Amendment_3_continuation.docx

DOCX document 17 KB Posted

Attached to
RECOVERYIDITAROD NATIONAL HISTORIC TRAIL IMPROVEMENTS-CHUGACH NF
Solicitation number
AG-0489-S-10-0112
Issued by

About this file

Amendment No. 3 page 2

View the file

Other files

File Type Posted
Amendment_4.pdf PDF
Amendment_3.pdf PDF
Survey_Data_Spokane_to_S26.xlsx XLSX spreadsheet
Survey_Data_Midpt_to_UI.xlsx XLSX spreadsheet
Survey_Data_Johnson_ to_ Spokane.xlsx XLSX spreadsheet
Survey_Data_S26_to_Tincan.xlsx XLSX spreadsheet
Survey_Data_MidpointAccess.xlsx XLSX spreadsheet
Survey_Data_UpperIngram_to_Tincan.xlsx XLSX spreadsheet
Amendment_2.pdf PDF
johnson_pass_to_MP73_waypoints_tracks.tpo —
jp2mp73.txt TXT text file
Amendment_1.pdf PDF
AccessibilityGuide.doc DOC document
Yellow_Cedar_Sources.doc DOC document
SF24.doc DOC document
Photos.doc DOC document
WageRates.txt TXT text file
Drawings.pdf PDF
RA891.pdf PDF
Yellow_Cedar_Sources.docx DOCX document
Natl_Design_Parameters.pdf PDF
RA892.pdf PDF
Photos.docx DOCX document
specifications.doc DOC document
Solicitation_RFP.doc DOC document
SF24.docx DOCX document
Map_Bridge_Sites.JPG JPG image
Offer_Submittal_Package.doc DOC document
AccessibilityGuide.docx DOCX document
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page 2 of 2 - Amendment #3 to AG-0489-S-10-0112 Iditarod NHT Improvements

A. Specifications And Payment Items For 931 Log Stringer Bridge:

For the purposes of this solicitation under specifications and payment items 931 the word “native” shall be construed to mean “Alaska Yellow Cedar [which may need to be imported from off the site of work]”. Refer to bridge construction requirements on the drawings.

B. Specification 911 Clearing and Grubbing:

Under specification section 911.03 &z” and i/2” shall read 1/2 inch.

C. H-9 Landscape Preservation:

Under clause H-9 Landscape Preservation delete the first paragraph and substitute the following:

“The contractor shall confine equipment operations to within the clearing limits or other areas designated in contract documents.”

D. Snow Load:

The contractor shall use 200 psf for the snow load requirement.

E. Wage Rates

The wage rates identified in the Pre-Proposal Meeting Documentation are for information only. Other classifications/rates may apply depending on the Contractor’s on-site operations and equipment. The applicable wage and fringe benefit rates are shown in the Wage Decision in the contract.

F. Generally Consistent Determinations:

GCD-5 and GCD-7 [see Preproposal Meeting Documentation] shall apply.

File details come from the government source that posted it. Updated .