Mechanical_Compiled.pdf
PDF 7 MB Posted
- Attached to
- Building 26 Remodel, Fort Missoula
- Solicitation number
- AG-03R6-S-14-0058
About this file
18 - Drawings (Mechanical)
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FUTURE
PHASE 1FUTURE
FUTURE
PHASE 1
FUTURE
PLANNED CONSTRUCTION PHASES:
1. THESE CONSTRUCTION DOCUMENTS
ARE LIMITED TO THE CONSTRUCTION
IDENTIFIED AS PHASE 1.
2. CONSTRUCTION AREAS INDICATED
"FUTURE" CONSTRUCTION ARE FOR
REFERENCE ONLY AND ARE NOT PART
OF THIS CONTRACT. NOTE THAT SOME
OF THE MECH. WORK REQ'D FOR PHASE
1 EXTENDS INTO FUTURE AREAS.
COORD. W/ GEN. CONT'R.
MECH. ROOM (SOUTH)
MECH. ROOM (NORTH)
4 4
ALL EXIST. STEAM
UNITS NORTH OF THIS
LINE ARE SERVED BY
MECH. ROOM (NORTH)
TYP. ALL 3 FLOORS
NORTH SOUTH
ALL EXIST. STEAM
UNITS SOUTH OF THIS
LINE ARE SERVED BY
MECH. ROOM (SOUTH)
TYP. ALL 3 FLOORS
STEAM RADIATOR
TYP. (TO REMAIN)
STEAM RADIATOR
TYP. (TO REMAIN)
STEAM RADIATOR
TYP. (REMOVE)
STEAM RADIATOR
TYP. (REMOVE)
1. MECH. ROOM (SOUTH): REMOVE EXISTING STEAM BOILER,
HOT WATER STORAGE TANKS AND ALL ASSOCIATED
STEAM HEATING COMPONENTS AND PIPING WITHIN THIS
BOILER ROOM. REMOVE ALL STEAM AND CONDENSATE
PIPING CONNECTED TO THIS HEATING SYSTEM
INCLUDING RADIATORS AND CONTROLS. ROOM TO BE
COMPLETELY CLEARED AND READY FOR INSTALLATION
OF NEW SYSTEMS & EQUIPMENT.
2. MECH. ROOM (NORTH): EXISTING STEAM BOILER AND ALL
ASSOCIATED COMPONENTS IN THIS BOILER ROOM AND
CONNECTED TO THIS HEATING SYSTEM TO REMAIN IN
SERVICE UNTIL THE CONSTRUCTION OF PHASE 3.
3. CONTRACTOR TO PROVIDE RETRO-COMMISIONING
SERVICES FOR THIS EXISTING STEAM HEATING SYSTEM
TO INSURE THAT SYSTEM WILL FUNCTION UNTIL
COMPLETION OF FUTURE CONSTRUCTION PHASES.
4. EXISTING STEAM AND CONDENSATE SYSTEM IN THIS
AREA TO REMAIN IN SERVICE UNTIL PHASE 3
CONSTRUCTION.
5. REMOVE ALL STEAM HEATING COMPONENTS AND PIPING
WITHIN THIS AREA INCLUDING RADIATORS AND
CONTROLS. AREA TO BE COMPLETELY CLEARED OF
EXISTING HEATING SYSTEM COMPONENTS AND READY
FOR INSTALLATION OF NEW SYSTEMS & EQUIPMENT
A D E F G H KCB J
BA
SE
M
EN
T M
EC
H
A N
IC
A
L D
EM
O
P
LA
N
1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED
TO COORDINATE WITH EACH OTHER AND VERIFY THAT
THERE ARE NO CONFLICTS IN LOCATION OF DUCTS,
CONDUITS, DIFFUSERS, BOXES AND OTHER ITEMS
THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT
OF MATERIALS.
2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE
FIELD VERIFIED. THESE DRAWINGS REPRESENT
SCHEMATIC SYSTEMS.
3. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND
PIPING SYSTEMS WITH OTHER TRADES. REFER TO
ARCHITECTURAL, STRUCTURAL, PLUMBING, AND
ELECTRICAL DRAWINGS AND FIRE PROTECTION SHOP
DRAWINGS FOR ADDITIONAL DETAILS NECESSARY FOR
COORDINATION.
4. ALL GRAYSCALE DUCTWORK/PIPING/EQUIPMENT IS TO
LEFT ALONE. BLACK IS TO BE REMOVED.
