Mechanical_Compiled.pdf

PDF 7 MB Posted

Attached to
Building 26 Remodel, Fort Missoula
Solicitation number
AG-03R6-S-14-0058
Issued by

About this file

18 - Drawings (Mechanical)

View the file

Other files

File Type Posted
S140058FinalAmendment0007QAs.pdf PDF
S140058FinalAmendment0006ScheduleB.pdf PDF
S140058FinalAmendment0005QAs.pdf PDF
S140058FinalAmendment0004QAs.pdf PDF
S140058FinalAmendmen0003QAs.pdf PDF
S140058FinalAmendmen0002QAs.pdf PDF
S140058FinalAmendmen0001QAs.pdf PDF
20140812SignInSheet.PDF PDF
SpecsVolume1B.pdf PDF
MT140064WageDeter.pdf PDF
Arch_Compiled_Part6.pdf PDF
Electrical_Compiled_Part1.pdf PDF
Structural_Compiled.pdf PDF
Plumbing_Compiled.pdf PDF
SpecsVolume2B.pdf PDF
Security_Compiled.pdf PDF
Arch_Compiled_Part4.pdf PDF
Electrical_Compiled_Part2.pdf PDF
Fire_Protection_Compiled.pdf PDF
Arch_Compiled_Part3.pdf PDF
Arch_Compiled_Part5.pdf PDF
FinalAG03R6S140058ShortSetBuild26ConsRFP.pdf PDF
FinalAG03R6S140058CompletePkgBuild26ConsRFP.pdf PDF
Arch_Compiled_Part2.pdf PDF
SpecsVolume2A.pdf PDF
Arch_Compiled_Part1.pdf PDF
SpecsVolume1C.pdf PDF
SpecsVolume1A.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FUTURE

PHASE 1FUTURE

FUTURE

PHASE 1

FUTURE

PLANNED CONSTRUCTION PHASES:

1. THESE CONSTRUCTION DOCUMENTS

ARE LIMITED TO THE CONSTRUCTION

IDENTIFIED AS PHASE 1.

2. CONSTRUCTION AREAS INDICATED

"FUTURE" CONSTRUCTION ARE FOR

REFERENCE ONLY AND ARE NOT PART

OF THIS CONTRACT. NOTE THAT SOME

OF THE MECH. WORK REQ'D FOR PHASE

1 EXTENDS INTO FUTURE AREAS.

COORD. W/ GEN. CONT'R.

MECH. ROOM (SOUTH)

MECH. ROOM (NORTH)

4 4

ALL EXIST. STEAM

UNITS NORTH OF THIS

LINE ARE SERVED BY

MECH. ROOM (NORTH)

TYP. ALL 3 FLOORS

NORTH SOUTH

ALL EXIST. STEAM

UNITS SOUTH OF THIS

LINE ARE SERVED BY

MECH. ROOM (SOUTH)

TYP. ALL 3 FLOORS

STEAM RADIATOR

TYP. (TO REMAIN)

STEAM RADIATOR

TYP. (TO REMAIN)

STEAM RADIATOR

TYP. (REMOVE)

STEAM RADIATOR

TYP. (REMOVE)

1. MECH. ROOM (SOUTH): REMOVE EXISTING STEAM BOILER,

HOT WATER STORAGE TANKS AND ALL ASSOCIATED

STEAM HEATING COMPONENTS AND PIPING WITHIN THIS

BOILER ROOM. REMOVE ALL STEAM AND CONDENSATE

PIPING CONNECTED TO THIS HEATING SYSTEM

INCLUDING RADIATORS AND CONTROLS. ROOM TO BE

COMPLETELY CLEARED AND READY FOR INSTALLATION

OF NEW SYSTEMS & EQUIPMENT.

2. MECH. ROOM (NORTH): EXISTING STEAM BOILER AND ALL

ASSOCIATED COMPONENTS IN THIS BOILER ROOM AND

CONNECTED TO THIS HEATING SYSTEM TO REMAIN IN

SERVICE UNTIL THE CONSTRUCTION OF PHASE 3.

3. CONTRACTOR TO PROVIDE RETRO-COMMISIONING

SERVICES FOR THIS EXISTING STEAM HEATING SYSTEM

TO INSURE THAT SYSTEM WILL FUNCTION UNTIL

COMPLETION OF FUTURE CONSTRUCTION PHASES.

4. EXISTING STEAM AND CONDENSATE SYSTEM IN THIS

AREA TO REMAIN IN SERVICE UNTIL PHASE 3

CONSTRUCTION.

5. REMOVE ALL STEAM HEATING COMPONENTS AND PIPING

WITHIN THIS AREA INCLUDING RADIATORS AND

CONTROLS. AREA TO BE COMPLETELY CLEARED OF

EXISTING HEATING SYSTEM COMPONENTS AND READY

FOR INSTALLATION OF NEW SYSTEMS & EQUIPMENT

A D E F G H KCB J

BA

SE

M

EN

T M

EC

H

A N

IC

A

L D

EM

O

P

LA

N

1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED

TO COORDINATE WITH EACH OTHER AND VERIFY THAT

THERE ARE NO CONFLICTS IN LOCATION OF DUCTS,

CONDUITS, DIFFUSERS, BOXES AND OTHER ITEMS

THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT

OF MATERIALS.

2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE

FIELD VERIFIED. THESE DRAWINGS REPRESENT

SCHEMATIC SYSTEMS.

3. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND

PIPING SYSTEMS WITH OTHER TRADES. REFER TO

ARCHITECTURAL, STRUCTURAL, PLUMBING, AND

ELECTRICAL DRAWINGS AND FIRE PROTECTION SHOP

DRAWINGS FOR ADDITIONAL DETAILS NECESSARY FOR

COORDINATION.

4. ALL GRAYSCALE DUCTWORK/PIPING/EQUIPMENT IS TO

LEFT ALONE. BLACK IS TO BE REMOVED.

5. COORDINATE ALL CONCRETE PENETRATIONS WITH

STRUCTURAL DRAWINGS TO VERIFY HOW AND WHERE

CONCRETE CAN BE CUT.

6. COORDINATE REMOVAL OF PIPING WITH ASBESTOS

ABATEMENT CONTRACTOR.

USFS BUILDING 26 - BASEMENT MECHANICAL DEMO PLAN 16

DM2.0 : DM2.0 1/8" = 1'-0"

NORTH

DM2.0

KEY NOTES:

BU

IL

D

IN

G

P H

A

SE

SO

U

T H

W

IN

G R

EN

O

V A

T

IO

N

U S

FO

R

ES

T

S

ER

V

IC

E, N

O R

T H

ER

N

R

EG

IO

N

R

EG

IO

N A

L O

FF

IC

E www.aearchitects.com

O W

N E

R

ISSUE DATE

REVISIONS

P R

O

JE

C T

D R

A W

IN

G

PROJECT No 13104.00 7.14.14

6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 59101

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

ARCHITII ECTSP

C

GENERAL NOTES:

2014 MORRISON-MAIERLE, INC.

(E)

SWR

PHASE 1

FUTURE PHASE 1

ALL EXIST. STEAM

UNITS NORTH OF THIS

LINE ARE SERVED BY

MECH. ROOM (NORTH)

TYP. ALL 3 FLOORS

NORTH SOUTH

ALL EXIST. STEAM

UNITS SOUTH OF THIS

LINE ARE SERVED BY

MECH. ROOM (SOUTH)

TYP. ALL 3 FLOORS2

STEAM RADIATOR

TYP. (REMOVE)

STEAM RADIATOR

TYP. (TO REMAIN)

STEAM RADIATOR

TYP. (REMOVE)

PLANNED CONSTRUCTION PHASES:

1. THESE CONSTRUCTION DOCUMENTS

ARE LIMITED TO THE CONSTRUCTION

IDENTIFIED AS PHASE 1.

2. CONSTRUCTION AREAS INDICATED

"FUTURE" CONSTRUCTION ARE FOR

REFERENCE ONLY AND ARE NOT PART

OF THIS CONTRACT. NOTE THAT SOME

OF THE MECH. WORK REQ'D FOR PHASE

1 EXTENDS INTO FUTURE AREAS.

COORD. W/ GEN. CONT'R.

3 3 3

1. REMOVE ALL STEAM HEATING COMPONENTS AND

PIPING WITHIN THIS AREA INCLUDING RADIATORS AND

CONTROLS. AREA TO BE COMPLETELY CLEARED OF

EXISTING HEATING SYSTEM COMPONENTS AND READY

FOR INSTALLATION OF NEW SYSTEMS & EQUIPMENT.

2. EXISTING STEAM AND CONDENSATE SYSTEMS IN THIS

AREA TO REMAIN IN SERVICE UNTIL PHASE 3

CONSTRUCTION.

3. EXISTING STEAM RADIATOR TO REMAIN. REMOVE

ASSOCIATED PIPING, CONTROLS AND WIRING.

SALVAGE NOTE:

EXISTING STEAM RADIATORS TO BE SALVAGED TO

OWNER FOR RE-USE IN FUTURE PHASED WORK.

COORDINATE SALVAGE W/ GEN. CONT'R.

A D E F G H KCB J

FI

R

ST

F

LO

O

R M

EC

H

A N

IC

A

L D

EM

O

P

LA

N

USFS BUILDING 26 - FIRST FLOOR MECHANICAL DEMO PLAN 16

DM2.1 : DM2.1 1/8" = 1'-0"

NORTH

DM2.1

KEY NOTES:

BU

IL

D

IN

G

P H

A

SE

SO

U

T H

W

IN

G R

EN

O

V A

T

IO

N

U S

FO

R

ES

T

S

ER

V

IC

E, N

O R

T H

ER

N

R

EG

IO

N

R

EG

IO

N A

L O

FF

IC

E www.aearchitects.com

O W

N E

R

ISSUE DATE

REVISIONS

P R

O

JE

C T

D R

A W

IN

G

PROJECT No 13104.00 7.14.14

6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 59101

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

ARCHITII ECTSP

C

1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED

TO COORDINATE WITH EACH OTHER AND VERIFY THAT

THERE ARE NO CONFLICTS IN LOCATION OF DUCTS,

CONDUITS, DIFFUSERS, BOXES AND OTHER ITEMS

THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT

OF MATERIALS.

2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE

FIELD VERIFIED. THESE DRAWINGS REPRESENT

SCHEMATIC SYSTEMS.

3. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND

PIPING SYSTEMS WITH OTHER TRADES. REFER TO

ARCHITECTURAL, STRUCTURAL, PLUMBING, AND

ELECTRICAL DRAWINGS AND FIRE PROTECTION SHOP

DRAWINGS FOR ADDITIONAL DETAILS NECESSARY FOR

COORDINATION.

4. ALL GRAYSCALE DUCTWORK/PIPING/EQUIPMENT IS TO

LEFT ALONE. BLACK IS TO BE REMOVED.

5. COORDINATE ALL CONCRETE PENETRATIONS WITH

STRUCTURAL DRAWINGS TO VERIFY HOW AND WHERE

CONCRETE CAN BE CUT.

