Drawings.pdf
PDF 1 MB Posted
- Solicitation number
- AG-0489-S-10-0112
About this file
Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_4.pdf | ||
| Amendment_3.pdf | ||
| Amendment_3_continuation.docx | DOCX document | |
| Survey_Data_Spokane_to_S26.xlsx | XLSX spreadsheet | |
| Survey_Data_Midpt_to_UI.xlsx | XLSX spreadsheet | |
| Survey_Data_Johnson_ to_ Spokane.xlsx | XLSX spreadsheet | |
| Survey_Data_S26_to_Tincan.xlsx | XLSX spreadsheet | |
| Survey_Data_MidpointAccess.xlsx | XLSX spreadsheet | |
| Survey_Data_UpperIngram_to_Tincan.xlsx | XLSX spreadsheet | |
| Amendment_2.pdf | ||
| johnson_pass_to_MP73_waypoints_tracks.tpo | — | |
| jp2mp73.txt | TXT text file | |
| Amendment_1.pdf | ||
| AccessibilityGuide.doc | DOC document | |
| Yellow_Cedar_Sources.doc | DOC document | |
| SF24.doc | DOC document | |
| Photos.doc | DOC document | |
| WageRates.txt | TXT text file | |
| RA891.pdf | ||
| Yellow_Cedar_Sources.docx | DOCX document | |
| Natl_Design_Parameters.pdf | ||
| RA892.pdf | ||
| Photos.docx | DOCX document | |
| specifications.doc | DOC document | |
| Solicitation_RFP.doc | DOC document | |
| SF24.docx | DOCX document | |
| Map_Bridge_Sites.JPG | JPG image | |
| Offer_Submittal_Package.doc | DOC document | |
| AccessibilityGuide.docx | DOCX document |
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Station/ Milepost
Description of Work Midpoint Access 10+00 – 97+83
Pay Item Estimated Quantity
10+00 Begin project. Spike in guardrail post on edge of parking area on east side of Seward Highway near milepost 72. Begin Centerline Staking for 8,886’ ahead.
Begin Clearing and Grubbing & Excavation for 8,886’ ahead. See typical control point and tables sheets H.1- 7 of drawings. See typical details on sheets C.1-3 of drawings.
908(01) 911(02) 912(01)
8,886 L.F.
8,886 L.F.
8,886 L.F.
11+05 Begin descending turn right.
12+30 bk = 11+27 ah
11+32
Construct Puncheon with Decking for 218’ ahead. See detail sheet F.2 of drawings.
Crossing center of creek.
932(01) 218 L.F.
13+50 to 15+50
Construct three Grade Dips as needed between these stations. See typical detail on sheet E.2 of drawings.
912(06) 3 Each
15+95 Construct Turnpike, Log Retainer, Type 1 for 60’ ahead.
See detail on sheet F.1 of drawings.
913(01) 913(03)
60 L.F.
33 S.Y.
17+05 Cross user made trail to Eddies Cabin. Construct
Turnpike. Log Retainer, Type 1 for 50’ ahead.
913(01) 913(03)
50 L.F.
28 S.Y.
21+05 Construct Turnpike, Log Retainer, Type 1 for 25’ ahead. 913(01)
913(03) 25 L.F.
14 S.Y
21+10 Install 12” Corrugated Polyethylene Pipe. See sheet E.1 of drawings.
921(01) 6 L.F.
21+30 Construct 14’ span Log Stringer Bridge, Type 4’ Wide
Native Log as staked. See details on sheets F.3-4 of drawings.
931(03) 14 L.F.
21+88 Construct Turnpike, Log Retainer, Type 1 for 102’ ahead.
913(01) 913(03)
102 L.F.
57 S.Y
23+27 Construct Turnpike, Log Retainer, Type 1 for 21’ ahead. 913(01)
21 L.F.
12 S.Y
23+48 Construct 14’ span Log Stringer Bridge, Type 4’ Wide
Native Log as staked.
23+62 Construct Turnpike, Log Retainer, Type 1 for 38’ ahead.
Construct side ditch on uphill side only.
913(01) 913(03)
38 L.F.
21S.Y.
WORK SUMMARY
DEPARTMENT OF AGRICULTURE
FOREST SERVICE
CHUGACH NATIONAL FOREST
IDITAROD NATIONAL
HISTORIC TRAIL
SHEET D.1
Description of Work Midpoint Access 10+00 – 97+83
24+10 Construct Grade Dip. 912(06) 1 Each
24+20 Construct Turnpike, Log Retainer, Type 1 for 25’ ahead.
913(01) 913(03)
29+89 Construct Turnpike, Log Retainer, Type 1 for 80’ ahead.
Do not construct side ditches.
913(01) 913(03)
80 L.F.
44 S.Y
30+69 Construct Turnpike, Log Retainer, Type 1 for 50’ ahead. 913(01)
28 S.Y
32+59 Construct Turnpike, Log Retainer, Type 1 for 108’
913(01) 913(03)
108 L.F.
60 S.Y
33+55 Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
33+65 to 34+60
Construct one Grade Dip as needed between these stations.
912(06) 1 Each
36+06 Construct Turnpike, Log Retainer, Type 1 for 71’ ahead. 913(01)
71 L.F.
39 S.Y
39+37 Construct Turnpike, Log Retainer, Type 1 for 27’ ahead. 913(01)
27 L.F.
15 S.Y
39+40 to 39+60
Install one 12” Corrugated Polyethylene Pipe as needed between these stations.
39+64 Construct Ditch on right for 22’ ahead. See sheet C.3 of
912(09) 22 L.F.
39+86 Construct Turnpike, Log Retainer, Type 1 for 42’ ahead. 913(01)
42 L.F.
23 S.Y
39+90 to 40+20
Install one 12” Corrugated Polyethylene Pipe as needed
40+42 Construct 20’ span Log Stringer Bridge, Type 4’ Wide
SHEET D.2
Description of Work Midpoint Access 10+00 – 97+83
41+15 Construct Turnpike, Log Retainer, Type 1 for 41’ ahead. 913(01)
41 L.F.
23 S.Y
41+15 to 41+55
Install two 12” Corrugated Polyethylene Pipes as needed between these stations.
921(01) 12 L.F.
43+40 Approximate northeast Lower Ingram Creek proposed bridge abutment. Bridge construction to be completed by others.
43+80 Approximate southwest Lower Ingram Creek proposed bridge abutment.
44+36 Construct Log Retaining Wall for 24’ ahead. See details on sheet F.5 of drawings.
934(01) 16 S.Y.
46+28 Climbing turn right. See details on sheet G.1 of
47+49 Construct Grade Dip. 912(06) 1 Each
51+49 Construct Grade Dip. 912(06) 1 Each
52+49 Construct Grade Dip. 912(06) 1 Each
52+59 Construct Ditch on right for 25’ ahead. 912(09) 25 L.F.
55+25 Construct Shallow Stream Ford and Gully Crossing
Structure. See details on sheet E.3 of drawings.
912(07) 1 Each
56+45 Construct Shallow Stream Ford and Gully Crossing
Structure.
56+65 Construct Shallow Stream Ford and Gully Crossing
57+19 Construct Shallow Stream Ford and Gully Crossing
57+60 Construct Grade Dip. 912(06) 1 Each
57+70 Construct Ditch on right for 105’ ahead. 912(09) 105 L.F.
SHEET D.3
Description of Work Midpoint Access 10+00 – 97+83
57+90 Construct Grade Dip. 912(06) 1 Each
58+41 Construct Grade Dip. 912(06) 1 Each
58+64 Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
58+75 Construct 12’ span Log Stringer Bridge, Type 4’ Wide
931(03) 12 L.F.
59+11 Construct Grade Dip. 912(06) 1 Each
59+21 Construct Ditch on right for 29’ ahead. 912(09) 29 L.F.
59+27 Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
60+31 Construct Grade Dip. 912(06) 1 Each
60+41 Construct Ditch on right for 10’ ahead. 912(09) 10 L.F.
60+51 Construct Turnpike, Log Retainer, Type 1 for 150’
913(01) 913(03)
150 L.F.
83 S.Y
60+60 to 61+80
Install four 12” Corrugated Polyethylene Pipes as
921(01) 24 L.F.
62+01 Construct Ditch on right for 50’ ahead. 912(09) 50 L.F.