5. COORDINATE ALL CONCRETE PENETRATIONS WITH
STRUCTURAL DRAWINGS TO VERIFY HOW AND WHERE
CONCRETE CAN BE CUT.
6. COORDINATE REMOVAL OF PIPING WITH ASBESTOS
ABATEMENT CONTRACTOR.
USFS BUILDING 26 - BASEMENT MECHANICAL DEMO PLAN 16
DM2.0 : DM2.0 1/8" = 1'-0"
NORTH
DM2.0
KEY NOTES:
BU
IL
D
IN
G
P H
A
SE
SO
U
T H
W
IN
G R
EN
O
V A
T
IO
N
U S
FO
R
ES
T
S
ER
V
IC
E, N
O R
T H
ER
N
R
EG
IO
N
R
EG
IO
N A
L O
FF
IC
E www.aearchitects.com
O W
N E
R
ISSUE DATE
REVISIONS
P R
O
JE
C T
D R
A W
IN
G
PROJECT No 13104.00 7.14.14
6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 59101
PH 4 0 6 . 2 4 8 . 2 6 3 3
FAX 4 0 6 . 2 4 8 . 2 4 2 7
2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 59802
PH 4 0 6 . 7 2 1 . 5 6 4 3
FAX 4 0 6 . 7 2 1 . 1 8 8 7
ARCHITII ECTSP
C
GENERAL NOTES:
2014 MORRISON-MAIERLE, INC.
(E)
SWR
PHASE 1
FUTURE PHASE 1
ALL EXIST. STEAM
UNITS NORTH OF THIS
LINE ARE SERVED BY
MECH. ROOM (NORTH)
TYP. ALL 3 FLOORS
NORTH SOUTH
ALL EXIST. STEAM
UNITS SOUTH OF THIS
LINE ARE SERVED BY
MECH. ROOM (SOUTH)
TYP. ALL 3 FLOORS2
STEAM RADIATOR
TYP. (REMOVE)
STEAM RADIATOR
TYP. (TO REMAIN)
STEAM RADIATOR
TYP. (REMOVE)
PLANNED CONSTRUCTION PHASES:
1. THESE CONSTRUCTION DOCUMENTS
ARE LIMITED TO THE CONSTRUCTION
IDENTIFIED AS PHASE 1.
2. CONSTRUCTION AREAS INDICATED
"FUTURE" CONSTRUCTION ARE FOR
REFERENCE ONLY AND ARE NOT PART
OF THIS CONTRACT. NOTE THAT SOME
OF THE MECH. WORK REQ'D FOR PHASE
1 EXTENDS INTO FUTURE AREAS.
COORD. W/ GEN. CONT'R.
3 3 3
1. REMOVE ALL STEAM HEATING COMPONENTS AND
PIPING WITHIN THIS AREA INCLUDING RADIATORS AND
CONTROLS. AREA TO BE COMPLETELY CLEARED OF
EXISTING HEATING SYSTEM COMPONENTS AND READY
FOR INSTALLATION OF NEW SYSTEMS & EQUIPMENT.
2. EXISTING STEAM AND CONDENSATE SYSTEMS IN THIS
AREA TO REMAIN IN SERVICE UNTIL PHASE 3
CONSTRUCTION.
3. EXISTING STEAM RADIATOR TO REMAIN. REMOVE
ASSOCIATED PIPING, CONTROLS AND WIRING.
SALVAGE NOTE:
EXISTING STEAM RADIATORS TO BE SALVAGED TO
OWNER FOR RE-USE IN FUTURE PHASED WORK.
COORDINATE SALVAGE W/ GEN. CONT'R.