6. COORDINATE REMOVAL OF PIPING WITH ASBESTOS

ABATEMENT CONTRACTOR.

DOWNDOWN

DOWN

DOWNDOWN

DOWNDOWN

DOWN

DOWNDOWN

DOWN

PHASE 1

FUTURE

FUTURE

ALL EXIST. STEAM

UNITS NORTH OF THIS

LINE ARE SERVED BY

MECH. ROOM (NORTH)

TYP. ALL 3 FLOORS

NORTH SOUTH

ALL EXIST. STEAM

UNITS SOUTH OF THIS

LINE ARE SERVED BY

MECH. ROOM (SOUTH)

TYP. ALL 3 FLOORS

1 1

STEAM RADIATOR

TYP. (REMOVE)

STEAM RADIATOR

TYP. (TO REMAIN)

STEAM RADIATOR

TYP. (REMOVE)

STEAM RADIATOR

TYP. (REMOVE)

PLANNED CONSTRUCTION PHASES:

1. THESE CONSTRUCTION DOCUMENTS

ARE LIMITED TO THE CONSTRUCTION

IDENTIFIED AS PHASE 1.

2. CONSTRUCTION AREAS INDICATED

"FUTURE" CONSTRUCTION ARE FOR

REFERENCE ONLY AND ARE NOT PART

OF THIS CONTRACT. NOTE THAT SOME

OF THE MECH. WORK REQ'D FOR PHASE

1 EXTENDS INTO FUTURE AREAS.

COORD. W/ GEN. CONT'R.

1. REMOVE ALL STEAM HEATING COMPONENTS AND

PIPING WITHIN THIS AREA INCLUDING RADIATORS AND

CONTROLS. AREA TO BE COMPLETELY CLEARED OF

EXISTING HEATING SYSTEM COMPONENTS AND READY

FOR INSTALLATION OF NEW SYSTEMS & EQUIPMENT.

2. EXISTING STEAM AND CONDENSATE SYSTEMS IN THIS

AREA TO REMAIN IN SERVICE UNTIL PHASE 3

CONSTRUCTION.

3. EXISTING STEAM RADIATOR TO REMAIN. REMOVE

ASSOCIATED PIPING, CONTROLS AND WIRING.

SALVAGE NOTE:

EXISTING STEAM RADIATORS TO BE SALVAGED TO

OWNER FOR RE-USE IN FUTURE PHASED WORK.

COORDINATE SALVAGE W/ GEN. CONT'R.

A D E F G H KCB J

SE

C

O N

D F

LO

O

R M

EC

H

A N

IC

A

L D

EM

O

P

LA

N

1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED

TO COORDINATE WITH EACH OTHER AND VERIFY THAT

THERE ARE NO CONFLICTS IN LOCATION OF DUCTS,

CONDUITS, DIFFUSERS, BOXES AND OTHER ITEMS

THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT

OF MATERIALS.

2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE

FIELD VERIFIED. THESE DRAWINGS REPRESENT

SCHEMATIC SYSTEMS.

3. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND

PIPING SYSTEMS WITH OTHER TRADES. REFER TO

ARCHITECTURAL, STRUCTURAL, PLUMBING, AND

ELECTRICAL DRAWINGS AND FIRE PROTECTION SHOP

DRAWINGS FOR ADDITIONAL DETAILS NECESSARY FOR

COORDINATION.

4. ALL GRAYSCALE DUCTWORK/PIPING/EQUIPMENT IS TO LEFT

ALONE. BLACK IS TO BE REMOVED.

5. COORDINATE ALL CONCRETE PENETRATIONS WITH

STRUCTURAL DRAWINGS TO VERIFY HOW AND WHERE

CONCRETE CAN BE CUT.

6. COORDINATE REMOVAL OF PIPING WITH ASBESTOS

ABATEMENT CONTRACTOR.

USFS BUILDING 26 - SECOND FLOOR MECHANICAL DEMO PLAN 16

DM2.2 : DM2.2 1/8" = 1'-0"

NORTH

DM2.2

KEY NOTES:

BU

IL

D

IN

G

P H

A

SE

SO

U

T H

W

IN

G R

EN

O

V A

T

IO

N

U S

FO

R

ES

T

S

ER

V

IC

E, N

O R

T H

ER

N

R

EG

IO

N

R

EG

IO

N A

L O

FF

IC

E www.aearchitects.com

O W

N E

R

ISSUE DATE

REVISIONS

P R

O

JE

C T

D R

A W

IN

G

PROJECT No 13104.00 7.14.14

6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 59101

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

ARCHITII ECTSP

C

CT1

UH2

FUTURE

PHASE 1FUTURE

FUTURE

FC108G

(ABOVE)

FC108C

(ABOVE)

FC108E

(ABOVE)

FC108F

(ABOVE)

FC108A

(ABOVE)

FC108D

(ABOVE)

7 7

FUTURE

BS108

FC108B

(ABOVE)

EH2

T

FC106A

(ABOVE)

FC106B

(ABOVE)

STAIR

RESTROOM

MECH / ELECT

ELECT/DATA

ELEVATOR

MACHINE

ELEVATOR

A

VESTIBULE

VESTIBULE

STEAM RADIATOR

TYP. (TO REMAIN)

STEAM RADIATOR

TYP. (TO REMAIN)

10 10 10

UH1

EH3

UNIT NOT SHOWN

IN EXACT LOCATION.

SEE NOTE 2.

TO BS104

& BS106

ECU1

INDOOR

ECU1

OUTDOOR

CONC. PAD BY

GEN. CONT'R

CONC. PAD BY

GEN. CONT'R

1. NEW BOILER ROOM (HATCHED AREA) - SEE M2.0A FOR

ENLARGED PLAN AND SCHEMATIC OF EQUIPMENT AND

PIPING LAYOUT.

2. CLOSET-CIRCUIT COOLING TOWER, CT-1 (AS SCHEDULED).

MOUNT ON NEW CONC. PAD. COORDINATE EXACT

PLACEMENT OF UNIT AND CONC. PAD WITH THE

ARCHITECT AND GEN. CONT'R. NOTE THAT THERE ARE

TREES AND OTHER LANDSCAPE FEATURES IN THE

VICINITY. REFER TO PIPING SCHEMATIC SHEET M2.0A.

3. SYSTEM #2 REFRIG. PIPING UP IN CHASE FROM FIRST

FLOOR ABOVE. NOTE: THIS BRANCH OF REFRIG. PIPING

MUST BE ROUTED AS SHOWN IN ORDER TO PROVIDE

PROPER BALANCE OF REFIG. SYSTEM.

4. PIPING CONTINUED ON ENLARGED BOILER ROOM PLAN,

M2.0A.

5. MOUNT PIPING TIGHT TO BOTTOM OF STRUCTURE.

6. VRF SYSTEM ZONE REFRIG. LINE BRANCH SELECTOR BOX.

IN ACCESSIBLE LOCATION ABOVE CEILING.

7. VRF SYSTEM HEATING/COOLING FAN-COIL UNIT ON MAIN

FLOOR ABOVE: FLOOR-MTD. CONSOL. REFER TO M2.1.

8. CORE-DRILL REFRIG. & CONDENSATE PIPING THRU CONC.

WALL.

9. ELECT. HEATER (AS SCHEDULED) CEILING MOUNT.

10. ROUTE REFRIGERANT AND CONDENSATE PIPING UP AND

BETWEEN FLOOR JOISTS.

11. ELECT. UNIT HEATER (AS SCHEDULED) SUSPENDED FROM

CEILING. TEMPORARY HEAT FOR PHASE 1.

A D E F G H KCB J

BA

SE

M

EN

T M

EC

H

A N

IC

A

L

PL

A N

1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED

TO COORDINATE WITH EACH OTHER AND VERIFY THAT

THERE ARE NO CONFLICTS IN LOCATION OF DUCTS,

CONDUITS, DIFFUSERS, BOXES AND OTHER ITEMS

THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT

OF MATERIALS.

2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE

FIELD VERIFIED. THESE DRAWINGS REPRESENT

SCHEMATIC SYSTEMS.

3. PROVIDE SEISMIC BRACING OF ALL EQUIPMENT, PIPING,

AND DUCTWORK AS REQUIRED BY LOCAL CODES.

4. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND

PIPING SYSTEMS WITH OTHER TRADES. REFER TO

ARCHITECTURAL, STRUCTURAL, PLUMBING, AND

ELECTRICAL DRAWINGS AND FIRE PROTECTION SHOP

DRAWINGS FOR ADDITIONAL DETAILS NECESSARY FOR

COORDINATION.

5. ALL DUCT AND PIPING IS SCHEMATICALLY DRAWN AND

COORDINATION BETWEEN TRADES MUST BE DONE FOR

PROPER EQUIPMENT, PIPING, AND DUCTWORK PLACEMENT

AND DESIGN.

6. FOLLOW MANUFACTURES WRITTEN INSTALLATION

INSTRUCTION FOR RUNNING THE COMBUSTION AIR AND

VENT PIPING AS WELL AS THE TERMINATION THROUGH THE

ROOF. FOLLOW ALL SAFETY INSTRUCTIONS.

7. COORDINATE ALL CONCRETE PENETRATIONS WITH

STRUCTURAL DRAWINGS TO VERIFY HOW AND WHERE

CONCRETE CAN BE CUT.

8. ALL PIPING THAT IS EXPOSED MUST BE PAINTED TO MATCH

SURROUNDINGS.

9. MECHANICAL CONTRACTOR SHALL FIRE SEAL ALL PIPING

AND DUCTWORK PASSING THROUGH RATED

CONSTRUCTION.

USFS BUILDING 26 - BASEMENT MECHANICAL PLAN16

M2.0 : M2.0 1/8" = 1'-0"

NORTH

M2.0

KEY NOTES:

BU

IL

D

IN

G

P H

A

SE

SO

U

T H

W

IN

G R

EN

O

V A

T

IO

N

U S

FO

R

ES

T

S

ER

V

IC

E, N

O R

T H

ER

N

R

EG

IO

N

R

EG

IO

N A

L O

FF

IC

E www.aearchitects.com

O W

N E

R

ISSUE DATE

REVISIONS

P R

O

JE

C T

D R

A W

IN

G

PROJECT No 13104.00 7.14.14

6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 59101

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

ARCHITII ECTSP

C

3"

6" 6"

6"

6"

3/4"

1"

3"3"

6"

2" 2"

2.5" 2.5"

6"

6"

6"

3"

3" 6"

6"

3"3"

F

P

5 5

4"

P1

BT1

BLR1

BLR2 FC104

(ABOVE)

BS104

HP1 (X3)

BS106

1. VRF SYSTEM #1: REFRIGERANT PIPING LINES (X3) UP IN CHASE TO FIRST FLOOR. REFER TO M2.1 FOR CONTINUATION.

REFER TO VRF SYSTEM SCHEMATIC SHEET M9.5. NOTE: REFRIG. PIPING FROM THIS CHASE TO HP1 NOT SHOWN FOR

CLARITY.