62+05 to 62+40
Install two 12” Corrugated Polyethylene Pipes as
64+50 to 66+10
Construct two Grade Dips as needed between these
912(06) 2 Each
66+17 Construct Turnpike, Log Retainer, Type 1 for 37’ ahead. 913(01)
37 L.F.
21 S.Y
66+32 Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
SHEET D.4
Description of Work Midpoint Access 10+00 – 97+83
67+21 Construct Turnpike, Log Retainer, Type 1 for 18’ ahead. 913(01)
18 L.F.
10 S.Y
67+29 Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
67+70 Construct Turnpike, Log Retainer, Type 1 for 43’ ahead. 913(01)
43 L.F.
24 S.Y
67+75 to 68+10
Install one 12” Corrugated Polyethylene Pipe as needed
70+56 Construct Turnpike, Log Retainer, Type 1 for 25’ ahead. 913(01)
70+60 to 70+80
Install one 12” Corrugated Polyethylene Pipe as needed
71+67 Construct Turnpike, Log Retainer, Type 1 for 63’ ahead. 913(01)
63 L.F.
35 S.Y
71+70 to 72+25
Install one 12” Corrugated Polyethylene Pipe as needed
79+08 Construct 18’ span Log Stringer Bridge, Type 4’ Wide
931(03) 18 L.F.
79+60 Construct Turnpike, Log Retainer, Type 1 for 21’ ahead. 913(01)
21 L.F.
12 S.Y
80+17 Construct Shallow Stream Ford and Gully Crossing
81+29 Construct Shallow Stream Ford and Gully Crossing
81+39 Construct Ditch on right for 26’ ahead. 912(09) 26 L.F.
81+40 to 81+60
Install two 12” Corrugated Polyethylene Pipes as
SHEET D.5
Description of Work Midpoint Access 10+00 – 97+83
81+65 Construct Turnpike, Log Retainer, Type 1 for 59’ ahead. 913(01)
59 L.F.
33 S.Y
82+24 Construct Ditch on right for 37’ ahead. 912(09) 37 L.F.
82+61 Construct Turnpike, Log Retainer, Type 1 for 23’ ahead. 913(01)
23 L.F.
13 S.Y
82+65 to 82+80
Install one 12” Corrugated Polyethylene Pipe as needed
82+84 Construct Ditch on right for 18’ ahead. 912(09) 18 L.F.
83+02 Construct Turnpike, Log Retainer, Type 1 for 48’ ahead. 913(01)
48 L.F.
27 S.Y
83+05 to 83+45
Install one 12” Corrugated Polyethylene Pipe as needed
83+50 Construct Ditch on right for 227’ ahead. 912(09) 227 L.F.
83+80 to 85+75
Install six 12” Corrugated Polyethylene Pipes as needed
921(01) 36 L.F.
86+18 Construct Shallow Stream Ford and Gully Crossing
86+28 Construct Ditch on right for 93’ ahead. 912(09) 93 L.F.
86+30 to 87+20
Install two 12” Corrugated Polyethylene Pipes as
90+45 Construct Shallow Stream Ford and Gully Crossing
91+21 Construct Grade Dip. 912(06) 1 Each
91+31 Construct Ditch on right for 31’ ahead. 912(09) 31 L.F.
92+33 Construct Shallow Stream Ford and Gully Crossing
SHEET D.6
Description of Work Midpoint Access 10+00 – 97+83
92+50 to 93+10
Install one 12” Corrugated Polyethylene Pipe as needed
93+30 Construct Grade Dip. 912(06) 1 Each
93+40 Construct Ditch on right for 60’ ahead. 912(09) 60 L.F.
93+45 to 93+90
Construct one Grade Dip as needed between these
94+00 Construct Turnpike, Log Retainer, Type 1 for 40’ ahead. 913(01)
40 L.F.
27 S.Y
94+10 to 94+30
Install one 12” Corrugated Polyethylene Pipe as needed
94+40 Construct Puncheon with Decking for 16’ ahead. 932(01) 16 L.F.
94+70 +/- Install one 12” Corrugated Polyethylene Pipe. Construct
Ditch on uphill side for 50’ ahead.
912(09) 921(01)
6 L.F.
95+31 Apparent climbing turn left
95+40 Construct Ditch on right for 75’ ahead. 912(09) 75 L.F.
96+69 Construct Shallow Stream Ford and Gully Crossing
97+83 Connect to Iditarod Mainline at 10+00. End Centerline
Staking. End Clearing and Grubbing. End Excavation.
End project Midpoint Access.
SHEET D.7
Description of Work Midpoint Access to Upper Ingram 10+00 – 80+70
10+00 = 97+83
Begin project. Junction with Midpoint Access at 97+83.
Begin Centerline Staking for 7,070’ ahead. Begin Clearing and Grubbing & Excavation for 7,070’ ahead.
See typical control point and tables sheets H.1-7 of drawings. See typical details on sheets C.1-3 of drawings.
908(01) 911(02) 912(01)
7,070 L.F.
7,070 L.F.
7,070 L.F.
10+05 Apparent climbing turn right. See details on sheet G.1
10+36 Construct Shallow Stream Ford and Gully Crossing
10+67 Construct Ditch on left for 22’ ahead. See sheet C.3 of
912(09) 22 L.F.
10+70 to 10+85
Install one 12” Corrugated Polyethylene Pipe as needed between these stations. See sheet E.1 of drawings.
11+20 Construct Shallow Stream Ford and Gully Crossing
11+35 Visible rock on surface.
11+49 Construct Turnpike, Log Retainer, Type 1 for 14’ ahead.
913(01) 913(03)
14 L.F.
8 S.Y
11+50 to 11+60
Install one 12” Corrugated Polyethylene Pipe as needed
12+30 Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
12+34 Construct Ditch on left for 196’ ahead 912(09) 196 L.F.
12+50 to 14+10
Install three 12” Corrugated Polyethylene Pipes as
921(01) 18 L.F.
16+67 Construct Grade Dip. See typical detail on sheet E.2 of
16+77 Construct Ditch on left for 42’ ahead 912(09) 42 L.F.
17+55 Construct Ditch on left for 63’ ahead 912(09) 63 L.F.
SHEET D.8
Description of Work Midpoint Access to Upper Ingram 10+00 – 80+70
17+75 to 18+10
Install one 12” Corrugated Polyethylene Pipe as needed
18+28 Construct Grade Dip. 912(06) 1 Each
19+55 Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
19+60 Construct Ditch on left for 118’ ahead 912(09) 118 L.F.
19+80 to 20+55
Install two 12” Corrugated Polyethylene Pipes as
21+36 Construct Grade Dip. 912(06) 1 Each
21+46 Construct Ditch on left for 18’ ahead 912(09) 18 L.F.
23+44 Construct Grade Dip. 912(06) 1 Each
26+64 Construct Grade Dip. 912(06) 1 Each
28+64 Construct Grade Dip. 912(06) 1 Each
32+51 Construct Grade Dip. 912(06) 1 Each
32+61 Construct Ditch on left for 50’ ahead 912(09) 50 L.F.
32+90+/- Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
33+20 Construct 14’ span Log Stringer Bridge, Type 4’ Wide
34+15 Construct Shallow Stream Ford and Gully Crossing
35+25 Visible rock on surface.
35+62 Visible rock on surface. Construct Shallow Stream Ford and Gully Crossing Structure
35+91 Approximate location of change from wood Pline stakes to wire stake Pline flags.
SHEET D.9
Description of Work Midpoint Access to Upper Ingram 10+00 – 80+70
36+98 Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
37+98 Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
40+98 Construct Grade Dip. 912(06) 1 Each
41+08 Construct Turnpike, Log Retainer, Type 1 for 28’ ahead. 913(01)
28 L.F.
16 S.Y
41+10 to 42+20
Install two 12” Corrugated Polyethylene Pipes as
41+65 Construct Turnpike, Log Retainer, Type 1 for 61’ ahead.
913(01) 913(03)
61 L.F.
34 S.Y
42+26 Construct Turnpike, Log Retainer, Type 1 for 28’ ahead. 913(01)
16 S.Y
42+35 to 42+50
Install one 12” Corrugated Polyethylene Pipe as needed
42+64 Construct Grade Dip. 912(06) 1 Each
42+74 Construct Ditch on left for 18’ ahead 912(09) 18 L.F.