A D E F G H KCB J
FI
R
ST
F
LO
O
R M
EC
H
A N
IC
A
L D
EM
O
P
LA
N
USFS BUILDING 26 - FIRST FLOOR MECHANICAL DEMO PLAN 16
DM2.1 : DM2.1 1/8" = 1'-0"
NORTH
DM2.1
KEY NOTES:
BU
IL
D
IN
G
P H
A
SE
SO
U
T H
W
IN
G R
EN
O
V A
T
IO
N
U S
FO
R
ES
T
S
ER
V
IC
E, N
O R
T H
ER
N
R
EG
IO
N
R
EG
IO
N A
L O
FF
IC
E www.aearchitects.com
O W
N E
R
ISSUE DATE
REVISIONS
P R
O
JE
C T
D R
A W
IN
G
PROJECT No 13104.00 7.14.14
6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 59101
PH 4 0 6 . 2 4 8 . 2 6 3 3
FAX 4 0 6 . 2 4 8 . 2 4 2 7
2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 59802
PH 4 0 6 . 7 2 1 . 5 6 4 3
FAX 4 0 6 . 7 2 1 . 1 8 8 7
ARCHITII ECTSP
C
1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED
TO COORDINATE WITH EACH OTHER AND VERIFY THAT
THERE ARE NO CONFLICTS IN LOCATION OF DUCTS,
CONDUITS, DIFFUSERS, BOXES AND OTHER ITEMS
THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT
OF MATERIALS.
2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE
FIELD VERIFIED. THESE DRAWINGS REPRESENT
SCHEMATIC SYSTEMS.
3. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND
PIPING SYSTEMS WITH OTHER TRADES. REFER TO
ARCHITECTURAL, STRUCTURAL, PLUMBING, AND
ELECTRICAL DRAWINGS AND FIRE PROTECTION SHOP
DRAWINGS FOR ADDITIONAL DETAILS NECESSARY FOR
COORDINATION.
4. ALL GRAYSCALE DUCTWORK/PIPING/EQUIPMENT IS TO
LEFT ALONE. BLACK IS TO BE REMOVED.
5. COORDINATE ALL CONCRETE PENETRATIONS WITH
STRUCTURAL DRAWINGS TO VERIFY HOW AND WHERE
CONCRETE CAN BE CUT.
6. COORDINATE REMOVAL OF PIPING WITH ASBESTOS
ABATEMENT CONTRACTOR.
DOWNDOWN
DOWN
DOWNDOWN
DOWNDOWN
DOWN
DOWNDOWN
DOWN
PHASE 1
FUTURE
FUTURE
ALL EXIST. STEAM
UNITS NORTH OF THIS
LINE ARE SERVED BY
MECH. ROOM (NORTH)
TYP. ALL 3 FLOORS
NORTH SOUTH
ALL EXIST. STEAM
UNITS SOUTH OF THIS
LINE ARE SERVED BY
MECH. ROOM (SOUTH)
TYP. ALL 3 FLOORS
1 1
STEAM RADIATOR
TYP. (REMOVE)
STEAM RADIATOR
TYP. (TO REMAIN)
STEAM RADIATOR
TYP. (REMOVE)
STEAM RADIATOR
TYP. (REMOVE)
PLANNED CONSTRUCTION PHASES:
1. THESE CONSTRUCTION DOCUMENTS
ARE LIMITED TO THE CONSTRUCTION
IDENTIFIED AS PHASE 1.
2. CONSTRUCTION AREAS INDICATED
"FUTURE" CONSTRUCTION ARE FOR
REFERENCE ONLY AND ARE NOT PART
OF THIS CONTRACT. NOTE THAT SOME
OF THE MECH. WORK REQ'D FOR PHASE
1 EXTENDS INTO FUTURE AREAS.
COORD. W/ GEN. CONT'R.
1. REMOVE ALL STEAM HEATING COMPONENTS AND
PIPING WITHIN THIS AREA INCLUDING RADIATORS AND
CONTROLS. AREA TO BE COMPLETELY CLEARED OF
EXISTING HEATING SYSTEM COMPONENTS AND READY
FOR INSTALLATION OF NEW SYSTEMS & EQUIPMENT.
2. EXISTING STEAM AND CONDENSATE SYSTEMS IN THIS
AREA TO REMAIN IN SERVICE UNTIL PHASE 3
CONSTRUCTION.
3. EXISTING STEAM RADIATOR TO REMAIN. REMOVE
ASSOCIATED PIPING, CONTROLS AND WIRING.
SALVAGE NOTE:
EXISTING STEAM RADIATORS TO BE SALVAGED TO
OWNER FOR RE-USE IN FUTURE PHASED WORK.
COORDINATE SALVAGE W/ GEN. CONT'R.
A D E F G H KCB J
SE
C
O N
D F
LO
O
R M
EC
H
A N
IC
A
L D
EM
O
P
LA
N
1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED
TO COORDINATE WITH EACH OTHER AND VERIFY THAT
THERE ARE NO CONFLICTS IN LOCATION OF DUCTS,
CONDUITS, DIFFUSERS, BOXES AND OTHER ITEMS
THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT
OF MATERIALS.