2. VRF SYSTEM #2: REFRIGERANT PIPING LINES (X3) UP IN CHASE TO FIRST/SECOND FLOOR. REFER TO M2.1 & M2.2 FOR CONTINUATION. REFER TO VRF SYSTEM SCHEMATIC SHEET M9.6. NOTE: REFRIG. PIPING FROM THIS CHASE TO HP2

NOT SHOWN FOR CLARITY.

3. VRF SYSTEM HEATING/COOLING FAN-COIL UNIT ON MAIN FLOOR ABOVE: FLOOR-MOUNTED CONSOL. REFER TO M2.1.

4. BOILER VENTS FROM BASEMENT MECH. ROOM IN CHIMNEY AND UP THRU ROOF. REFER TO DETAIL. REFER TO M2.1 & M2.0 FOR CONTINUATION. THERE ARE TO BE A TOTAL OF (4) PAIRS OF 4"-DIA PVC VENTS TO BE INSTALLED IN THIS CHIMNEY. (2) ARE FOR BLR1 & BLR 2, (2) ARE FOR FUTURE BLR3 & BLR4. CAP PIPING FOR 3 & 4 IN BOILER ROOM

READY FOR FUTURE CONNECTION.

5. STACK PUMPS VERTICALLY TIGHT TO WALL. (3) PUMPS FOR PHASE 1, PROVIDE SPACE FOR (2) FUTURE PHASE

PUMPS.

6. 6"CWS, 6"CWR & 3/4"CW TO CT1. REFER TO M2.0 FOR CONTINUATION. REFER TO PLUMB. PLANS FOR COLD WATER

MAKE-UP.

7. TO BS108. REFER TO M2.0 FOR CONTINUATION.

8. TO FC106A & B. REFER TO M2.0 FOR CONTINUATION.

9. SYSTEM #2 REFRIG. PIPING FROM FIRST FLOOR ABOVE. REFER TO M2.0 FOR CONTINUATION. NOTE THIS BRANCH OF REFRIG. PIPING MUST BE ROUTED AS SHOWN IN ORDER TO PROVIDE PROPER REFRIG. BALANCE OF SYSTEM.

10. REFRIG. PIPING FROM VRF SYSTEM #1 TO BASEMENT LOOP. REFER TO M2.0 FOR CONTINUATION. NOTE: REFRIG.

PIPING FROM THIS CHASE TO HP1 NOT SHOWN FOR CLARITY.

11. PIPING CONTINUED ON M2.0.

12. HEAT PUMPS TO BE MOUNTED ON FIELD-FABRICATED GALVANIZED STEEL STANDS. OBSERVED FLOOR ELEVATION

CHANGES IN THE BOILER ROOM. CONSTRUCT STAND LEGS TO FIT EXISIT. CONDITIONS.

6"

CHASE

HP2 (X3)

GF1ET1P2

P3

EXIST.

CHIMNEY

AS1

FLOOR

DN 17"

FLOOR

DN 17"

NOTE:

NOT ALL REFRIG. PIPING NOT SHOWN ON THIS

PLAN FOR CLARITY. REFER TO VRF SYSTEM

PIPING SCHEMATICS M9.5 & M9.6.

4"

4"

FUTURE

PHASE(S)

4"

4"

T1

T1 T1

T1 T1

T1

HVAC PIPING LEGEND

SYMBOL DESCRIPTION

HORIZONTAL ELBOW

HORIZONTAL TEE

AUTOMATIC FLOW CONTROL

BALL VALVE

CHECK VALVE

STRAINER

UNION

HOSE END DRAIN

PRESSURE GAUGE

TEMPERATURE SENSOR

THERMOMETER

PRESSURE RELIEF VALVE

T

76 GPM76 GPM

6"

111111

FUTURE

BOILERS

T1

T1

3"

6"

12"

MAX.

FUTURE DOOR

(KEEP CLEAR)

BA

SE

M

EN

T B

O

IL

ER

R

O O

M P

LA

N

P

IP

IN

G

SC

H

EM

A T

IC

USFS BUILDING 26 - ENLARGED BOILER ROOM PLAN16

M2.0A : M2.0 1/4" = 1'-0"

NORTH M2.0A

BU

IL

D

IN

G

P H

A

SE

SO

U

T H

W

IN

G R

EN

O

V A

T

IO

N

U S

FO

R

ES

T

S

ER

V

IC

E, N

O R

T H

ER

N

R

EG

IO

N

R

EG

IO

N A

L O

FF

IC

E www.aearchitects.com

O W

N E

R

ISSUE DATE

REVISIONS

P R

O

JE

C T

D R

A W

IN

G

PROJECT No 13104.00 7.14.14

6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 59101

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

ARCHITII ECTSP

C

2014 MORRISON-MAIERLE, INC.

USFS BUILDING 26 - BOILER ROOM HYDRONIC PIPING SCHEMATIC1

M2.0A : M2.0 NO SCALE

KEY NOTES:

BS102

FC102B

FC102A

FC101C

BS101

FC100A

T

T

T 101

T 104

T 106

T

T T 108 T 107

T

T T

FC102D

FC102C

FC103

FC105A

FC108A

FC108C

FC107B FC107CFC107A

FC107D

TYP. 4

TYP. 4

3 3

FC104

FC106A

PHASE 1

FUTURE PHASE 1

FC101B

FC100C

BS103

FC107FFC107E

FC108B4

T

4FC108D

4 FC108E

T

FC106B4

T 105

BS100

FC101A

FC101D

T T

EH1

T

BS107

VENT

CHASE

PRIVATE

OFFICE

HR

CONFERENCE

OFFICE

OFFICE

OPEN

OFFICE

(12 STAFF)

OPEN

OFFICE

(16 STAFF)

ENTRY

HALL

RECEPTION

(2 STAFF)

BREAK

PRIVATE

OFFICE

JANITOR

WOMENS

RESTROOM

MENS

RESTROOM

EXECUTIVE

ASSISTANT

(2 STAFF)

REGIONAL

FORESTER

DEPUTY

REGIONAL

FORESTER

DEPUTY

REGIONAL

FORESTER

COFFEE / COPY

LARGE

CONFERENCE

TELE/DATA

PRINT / COPY / FAX

CONFERENCE

ENTRY

ELEVATOR

A

STAIR

FC105B

BS105

5 5

T

FC108G

4 FC108F

STEAM RADIATOR

TYP. (TO REMAIN)

EH4

EXIST.

CHIMNEY

CHASE

8 8 8

T

T

FC100B

1. VRF SYSTEM #1: REFRIGERANT LINES DOWN IN CHASE

FROM BASEMENT. REFER TO M2.0 FOR CONTINUATION.

REFER TO VRF SYSTEM SCHEMATIC FOR PIPE SIZES.

2. VRF SYSTEM #2: REFRIGERANT LINES UP/DN IN CHASE

FROM BASEMENT AND TO SECOND FLOOR. REFER TO

M2.0 & M2.2 FOR CONTINUATION. REFER TO VRF SYSTEM

SCHEMATIC FOR PIPE SIZES.

3. VRF SYSTEM HEATING/COOLING FAN-COIL UNIT:

CEILING-MOUNTED CASSETTE.

4. VRF SYSTEM HEATING/COOLING FAN-COIL UNIT:

FLOOR-MOUNTED CONSOL. NOTE: REFRIG. PIPING FOR

ALL FLOOR-MOUNTED FAN-COILS FROM BASEMENT

BELOW. REFER TO M2.0 FOR PIPING LAYOUT.

5. VRF SYSTEM HEATING/COOLING FAN-COIL UNIT:

HIGH-WALL MOUNTED UNIT.

6. VRF SYSTEM ZONE REFRIGERANT LINE BRANCH

SELECTOR BOX. IN ACCESSIBLE LOCATION ABOVE LAY-IN

CEILING.

7. BOILER VENTS FROM BASEMENT MECH. ROOM IN

CHIMNEY AND UP THRU ROOF. REFER TO DETAIL. REFER

TO M2.1 & M2.0 FOR CONTINUATION. THERE ARE TO BE A

TOTAL OF (4) PAIRS OF 4"-DIA PVC VENTS INSTALLED IN

THIS CHIMNEY. (2) ARE FOR BLR1 & BLR 2, (2) ARE FOR

FUTURE BLR3 & BLR4. CAP PIPING FOR 3 & 4 IN BOILER

ROOM READY FOR FUTURE CONNECTION.

8. EXISTING PLASTER CEILING IN THESE AREAS TO REMAIN.

PIPING, DUCTWORK OR EQUIPMENT ABOVE THESE

AREAS MUST BE ROUTED BETWEEN JOISTS. COORD.

CUTTING OF CEILING PLASTER W/ GEN. CONT'R.

9. ELECTRIC HEATER (AS SCHEDULED) MOUNTED LOW ON

WALL. REFER TO DETAIL.

10. ELECTRIC HEATER (AS SCHEDULED) MOUNTED LOW ON

WALL. REFER TO DETAIL. NOTE: THIS IS A FIRE-RATED

WALL, FIRE-CAULK AROUND HEATER PENETRATIONS AS

REQUIRED. REFER TO SPECIFICATIONS.

11. ROUTE REFRIGERANT PIPING UP AND BETWEEN FLOOR

JOISTS. ROUTE PIPING OVER STRUCTURAL BEAM(S).

12. CORE-DRILL REFRIG. PIPING THRU CONC. WALL.

13. SYSTEM #2 REFRIG. PIPING DOWN IN CHASE TO MECH.

RM. WHERE IT IS TO SERVE BRANCH SELECTOR BOXES

BS104 & BS106. NOTE THIS BRANCH OF REFRIG. PIPING

MUST BE ROUTED AS SHOWN IN ORDER TO PROVIDE

PROPER REFRIG. BALANCE OF SYSTEM.

A D E F G H KCB J

FI

R

ST

F

LO

O

R M

EC

H

A N

IC

A

L

PL

A N

1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED

TO COORDINATE WITH EACH OTHER AND VERIFY THAT

THERE ARE NO CONFLICTS IN LOCATION OF DUCTS,

CONDUITS, DIFFUSERS, BOXES AND OTHER ITEMS

THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT

OF MATERIALS.

2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE

FIELD VERIFIED. THESE DRAWINGS REPRESENT

SCHEMATIC SYSTEMS

3. PROVIDE SEISMIC BRACING OF ALL EQUIPMENT, PIPING,

AND DUCTWORK AS REQUIRED BY LOCAL CODES.

4. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND

PIPING SYSTEMS WITH OTHER TRADES. REFER TO

ARCHITECTURAL, STRUCTURAL, PLUMBING, AND

ELECTRICAL DRAWINGS AND FIRE PROTECTION SHOP

DRAWINGS FOR ADDITIONAL DETAILS NECESSARY FOR

COORDINATION.

5. ALL DUCT AND PIPING IS SCHEMATICALLY DRAWN AND

COORDINATION BETWEEN TRADES MUST BE DONE FOR

PROPER EQUIPMENT, PIPING, AND DUCTWORK PLACEMENT

AND DESIGN.