43+02 Construct Grade Dip. 912(06) 1 Each
43+20 to 43+60
Install two 12” Corrugated Polyethylene Pipe as needed
43+74 Construct Grade Dip. 912(06) 1 Each
43+84 Construct Ditch on left for 116’ ahead 912(09) 116 L.F.
44+10 to 44+80
Install one 12” Corrugated Polyethylene Pipe as needed
45+31 Construct Grade Dip. 912(06) 1 Each
45+41 Construct Ditch on left for 22’ ahead 912(09) 22 L.F.
45+84 Construct Shallow Stream Ford and Gully Crossing
SHEET D.10
Description of Work Midpoint Access to Upper Ingram 10+00 – 80+70
46+69 Construct Grade Dip. 912(06) 1 Each
46+79 Construct Ditch on left for 44’ ahead 912(09) 44 L.F.
46+90 to 47+10
Install one 12” Corrugated Polyethylene Pipe as needed
47+33 Construct Grade Dip. 912(06) 1 Each
47+43 Construct Ditch on left for 27’ ahead 912(09) 27 L.F.
48+10 Construct Turnpike, Log Retainer, Type 1 for 14’ ahead. 913(01)
8 S.Y
48+15+/- Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
48+59 Construct Grade Dip. 912(06) 1 Each
48+69 Construct Ditch on left for 80 ’ ahead 912(09) 80 L.F.
48+90 to 49+30
Install one 12” Corrugated Polyethylene Pipe as needed
49+59 Construct Grade Dip. 912(06) 1 Each
49+69 Construct Ditch on left for 67 ’ ahead 912(09) 67 L.F.
52+36 Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
54+49 Construct Grade Dip. 912(06) 1 Each
54+59 Construct Ditch on left for 331’ ahead 912(09) 331 L.F.
54+99+/- Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
55+49 Construct Grade Dip. 912(06) 1 Each
55+99+/- Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
56+49 Construct Grade Dip. 912(06) 1 Each
SHEET D.11
Description of Work Midpoint Access to Upper Ingram 10+00 – 80+70
56+99+/- Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
57+49 Construct Grade Dip. 912(06) 1 Each
57+90 Construct Turnpike, Log Retainer, Type 1 for 24’ ahead. 913(01)
24 L.F.
13 S.Y
58+02+/- Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
58+14 Construct Ditch on left for 90’ ahead 912(09) 90 L.F.
58+30 to 58+85
Install two 12” Corrugated Polyethylene Pipes as
59+14 Construct Grade Dip. 912(06) 1 Each
59+24 Construct Ditch on left for 140’ ahead 912(09) 140 L.F.
59+40 to 60+50
Install three 12” Corrugated Polyethylene Pipes as
60+84 Construct Shallow Stream Ford and Gully Crossing
60+94 Construct Ditch on left for 198’ ahead 912(09) 198 L.F.
61+10 to 62+80
Install four 12” Corrugated Polyethylene Pipes as
62+92 Construct Turnpike, Log Retainer, Type 1 for 10’ ahead. 913(01)
10 L.F.
6 S.Y
62+97 Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
63+02 Construct Ditch on left for 22’ ahead 912(09) 22 L.F.
63+24 Construct Turnpike, Log Retainer, Type 1 for 10’ ahead. 913(01)
6 S.Y
63+24+/- Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
63+34 Construct Ditch on left for 88’ ahead 912(09) 88 L.F.
SHEET D.12
Description of Work Midpoint Access to Upper Ingram 10+00 – 80+70
63+50 to 64+10
Install two 12” Corrugated Polyethylene Pipes as
64+32 Construct Grade Dip. 912(06) 1 Each
64+42 Construct Ditch on left for 275’ ahead 912(09) 275 L.F.
64+60 to 67+00
Install six 12” Corrugated Polyethylene Pipes as needed
67+27 Construct Shallow Stream Ford and Gully Crossing
67+37 Construct Ditch on left for 11’ ahead 912(09) 11 L.F.
67+58 Construct Shallow Stream Ford and Gully Crossing
67+78 Construct Shallow Stream Ford and Gully Crossing
67+88 Construct Turnpike, Log Retainer, Type 1 for 12’ ahead. 913(01)
12 L.F.
7 S.Y
67+93 Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
68+00 Construct Ditch on left for 209’ ahead 912(09) 209 L.F.
68+20 to 69+85
Install four 12” Corrugated Polyethylene Pipes as
70+19 Construct Shallow Stream Ford and Gully Crossing
70+44 Construct 16’ span Log Stringer Bridge, Type 4’ Wide
931(03) 16 L.F.
70+80 Construct Shallow Stream Ford and Gully Crossing
71+00 Construct Shallow Stream Ford and Gully Crossing
SHEET D.13
Description of Work Midpoint Access to Upper Ingram 10+00 – 80+70
71+10 Construct Ditch on left for 80’ ahead 912(09) 80 L.F.
71+30 to 71+70
Install two 12” Corrugated Polyethylene Pipes as
72+00 Construct Grade Dip. 912(06) 1 Each
72+10 Construct Ditch on left for 380’ ahead 912(09) 380 L.F.
72+30 to 75+70
Install six 12” Corrugated Polyethylene Pipes as needed
76+00 Construct Grade Dip. 912(06) 1 Each
76+10 Construct Ditch on left for 200’ ahead 912(09) 200 L.F.
76+30 to 77+90
Install four 12” Corrugated Polyethylene Pipes as
78+20 Construct Shallow Stream Ford and Gully Crossing
78+30 Construct Ditch on left for 63’ ahead 912(09) 63 L.F.
79+03 Construct Shallow Stream Ford and Gully Crossing
79+13 Construct Ditch on left for 132’ ahead 912(09) 132 L.F.
80+55 Construct Grade Dip. 912(06) 1 Each
80+70 Approximate northeast Upper Ingram Creek proposed bridge abutment. Bridge construction to be completed by others. End Centerline Staking. End Clearing and Grubbing. End Excavation. End project segment.
SHEET D.14
Description of Work Upper Ingram to Tincan 81+10 – 251+30
Pay Item Estimated Quantity
81+10 Begin project segment. Approximate southwest Upper Ingram Creek proposed bridge abutment. Bridge construction to be completed by others. Begin Centerline Staking for 17,020’ ahead. Begin Clearing and Grubbing & Excavation for 17,020’ ahead. See typical control point and tables sheets H.1-7 of drawings. See typical details on sheets C.1-3 of drawings.
908(01) 911(02) 912(01)
17,020 L.F.
17,020 L.F.
17,020 L.F.
81+43 Construct Shallow Stream Ford and Gully Crossing
81+53 Construct Ditch on left for 99’ ahead. See sheet C.3 of
912(09) 99 L.F.
82+62 Construct Shallow Stream Ford and Gully Crossing
82+72 Construct Ditch on left for 70’ ahead. 912(09) 70 L.F.
83+52 Construct Shallow Stream Ford and Gully Crossing
83+62 Construct Ditch on left for 10’ ahead. 912(09) 10 L.F.
83+72 Construct Turnpike, Log Retainer, Type 1 for 10’ ahead.
See details on sheet F.1 of drawings.
913(01) 913(03)
6 S.Y.
83+82 Construct Puncheon with Decking for 10’ ahead. See details on sheet F.2 of drawings.
932(01) 10 L.F.
83+92 Construct Ditch on left for 238’ ahead. 912(09) 238 L.F.
84+10 to 86+10
Install four 12” Corrugated Polyethylene Pipes between these stations as needed. See sheet E.1 of drawings.
86+40 Construct Shallow Stream Ford and Gully Crossing
86+50 Construct Ditch on left for 98’ ahead. 912(09) 98 L.F.
86+70 to 87+30
Install two 12” Corrugated Polyethylene Pipes between these stations as needed.
SHEET D.15
Description of Work Upper Ingram to Tincan 81+10 – 251+30
87+58 Construct Shallow Stream Ford and Gully Crossing
87+68 Construct Ditch on left for 142’ ahead. 912(09) 142 L.F.
87+80 to 88+90
Install three 12” Corrugated Polyethylene Pipes between
89+10 Construct Turnpike, Log Retainer, Type 1 for 106’
913(01) 913(03)
106 L.F.
59 S.Y.
90+16 Construct Ditch on left for 58’ ahead. 912(09) 58 L.F.
90+20 to 90+60
Install two 12” Corrugated Polyethylene Pipes between
90+37 Visible rock on surface.