2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE
FIELD VERIFIED. THESE DRAWINGS REPRESENT
SCHEMATIC SYSTEMS.
3. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND
PIPING SYSTEMS WITH OTHER TRADES. REFER TO
ARCHITECTURAL, STRUCTURAL, PLUMBING, AND
ELECTRICAL DRAWINGS AND FIRE PROTECTION SHOP
DRAWINGS FOR ADDITIONAL DETAILS NECESSARY FOR
COORDINATION.
4. ALL GRAYSCALE DUCTWORK/PIPING/EQUIPMENT IS TO LEFT
ALONE. BLACK IS TO BE REMOVED.
5. COORDINATE ALL CONCRETE PENETRATIONS WITH
STRUCTURAL DRAWINGS TO VERIFY HOW AND WHERE
CONCRETE CAN BE CUT.
6. COORDINATE REMOVAL OF PIPING WITH ASBESTOS
ABATEMENT CONTRACTOR.
USFS BUILDING 26 - SECOND FLOOR MECHANICAL DEMO PLAN 16
DM2.2 : DM2.2 1/8" = 1'-0"
NORTH
DM2.2
KEY NOTES:
BU
IL
D
IN
G
P H
A
SE
SO
U
T H
W
IN
G R
EN
O
V A
T
IO
N
U S
FO
R
ES
T
S
ER
V
IC
E, N
O R
T H
ER
N
R
EG
IO
N
R
EG
IO
N A
L O
FF
IC
E www.aearchitects.com
O W
N E
R
ISSUE DATE
REVISIONS
P R
O
JE
C T
D R
A W
IN
G
PROJECT No 13104.00 7.14.14
6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 59101
PH 4 0 6 . 2 4 8 . 2 6 3 3
FAX 4 0 6 . 2 4 8 . 2 4 2 7
2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 59802
PH 4 0 6 . 7 2 1 . 5 6 4 3
FAX 4 0 6 . 7 2 1 . 1 8 8 7
ARCHITII ECTSP
C
CT1
UH2
FUTURE
PHASE 1FUTURE
FUTURE
FC108G
(ABOVE)
FC108C
(ABOVE)
FC108E
(ABOVE)
FC108F
(ABOVE)
FC108A
(ABOVE)
FC108D
(ABOVE)
7 7
FUTURE
BS108
FC108B
(ABOVE)
EH2
T
FC106A
(ABOVE)
FC106B
(ABOVE)
STAIR
RESTROOM
MECH / ELECT
ELECT/DATA
ELEVATOR
MACHINE
ELEVATOR
A
VESTIBULE
VESTIBULE
STEAM RADIATOR
TYP. (TO REMAIN)
STEAM RADIATOR
TYP. (TO REMAIN)
10 10 10
UH1
EH3
UNIT NOT SHOWN
IN EXACT LOCATION.
SEE NOTE 2.
TO BS104
& BS106
ECU1
INDOOR
ECU1
OUTDOOR
CONC. PAD BY
GEN. CONT'R
CONC. PAD BY
GEN. CONT'R
1. NEW BOILER ROOM (HATCHED AREA) - SEE M2.0A FOR
ENLARGED PLAN AND SCHEMATIC OF EQUIPMENT AND
PIPING LAYOUT.
2. CLOSET-CIRCUIT COOLING TOWER, CT-1 (AS SCHEDULED).
MOUNT ON NEW CONC. PAD. COORDINATE EXACT
PLACEMENT OF UNIT AND CONC. PAD WITH THE
ARCHITECT AND GEN. CONT'R. NOTE THAT THERE ARE
TREES AND OTHER LANDSCAPE FEATURES IN THE
VICINITY. REFER TO PIPING SCHEMATIC SHEET M2.0A.
3. SYSTEM #2 REFRIG. PIPING UP IN CHASE FROM FIRST
FLOOR ABOVE. NOTE: THIS BRANCH OF REFRIG. PIPING
MUST BE ROUTED AS SHOWN IN ORDER TO PROVIDE
PROPER BALANCE OF REFIG. SYSTEM.
4. PIPING CONTINUED ON ENLARGED BOILER ROOM PLAN,
M2.0A.
5. MOUNT PIPING TIGHT TO BOTTOM OF STRUCTURE.
6. VRF SYSTEM ZONE REFRIG. LINE BRANCH SELECTOR BOX.
IN ACCESSIBLE LOCATION ABOVE CEILING.