6. FOLLOW MANUFACTURES WRITTEN INSTALLATION

INSTRUCTION FOR RUNNING THE COMBUSTION AIR AND

VENT PIPING AS WELL AS THE TERMINATION THROUGH THE

ROOF. FOLLOW ALL SAFETY INSTRUCTIONS.

7. COORDINATE ALL CONCRETE PENETRATIONS WITH

STRUCTURAL DRAWINGS TO VERIFY HOW AND WHERE

CONCRETE CAN BE CUT.

8. ALL PIPING THAT IS EXPOSED MUST BE PAINTED TO MATCH

SURROUNDINGS.

9. MECHANICAL CONTRACTOR SHALL FIRE SEAL ALL PIPING

AND DUCTWORK PASSING THROUGH RATED

CONSTRUCTION.

KEY NOTES:

USFS BUILDING 26 - FIRST FLOOR MECHANICAL PLAN16

M2.1 : M2.1 1/8" = 1'-0"

NORTH

M2.1

BU

IL

D

IN

G

P H

A

SE

SO

U

T H

W

IN

G R

EN

O

V A

T

IO

N

U S

FO

R

ES

T

S

ER

V

IC

E, N

O R

T H

ER

N

R

EG

IO

N

R

EG

IO

N A

L O

FF

IC

E www.aearchitects.com

O W

N E

R

ISSUE DATE

REVISIONS

P R

O

JE

C T

D R

A W

IN

G

PROJECT No 13104.00 7.14.14

6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 59101

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

ARCHITII ECTSP

C

DOWNDOWN

DOWNDOWN

DOWN

DOWNDOWN

DOWN

DOWN PHASE 1

FUTURE

FUTURE

FC200B

FC200A

FC200C

FC201

FC200D

FC200E

FC200F

FC203

FC204

FC202A FC202E

FC202B FC202F

FC202C FC202G

FC202D

FC202H

T205

FC205A FC205B 4

T T

T206

BS206

BS202

FC206

BS204

BS203

BS201

T

T

T

TYP. 8

T202

BS200

T

TYP. 6

VENT

CHASE

EXIST.

CHIMNEY

OFFICE

OFFICE

OFFICE

SMALL

CONFERENCE

SMALL

CONFERENCE

SMALL

CONFERENCE

OPEN

OFFICE

(23 STAFF)

OPEN

OFFICE

(22 STAFF)

STAIR

ELEVATOR

A

TELE/DATA

ELECTRICAL

STEAM RADIATOR

TYP. (TO REMAIN)

4 FC205C 4

BS205

T

EH5

NEW

CHASE

1. CORE-DRILL REFRIGERANT PIPING THRU CONC.

WALL.

2. VRF SYSTEM #2: REFRIGERANT LINES IN CHASE

FROM FIRST FLOOR BELOW. REFER TO M2.1 FOR

CONTINUATION. REFER TO VRF SYSTEM SCHEMATIC

FOR PIPE SIZES.

3. VRF SYSTEM HEATING/COOLING FAN-COIL UNIT:

CEILING-MOUNTED CASSETTE.

4. VRF SYSTEM HEATING/COOLING FAN-COIL UNIT:

FLOOR-MOUNTED CONSOL. NOTE: REFRIG. PIPING

FOR ALL FLOOR-MOUNTED FAN-COILS FROM FIRST

FLOOR BELOW. REFER TO M2.1 FOR PIPING LAYOUT.

5. VRF SYSTEM HEATING/COOLING FAN-COIL UNIT:

HIGH-WALL MOUNTED UNIT.

6. VRF SYSTEM ZONE REFRIGERANT LINE BRANCH

SELECTOR BOX. IN ACCESSIBLE LOCATION ABOVE

LAY-IN CEILING.

7. BOILER VENTS FROM BASEMENT MECH. ROOM IN

CHIMNEY AND UP THRU ROOF. REFER TO DETAIL.

REFER TO M2.1 & M2.0 FOR CONTINUATION. THERE

ARE TO BE A TOTAL OF (4) PAIRS OF 4"-DIA PVC

VENTS INSTALLED IN THIS CHIMNEY. (2) ARE FOR

BLR1 & BLR 2, (2) ARE FOR FUTURE BLR3 & BLR4. CAP

PIPING FOR 3 & 4 IN BOILER ROOM READY FOR

FUTURE CONNECTION.

8. EXISTING PLASTER CEILING IN THESE AREAS TO

REMAIN. PIPING, DUCTWORK OR EQUIPMENT ABOVE

THESE AREAS MUST BE ROUTED BETWEEN JOISTS.

COORD. CUTTING OF CEILING PLASTER W/ GEN.

CONT'R.

9. REFRIG. PIPING IN UNCONDITIONED ATTIC SPACE.

INSULATE PIPING IN ACCORDANCE WITH

MANUFACTURE'S RECOMMENDATIONS.

10. REFRIG. PIPING DOWN (FROM ATTIC SPACE) IN

FRAMED WALL TO FLOOR-MOUNTED FAN COIL UNIT(S)

11. ROUTE REFRIGERANT PIPING UP AND BETWEEN

FLOOR JOISTS. ROUTE PIPING OVER STRUCTURAL

BEAM(S).

12. CORE-DRILL REFRIGERANT PIPING THROUGH

CONCRETE WALL.

13. ELECTRIC HEATER (AS SCHEDULED) MOUNTED LOW

ON WALL. REFER TO DETAIL. NOTE: THIS IS A

FIRE-RATED WALL, FIRE-CAULK AROUND HEATER

PENETRATIONS AS REQUIRED. REFER TO

SPECIFICATIONS.

A D E F G H KCB J

SE

C

O N

D F

LO

O

R M

EC

H

A N

IC

A

L

PL

A N

USFS BUILDING 26 - SECOND FLOOR MECHANICAL PLAN16

M2.2 : M2.2 1/8" = 1'-0"

NORTH

M2.2

BU

IL

D

IN

G

P H

A

SE

SO

U

T H

W

IN

G R

EN

O

V A

T

IO

N

U S

FO

R

ES

T

S

ER

V

IC

E, N

O R

T H

ER

N

R

EG

IO

N

R

EG

IO

N A

L O

FF

IC

E www.aearchitects.com

O W

N E

R

ISSUE DATE

REVISIONS

P R

O

JE

C T

D R

A W

IN

G

PROJECT No 13104.00 7.14.14

6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 59101

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

ARCHITII ECTSP

C

2014 MORRISON-MAIERLE, INC.

1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED

TO COORDINATE WITH EACH OTHER AND VERIFY THAT

THERE ARE NO CONFLICTS IN LOCATION OF DUCTS,

CONDUITS, DIFFUSERS, BOXES AND OTHER ITEMS

THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT

OF MATERIALS.

2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE

FIELD VERIFIED. THESE DRAWINGS REPRESENT

SCHEMATIC SYSTEMS.

3. PROVIDE SEISMIC BRACING OF ALL EQUIPMENT, PIPING,

AND DUCTWORK AS REQUIRED BY LOCAL CODES.

4. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND

PIPING SYSTEMS WITH OTHER TRADES. REFER TO

ARCHITECTURAL, STRUCTURAL, PLUMBING, AND

ELECTRICAL DRAWINGS AND FIRE PROTECTION SHOP

DRAWINGS FOR ADDITIONAL DETAILS NECESSARY FOR

COORDINATION.

5. ALL DUCT AND PIPING IS SCHEMATICALLY DRAWN AND

COORDINATION BETWEEN TRADES MUST BE DONE FOR

PROPER EQUIPMENT, PIPING, AND DUCTWORK PLACEMENT

AND DESIGN.

6. FOLLOW MANUFACTURES WRITTEN INSTALLATION

INSTRUCTION FOR RUNNING THE COMBUSTION AIR AND

VENT PIPING AS WELL AS THE TERMINATION THROUGH THE

ROOF. FOLLOW ALL SAFETY INSTRUCTIONS.

7. COORDINATE ALL CONCRETE PENETRATIONS WITH

STRUCTURAL DRAWINGS TO VERIFY HOW AND WHERE

CONCRETE CAN BE CUT.

8. ALL PIPING THAT IS EXPOSED MUST BE PAINTED TO MATCH

SURROUNDINGS.

9. MECHANICAL CONTRACTOR SHALL FIRE SEAL ALL PIPING

AND DUCTWORK PASSING THROUGH RATED

CONSTRUCTION.

KEY NOTES:

STAIR

RESTROOM

MECH / ELECT

ELECT/DATA

ELEVATOR

MACHINE

ELEVATOR

A

VESTIBULE

VESTIBULE

PHASE 1

FC108G

(ABOVE)FC108C

(ABOVE)

FC108E

(ABOVE)

FC108F

(ABOVE)

FC108A

(ABOVE)

FC108D

(ABOVE)

FC108B

(ABOVE)

FC106A

(ABOVE)

FC106B

(ABOVE)

5 5 5

1 1 1

5 4

5 5

1 1

11 6 11

EF3

T

1. CONDENSATE DRAIN FROM VRF SYSTEM FAN COIL UNIT.

2. CONDENSATE DRAIN PIPING DOWN TO FLOOR SINK.

REFER TO PLUMB. PLANS FOR EXACT SINK LOCATION.

3. CONDENSATE DRAIN FROM ENVIRONMENTAL CONTROL

UNIT ECU1 TO FLOOR SINK.

4. CORE-DRILL REFRIG. & CONDENSATE PIPING THRU

CONC. WALL.

5. ROUTE REFRIGERANT AND CONDENSATE PIPING UP AND

BETWEEN FLOOR JOISTS.

6. 2" CONDENSATE PIPING DOWN TIGHT TO WALL TO

FLOOR SINK. REFER TO PLUMB. PLANS FOR EXACT

FLOOR SINK LOCATION.

7. CONDENSATE DRAIN PIPING IN CHASE FROM FLOORS

ABOVE. REFER TO M3.1 & M3.2.

8. CONDENSATE DRAIN PIPING FROM FIRST FLOOR ABOVE.

REFER TO M3.1.

9. ROUTE CONDENSATE PIPING FULL-SIZED TO FLOOR

DRAIN OR APPROVED RECEPTOR WITHIN BOILER ROOM.

10. MOUNT PIPING AS TIGHT TO BOTTOM OF STRUCTURE AS

POSSIBLE.

11. CONDENSATE PIPING DROP FROM MAIN FLOOR ABOVE.

REFER TO M3.1 FOR CONTINUATION.

12. ROUTE EXHAUST FROM ELEVATOR EQUIPMENT ROOM

TO ADJACENT ROOM WITH WALL-MOUNTED GRILLE

(MOUNT HIGH), PROVIDE A SEPARATE INTAKE GRILLES

FOR MAKE-UP AIR (MOUNT 12" AFF) BOTH SIDES OF

WALL.

A D E F G H KCB J

BA

SE

M

EN

T C

O N

D

EN

SA

T

E

PI

PI

N

G P

LA

N

1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED

TO COORDINATE WITH EACH OTHER AND VERIFY THAT

THERE ARE NO CONFLICTS IN LOCATION OF DUCTS,

CONDUITS, DIFFUSERS, BOXES AND OTHER ITEMS

THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT

OF MATERIALS.