90+84 Construct Shallow Stream Ford and Gully Crossing
90+88 Visible rock on surface.
90+94 Construct Ditch on left for 148’ ahead. 912(09) 148 L.F.
91+20 to 92+20
Install three 12” Corrugated Polyethylene Pipes between
92+52 Construct Shallow Stream Ford and Gully Crossing
92+62 Construct Ditch on left for 30’ ahead. 912(09) 30 L.F.
92+70 to 92+85
Install one 12” Corrugated Polyethylene Pipe as needed
93+02 Construct Shallow Stream Ford and Gully Crossing
93+12 Construct Ditch on left for 130’ ahead. 912(09) 130 L.F.
93+20 to 94+05
Install two 12” Corrugated Polyethylene Pipes between
SHEET D.16
Description of Work Upper Ingram to Tincan 81+10 – 251+30
94+42 Construct Turnpike, Log Retainer, Type 1 for 10’ ahead. 913(01)
94+62 Construct Shallow Stream Ford and Gully Crossing
94+67 Visible rock on surface.
94+72 Construct Ditch on left for 13’ ahead. 912(09) 13 L.F.
94+85 Construct Log Retaining Wall for 12’ ahead. See detail on sheet F.5 of drawings.
934(01) 8 S.Y.
94+97 Construct Ditch on left for 10’ ahead. 912(09) 10 L.F.
95+17 Visible rock on surface. Construct Grade Dip. See typical detail on sheet E.2 of drawings.
95+35 Visible rock on surface. Construct Ditch on left for 222’
912(09) 222 L.F.
95+60 to 97+40
Install five 12” Corrugated Polyethylene Pipes between
921(01) 30 L.F.
97+57 Construct Turnpike, Log Retainer, Type 1 for 14’ ahead. 913(01)
8 S.Y.
97+64+/- Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
97+71 Construct Ditch on left for 44’ ahead. 912(09) 44 L.F.
98+25 Construct Shallow Stream Ford and Gully Crossing
98+35 Construct Ditch on left for 81’ ahead. 912(09) 81 L.F.
98+40 Minimum 2’ cut at centerline.
98+50 to 99+00
Install two 12” Corrugated Polyethylene Pipes between
SHEET D.17
Description of Work Upper Ingram to Tincan 81+10 – 251+30
99+26 Construct Shallow Stream Ford and Gully Crossing
99+36 Construct Ditch on left for 44’ ahead. 912(09) 44 L.F.
99+50 to 99+70
Install one 12” Corrugated Polyethylene Pipe between
99+90 Construct Shallow Stream Ford and Gully Crossing
100+00 Construct Ditch on left for 10’ ahead. 912(09) 10 L.F.
100+20 Construct Shallow Stream Ford and Gully Crossing
100+30 Construct Ditch on left for 26’ ahead. 912(09) 26 L.F.
100+66 Construct Shallow Stream Ford and Gully Crossing
100+76 Construct Ditch on left for 120’ ahead. 912(09) 120 L.F.
100+90 to 101+80
Install three 12” Corrugated Polyethylene Pipes between
102+23 Climbing turn right.
102+45 Climbing turn left.
102+83 Climbing turn right.
102+97 Construct Ditch on left for 118’ ahead. 912(09) 118 L.F.
102+97 to 104+00
Install three 12” Corrugated Polyethylene Pipes between
104+25 Construct Shallow Stream Ford and Gully Crossing
104+35 Construct Ditch on left for 10’ ahead. 912(09) 10 L.F.
SHEET D.18
Description of Work Upper Ingram to Tincan 81+10 – 251+30
104+55 Construct Grade Dip. 912(06) 1 Each
104+65 Construct Ditch on left for 233’ ahead. 912(09) 233 L.F.
104+90 to 106+80
Install five 12” Corrugated Polyethylene Pipes between
921(01) 30 L.F.
107+08 Construct Shallow Stream Ford and Gully Crossing
107+18 Construct Ditch on left for 559’ ahead. 912(09) 559 L.F.
107+30 to 112+50
Install ten 12” Corrugated Polyethylene Pipes between
921(01) 60 L.F.
112+77 Construct Turnpike, Log Retainer, Type 1 for 19’ ahead. 913(01)
19 L.F.
11 S.Y.
112+84+/- Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
112+96 Construct 20’ span Log Stringer Bridge, Type 4’ Wide
931(03) 20 L.F.
113+20 Construct Ditch on left for 30’ ahead. 912(09) 30 L.F.
113+60 Construct Grade Dip. 912(06) 1 Each
113+70 Construct Ditch on left for 190’ ahead. 912(09) 190 L.F.
113+90 to 115+40
Install four 12” Corrugated Polyethylene Pipes between
115+70 Construct Grade Dip. 912(06) 1 Each
115+80 Construct Ditch on left for 280’ ahead. 912(09) 280 L.F.
116+00 to 118+40
Install six 12” Corrugated Polyethylene Pipes between
118+70 Construct Grade Dip. 912(06) 1 Each
118+80 Construct Ditch on left for 112’ ahead. 912(09) 112 L.F.
SHEET D.19
Description of Work Upper Ingram to Tincan 81+10 – 251+30
119+00 to 119+80
Install two 12” Corrugated Polyethylene Pipes between
119+92 Construct Turnpike, Log Retainer, Type 1 for 54’ ahead. 913(01)
54 L.F.
30 S.Y.
120+00 to 120+40
Install two 12” Corrugated Polyethylene Pipes between
122+96 Construct Turnpike, Log Retainer, Type 1 for 32’ ahead. 913(01)
32 L.F.
18 S.Y.
123+28 Construct Ditch on right (uphill) for 700’ ahead. 912(09) 700 L.F.
123+28 to 130+28
Install fifteen 12” Corrugated Polyethylene Pipes between these stations as needed.
921(01) 90 L.F.
130+28 Ricardo undeveloped camp area.
131+79 Construct Turnpike, Log Retainer, Type 1 for 159’
913(01) 913(03)
159 L.F.
88 S.Y.
133+48 Construct Shallow Stream Ford and Gully Crossing
134+49 Construct Ditch on left (uphill) for 143’ ahead 912(09) 143 L.F.
136+02 Construct Shallow Stream Ford and Gully Crossing
136+31 Construct Ditch on left for 19’ ahead. 912(09) 19 L.F.
136+60 Construct Grade Dip. 912(06) 1 Each
136+70 Construct Ditch on left for 56’ ahead. 912(09) 56 L.F.
138+88 Construct Shallow Stream Ford and Gully Crossing
139+52 Construct Ditch on left for 27’ ahead. 912(09) 27 L.F.
139+89 Construct Grade Dip. 912(06) 1 Each
SHEET D.20
Description of Work Upper Ingram to Tincan 81+10 – 251+30
142+06 Construct Ditch on left for 73’ ahead 912(09) 73 L.F.
142+89 Construct Grade Dip. 912(06) 1 Each
143+47 Construct Grade Dip. 912(06) 1 Each
144+21 Construct Shallow Stream Ford and Gully Crossing
145+83 Construct Ditch on left for 16’ ahead. 912(09) 16 L.F.
146+09 Construct Grade Dip. 912(06) 1 Each
146+19 Construct Ditch on left for 28’ ahead. 912(09) 28 L.F.
146+57 Construct Grade Dip. 912(06) 1 Each
146+67 Construct Ditch on left for 189’ ahead. 912(09) 189 L.F.
148+66 Construct Grade Dip. 912(06) 1 Each
148+91 Construct Ditch on left for 59’ ahead. 912(09) 59 L.F.
149+60 Construct Grade Dip. 912(06) 1 Each
149+70 Construct Ditch on left for 132’ ahead. 912(09) 132 L.F.
154+14 Construct Ditch on left for 92’ ahead. 912(09) 92 L.F.
155+16 Construct Grade Dip. 912(06) 1 Each
155+26 Construct Ditch on left for 63’ ahead. 912(09) 63 L.F.
155+99 Construct Grade Dip. 912(06) 1 Each
156+09 Construct Ditch on left for 101’ ahead. 912(09) 101 L.F.
157+20 Construct Grade Dip. 912(06) 1 Each
157+30 Construct Ditch on left for 99’ ahead. 912(09) 99 L.F.
SHEET D.21
Description of Work Upper Ingram to Tincan 81+10 – 251+30
161+29 Construct Ditch on left for 171’ ahead. 912(09) 171 L.F.