7. VRF SYSTEM HEATING/COOLING FAN-COIL UNIT ON MAIN
FLOOR ABOVE: FLOOR-MTD. CONSOL. REFER TO M2.1.
8. CORE-DRILL REFRIG. & CONDENSATE PIPING THRU CONC.
WALL.
9. ELECT. HEATER (AS SCHEDULED) CEILING MOUNT.
10. ROUTE REFRIGERANT AND CONDENSATE PIPING UP AND
BETWEEN FLOOR JOISTS.
11. ELECT. UNIT HEATER (AS SCHEDULED) SUSPENDED FROM
CEILING. TEMPORARY HEAT FOR PHASE 1.
A D E F G H KCB J
BA
SE
M
EN
T M
EC
H
A N
IC
A
L
PL
A N
1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED
TO COORDINATE WITH EACH OTHER AND VERIFY THAT
THERE ARE NO CONFLICTS IN LOCATION OF DUCTS,
CONDUITS, DIFFUSERS, BOXES AND OTHER ITEMS
THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT
OF MATERIALS.
2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE
FIELD VERIFIED. THESE DRAWINGS REPRESENT
SCHEMATIC SYSTEMS.
3. PROVIDE SEISMIC BRACING OF ALL EQUIPMENT, PIPING,
AND DUCTWORK AS REQUIRED BY LOCAL CODES.
4. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND
PIPING SYSTEMS WITH OTHER TRADES. REFER TO
ARCHITECTURAL, STRUCTURAL, PLUMBING, AND
ELECTRICAL DRAWINGS AND FIRE PROTECTION SHOP
DRAWINGS FOR ADDITIONAL DETAILS NECESSARY FOR
COORDINATION.
5. ALL DUCT AND PIPING IS SCHEMATICALLY DRAWN AND
COORDINATION BETWEEN TRADES MUST BE DONE FOR
PROPER EQUIPMENT, PIPING, AND DUCTWORK PLACEMENT
AND DESIGN.
6. FOLLOW MANUFACTURES WRITTEN INSTALLATION
INSTRUCTION FOR RUNNING THE COMBUSTION AIR AND
VENT PIPING AS WELL AS THE TERMINATION THROUGH THE
ROOF. FOLLOW ALL SAFETY INSTRUCTIONS.
7. COORDINATE ALL CONCRETE PENETRATIONS WITH
STRUCTURAL DRAWINGS TO VERIFY HOW AND WHERE
CONCRETE CAN BE CUT.
8. ALL PIPING THAT IS EXPOSED MUST BE PAINTED TO MATCH
SURROUNDINGS.
9. MECHANICAL CONTRACTOR SHALL FIRE SEAL ALL PIPING
AND DUCTWORK PASSING THROUGH RATED
CONSTRUCTION.
USFS BUILDING 26 - BASEMENT MECHANICAL PLAN16
M2.0 : M2.0 1/8" = 1'-0"
NORTH
M2.0
KEY NOTES:
BU
IL
D
IN
G
P H
A
SE
SO
U
T H
W
IN
G R
EN
O
V A
T
IO
N
U S
FO
R
ES
T
S
ER
V
IC
E, N
O R
T H
ER
N
R
EG
IO
N
R
EG
IO
N A
L O
FF
IC
E www.aearchitects.com
O W
N E
R
ISSUE DATE
REVISIONS
P R
O
JE
C T
D R
A W
IN
G
PROJECT No 13104.00 7.14.14
6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 59101
PH 4 0 6 . 2 4 8 . 2 6 3 3
FAX 4 0 6 . 2 4 8 . 2 4 2 7
2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 59802
PH 4 0 6 . 7 2 1 . 5 6 4 3
FAX 4 0 6 . 7 2 1 . 1 8 8 7
ARCHITII ECTSP
C
3"
6" 6"
6"
6"
3/4"
1"
3"3"
6"
2" 2"
2.5" 2.5"
6"
6"
6"
3"
3" 6"
6"
3"3"
F
P
5 5
4"
P1
BT1
BLR1
BLR2 FC104
(ABOVE)
BS104
HP1 (X3)
BS106
1. VRF SYSTEM #1: REFRIGERANT PIPING LINES (X3) UP IN CHASE TO FIRST FLOOR. REFER TO M2.1 FOR CONTINUATION.
REFER TO VRF SYSTEM SCHEMATIC SHEET M9.5. NOTE: REFRIG. PIPING FROM THIS CHASE TO HP1 NOT SHOWN FOR
CLARITY.