2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE

FIELD VERIFIED. THESE DRAWINGS REPRESENT

SCHEMATIC SYSTEMS.

3. PROVIDE SEISMIC BRACING OF ALL EQUIPMENT, PIPING,

AND DUCTWORK AS REQUIRED BY LOCAL CODES.

4. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND

PIPING SYSTEMS WITH OTHER TRADES. REFER TO

ARCHITECTURAL, STRUCTURAL, PLUMBING, AND

ELECTRICAL DRAWINGS AND FIRE PROTECTION SHOP

DRAWINGS FOR ADDITIONAL DETAILS NECESSARY FOR

COORDINATION.

5. ALL DUCT AND PIPING IS SCHEMATICALLY DRAWN AND

COORDINATION BETWEEN TRADES MUST BE DONE FOR

PROPER EQUIPMENT, PIPING, AND DUCTWORK PLACEMENT

AND DESIGN.

6. FOLLOW MANUFACTURES WRITTEN INSTALLATION

INSTRUCTION FOR RUNNING THE COMBUSTION AIR AND

VENT PIPING AS WELL AS THE TERMINATION THROUGH THE

ROOF. FOLLOW ALL SAFETY INSTRUCTIONS.

7. COORDINATE ALL CONCRETE PENETRATIONS WITH

STRUCTURAL DRAWINGS TO VERIFY HOW AND WHERE

CONCRETE CAN BE CUT.

8. ALL PIPING THAT IS EXPOSED MUST BE PAINTED TO MATCH

SURROUNDINGS.

9. MECHANICAL CONTRACTOR SHALL FIRE SEAL ALL PIPING

AND DUCTWORK PASSING THROUGH RATED

CONSTRUCTION.

USFS BUILDING 26 - BASEMENT CONDENSATE PIPING PLAN16

M3.0 : M3.0 1/8" = 1'-0"

NORTH

M3.0

KEY NOTES:

BU

IL

D

IN

G

P H

A

SE

SO

U

T H

W

IN

G R

EN

O

V A

T

IO

N

U S

FO

R

ES

T

S

ER

V

IC

E, N

O R

T H

ER

N

R

EG

IO

N

R

EG

IO

N A

L O

FF

IC

E www.aearchitects.com

O W

N E

R

ISSUE DATE

REVISIONS

P R

O

JE

C T

D R

A W

IN

G

PROJECT No 13104.00 7.14.14

6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 59101

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

ARCHITII ECTSP

C

PHASE 1

FUTURE PHASE 1

PRIVATE

OFFICE

HR

CONFERENCE

OFFICE

OFFICE

OPEN

OFFICE

(12 STAFF)

OPEN

OFFICE

(16 STAFF)

ENTRY

HALL

RECEPTION

(2 STAFF)

BREAK

PRIVATE

OFFICE

JANITOR

WOMENS

RESTROOM

MENS

RESTROOM

EXECUTIVE

ASSISTANT

(2 STAFF)

REGIONAL

FORESTER

DEPUTY

REGIONAL

FORESTER

DEPUTY

REGIONAL

FORESTER

COFFEE / COPY

LARGE

CONFERENCE

PRINT / COPY / FAX

CONFERENCE

ENTRY

ELEVATOR

A

STAIR

15 2

1 1

FC102B

FC102A

FC101C

FC100A

FC102D

FC102C

FC103

FC105A

FC101B

FC100C

FC101A

FC101D

FC105B

EF1

TELE/DATA

T

FC100B

FC107B FC107CFC107A

FC107D FC107FFC107E

FSD

-6

-10

10 6

- 10

10 6

6 6

1. CORE-DRILL DUCT AND PIPING PENETRATIONS THRU

CONC. WALL. ALSO REFER TO M2.1 FOR REFRIGERANT

PIPING.

2. ROUTE DUCTWORK UP AND BETWEEN FLOOR JOISTS.

ROUTE DUCTWORK OVER STRUCTURAL BEAM(S).

3. CONDENSATE DRAIN DOWN IN NEW FRAMED WALL TO

BASEMENT CEILING BELOW. CORE-DRILL THRU CONC.

FLOOR AS REQ'D. REFER TO M3.0 FOR CONTINUATION.

4. CONDENSATE DRAIN DOWN IN CHASE TO BASEMENT

CEILING BELOW AND THEN SLOPE TO MECH ROOM.

ROUTE PIPING FULL-SIZED TO NEAREST FLOOR DRAIN

OR APPROVED RECEPTOR WITHIN MECH ROOM.

5. CONDENSATE DRAIN DOWN IN CHASE TO BASEMENT

MECH. ROOM. ROUTE PIPING FULL-SIZED TO NEAREST

FLOOR DRAIN OR APPROVED RECEPTOR. REFER TO

M3.0.

6. EXISTING PLASTER CEILING IN THIS AREA. DO NOT

ROUTE DUCTWORK OR CONDENSATE PIPING.

7. CONDENSATE DRAIN FROM VRF SYSTEM FAN COIL UNIT.

8. CONDENSATE DRAIN DOWN IN NEW WALL TO SINK DRAIN.

REFER TO DETAIL 14/M9.7. 1-1/2" CONDENSATE DRAIN UP

TO 2ND FLOOR CEILING. REFER TO M3.2 FOR

CONTINUATION.

9. FIRE/SMOKE DAMPER AT FIRE-RATED WALL.

10. TRANSFER AIR GRILLE DUCTED TO CEILING OF

ADJACENT AREA. ROUTE SHORT SECTION OF

DUCTWORK THRU FULL-HEIGHT WALL AND OVER TO

ADJACENT AREA AS SHOWN. LINE DUCTWORK 1" DUCT

LINER. REFER TO DETAIL 12/M9.7.

A D E F G H KCB J

FI

R

ST

F

LO

O

R V

EN

T

IL

A

T

IO

N A

N D

C O

N D

EN

SA

T E

PI

PI

N G

P

LA

N

1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED

TO COORDINATE WITH EACH OTHER AND VERIFY THAT

THERE ARE NO CONFLICTS IN LOCATION OF DUCTS,

CONDUITS, DIFFUSERS, BOXES AND OTHER ITEMS

THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT

OF MATERIALS.

2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE

FIELD VERIFIED. THESE DRAWINGS REPRESENT

SCHEMATIC SYSTEMS.

3. PROVIDE SEISMIC BRACING OF ALL EQUIPMENT, PIPING,

AND DUCTWORK AS REQUIRED BY LOCAL CODES.

4. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND

PIPING SYSTEMS WITH OTHER TRADES. REFER TO

ARCHITECTURAL, STRUCTURAL, PLUMBING, AND

ELECTRICAL DRAWINGS AND FIRE PROTECTION SHOP

DRAWINGS FOR ADDITIONAL DETAILS NECESSARY FOR

COORDINATION.

5. ALL DUCT AND PIPING IS SCHEMATICALLY DRAWN AND

COORDINATION BETWEEN TRADES MUST BE DONE FOR

PROPER EQUIPMENT, PIPING, AND DUCTWORK PLACEMENT

AND DESIGN.

6. FOLLOW MANUFACTURES WRITTEN INSTALLATION

INSTRUCTION FOR RUNNING THE COMBUSTION AIR AND

VENT PIPING AS WELL AS THE TERMINATION THROUGH THE

ROOF. FOLLOW ALL SAFETY INSTRUCTIONS.

7. COORDINATE ALL CONCRETE PENETRATIONS WITH

STRUCTURAL DRAWINGS TO VERIFY HOW AND WHERE

CONCRETE CAN BE CUT.

8. ALL PIPING THAT IS EXPOSED MUST BE PAINTED TO MATCH

SURROUNDINGS.

9. MECHANICAL CONTRACTOR SHALL FIRE SEAL ALL PIPING

AND DUCTWORK PASSING THROUGH RATED

CONSTRUCTION.

KEY NOTES:

USFS BUILDING 26 - FIRST FLOOR VENTILATION AND CONDENSATE PIPING PLAN16

M3.1 : M3.1 1/8" = 1'-0"

NORTH

M3.1

BU

IL

D

IN

G

P H

A

SE

SO

U

T H

W

IN

G R

EN

O

V A

T

IO

N

U S

FO

R

ES

T

S

ER

V

IC

E, N

O R

T H

ER

N

R

EG

IO

N

R

EG

IO

N A

L O

FF

IC

E www.aearchitects.com

O W

N E

R

ISSUE DATE

REVISIONS

P R

O

JE

C T

D R

A W

IN

G

PROJECT No 13104.00 7.14.14

6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 59101

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

ARCHITII ECTSP

C

DOWNDOWN

DOWNDOWN

DOWN

DOWNDOWN

DOWN

DOWN

PHASE 1

FUTURE

FUTURE

OFFICE

OFFICE

OFFICE

SMALL

CONFERENCE

SMALL

CONFERENCE

SMALL

CONFERENCE

OPEN

OFFICE

(23 STAFF)

OPEN

OFFICE

(22 STAFF)

STAIR

ELEVATOR

A

TELE/DATA

ELECTRICAL

15 2

1 2

FC200B

FC200A

FC200C

FC200D

FC200E

FC200F

FC203

FC204

FC202A FC202E

FC202B FC202F

FC202C FC202G

FC202D

FC202H

EF2

T

FC201

HRV1

(ATTIC)

7 7

44 4

1FC206

1010 10

1. CORE-DRILL DUCT AND PIPING PENETRATIONS THRU

CONC. WALL. ALSO REFER TO M2.2 FOR REFRIGERANT

PIPING.

2. SAWCUT OR CORE-DRILLE PENETRATIONS THRU

CONC. FLOOR AS REQ'D FOR NEW DUCTWORK.

3. TERMINATE SHORT SECTION OF DUCT WITH VOLUME

DAMPER FOR CONNECTION TO FUTURE RESTROOM

EXHAUST GRILLES. BALANCE EACH BRANCH AS

INDICATED.

4. DUCTWORK CONTINUED IN ATTIC ABOVE. REFER TO M3.3

FOR DUCTWORK PLAN.

5. CONDENSATE DRAIN FROM HRV UNIT IN ATTIC ABOVE.

REFER TO M3.3. REFER TO CONDENSATE DRAIN DETAIL

16/M9.7.

6. CONDENSATE DRAIN DOWN IN NEW FRAMED WALL TO

FIRST FLOOR CEILING BELOW. CORE-DRILL THRU CONC.

FLOOR AS REQ'D. REFER TO M3.1 FOR CONTINUATION.

7. CONDENSATE DRAIN FROM VRF SYSTEM FAN COIL UNIT.

8. CONDENSATE DRAIN DOWN IN NEW WALL TO SINK DRAIN.

REFER TO DETAIL 14/M9.7.

9. CONDENSATE DRAIN DOWN IN CHASE TO BASEMENT

MECH. ROOM. REFER TO M3.0 FOR CONTINUATION

10. EXISTING PLASTER CEILING IN THIS AREA. DO NOT

ROUTE DUCTWORK OR CONDENSATE PIPING.