163+10 Construct Grade Dip. 912(06) 1 Each
163+20 Construct Ditch on left for 26’ ahead. 912(09) 26 L.F.
163+56 Construct Grade Dip. 912(06) 1 Each
163+66 Construct Ditch on left for 79’ ahead. 912(09) 79 L.F.
164+55 Construct Grade Dip. 912(06) 1 Each
164+65 Construct Ditch on left for 7’ ahead. 912(09) 7 L.F.
164+82 Construct Grade Dip. 912(06) 1 Each
164+92 Construct Ditch on left for 92’ ahead. 912(09) 92 L.F.
165+94 Construct Grade Dip. 912(06) 1 Each
168+09 Construct Grade Dip. 912(06) 1 Each
168+43 Construct Grade Dip. 912(06) 1 Each
170+27 Construct Grade Dip. 912(06) 1 Each
171+39 Construct Grade Dip. 912(06) 1 Each
171+49 Construct Turnpike, Log Retainer, Type 1 for 111’
913(01) 913(03)
111 L.F.
62 S.Y.
171+50 to 172+50
Install two 12” Corrugated Polyethylene Pipes between
174+28 Construct Grade Dip. 912(06) 1 Each
174+38 Construct Ditch on left for 181’ ahead. 912(09) 181 L.F.
176+29 Construct Grade Dip. 912(06) 1 Each
176+39 Construct Ditch on left for 127’ ahead. 912(09) 127 L.F.
SHEET D.22
Description of Work Upper Ingram to Tincan 81+10 – 251+30
176+76 Visible surface rock on left.
177+76 Visible surface rock on left. Construct Grade Dip. 912(06) 1 Each
177+86 Construct Ditch on left for 8’ ahead. 912(09) 8 L.F.
178+04 Visible rock on surface. Construct Grade Dip. 912(06) 1 Each
178+14 Construct Ditch on left for 20’ ahead. 912(09) 20 L.F.
178+44 Construct Grade Dip. 912(06) 1 Each
178+55 Construct Ditch on left for 113’ ahead. 912(09) 113 L.F.
179+44 Visible surface rock on left.
179+78 Construct Grade Dip. 912(06) 1 Each
179+88 Construct Ditch on left for 98’ ahead. 912(09) 98 L.F.
180+78 Cross Ski Hike user made trail.
180+96 Construct Grade Dip. 912(06) 1 Each
181+06 Construct Ditch on left for 79’ ahead. 912(09) 79 L.F.
181+95 Visible surface rock on left. Construct Grade Dip. 912(06) 1 Each
182+05 Construct Ditch on left for 30’ ahead. 912(09) 30 L.F.
183+52 Construct Grade Dip. 912(06) 1 Each
184+02 Visible rock on surface.
184+89 Construct Grade Dip. 912(06) 1 Each
185+34 Visible surface rock on left.
185+87 Construct Grade Dip. 912(06) 1 Each
SHEET D.23
Description of Work Upper Ingram to Tincan 81+10 – 251+30
187+98 Construct Ditch on left for 249’ ahead. 912(09) 249 L.F.
190+57 Construct Shallow Stream Ford and Gully Crossing
190+67 Construct Ditch on left for 60’ ahead. 912(09) 60 L.F.
191+37 Construct Grade Dip. 912(06) 1 Each
192+73 Construct Turnpike, Log Retainer, Type 1 for 120’
913(01) 913(03)
120 L.F.
67 S.Y.
193+73 Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
194+28 Construct Grade Dip. 912(06) 1 Each
194+38 Construct Ditch on left for 253’ ahead. 912(09) 253 L.F.
197+01 Construct Grade Dip. 912(06) 1 Each
197+11 Construct Ditch on left for 78’ ahead. 912(09) 78 L.F.
197+99 Construct Grade Dip. 912(06) 1 Each
198+09 Construct Ditch on left for 11’ ahead. 912(09) 11 L.F.
200+08 Construct Grade Dip. 912(06) 1 Each
200+94 Construct Ditch on left for 50’ ahead. 912(09) 50 L.F.
201+54 Construct Grade Dip. 912(06) 1 Each
201+64 Construct Ditch on left for 23’ ahead. 912(09) 23 L.F.
201+97 Construct Grade Dip. 912(06) 1 Each
202+07 Construct Ditch on left for 22’ ahead. 912(09) 22 L.F.
202+39 Construct Grade Dip. 912(06) 1 Each
202+49 Construct Ditch on left for 105’ ahead. 912(09) 105 L.F.
SHEET D.24
Description of Work Upper Ingram to Tincan 81+10 – 251+30
203+54 Construct Turnpike, Log Retainer, Type 1 for 51’ ahead. 913(01)
51 L.F.
28 S.Y.
203+60 Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
203+83 Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
204+55 Construct Ditch on left for 43’ ahead. 912(09) 43 L.F.
204+98 Construct Turnpike, Log Retainer, Type 1 for 198’
913(01) 913(03)
198 L.F.
110 S.Y.
205+96 Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
207+60 Construct Ditch on left for 49’ ahead. 912(09) 49 L.F.
208+09 Construct Turnpike, Log Retainer, Type 1 for 56’ ahead. 913(01)
56 L.F.
31 S.Y.
208+15 to 208+55
Install two 12” Corrugated Polyethylene Pipes between
208+65 Construct Ditch on left for 90’ ahead. 912(09) 90 L.F.
209+65 Construct Grade Dip. 912(06) 1 Each
210+83 Construct Ditch on left for 57’ ahead. 912(09) 57 L.F.
211+50 Construct Grade Dip. 912(06) 1 Each
213+01 Construct Turnpike, Log Retainer, Type 1 for 237’
913(01) 913(03)
237 L.F.
132 S.Y.
213+38 Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
215+38 Construct Ditch on left for 183’ ahead. 912(09) 183 L.F.
217+21 Construct Turnpike, Log Retainer, Type 1 for 235’
913(01) 913(03)
235 L.F.
131 S.Y.
217+97 Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
SHEET D.25
Description of Work Upper Ingram to Tincan 81+10 – 251+30
218+97 Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
219+56 Construct Ditch on left for 47’ ahead. 912(09) 47 L.F.
220+13 Construct Grade Dip. 912(06) 1 Each
220+23 Construct Ditch on left for 124’ ahead. 912(09) 124 L.F.
221+57 Construct Grade Dip. 912(06) 1 Each
221+67 Construct Ditch on left for 202’ ahead. 912(09) 202 L.F.
223+79 Construct Grade Dip. 912(06) 1 Each
224+81 Construct Grade Dip. 912(06) 1 Each
225+93 Construct Ditch on left for 9’ ahead. 912(09) 9 L.F.
226+12 Construct Grade Dip. 912(06) 1 Each
226+22 Construct Ditch on left for 70’ ahead. 912(09) 70 L.F.
227+02 Construct Grade Dip. 912(06) 1 Each
228+99 Construct Ditch on left for 80’ ahead. 912(09) 80 L.F.
229+89 Construct Grade Dip. 912(06) 1 Each
229+99 Construct Ditch on left for 170’ ahead. 912(09) 170 L.F.
230+30 to
231+40 Install two 12” Corrugated Polyethylene Pipes between
231+79 Construct Grade Dip. 912(06) 1 Each
232+86 Construct Ditch on left for 80’ ahead. 912(09) 80 L.F.
233+76 Construct Grade Dip. 912(06) 1 Each
233+86 Construct Ditch on left for 309’ ahead. 912(09) 309 L.F.
234+76+/- Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
SHEET D.26
Description of Work Upper Ingram to Tincan 81+10 – 251+30
235+76+/- Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
237+05 Construct Grade Dip. 912(06) 1 Each
237+15 Construct Ditch on left for 125’ ahead. 912(09) 125 L.F.
238+32 Minimum cut 1’ at centerline.
238+50 Construct Grade Dip. 912(06) 1 Each
238+60 Construct Ditch on left for 95’ ahead. 912(09) 95 L.F.
239+65 Construct Grade Dip. 912(06) 1 Each
240+25 Minimum cut 1’ at centerline.
240+68 Construct Grade Dip. 912(06) 1 Each
241+12 Minimum cut 1’ at centerline.
241+36 Construct Ditch on left for 38’ ahead. 912(09) 38 L.F.
