Wage_Determination95-0228_sca.htm HTM file
d.ProjectDescriptions_Locations_Drawings.pdf PDF
e.Specifications.pdf PDF
j.DB_Oregon_Wage_Determination_Res1.htm HTM file
o.DB-WA_Wage_Determination_Res3.htm HTM file
p.DB_Idaho_Wage_Determination_Building.htm HTM file
t.sf25_Performance_Bond.pdf PDF
c.TitleSheet.pdf PDF
a.Bidders_Packet.rtf RTF text file
q.DB_Oregon_Wage_Determination_Building.htm HTM file
r.DB-WA_Wage_Determination_Building.htm HTM file
m.DB-WA_Wage_Determination_Res1.htm HTM file
i.DB_Idaho_Wage_Determination_Residential.htm HTM file
g.Washington_Wage_Determination77-0209_sca.htm HTM file
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hoist Removal Project Umatilla National Forest

Project Description

Project includes

1. Demolition of 1960-era vehicle hoist: Work includes removal and disposal of all metal hoist items, including but not limited to, chains, cylinders, guide rails and other attachments and controls.

2. Work also includes removal of hydraulic fluid collection reservoir and containment culvert (est. 175 gal capacity).

3. Contractor shall install one air fitting and connecting plumbing (Government Furnished Material) prior to closure of pit.

4. Re-establish Concrete floor: Contractor shall close up pit and other floor depressions associated with hoist removal. Finished concrete floor shall match existing shop floor elevation. Neatline saw cuts required to make a uniform patch. Fill in access pit (estimated 2 ft wide x 13 long ft x 8 ft deep) with common borrow material and minimum of 8 inches of crushed aggregate on top. Moisten and compact fill material in maximum layers of 6 inches until no visible deflection observed.

5. Provide all labor and materials to form up and pour 8 inch concrete slab with rebar reinforcement (a 12” x 12” grid full length of pit) to complete pit closure.

Potable water and electricity are available on site.

Work Restrictions: Government employees will be working in the building. Compound is locked from 6 pm to 6 am each evening. Work hours limited to 6:00 am - 6:00 pm Monday through Friday.

Project Location

Directions from Pendleton: From I-84 Exit 210 (near Red Lion Motel) proceed north on Hwy 11 to stop light at Court Street. Proceed ahead through the stop light; onto Court Place; road curves slightly to the rightt. Proceed two block to 12th Street; turn left and proceed ahead one block to Byers Street. Turn right onto Byers; proceed ahead past Washington Elementary School. Umatilla National Forest Warehouse Compound is first left past the school yard. Note: Compound is gated and locked weekends and after 6 pm on weekdays.

File details come from the government source that posted it. Updated .