11. TRANSFER AIR GRILLE DUCTED TO CEILING OF

ADJACENT AREA. ROUTE SHORT SECTION OF

DUCTWORK THRU FULL-HEIGHT WALL AND OVER TO

ADJACENT AREA AS SHOWN. LINE DUCTWORK 1" DUCT

LINER. REFER TO DETAIL 12/M9.7.

A D E F G H KCB J

1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED

TO COORDINATE WITH EACH OTHER AND VERIFY THAT

THERE ARE NO CONFLICTS IN LOCATION OF DUCTS,

CONDUITS, DIFFUSERS, BOXES AND OTHER ITEMS

THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT

OF MATERIALS.

2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE

FIELD VERIFIED. THESE DRAWINGS REPRESENT

SCHEMATIC SYSTEMS.

3. PROVIDE SEISMIC BRACING OF ALL EQUIPMENT, PIPING,

AND DUCTWORK AS REQUIRED BY LOCAL CODES

4. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND

PIPING SYSTEMS WITH OTHER TRADES. REFER TO

ARCHITECTURAL, STRUCTURAL, PLUMBING, AND

ELECTRICAL DRAWINGS AND FIRE PROTECTION SHOP

DRAWINGS FOR ADDITIONAL DETAILS NECESSARY FOR

COORDINATION.

5. ALL DUCT AND PIPING IS SCHEMATICALLY DRAWN AND

COORDINATION BETWEEN TRADES MUST BE DONE FOR

PROPER EQUIPMENT, PIPING, AND DUCTWORK PLACEMENT

AND DESIGN.

6. FOLLOW MANUFACTURES WRITTEN INSTALLATION

INSTRUCTION FOR RUNNING THE COMBUSTION AIR AND

VENT PIPING AS WELL AS THE TERMINATION THROUGH THE

ROOF. FOLLOW ALL SAFETY INSTRUCTIONS.

7. COORDINATE ALL CONCRETE PENETRATIONS WITH

STRUCTURAL DRAWINGS TO VERIFY HOW AND WHERE

CONCRETE CAN BE CUT.

8. ALL PIPING THAT IS EXPOSED MUST BE PAINTED TO MATCH

SURROUNDINGS.

9. MECHANICAL CONTRACTOR SHALL FIRE SEAL ALL PIPING

AND DUCTWORK PASSING THROUGH RATED

CONSTRUCTION.

KEY NOTES:

USFS BUILDING 26 - SECOND FLOOR VENTILATION AND CONDENSATE PIPING PLAN16

M3.2 : M3.2 1/8" = 1'-0"

NORTH

M3.2

BU

IL

D

IN

G

P H

A

SE

SO

U

T H

W

IN

G R

EN

O

V A

T

IO

N

U S

FO

R

ES

T

S

ER

V

IC

E, N

O R

T H

ER

N

R

EG

IO

N

R

EG

IO

N A

L O

FF

IC

E www.aearchitects.com

O W

N E

R

ISSUE DATE

REVISIONS

P R

O

JE

C T

D R

A W

IN

G

PROJECT No 13104.00 7.14.14

6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 59101

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

ARCHITII ECTSP

C

2014 MORRISON-MAIERLE, INC.

GENERAL NOTES:

SE

C

O N

D F

LO

O

R V

EN

T

IL

A

T

IO

N A

N D

C O

N D

EN

SA

T E

PI

PI

N G

P

LA

N

L1L2

NOTE:

ATTIC IS UNCONDITIONED. ALL DUCTWORK

IS TO BE INSULATED WITH R-8 DUCT WRAP.

REFER TO DUCT MATERIAL SCHEDULE.

1. HEAT RECOVERY VENTILATION UNIT, HRV1 TO BE

MOUNTED IN INSULATED ATTIC ENCLOSURE. HRV UNIT

TO BE SUSPENDED FROM EXISTING ROOF FRAMING

ABOVE WITH THREADED RODS AND VIBRATION

ISOLATORS. ENCLOSURE TO BE CONSTRUCTED BY GEN.

CONT'R. OF WOOD-FRAMED WALLS AND SHEATHED WITH

PLYWOOD. 2"-THK RIGID "BLUE BOARD" INSULATION IS

TO BE ADHERED TO THE ENTIRE TOP AND 4 SIDES.

EXISTING CEILING INSULATION IN THE ATTIC IS TO BE

REMOVED IN THE AREA BELOW THE ENCLOSURE TO

ALLOW HEAT FROM THE CONDITIONED SPACE BELOW TO

RISE INTO ENCLOSURE. HINGED ACCESS DOORS ARE TO

BE PROVIDED FOR UNIT MAINTENANCE. COORD.

MAINTENANCE ACCESS REQUIREMENTS WITH GEN.

CONT'R. ROUTE CONDENSATE DRAIN AS SHOWN ON

M3.2.

2. CUT 12X12 OPENING THRU EXIST. CEILING TO ALLOW

CONDITIONED ROOM AIR FROM CEILING PLENUM BELOW

TO TRANSFER UP INTO HRV ENCLOSURE. TRANSFER

GRILLE MOUNTED TO TOP SURFACE.

3. EXISTING GLASS TO BE REMOVED FROM THE DORMER'S

CENTER WINDOW. NEW LOUVER TO BE MOUNTED IN THE

WINDOW OPENING. COORD. WITH GEN. CONT'R.

4. FRESH AIR VENTILATION BRANCH DOWN TO SUPPLY

GRILLE IN 2ND FLOOR CEILING BELOW. REFER TO M3.2

FOR CONTINUATION.

5. 14"Ø DUCT DOWN IN CHASE BELOW TO FIRST FLOOR

VENTILATION. REFER TO M3.1 FOR CONTINUATION.

6. BOILER VENTS FROM BASEMENT MECH. ROOM IN

CHIMNEY AND UP THRU ROOF. REFER TO DETAIL 9/M9.7.

THERE ARE TO BE A TOTAL OF (4) PAIRS OF 4"-DIA PVC

VENTS INSTALLED IN THIS CHIMNEY. (2) ARE FOR BLR1 &

BLR 2, (2) ARE FOR FUTURE BLR3 & BLR4. CAP PIPING

FOR 3 & 4 IN BOILER ROOM READY FOR FUTURE

CONNECTION.

A D E F G H KCB J

A T

T

IC

V

EN

T

IL

A T

IO

N

P

LA

N

1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED

TO COORDINATE WITH EACH OTHER AND VERIFY THAT

THERE ARE NO CONFLICTS IN LOCATION OF DUCTS,

CONDUITS, DIFFUSERS, BOXES AND OTHER ITEMS

THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT

OF MATERIALS.

2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE

FIELD VERIFIED. THESE DRAWINGS REPRESENT

SCHEMATIC SYSTEMS.

3. PROVIDE SEISMIC BRACING OF ALL EQUIPMENT, PIPING,

AND DUCTWORK AS REQUIRED BY LOCAL CODES.

4. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND

PIPING SYSTEMS WITH OTHER TRADES. REFER TO

ARCHITECTURAL, STRUCTURAL, PLUMBING, AND

ELECTRICAL DRAWINGS AND FIRE PROTECTION SHOP

DRAWINGS FOR ADDITIONAL DETAILS NECESSARY FOR

COORDINATION.

5. ALL DUCT AND PIPING IS SCHEMATICALLY DRAWN AND

COORDINATION BETWEEN TRADES MUST BE DONE FOR

PROPER EQUIPMENT, PIPING, AND DUCTWORK PLACEMENT

AND DESIGN.

6. FOLLOW MANUFACTURES WRITTEN INSTALLATION

INSTRUCTION FOR RUNNING THE COMBUSTION AIR AND

VENT PIPING AS WELL AS THE TERMINATION THROUGH THE

ROOF. FOLLOW ALL SAFETY INSTRUCTIONS.

7. COORDINATE ALL CONCRETE PENETRATIONS WITH

STRUCTURAL DRAWINGS TO VERIFY HOW AND WHERE

CONCRETE CAN BE CUT.

8. ALL PIPING THAT IS EXPOSED MUST BE PAINTED TO MATCH

SURROUNDINGS.

9. MECHANICAL CONTRACTOR SHALL FIRE SEAL ALL PIPING

AND DUCTWORK PASSING THROUGH RATED

CONSTRUCTION.

KEY NOTES:

USFS BUILDING 26 - ATTIC VENTILATION PLAN16

M3.3 : M3.3 1/8" = 1'-0"

NORTH

M3.3

BU

IL

D

IN

G

P H

A

SE

SO

U

T H

W

IN

G R

EN

O

V A

T

IO

N

U S

FO

R

ES

T

S

ER

V

IC

E, N

O R

T H

ER

N

R

EG

IO

N

R

EG

IO

N A

L O

FF

IC

E www.aearchitects.com

O W

N E

R

ISSUE DATE

REVISIONS

P R

O

JE

C T

D R

A W

IN

G

PROJECT No 13104.00 7.14.14

6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 59101

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

ARCHITII ECTSP

C

DUCT MATERIAL SCHEDULE

SHAPE FUNCTION DESCRIPTION MATERIAL GAUGE INSULATION R-VALUE NOTES

RECT. OUTSIDE AIR OUTSIDE TO HRV (IN ATTIC) SHEET METAL 24 GA. WRAP R-8 1

RECT. RELIEF AIR RELIEF FROM HRV (IN ATTIC) SHEET METAL 24 GA. NONE - -

RECT. EXHAUST

EXH. FROM RESTROOMS TO

HRV (ATTIC) SHEET METAL 24 GA. WRAP R-8 1

RECT. EXHAUST

EXH. FROM RESTROOMS TO

HRV (CONDITIONED SPACE) SHEET METAL 24 GA. NONE - -

ROUND EXHAUST

EXH. FROM RESTROOMS TO

HRV (CONDITIONED SPACE) <12"=SNAPPY DUCT, >12" SPIRAL SHEET METAL 24 GA. NONE - -

RECT. SUPPLY SUPPLY FROM HRV (IN ATTIC) SHEET METAL 24 GA. WRAP R-8 1

RECT. SUPPLY

SUPPLY FROM HRV

(CONDITIONED SPACE) SHEET METAL 24 GA. WRAP R-5 1

ROUND SUPPLY SUPPLY FROM HRV (IN ATTIC) <12"=SNAPPY DUCT, >12" SPIRAL SHEET METAL 24 GA. WRAP R-8 1

ROUND SUPPLY

SUPPLY FROM HRV

(CONDITIONED SPACE) <12"=SNAPPY DUCT, >12" SPIRAL SHEET METAL 24 GA. WRAP R-5 1

ROUND SUP./RET. 4' LENGTH MAX - AT GRD'S FLEX N/A INTEGRAL -- --

NOTES:

1. ALL SERVICE INSULATION JACKET IS TO BE SEALED AT THE EXPOSED SEAMS/EDGES/CORNERS.

2. ALL DUCTWORK DIMENSIONS SHOWN ON PLAN ARE INSIDE CLEAR FREE AREA DIMENSIONS.

REMARKS:

1. PROVIDE SEISMIC BRACING OF ALL DUCTWORK AS REQUIRED BY LOCAL CODES.

2. INTERNALLY LINE WITH NON FIBROUS DUCT LINER.

HVAC LEGEND

PIPING

REFRIGERANT

CONDENSATE

RISE / FALL IN PIPING

FITTINGS

DUCTWORK

SUPPLY/RETURN DUCTWORK

VERTICAL TRANSITION SUPPLY DUCT

VERTICAL TRANSITION RETURN DUCT

CEILING SUPPLY AIR DIFFUSER

CEILING RETURN GRILLE

CEILING EXHAUST GRILLE

FLOOR REGISTER

AIR DEVICE NUMBER & CFM

DUCT TURNING VANES

MANUAL VOLUME DAMPER

BACKDRAFT DAMPER

FIRE/SMOKE DAMPER

HRV

EXHAUST FAN

CONTROLS

THERMOSTAT

PRESSURE SENSOR

DUCT MOUNTED SMOKE DETECTOR

WALL SWITCH

CONTROL PANEL FOR B.A.S.