241+74 Construct Turnpike, Log Retainer, Type 1 for 64’ ahead. 913(01)
64 L.F.
36 S.Y.
242+15 Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
242+38 Construct Ditch on left for 102’ ahead. 912(09) 102 L.F.
243+50 Construct Grade Dip. 912(06) 1 Each
243+60 Construct Ditch on left for 40’ ahead. 912(09) 40 L.F.
244+00 Construct Turnpike, Log Retainer, Type 1 for 192’
913(01) 913(03)
192 L.F.
107 S.Y.
244+13 Edge of bluff above Tincan Creek approximately 15’ left.
244+69 Edge of bluff above Tincan Creek approximately 18’ left.
SHEET D.27
Description of Work Upper Ingram to Tincan 81+10 – 251+30
249+41 Construct Grade Dip. 912(06) 1 Each
251+30 Connect to Center Ridge Trail. Approximately 36’ to the south is the north end of Tincan Creek bridge. End Centerline Staking. End Clearing and Grubbing. End Excavation. End project.
SHEET D.28
Description of Work Johnson Pass North to Spokane Ck. 10+00 to 102+92
10+00 Begin Project. Segment terminus begins on existing trail approximately 400’ south of the Johnson Pass North trailhead. Begin Centerline Staking for 9,292’ ahead.
Begin Clearing and Grubbing & Excavation for 9,292’ ahead. See typical control point and tables sheets H.1-7 of drawings. See typical detail sheets C.1-3 of drawings.
908(01) 911(02) 912(01)
9,292 L.F.
9,292 L.F.
9,292 L.F.
10+48 Construct Puncheon with Decking for 50’ ahead. See
932(01)
11+50 to 12+80
Muskeg approximately 30’ left.
13+66 Construct Grade Dip. See typical detail on sheet E.2 of
15+86 Construct Puncheon with Decking for 40’ ahead. 932(01) 40 L.F.
16+26 Construct Ditch on right for 225’ ahead. See detail sheet
C.3 of drawings.
912(09) 225 L.F.
16+30 to 18+40
Install four 12” Corrugated Polyethylene Pipes as needed between these stations. See sheet E.1 of drawings.
18+89 Construct Grade Dip. 912(06) 1 Each
19+57 Construct Grade Dip. 912(06) 1 Each
19+67 Construct Ditch on right for 90’ ahead. 912(09) 90 L.F.
20+57 Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
22+28 Construct Grade Dip. 912(06) 1 Each
23+04 Construct Grade Dip. 912(06) 1 Each
23+71 Construct Grade Dip. 912(06) 1 Each
25+41 Construct Turnpike, Log Retainer, Type 1 for 60’ ahead.
913(01) 913(03)
60 L.F.
34 S.Y.
25+51 Install 12” Corrugated Polyethylene Pipe.
SHEET D.29
Description of Work Johnson Pass North to Spokane Ck. 10+00 to 102+92
25+84 Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
27+13 Construct Puncheon with Decking for 32’ ahead. 932(01) 32 L.F.
27+45 +/- Enter Aspen & Alder.
28+99 Construct Grade Dip. 912(06) 1 Each
29+09 Construct Ditch on right for 26’ ahead. 912(09) 26 L.F.
29+36 Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
29+50 +/- Enter Hemlock and Spruce.
31+62 Construct Grade Dip. 912(06) 1 Each
31+72 Construct Ditch on right for 53’ ahead. 912(09) 53 L.F.
31+95 Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
34+91 Construct Grade Dip. 912(06) 1 Each
38+08 Construct Grade Dip. 912(06) 1 Each
38+63 Install 12” Corrugated Polyethylene Pipe. Construct Ditch on right for 40’ ahead.
912(09) 921(01)
40+50 +/- Enter Alder and Willow.
41+32 Construct Ditch on right for 17’ ahead. 912(09) 17 L.F.
41+59 Construct Grade Dip. 912(06) 1 Each
42+80 Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
43+11 Construct Grade Dip. 912(06) 1 Each
44+22 Pete’s Creek crossing. Construct 18’ span Log Stringer
Bridge, Type 4’ Wide Native Log as staked. See details on sheets F.3-4 of drawings. Native materials are located within 500’ of bridge site.
931(03) 18 L.F.
SHEET D.30
Description of Work Johnson Pass North to Spokane Ck. 10+00 to 102+92
46+00 +/- Cross under existing electrical power lines.
47+87 Construct 10’ span Log Stringer Bridge, Type 4’ Wide
931(03) 10 L.F.
49+05 Construct Grade Dip. 912(06) 1 Each
49+26 Construct Grade Dip. 912(06) 1 Each
49+97 Enter Hemlock and Spruce.
52+09 Construct 8’ span Log Stringer Bridge, Type 4’ Wide
931(03) 8 L.F.
56+94 Construct Shallow Stream Ford and Gully Crossing
Structure. See detail on sheet E.3 of drawings.
57+04 Construct Ditch on right for 10’ ahead. 912(09) 10 L.F.
58+54 Construct 16’ span Log Stringer Bridge, Type 4’ Wide
931(03) 16 L.F.
58+95 Construct Grade Dip. 912(06) 1 Each
59+05 Construct Ditch on right for 10’ ahead. 912(09) 10 L.F.
61+79 Construct Puncheon with Decking for 16’ ahead. 932(01) 16 L.F.
62+16 Construct Shallow Stream Ford and Gully Crossing
63+64 Construct Grade Dip. 912(06) 1 Each
64+20 Construct Grade Dip. 912(06) 1 Each
65+03 Construct 10’ span Log Stringer Bridge, Type 4’ Wide
931(03) 10 L.F.
66+77 Cross overgrown access spur.
SHEET D.31
Description of Work Johnson Pass North to Spokane Ck. 10+00 to 102+92
67+73 Install 12” Corrugated Polyethylene Pipe. Construct Ditch on right for 18’ ahead.
912(09) 921(01)
18 L.F.
69+00 +/- Enter Powerline Right-of-Way. Enter predominant alder.
69+20 +/- Climbing turn right.
70+27 Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
72+45 Install 12” Corrugated Polyethylene Pipe. Construct Ditch on left for 53’ ahead.
912(09) 921(01)
53 L.F.
73+08 Construct Shallow Stream Ford and Gully Crossing
73+74 Climbing turn left.
74+00 +/- Depart Powerline Right-of-Way.
74+80 +/- Enter hemlock and spruce.
74+88 Construct Shallow Stream Ford and Gully Crossing
75+84 Construct Grade Dip. 912(06) 1 Each
77+51 Construct Shallow Stream Ford and Gully Crossing
78+60 Construct Turnpike, Log Retainer, Type 1 for 40’ ahead. 913(01)
22 S.Y.
78+68 Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
78+88 Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
81+75 Construct Grade Dip. 912(06) 1 Each
83+05 Rock outcrop on right. Construct Grade Dip. 912(06) 1 Each
85+09 Construct Grade Dip. 912(06) 1 Each
SHEET D.32
Description of Work Johnson Pass North to Spokane Ck. 10+00 to 102+92
85+70 Construct Grade Dip. 912(06) 1 Each
87+97 Construct Shallow Stream Ford and Gully Crossing
89+77 Install 12” Corrugated Polyethylene Pipe. Construct Ditch on right for 20’ ahead.
912(09) 921(01)
20 L.F.
96+87 Construct Grade Dip. 912(06) 1 Each
96+97 Construct Ditch on right for 35’ ahead. 912(09) 35 L.F.
97+42 Construct Grade Dip. 912(06) 1 Each
97+52 Construct Ditch on right for 20’ ahead. 912(09) 20 L.F.
98+99 Construct Grade Dip. 912(06) 1 Each
99+94 Construct Grade Dip. 912(06) 1 Each
100+04 Construct Ditch on right for 25’ ahead. 912(09) 25 L.F.
100+39 Construct Grade Dip. 912(06) 1 Each
100+49 Construct Ditch on right for 27’ ahead. 912(09) 27 L.F.
102+92 Approximate south abutment of proposed Spokane Creek
Bridge. End Centerline Staking. End Clearing and Grubbing. End Excavation and project segment.
SHEET D.33
Description of Work Spokane Creek to Section 26 Creek 103+52 to 184+16
103+52 Approximate north abutment to proposed Spokane Creek bridge. Begin Centerline Staking for 8,064’ ahead. Begin Clearing and Grubbing & Excavation for 8,064’ ahead.