2. VRF SYSTEM #2: REFRIGERANT PIPING LINES (X3) UP IN CHASE TO FIRST/SECOND FLOOR. REFER TO M2.1 & M2.2 FOR CONTINUATION. REFER TO VRF SYSTEM SCHEMATIC SHEET M9.6. NOTE: REFRIG. PIPING FROM THIS CHASE TO HP2
NOT SHOWN FOR CLARITY.
3. VRF SYSTEM HEATING/COOLING FAN-COIL UNIT ON MAIN FLOOR ABOVE: FLOOR-MOUNTED CONSOL. REFER TO M2.1.
4. BOILER VENTS FROM BASEMENT MECH. ROOM IN CHIMNEY AND UP THRU ROOF. REFER TO DETAIL. REFER TO M2.1 & M2.0 FOR CONTINUATION. THERE ARE TO BE A TOTAL OF (4) PAIRS OF 4"-DIA PVC VENTS TO BE INSTALLED IN THIS CHIMNEY. (2) ARE FOR BLR1 & BLR 2, (2) ARE FOR FUTURE BLR3 & BLR4. CAP PIPING FOR 3 & 4 IN BOILER ROOM
READY FOR FUTURE CONNECTION.
5. STACK PUMPS VERTICALLY TIGHT TO WALL. (3) PUMPS FOR PHASE 1, PROVIDE SPACE FOR (2) FUTURE PHASE
PUMPS.
6. 6"CWS, 6"CWR & 3/4"CW TO CT1. REFER TO M2.0 FOR CONTINUATION. REFER TO PLUMB. PLANS FOR COLD WATER
MAKE-UP.
7. TO BS108. REFER TO M2.0 FOR CONTINUATION.
8. TO FC106A & B. REFER TO M2.0 FOR CONTINUATION.
9. SYSTEM #2 REFRIG. PIPING FROM FIRST FLOOR ABOVE. REFER TO M2.0 FOR CONTINUATION. NOTE THIS BRANCH OF REFRIG. PIPING MUST BE ROUTED AS SHOWN IN ORDER TO PROVIDE PROPER REFRIG. BALANCE OF SYSTEM.
10. REFRIG. PIPING FROM VRF SYSTEM #1 TO BASEMENT LOOP. REFER TO M2.0 FOR CONTINUATION. NOTE: REFRIG.
PIPING FROM THIS CHASE TO HP1 NOT SHOWN FOR CLARITY.
11. PIPING CONTINUED ON M2.0.
12. HEAT PUMPS TO BE MOUNTED ON FIELD-FABRICATED GALVANIZED STEEL STANDS. OBSERVED FLOOR ELEVATION
CHANGES IN THE BOILER ROOM. CONSTRUCT STAND LEGS TO FIT EXISIT. CONDITIONS.
6"
CHASE
HP2 (X3)
GF1ET1P2
P3
EXIST.
CHIMNEY
AS1
FLOOR
DN 17"
FLOOR
DN 17"
NOTE:
NOT ALL REFRIG. PIPING NOT SHOWN ON THIS
PLAN FOR CLARITY. REFER TO VRF SYSTEM
PIPING SCHEMATICS M9.5 & M9.6.
4"
4"
FUTURE
PHASE(S)
4"
4"
T1
T1 T1
T1 T1
T1
HVAC PIPING LEGEND
SYMBOL DESCRIPTION
HORIZONTAL ELBOW
HORIZONTAL TEE
AUTOMATIC FLOW CONTROL
BALL VALVE
CHECK VALVE
STRAINER
UNION
HOSE END DRAIN
PRESSURE GAUGE
TEMPERATURE SENSOR
THERMOMETER
PRESSURE RELIEF VALVE
T
76 GPM76 GPM
6"
111111
FUTURE
BOILERS
T1
T1
3"
6"
12"
MAX.