PROJECT INFORMATION

PROJECT LOCATION: MISSOULA MT

PROJECT ALTITUDE: 3209 FEET ABOVE SEA LEVEL

SUMMER DESIGN TEMP: 91°F DRY BULB, 62°F WET BULB (ASHRAE 99% DESIGN)

ALL MECHANICAL AND PLUMBING EQUIPMENT SHALL BE SEISMICALLY BRACED

PER THE 2009 INTERNATIONAL BUILDING CODE. SEISMIC DESIGN

REQUIREMENTS FOR THE PROJECT ARE AS FOLLOWS:

SEISMIC DESIGN CATEGORY: D

IMPORTANCE FACTOR (Ip): 1.0

IMPORTANCE FACTOR FOR GAS PIPING: 1.5

THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE TO INCLUDE BRACING

AND RESTRAINTS. BRACING & RESTRAINT DETAILS SHALL BE INCLUDED IN SHOP

DRAWING SUBMITTAL FOR REVIEW AND BY THE ENGINEER.

SEISMIC NOTES

HVAC PIPING LEGEND

SYMBOL DESCRIPTION

ELBOW

TEE

SYSTEM PUMP

CIRCULATOR PUMP

BALL VALVE

CONTROL VALVE - 2 WAY

CONTROL VALVE - 3 WAY

CHECK VALVE

HOSE END DRAIN

STRAINER

CIRCUIT BALANCING VALVE

AUTOMATIC AIR VENT -

INSTALL AT ALL HIGH POINTS IN

SYSTEM

TEMPERATURE GAUGE

PRESSURE GAUGE

FLOW METER

TEMPERATURE SENSOR

PRESSURE SENSOR

F

T

P

DIRECT DIGITAL CONTROL POINTS

HARDWARE POINTS SOFTWARE POINTS

NOTES

POINT NAME AI AO BI BO AV BV ADJ. SCH. TRD. ALM. DISP.

SYSTEM PUMPS (P1, P2, P3)

SYSTEM PUMP 1 STATUS X X X

SYSTEM PUMP 2 STATUS X X X

SYSTEM PUMP 3 STATUS X X X

SYSTEM PUMP 1 START/ STOP X X X

SYSTEM PUMP 2 START/ STOP X X X

SYSTEM PUMP 2 START/ STOP X X X

SYSTEM PUMP 1 FAILURE X

SYSTEM PUMP 2 FAILURE X

SYSTEM PUMP 3 FAILURE X

SYSTEM PUMP 1 RUNTIME EXCEEDED X

SYSTEM PUMP 2 RUNTIME EXCEEDED X

SYSTEM PUMP 3 RUNTIME EXCEEDED X

BOILERS (BLR1, BLR2)

HOT WATER SUPPLY TEMP. X X X BAS

HOT WATER RETURN TEMP. X X X BAS

BOILER 1 STATUS X X X BAS

BOILER 2 STATUS X X X BAS

BOILER PUMP 1 STATUS X X X BAS

BOILER PUMP 2 STATUS X X X BAS

BOILER PUMP 1 START/ STOP X X X BAS

BOILER PUMP 2 START/ STOP X X X BAS

BOILER 1 ENABLE X X BAS

BOILER 2 ENABLE X X BAS

OUTSIDE AIR TEMP. X X BAS

BOILER 1 FAILURE X BAS

BOILER 2 FAILURE X BAS

BOILER PUMP 1 FAILURE X BAS

BOILER PUMP 2 FAILURE X BAS

BOILER 1 RUNTIME EXCEEDED X BAS

BOILER 2 RUNTIME EXCEEDED X BAS

HOT WATER SUPPLY TEMP. LIMIT EXCEEDED X BAS

HEAT PUMPS (HP1, HP2)

REFER TO DAIKIN I-TOUCH CONTROL SPECIFICATIONS FOR POINTS INTERFACE WITH BAS

CONTROL VALVE (CV1, CV2) X X BAS

ALARM CONTACTS X X X X BAS

COOLING TOWER (CT1)

CONDENSER WATER SUPPLY TEMP. X X X COOLING TOWER CONTROL PANEL

CONDENSER WATER RETURN TEMP. X X X COOLING TOWER CONTROL PANEL

DAMPER X X X COOLING TOWER CONTROL PANEL

BYPASS CONTROL VALVE, CV3 X X X BAS

EMERGENCY SHUTDOWN X X X X COOLING TOWER CONTROL PANEL

CONDENSER WATER PUMP STATUS X X X COOLING TOWER CONTROL PANEL

SPRAY PUMP STATUS X X X COOLING TOWER CONTROL PANEL

FAN STATUS X X X COOLING TOWER CONTROL PANEL

FAN VFD FAULT X X X COOLING TOWER CONTROL PANEL

CONDENSATE WATER PUMP START/ STOP X X X COOLING TOWER CONTROL PANEL

SPRAY PUMP START/ STOP X X X COOLING TOWER CONTROL PANEL

FAN START/ STOP X X X COOLING TOWER CONTROL PANEL

MAKEUP VALVE X X X BAS

OUTSIDE AIR TEMP. X X BAS

CONDENSER WATER PUMP FAILURE X COOLING TOWER CONTROL PANEL

SPRAY PUMP FAILURE X COOLING TOWER CONTROL PANEL

LOW CONDENSER WATER SUPPLY TEMP. X COOLING TOWER CONTROL PANEL

HIGH CONDENSER WATER SUPPLY TEMP. X COOLING TOWER CONTROL PANEL

FAN FAILURE X COOLING TOWER CONTROL PANEL

MAKEUP VALVE RUNTIME EXCEEDED X COOLING TOWER CONTROL PANEL

HIGH CONDENSER WATER RETURN TEMP. X COOLING TOWER CONTROL PANEL

HIGH CONDENSER WATER RETURN TEMP. X COOLING TOWER CONTROL PANEL

GLYCOL FEEDER (GF1)

ALARM CONTACTS X X X X

DEFINITIONS:

AI= ANALOG INPUT

AO= ANALOG OUTPUT

BI= BINARY INPUT

BO= BINARY OUTPUT

AV= ANALOG VALUE

BV= BINARY VALUE

REFERENCES:

1. REFER TO SPEC. SECTION 230900

INSTRUMENTATION AND

CONTROL FOR HVAC FOR MORE

INFORMATION.

DEFINITIONS:

ADJ. = ADJUSTABLE

SCH. = SCHEDULE

TRD. = TREND

ALM. = ALARM

DISP. = DISPLAY

BAS = BUILDING AUTOMATION SYST.

REFERENCES:

2. REFER TO SPEC. SECTION 230993

SEQUENCE OF OPERATIONS FOR

HVAC CONTROL FOR MORE

INFORMATION.

PIPE MATERIAL SCHEDULE

SYSTEM MATERIAL SIZES INSULATION THICKNESS** ADD'L DETAILS

HYDRONIC SUPPLY/RETURN (BOILER) 'L' COPPER / STEEL

<=11

2" 11

2" WRAP WITH ASJ SEE BELOW

>11

2" 2" WRAP WITH ASJ

HEAT PUMP WATER SUPPLY/RETURN -

CONDITIONED SPACE

'L' COPPER / STEEL /

AQUATHERM BLUE PIPE

(SDR11)

ALL NONE SEE BELOW

COMBUSTION AIR & VENT PIPING SCHEDULE 40 PVC ALL NONE SEE BELOW

CHILLED WATER - CONDITIONED SPACE

'L' COPPER / STEEL /

AQUATHERM BLUE PIPE

(SDR11)

ALL 11

2" WRAP WITH ASJ SEE BELOW

CHILLED WATER -BURIED

AQUATHERM BLUE PIPE

(SDR 11) ALL NONE

6-FT MIN. BURIAL

DEPTH, 2-FT MIN.

HORIZ. SEPARATION

REFRIGERANT PIPING REFER TO SPECIFICATIONS. ALSO REFER TO DAIKIN INSTALLATION INSTRUCTIONS.

NATURAL GAS PIPING THREADED BLACK IRON ALL NONE PAINT ORANGE

CONDENSATE DRAIN PIPING SCHEDULE 40 PVC ALL NONE SEE BELOW

** BASED ON INSULATION HAVING A CONDUCTIVITY

(K) NOT EXCEEDING 0.27 BTU PER INCH/H*FT^2*DEG F

1. PROVIDE SEISMIC BRACING OF PIPING 2 1/2" AND LARGER

OR AS REQUIRED BY LOCAL CODES.

2. INSULATION SHALL BE FIBERGLASS WITH ALL SERVICE

JACKET

3. ALL SERVICE INSULATION JACKET IS TO BE SEALED AT

ALL SEAMS, EDGES, ETC.

4. PROVIDE PVC COATED JACKET OVER INSULATION FOR

MECHANICAL ROOM PIPING.

5. ANY CONNECTIONS THAT ARE DISSIMILAR METALS SHALL

REQUIRE BRASS UNIONS OR FLANGE SEPARATION.

PIPE MATERIAL REMARKS:

FSD

GENERAL CONTROLS NOTE

THIS PROJECT WILL INCLUDE THE INSTALLATION OF A BUILDING AUTOMATION SYSTEM (BAS). SEE SPECIFICATION SECTIONS 230900

"INSTRUMENTATION AND CONTROL FOR HVAC" AND 230993 "SEQUENCE OF OPERATIONS FOR HVAC CONTROLS"

IT SHALL BE THE RESPONSIBILITY OF THE TEMPERATURE CONTROLS CONTRACTOR TO PROVIDE ALL LABOR, MATERIAL, EQUIPMENT AND SOFTWARE NOT SPECIFICALLY REFERRED TO ON THE PLANS OR IN THE SPECIFICATION TO ACHIEVE THE SEQUENCE OF OPERATIONS DESCRIBED IN SPECIFICATION SECTION 230993 "SEQUENCE OF OPERATIONS FOR HVAC CONTROLS", THE SEQUENCES SHOWN ON THE

DRAWINGS OR ANY OTHER LOCATION IN THE CONTRACT DOCUMENTS.

