Amendment_3_continuation.docx
DOCX document 17 KB Posted
- Solicitation number
- AG-0489-S-10-0112
About this file
Amendment No. 3 page 2
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_4.pdf | ||
| Amendment_3.pdf | ||
| Survey_Data_Spokane_to_S26.xlsx | XLSX spreadsheet | |
| Survey_Data_Midpt_to_UI.xlsx | XLSX spreadsheet | |
| Survey_Data_Johnson_ to_ Spokane.xlsx | XLSX spreadsheet | |
| Survey_Data_S26_to_Tincan.xlsx | XLSX spreadsheet | |
| Survey_Data_MidpointAccess.xlsx | XLSX spreadsheet | |
| Survey_Data_UpperIngram_to_Tincan.xlsx | XLSX spreadsheet | |
| Amendment_2.pdf | ||
| johnson_pass_to_MP73_waypoints_tracks.tpo | — | |
| jp2mp73.txt | TXT text file | |
| Amendment_1.pdf | ||
| AccessibilityGuide.doc | DOC document | |
| Yellow_Cedar_Sources.doc | DOC document | |
| SF24.doc | DOC document | |
| Photos.doc | DOC document | |
| WageRates.txt | TXT text file | |
| Drawings.pdf | ||
| RA891.pdf | ||
| Yellow_Cedar_Sources.docx | DOCX document | |
| Natl_Design_Parameters.pdf | ||
| RA892.pdf | ||
| Photos.docx | DOCX document | |
| specifications.doc | DOC document | |
| Solicitation_RFP.doc | DOC document | |
| SF24.docx | DOCX document | |
| Map_Bridge_Sites.JPG | JPG image | |
| Offer_Submittal_Package.doc | DOC document | |
| AccessibilityGuide.docx | DOCX document |
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page 2 of 2 - Amendment #3 to AG-0489-S-10-0112 Iditarod NHT Improvements
A. Specifications And Payment Items For 931 Log Stringer Bridge:
For the purposes of this solicitation under specifications and payment items 931 the word “native” shall be construed to mean “Alaska Yellow Cedar [which may need to be imported from off the site of work]”. Refer to bridge construction requirements on the drawings.
B. Specification 911 Clearing and Grubbing:
Under specification section 911.03 &z” and i/2” shall read 1/2 inch.
C. H-9 Landscape Preservation:
Under clause H-9 Landscape Preservation delete the first paragraph and substitute the following:
“The contractor shall confine equipment operations to within the clearing limits or other areas designated in contract documents.”
D. Snow Load:
The contractor shall use 200 psf for the snow load requirement.
E. Wage Rates
The wage rates identified in the Pre-Proposal Meeting Documentation are for information only. Other classifications/rates may apply depending on the Contractor’s on-site operations and equipment. The applicable wage and fringe benefit rates are shown in the Wage Decision in the contract.
F. Generally Consistent Determinations:
GCD-5 and GCD-7 [see Preproposal Meeting Documentation] shall apply.