See typical control point and tables sheets H.1-7 of drawings. See typical details on sheets C.1-3 of drawings.
908(01) 911(02) 912(01)
8,064 L.F.
8,064 L.F.
8,064 L.F.
103+62 Install 12” Corrugated Polyethylene Pipe. See sheet E.1
104+18 Construct Grade Dip. See typical detail on sheet E.2 of
105+19 Rock outcrop on right.
107+31 Construct Grade Dip. 912(06) 1 Each
110+40 Construct Grade Dip. 912(06) 1 Each
110+60 Construct Shallow Stream Ford and Gully Crossing
112+31 Construct Grade Dip. 912(06) 1 Each
112+70 +/- Enter predominantly alder.
112+71 Construct Shallow Stream Ford and Gully Crossing
114+39 Construct Grade Dip. 912(06) 1 Each
114+71 Construct Shallow Stream Ford and Gully Crossing
114+81 Construct Ditch on right for 44’ ahead. See detail on sheet C.3 of drawings.
912(09) 44 L.F.
115+35 Construct Grade Dip. 912(06) 1 Each
115+55 Construct Grade Dip. 912(06) 1 Each
115+65 Construct Ditch on right for 32’ ahead. 912(09) 32 L.F.
SHEET D.34
Description of Work Spokane Creek to Section 26 Creek 103+52 to 184+16
116+07 Construct Grade Dip. 912(06) 1 Each
116+17 Construct Ditch on right for 62’ ahead. 912(09) 62 L.F.
116+89 Construct Grade Dip. 912(06) 1 Each
116+99 Construct Ditch on right for 45’ ahead. 912(09) 45 L.F.
117+54 Construct Grade Dip. 912(06) 1 Each
117+64 Construct Ditch on right for 137’ ahead. 912(09) 137 L.F.
119+11 Construct Grade Dip. 912(06) 1 Each
119+21 Construct Ditch on right for 80’ ahead. 912(09) 80 L.F.
120+11 Construct Grade Dip. 912(06) 1 Each
120+21 Construct Ditch on right for 34’ ahead. 912(09) 34 L.F.
120+65 Construct Grade Dip. 912(06) 1 Each
120+75 Construct Ditch on right for 108’ ahead 912(09) 108 L.F.
121+93 Construct Grade Dip. 912(06) 1 Each
123+15 Construct Grade Dip. 912(06) 1 Each
124+47 Construct Grade Dip. 912(06) 1 Each
126+51 Construct Shallow Stream Ford and Gully Crossing
127+08 Construct Grade Dip. 912(06) 1 Each
127+47 Construct Shallow Stream Ford and Gully Crossing
127+73 Construct Grade Dip. 912(06) 1 Each
129+40 +/- Enter predominantly hemlock.
SHEET D.35
Description of Work Spokane Creek to Section 26 Creek 103+52 to 184+16
130+26 Construct Grade Dip. 912(06) 1 Each
131+37 Rock outcrop on right.
131+81 Construct Shallow Stream Ford and Gully Crossing
131+91 Construct Ditch on right for 44’ ahead 912(09) 44 L.F.
132+45 Construct Grade Dip. 912(06) 1 Each
133+65 Rock outcrop on right.
134+85 Construct Turnpike, Log Retainer, Type 1 for 35’ ahead.
913(01) 913(03)
35 L.F.
20 S.Y.
136+00 +/- Enter predominantly alder.
136+73 Construct Grade Dip. 912(06) 1 Each
136+83 Construct Ditch on right for 60’ ahead. 912(09) 60 L.F.
137+53 Construct Shallow Stream Ford and Gully Crossing
137+63 Construct Ditch on right for 12’ ahead. 912(09) 12 L.F.
137+85 Construct Grade Dip. 912(06) 1 Each
137+95 Construct Ditch on right for 88’ ahead. 912(09) 88 L.F.
138+93 Construct Grade Dip. 912(06) 1 Each
139+03 Construct Ditch on right for 40’ ahead. 912(09) 40 L.F.
139+53 Construct Grade Dip. 912(06) 1 Each
139+63 Construct Ditch on right for 225’ ahead. 912(09) 225 L.F.
141+98 Construct Grade Dip. 912(06) 1 Each
SHEET D.36
Description of Work Spokane Creek to Section 26 Creek 103+52 to 184+16
143+79 Construct Grade Dip. 912(06) 1 Each
144+40 +/- Enter predominantly hemlock and spruce.
144+82 Construct Grade Dip. 912(06) 1 Each
146+96 Construct Grade Dip. 912(06) 1 Each
147+06 Construct Ditch on right for 45’ ahead. 912(09) 45 L.F.
147+52 Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
147+64 Descending turn right.
148+32 Construct Grade Dip. 912(06) 1 Each
150+15 Approximate south abutment proposed Bertha Creek bridge. Bridge construction to be completed by others.
150+75 Approximate north abutment proposed Bertha Creek bridge.
151+74 Construct Shallow Stream Ford and Gully Crossing
153+64 Construct Grade Dip. 912(06) 1 Each
156+48 Construct Shallow Stream Ford and Gully Crossing
156+68 Construct Grade Dip. 912(06) 1 Each
156+78 Construct Ditch on right for 160’ ahead. 912(09) 160 L.F.
158+48 Construct Grade Dip. 912(06) 1 Each
158+58 Construct Ditch on right for 200’ ahead. 912(09) 200 L.F.
160+68 Construct Grade Dip. 912(06) 1 Each
161+84 Construct Grade Dip. 912(06) 1 Each
SHEET D.37
Description of Work Spokane Creek to Section 26 Creek 103+52 to 184+16
162+72 Rock outcrop on right.
163+00 Construct Grade Dip. 912(06) 1 Each
164+38 Construct Grade Dip. 912(06) 1 Each
165+18 Construct Grade Dip. 912(06) 1 Each
169+60 Construct Grade Dip. 912(06) 1 Each
170+50 Construct Grade Dip. 912(06) 1 Each
171+80 Construct Grade Dip. 912(06) 1 Each
175+17 Descending turn right.
176+50 +/- Enter predominantly alder.
176+78 Construct Puncheon with Decking for 32’ ahead. See
932(01) 32 L.F.
177+20 Construct Shallow Stream Ford and Gully Crossing
177+30 Construct Puncheon with Decking for 35’ ahead. 932(01) 35 L.F.
177+65 Construct Ditch on right for 82’ ahead. 912(09) 82 L.F.
178+57 Construct Grade Dip. 912(06) 1 Each
178+80 +/- Enter predominantly hemlock.
179+75 Construct Grade Dip. 912(06) 1 Each
179+85 Construct Ditch on right for 52’ ahead. 912(09) 52 L.F.
180+47 Construct Grade Dip. 912(06) 1 Each
181+74 Construct Grade Dip. 912(06) 1 Each
182+64 Construct Shallow Stream Ford and Gully Crossing
SHEET D.38
Description of Work Spokane Creek to Section 26 Creek 103+52 to 184+16
182+81 Construct Ditch on right for 35’ ahead. 912(09) 35 L.F.
183+00 +/- Enter predominantly alder.
183+26 Construct Grade Dip. 912(06) 1 Each
183+36 Construct Ditch on right for 50’ ahead. 912(09) 50 L.F.
184+16 Approximate south abutment of proposed Section 26
Creek Bridge. End Centerline Staking. End Clearing and Grubbing. End Excavation and project segment.
SHEET D.39
Description of Work Section 26 Creek to Tincan 184+86 to 300+53
184+86 Approximate north abutment to proposed Section 26
Creek bridge. Begin Centerline Staking for 11,567’ ahead. Begin Clearing and Grubbing & Excavation for 11,567’ ahead. See typical control point and tables sheets H.1-7 of drawings. See typical details on sheets C.1-3 of drawings. Continue predominant alder and grasses.
908(01) 911(02) 912(01)
11,567 L.F.
11,567 L.F.
11,567 L.F.
185+91 Construct Grade Dip. See typical detail on sheet E.2 of
186+01 Construct Ditch on right for 132’ ahead. See detail on sheet C.3 of drawings.
912(09) 132 L.F.
187+43 Construct Grade Dip. 912(06) 1 Each
187+53 Construct Ditch on right for 87’ ahead. 912(09) 87 L.F.