PROVIDE EVERYTHING SHOWN ON THE POINTS LIST AS WELL AS EVERYTHING IN THE SEQUENCES OR ANY OTHER PART OF THE CONTRACT

DOCUEMENTS REGARDLESS OF IF THEY ARE LISTED ON THE POINTS LIST.

M

EC

H A

N

IC

A L

LE

G

EN

D

S

S C

H

ED

U

LE

S

M9.1

2014 MORRISON-MAIERLE, INC.

BU

IL

D

IN

G

P H

A

SE

SO

U

T H

W

IN

G R

EN

O

V A

T

IO

N

U S

FO

R

ES

T

S

ER

V

IC

E, N

O R

T H

ER

N

R

EG

IO

N

R

EG

IO

N A

L O

FF

IC

E www.aearchitects.com

O W

N E

R

ISSUE DATE

REVISIONS

P R

O

JE

C T

D R

A W

IN

G

PROJECT No 13104.00 7.14.14

6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 59101

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

ARCHITII ECTSP

C

ACCESSORIES:

1. FACTORY PROVIDED STRAINERS FOR EACH HEAT PUMP: DAIKIN BWU26A20

2. PROVIDE WITH COOL/HEAT SELECTOR

VARIABLE REFRIGERANT VOLUME HEAT PUMP SCHEDULE

SYSTEM MARK MANUFACTURER ASSEMBLY MODEL

NUMBER

INDIVIDUAL MODEL

NUMBER

COMBINATION SIZING

PERCENTAGE

HEATING DATA COOLING DATA

REFRIGERANT TYPE

UNIT PHYSICAL DATA

REMARKS, ACCESSORIES AND CONTROLSHEATING CAP.

(BTU/H)

HEATING SIZING

CONDITIONS (EWT / LWT) COP

COOLING CAP.

(BTU/H)

FLOW RATE

(GPM)

HEAD

(FT)

COOLING SIZING

CONDITIONS (EWT / LWT) EER WIDTH (IN) HEIGHT (IN) DEPTH (IN) WEIGHT (LBS)

VRF

SYSTEM

#1

HP1(1)

DAIKIN

RWEYQ216PTJU - HR

RWEYQ72PTJU - HR

123% 309,560 70°F / 63.5°F 4.8 222,345 76.2 8.9 75°F / 82.6°F 14.5

R410A 30.7 39.4 21.7 331 SEE BELOW

HP1(2) RWEYQ72PTJU - HR R410A 30.7 39.4 21.7 331 SEE BELOW

HP1(3) RWEYQ72PTJU - HR R410A 30.7 39.4 21.7 331 SEE BELOW

VRF

SYSTEM

#2

HP1(1)

RWEYQ252PTJU - HR

RWEYQ84PTJU - HR

123% 317,738 70°F / 63.5°F 4.5 248,602 76.2 8.9 75°F / 82.6°F 12.8

R410A 30.7 39.4 21.7 331 SEE BELOW

HP1(2) RWEYQ84PTJU - HR R410A 30.7 39.4 21.7 331 SEE BELOW

HP1(3) RWEYQ84PTJU - HR R410A 30.7 39.4 21.7 331 SEE BELOW

VARIABLE REFRIGERANT VOLUME FAN COIL AND BRANCH SELECTOR BOX SCHEDULE

SYSTEM MARK ROOMS SERVED MANF. MODEL NUMBER TYPE

SOUND

(dBA)

SUPPLY FAN EVAPORATOR COIL UNIT PHYSICAL DATA

CONDENSATE

PUMP REMARKS

ASSOCIATED BRANCH SELECTOR

CFM

(COOLING) WORKING FLUID

REQUIRED

SENS. COOL

(BTU/H)

AVAILABLE

TOT. COOL

(BTU/H)

AVAILABLE

SENS. COOL

(BTU/H)

REQUIRED

HEAT.

(BTU/H)

AVAILABLE

HEAT

(BTU/H)

WIDTH (IN) HEIGHT (IN) DEPTH (IN) WEIGHT (LBS) MARK MODEL DIMENSIONS (WxHxD) WEIGHT (LBS)

V R

F S

Y S

TE

M

FC100A 123 Office DAIKIN FXZQ09MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 29-32 320 40% PROP. GLY. 6.0 8.1 6.5 9.3 11.1 22.6 11.3 22.6 42 YES SEE BELOW

BS100 BSVQ36PVJU 15.3X8.1X12.8 26FC100B 124 Conference DAIKIN FXAQ18PVJU HIGH WALL-MOUNTED 37-43 500 40% PROP. GLY. 9.0 15.4 12.8 10.6 21.0 41.3 11.4 9.3 31 YES SEE BELOW

FC100C 125 Office DAIKIN FXZQ07MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 29-31 320 40% PROP. GLY. 3.6 6.4 5.5 2.6 8.7 22.6 11.3 22.6 42 YES SEE BELOW

FC101A 121 Open Office DAIKIN FXZQ09MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 29-32 320 40% PROP. GLY. 6.5 8.1 6.5 4.5 11.1 22.6 11.3 22.6 42 YES SEE BELOW

BS101 BSVQ60PVJU 13.3X8.1X12.8 26

FC101B 121 Open Office DAIKIN FXZQ09MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 29-32 320 40% PROP. GLY. 6.5 8.1 6.5 4.5 11.1 22.6 11.3 22.6 42 YES SEE BELOW

FC101C 121 Open Office DAIKIN FXZQ09MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 29-32 320 40% PROP. GLY. 6.5 8.1 6.5 4.5 11.1 22.6 11.3 22.6 42 YES SEE BELOW

FC101D 121 Open Office DAIKIN FXZQ09MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 29-32 320 40% PROP. GLY. 6.5 8.1 6.5 4.5 11.1 22.6 11.3 22.6 42 YES SEE BELOW

FC102A 120 Open Office DAIKIN FXZQ15MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 30-36 388 40% PROP. GLY. 9.5 12.8 10.3 7.0 18.1 22.6 11.3 22.6 42 YES SEE BELOW

BS102 BSVQ60PVJU 13.3X8.1X12.8 26

FC102B 120 Open Office DAIKIN FXZQ15MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 30-36 388 40% PROP. GLY. 9.5 12.8 10.3 7.0 18.1 22.6 11.3 22.6 42 YES SEE BELOW

FC102C 120 Open Office DAIKIN FXZQ15MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 30-36 388 40% PROP. GLY. 9.5 12.8 10.3 7.0 18.1 22.6 11.3 22.6 42 YES SEE BELOW

FC102D 120 Open Office DAIKIN FXZQ15MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 30-36 388 40% PROP. GLY. 9.5 12.8 10.3 7.0 18.1 22.6 11.3 22.6 42 YES SEE BELOW

FC103 118 Conference DAIKIN FXZQ07MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 29-31 320 40% PROP. GLY. 2.0 6.4 5.5 - 8.7 22.6 11.3 22.6 42 YES SEE BELOW BS103 BSVQ36PVJU 15.3X8.1X12.8 26

FC107A 103 Break DAIKIN FXAQ09PVJU HIGH WALL-MOUNTED 31-37 280 40% PROP. GLY. 7.0 8.1 7.2 6.8 11.1 31.3 11.4 9.3 26 YES SEE BELOW

BS107 BSVQ60PVJU 13.3x8.1x12.8 26

FC107B 104 Conference DAIKIN FXAQ09PVJU HIGH WALL-MOUNTED 31-37 280 40% PROP. GLY. 6.3 8.1 7.2 5.3 11.1 31.3 11.4 9.3 26 YES SEE BELOW

FC107C 104 Conference DAIKIN FXAQ09PVJU HIGH WALL-MOUNTED 31-37 280 40% PROP. GLY. 6.3 8.1 7.2 5.3 11.1 31.3 11.4 9.3 26 YES SEE BELOW

FC107D 109 Womens Restroom DAIKIN FXAQ07PVJU HIGH WALL-MOUNTED 29-35 260 40% PROP. GLY. 3.1 6.4 6.2 4.1 8.7 31.3 11.4 9.3 26 YES SEE BELOW

FC107E 110 Mens Restroom DAIKIN FXAQ07PVJU HIGH WALL-MOUNTED 29-35 260 40% PROP. GLY. 3.0 6.4 6.2 4.2 8.7 31.3 11.4 9.3 26 YES SEE BELOW

FC107F 111 Janitor DAIKIN FXAQ07PVJU HIGH WALL-MOUNTED 29-35 260 40% PROP. GLY. 2.5 6.4 6.2 3.2 8.7 31.3 11.4 9.3 26 YES SEE BELOW

FC108A 107 Private Office HR DAIKIN FXLQ12MVJU9 FLOOR STANDING 32-36 280 40% PROP. GLY. 3.8 10.2 8.0 3.6 14.0 44.9 23.6 8.7 55 YES SEE BELOW

BS108 BSVQ96PVJU 15.3x8.1x12.8 33

FC108B 108 Private Office DAIKIN FXLQ12MVJU9 FLOOR STANDING 32-36 280 40% PROP. GLY. 3.6 10.2 8.0 3.3 14.0 44.9 23.6 8.7 55 YES SEE BELOW

FC108C 102 Reception DAIKIN FXLQ12MVJU9 FLOOR STANDING 32-36 280 40% PROP. GLY. 4.6 10.2 8.0 3.7 14.0 44.9 23.6 8.7 55 YES SEE BELOW

FC108D 101 Entry (N) DAIKIN FXLQ12MVJU9 FLOOR STANDING 32-36 280 40% PROP. GLY. 2.2 10.2 8.0 3.3 14.0 44.9 23.6 8.7 55 YES SEE BELOW

FC108E 101 Entry (N) DAIKIN FXLQ12MVJU9 FLOOR STANDING 32-36 280 40% PROP. GLY. 2.2 10.2 8.0 3.3 14.0 44.9 23.6 8.7 55 YES SEE BELOW

FC108F 105 Entry (S) DAIKIN FXLQ12MVJU9 FLOOR STANDING 32-36 280 40% PROP. GLY. 2.2 10.2 8.0 3.3 14.0 44.9 23.6 8.7 55 YES SEE BELOW

FC108G 105 Entry (S) DAIKIN FXLQ12MVJU9 FLOOR STANDING 32-36 280 40% PROP. GLY. 2.2 10.2 8.0 3.3 14.0 44.9 23.6 8.7 55 YES SEE BELOW

V R

F S

Y S

TE

M

FC104 117 Dep Rgnl. Forr. DAIKIN FXLQ12MVJU9 FLOOR STANDING 32-36 280 40% PROP. GLY. 5.1 10.3 8.0 3.4 14.0 44.9 23.6 8.7 55 YES SEE BELOW BS104 BSVQ36PVJU 15.3X8.1X12.8 26

FC105A 115/116 Coffee/Exec Asst DAIKIN FXZQ07MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 29-31 320 40% PROP. GLY. 5.5 6.4 5.6 3.3 8.7 22.6 11.3 22.6 42 YES SEE BELOW

BS105 BSVQ36PVJU 15.3X8.1X12.8 26

FC105B 115/116 Coffee/Exec Asst DAIKIN FXZQ07MVJU9 CEILING-MOUNTED…

This is the start of the file's text. The full file is on GovTribe.