U S D A F O R E S T S E R V I C E – B U I L D I N G 2 6 F O R T M I S S O U L A
M I S S O U L A , M O N TA N A
P r o j e c t M a n u a l J u l y 1 4 , 2 0 1 4
222 N. Higgins Ave.
Missoula, MT 59802 www.aearchi tects .com A&E Architects Project No. -- 13104.00 S e t N o . _______
VOLUME 2
D I V I S I O N S 2 1 - 2 8
USDA FOREST SERVICE – BUILDING 26
FORT MISSOULA
MISSOULA, MONTANA
TABLE OF CONTENTS – VOLUME 2 TBC -1
TABLE OF CONTENTS - VOLUME 2
The following listed documents comprise the Table of Contents for the USDA FOREST SERVICE – BUILDING 26, Fort Missoula, Missoula, Montana. The numerical sequence of Sections or Divisions is interrupted, such interruptions are intentional.
DIVISION 21 - FIRE SUPPRESSION
210517 SLEEVES AND SLEEVE SEALS FOR FIRE-SUPPRESSION PIPING
210518 ESCUTCHEONS FOR FIRE-SUPPRESSION PIPING
210553 IDENTIFICATION FOR FIRE-SUPPRESSION PIPING AND EQUIPMENT
211100 FACILITY FIRE-SUPPRESSION WATER-SERVICE PIPING
211313 WET-PIPE SPRINKLER SYSTEMS
211316 DRY-PIPE SPRINKLER SYSTEMS
DIVISION 22 - PLUMBING
220500 COMMON WORK RESULTS FOR PLUMBING
220519 METERS AND GAGES FOR PLUMBING PIPING
220523 GENERAL-DUTY VALVES FOR PLUMBING PIPING
220529 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
220548 VIBRATION AND SEISMIC CONTROLS FOR PLUMBING PIPING AND EQUIPMENT
220553 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
220719 PLUMBING PIPING INSULATION
221116 DOMESTIC WATER PIPING
221316 223100
SANITARY WASTE AND VENT PIPING
DOMESTIC WATER SOFTENERS
223300 ELECTRIC, DOMESTIC-WATER HEATERS
224100 PLUMBING FIXTURES
DIVISION 23 - HEATING VENTILATING AND AIR CONDITIONING
230000 230517
MECHANICAL GENERAL REQUIREMENTS
SLEEVES AND SLEEVE SEALS FOR HVAC PIPING
230519 METERS AND GAGES FOR HVAC PIPING
230548 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT
230553 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
230593 TESTING, ADJUSTING, AND BALANCING FOR HVAC
230713 DUCT INSULATION
230716 230719
HVAC EQUPMENT INSULATION
HVAC PIPING INSULATION
230900 INSTRUMENTATION AND CONTROL FOR HVAC
230993 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS
231123 232113 232123 232300
FACILITY NATURAL-GAS PIPING
HYDRONIC PIPING
HYDRONIC PUMPS
REFRIGERANT PIPING
232500 233113
HVAC WATER TREATMENT
METAL DUCTS
USDA FOREST SERVICE – BUILDING 26
MISSOULA, MONTANA
TABLE OF CONTENTS – VOLUME 2 TBC -2
233300 AIR DUCT ACCESSORIES
233423 HVAC POWER VENTILATORS
233713 DIFFUSERS, REGISTERS, AND GRILLES
235216 236313 236500
CONDENSING BOILERS
VARIABLE REFRIGERANT VOLUME – WATER-COOLED HEAT PUMPS
COOLING TOWERS
237200 AIR-TO-AIR ENERGY RECOVERY EQUIPMENT
238219 FAN COIL UNITS
238239 UNIT HEATERS
DIVISION 26 - ELECTRICAL
260519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
260526 GROUNDING AND BONDING FOR ELECTRICALSYSTEMS
260529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
260533 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS
260548 VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS
260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS
260923 LIGHTING CONTROL DEVICES
262413 SWITCHBOARDS
262416 PANELBOARDS
262713 ELECTRICITY METERING
262726 WIRING DEVICES
262813 FUSES
262816 ENCLOSED SWITCHES AND CIRCUIT BREAKERS
262913 ENCLOSED CONTROLLERS
264313 SURGE PROTECTION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS
265100 INTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
270000 TELECOMMUNICATIONS WIRING SYSTEMS
275119 SOUND MASKING SYSTEMS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
281300 ACCESS CONTROL SYSTEM
283111 DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM
END OF TABLE OF CONTENTS – VOLUME 2
USDA FOREST SERVICE - BUILDING 26
MISSOULA, MONTANA
SECTION 210517 - SLEEVES AND SLEEVE SEALS FOR FIRE-SUPPRESSION PIPING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Sleeves.