188+50 Construct Grade Dip. 912(06) 1 Each
188+60 Construct Ditch on right for 102’ ahead. 912(09) 102 L.F.
189+72 Construct Grade Dip. 912(06) 1 Each
189+82 Construct Ditch on right for 23’ ahead. 912(09) 23 L.F.
190+15 Construct Shallow Stream Ford and Gully Crossing
190+25 Construct Ditch on right for 6’ ahead. 912(09) 6 L.F.
190+41 Construct Grade Dip. 912(06) 1 Each
190+51 Construct Ditch on right for 75’ ahead. 912(09) 75 L.F.
191+36 Construct Shallow Stream Ford and Gully Crossing
191+56 Construct Shallow Stream Ford and Gully Crossing
191+66 Construct Ditch on right for 126’ ahead. 912(09) 126 L.F.
193+02 Construct Grade Dip. 912(06) 1 Each
SHEET D.40
Description of Work Section 26 Creek to Tincan 184+86 to 300+53
193+12 Construct Ditch on right for 19’ ahead. 912(09) 19 L.F.
193+41 Construct Grade Dip. 912(06) 1 Each
193+51 Construct Ditch on right for 48’ ahead. 912(09) 48 L.F.
194+09 Construct Grade Dip. 912(06) 1 Each
194+19 Construct Turnpike, Sawn Timber Retainer, Type 1 for 43’ ahead. See sheet F.1 of drawings.
913(01)A 913(03)
43 L.F.
24 S.Y.
194+62 Construct Ditch on right for 166’ ahead. 912(09) 166 L.F.
196+38 Construct Grade Dip. 912(06) 1 Each
196+48 Construct Ditch on right for 116’ ahead. 912(09) 116 L.F.
197+74 Construct Grade Dip. 912(06) 1 Each
197+84 Construct Ditch on right for 39’ ahead. 912(09) 39 L.F.
198+33 Construct Shallow Stream Ford and Gully Crossing
198+43 Construct Ditch on right for 116’ ahead. 912(09) 116 L.F.
199+69 Construct Grade Dip. 912(06) 1 Each
199+79 Construct Ditch on right for 29’ ahead. 912(09) 29 L.F.
200+18 Construct Shallow Stream Ford and Gully Crossing
200+38 Construct Shallow Stream Ford and Gully Crossing
200+48 Construct Ditch on right for 116’ ahead. 912(09) 116 L.F.
201+64 Construct Puncheon with Decking for 45’ ahead. See
932(01) 45 L.F.
202+09 Construct Ditch on right for 32’ ahead. 912(09) 32 L.F.
SHEET D.41
Description of Work Section 26 Creek to Tincan 184+86 to 300+53
202+51 Construct Shallow Stream Ford and Gully Crossing
202+61 Construct Ditch on right for 151’ ahead. 912(09) 151 L.F.
204+22 Construct Shallow Stream Ford and Gully Crossing
204+32 Construct Ditch on right for 57’ ahead. 912(09) 57 L.F.
204+99 Construct Grade Dip. 912(06) 1 Each
205+09 Construct Ditch on right for 70’ ahead. 912(09) 70 L.F.
205+89 Construct Grade Dip. 912(06) 1 Each
205+99 Construct Ditch on right for 27’ ahead. 912(09) 27 L.F.
206+26 Construct Turnpike, Sawn Timber Retainer, Type 1 for
157’ ahead.
913(01)A 913(03)
157 L.F.
88 S.Y.
206+39 Install 12” Corrugated Polyethylene Pipe. See sheet E.1
207+74 Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
207+83 Construct Ditch on right for 43’ ahead. 912(09) 43 L.F.
208+36 Construct Shallow Stream Ford and Gully Crossing
208+46 Construct Ditch on right for 77’ ahead. 912(09) 77 L.F.
209+23 Construct Puncheon with Decking for 102’ ahead. Wet area on left for approximately 100’ ahead.
932(01) 102 L.F.
210+25 Construct Ditch on right for 57’ ahead. 912(09) 57 L.F.
210+92 Construct Grade Dip. 912(06) 1 Each
211+02 Construct Ditch on right for 26’ ahead. 912(09) 26 L.F.
SHEET D.42
Description of Work Section 26 Creek to Tincan 184+86 to 300+53
211+38 Construct Shallow Stream Ford and Gully Crossing
212+32 Construct Grade Dip. 912(06) 1 Each
213+09 Construct Shallow Stream Ford and Gully Crossing
214+77 Construct Grade Dip. 912(06) 1 Each
215+37 Construct Shallow Stream Ford and Gully Crossing
217+03 Construct Grade Dip. 912(06) 1 Each
217+31 Construct Shallow Stream Ford and Gully Crossing
218+66 Construct Turnpike, Sawn Timber Retainer, Type 1 for 27’
913(01)A 913(03)
27 L.F.
15 S.Y.
218+85 Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
219+19 Construct Grade Dip. 912(06) 1 Each
219+85 Construct Shallow Stream Ford and Gully Crossing
219+95 Construct Ditch on right for 22’ ahead. 912(09) 22 L.F.
220+17 Construct Turnpike, Sawn Timber Retainer, Type 1 for 97’
913(01)A 913(03)
97 L.F.
54 S.Y.
220+42 Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
220+87 Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
221+24 Construct Grade Dip. 912(06) 1 Each
221+34 Construct Ditch on right for 159’ ahead. 912(09) 159 L.F.
223+03 Construct Grade Dip. 912(06) 1 Each
SHEET D.43
Description of Work Section 26 Creek to Tincan 184+86 to 300+53
223+80 +/- Creek approximately 30’ left for approximately 200’
224+28 Construct Grade Dip. 912(06) 1 Each
224+87 Construct Grade Dip. 912(06) 1 Each
225+55 Approximate south abutment to proposed Taylor Creek
225+85 Approximate north abutment to proposed Taylor Creek bridge.
226+17 Construct Grade Dip. 912(06) 1 Each
229+57 Construct Grade Dip. 912(06) 1 Each
229+67 Construct Ditch on right for 52’ ahead. 912(09) 52 L.F.
230+29 Construct Grade Dip. 912(06) 1 Each
231+40 +/- Enter predominantly hemlock.
237+07 Construct Grade Dip. 912(06) 1 Each
237+76 Construct Shallow Stream Ford and Gully Crossing
237+80 +/- Enter predominantly alder & grasses.
238+05 Construct Ditch on right for 188’ ahead. 912(09) 188 L.F.
240+03 Construct Shallow Stream Ford and Gully Crossing
240+10 Enter predominantly hemlock.
241+59 Construct Grade Dip. 912(06) 1 Each
242+70 +/- Enter predominantly alder.
242+79 Construct Grade Dip. 912(06) 1 Each
SHEET D.44
Description of Work Section 26 Creek to Tincan 184+86 to 300+53
245+73 Construct Turnpike, Sawn Timber Retainer, Type 1 for 10’
913(01)A 913(03)
250+77 Construct Turnpike, Sawn Timber Retainer, Type 1 for
235’ ahead.
913(01)A 913(03)
235 L.F.
131 S.Y.
253+77 Construct Turnpike, Sawn Timber Retainer, Type 1 for 80’
913(01)A 913(03)
80 L.F.
44 S.Y.
254+57 Construct Ditch on right for 68’ ahead. 912(09) 68 L.F.
255+35 Construct Grade Dip. 912(06) 1 Each
255+84 Construct Turnpike, Sawn Timber Retainer, Type 1 for
104’ ahead.
913(01)A 913(03)
104 L.F.
58 S.Y.
256+98 Construct Grade Dip. 912(06) 1 Each
257+08 Construct Ditch on right for 88’ ahead. 912(09) 88 L.F.
258+06 Construct Grade Dip. 912(06) 1 Each
258+16 Construct Turnpike, Sawn Timber Retainer, Type 1 for
101’ ahead.
913(01)A 913(03)
101 L.F.
56 S.Y.
259+27 Construct Grade Dip. 912(06) 1 Each
259+37 Construct Turnpike, Sawn Timber Retainer, Type 1 for 62’
913(01)A 913(03)
62 L.F.
34 S.Y.
260+09 Construct Shallow Stream Ford and Gully Crossing
260+19 Construct Turnpike, Sawn Timber Retainer, Type 1 for
137’ ahead.
913(01)A 913(03)
137 L.F.
76 S.Y.
261+60 +/- Enter…