2. Sleeve-seal systems.
3. Grout.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product indicated.
PART 2 - PRODUCTS
2.1 SLEEVES
A. Cast-Iron Wall Pipes: Cast or fabricated of cast or ductile iron and equivalent to ductile-iron pressure pipe, with plain ends and integral waterstop unless otherwise indicated.
B. Galvanized-Steel Wall Pipes: ASTM A 53/A 53M, Schedule 40, with plain ends and welded steel collar; zinc coated.
C. Galvanized-Steel-Pipe Sleeves: ASTM A 53/A 53M, Type E, Grade B, Schedule 40, zinc coated, with plain ends.
D. PVC-Pipe Sleeves: ASTM D 1785, Schedule 40.
E. Galvanized-Steel-Sheet Sleeves: 0.0239-inch minimum thickness; round tube closed with welded longitudinal joint.
2.2 SLEEVE-SEAL SYSTEMS
A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
1. Advance Products & Systems, Inc.
2. CALPICO, Inc.
3. Metraflex Company (The).
4. Pipeline Seal and Insulator, Inc.
5. Proco Products, Inc.
B. Description: Modular sealing-element unit, designed for field assembly, for filling annular space between piping and sleeve.
SLEEVES AND SLEEVE SEALS FOR FIRE-SUPPRESSION PIPING 210517 - 1
http://www.specagent.com/LookUp/?uid=123456820639&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456803801&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456803802&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456803803&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456803804&mf=04&src=wd
MISSOULA, MONTANA
1. Sealing Elements: EPDM-rubber or NBR interlocking links shaped to fit surface of pipe.
Include type and number required for pipe material and size of pipe.
2. Pressure Plates: Carbon steel.
3. Connecting Bolts and Nuts: Carbon steel, with corrosion-resistant coating, of length required to secure pressure plates to sealing elements.
2.3 GROUT
A. Standard: ASTM C 1107/C 1107M, Grade B, post-hardening and volume-adjusting, dry, hydraulic-cement grout.
B. Characteristics: Nonshrink; recommended for interior and exterior applications.
C. Design Mix: 5000-psi, 28-day compressive strength.
D. Packaging: Premixed and factory packaged.
PART 3 - EXECUTION
3.1 SLEEVE INSTALLATION
A. Install sleeves for piping passing through penetrations in floors, partitions, roofs, and walls.
B. For sleeves that will have sleeve-seal system installed, select sleeves of size large enough to provide 1-inch annular clear space between piping and concrete slabs and walls.
1. Sleeves are not required for core-drilled holes.
C. Install sleeves in concrete floors, concrete roof slabs, and concrete walls as new slabs and walls are constructed.
1. Cut sleeves to length for mounting flush with both surfaces.
a. Exception: Extend sleeves installed in floors of mechanical equipment areas or other wet areas 2 inches above finished floor level.
2. Using grout, seal the space outside of sleeves in slabs and walls without sleeve-seal system.
D. Install sleeves for pipes passing through interior partitions.
1. Cut sleeves to length for mounting flush with both surfaces.
2. Install sleeves that are large enough to provide 1/4-inch annular clear space between sleeve and pipe or pipe insulation.
3. Seal annular space between sleeve and piping or piping insulation; use joint sealants appropriate for size, depth, and location of joint.
E. Fire-Barrier Penetrations: Maintain indicated fire rating of walls, partitions, ceilings, and floors at pipe penetrations. Seal pipe penetrations with firestop materials.
SLEEVES AND SLEEVE SEALS FOR FIRE-SUPPRESSION PIPING 210517 - 2
MISSOULA, MONTANA
3.2 SLEEVE-SEAL-SYSTEM INSTALLATION
A. Install sleeve-seal systems in sleeves in exterior concrete walls and slabs-on-grade at service piping entries into building.
B. Select type, size, and number of sealing elements required for piping material and size and for sleeve ID or hole size. Position piping in center of sleeve. Center piping in penetration, assemble sleeve-seal system components, and install in annular space between piping and sleeve. Tighten bolts against pressure plates that cause sealing elements to expand and make a watertight seal.
3.3 SLEEVE AND SLEEVE-SEAL SCHEDULE
A. Use sleeves and sleeve seals for the following piping-penetration applications:
1. Exterior Concrete Walls above Grade:
a. Cast-iron wall sleeves.
2. Exterior Concrete Walls below Grade:
a. Cast-iron wall sleeves with sleeve-seal system.
1) Select sleeve size to allow for 1-inch annular clear space between piping and sleeve for installing sleeve-seal system.
b. Galvanized-steel-pipe sleeves with sleeve-seal system.
1) Select sleeve size to allow for 1-inch annular clear space between piping and sleeve for installing sleeve-seal system.
3. Concrete Slabs above Grade:
a. PVC-pipe sleeves.
4. Interior Partitions:
a. Galvanized-steel-pipe sleeves.
END OF SECTION 210517
SLEEVES AND SLEEVE SEALS FOR FIRE-SUPPRESSION PIPING 210517 - 3