FUTURE DOOR
(KEEP CLEAR)
BA
SE
M
EN
T B
O
IL
ER
R
O O
M P
LA
N
P
IP
IN
G
SC
H
EM
A T
IC
USFS BUILDING 26 - ENLARGED BOILER ROOM PLAN16
M2.0A : M2.0 1/4" = 1'-0"
NORTH M2.0A
BU
IL
D
IN
G
P H
A
SE
SO
U
T H
W
IN
G R
EN
O
V A
T
IO
N
U S
FO
R
ES
T
S
ER
V
IC
E, N
O R
T H
ER
N
R
EG
IO
N
R
EG
IO
N A
L O
FF
IC
E www.aearchitects.com
O W
N E
R
ISSUE DATE
REVISIONS
P R
O
JE
C T
D R
A W
IN
G
PROJECT No 13104.00 7.14.14
6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 59101
PH 4 0 6 . 2 4 8 . 2 6 3 3
FAX 4 0 6 . 2 4 8 . 2 4 2 7
2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 59802
PH 4 0 6 . 7 2 1 . 5 6 4 3
FAX 4 0 6 . 7 2 1 . 1 8 8 7
ARCHITII ECTSP
C
2014 MORRISON-MAIERLE, INC.
USFS BUILDING 26 - BOILER ROOM HYDRONIC PIPING SCHEMATIC1
M2.0A : M2.0 NO SCALE
KEY NOTES:
BS102
FC102B
FC102A
FC101C
BS101
FC100A
T
T
T 101
T 104
T 106
T
T T 108 T 107
T
T T
FC102D
FC102C
FC103
FC105A
FC108A
FC108C
FC107B FC107CFC107A
FC107D
TYP. 4
TYP. 4
3 3
FC104
FC106A
PHASE 1
FUTURE PHASE 1
FC101B
FC100C
BS103
FC107FFC107E
FC108B4
T
4FC108D
4 FC108E
T
FC106B4
T 105
BS100
FC101A
FC101D
T T
EH1
T
BS107
VENT
CHASE
PRIVATE
OFFICE
HR
CONFERENCE
OFFICE
OFFICE
OPEN
OFFICE
(12 STAFF)
OPEN
OFFICE
(16 STAFF)
ENTRY
HALL
RECEPTION
(2 STAFF)
BREAK
PRIVATE
OFFICE
JANITOR
WOMENS
RESTROOM
MENS
RESTROOM
EXECUTIVE
ASSISTANT
(2 STAFF)
REGIONAL
FORESTER
DEPUTY
REGIONAL
FORESTER
DEPUTY
REGIONAL
FORESTER
COFFEE / COPY
LARGE
CONFERENCE
TELE/DATA
PRINT / COPY / FAX
CONFERENCE
ENTRY
ELEVATOR
A
STAIR
FC105B
BS105
5 5
T
FC108G
4 FC108F
STEAM RADIATOR
TYP. (TO REMAIN)
EH4
EXIST.
CHIMNEY
CHASE
8 8 8
T
T
FC100B
1. VRF SYSTEM #1: REFRIGERANT LINES DOWN IN CHASE
FROM BASEMENT. REFER TO M2.0 FOR CONTINUATION.
REFER TO VRF SYSTEM SCHEMATIC FOR PIPE SIZES.
2. VRF SYSTEM #2: REFRIGERANT LINES UP/DN IN CHASE
FROM BASEMENT AND TO SECOND FLOOR. REFER TO
M2.0 & M2.2 FOR CONTINUATION. REFER TO VRF SYSTEM
SCHEMATIC FOR PIPE SIZES.
3. VRF SYSTEM HEATING/COOLING FAN-COIL UNIT:
CEILING-MOUNTED CASSETTE.
4. VRF SYSTEM HEATING/COOLING FAN-COIL UNIT:
FLOOR-MOUNTED CONSOL. NOTE: REFRIG. PIPING FOR
ALL FLOOR-MOUNTED FAN-COILS FROM BASEMENT
BELOW. REFER TO M2.0 FOR PIPING LAYOUT.
5. VRF SYSTEM HEATING/COOLING FAN-COIL UNIT:
HIGH-WALL MOUNTED UNIT.
6. VRF SYSTEM ZONE REFRIGERANT LINE BRANCH
SELECTOR BOX. IN ACCESSIBLE LOCATION ABOVE LAY-IN
CEILING.
7. BOILER VENTS FROM BASEMENT MECH. ROOM IN
CHIMNEY AND UP THRU ROOF. REFER TO DETAIL. REFER
TO M2.1 & M2.0 FOR CONTINUATION. THERE ARE TO BE A
TOTAL OF (4) PAIRS OF 4"-DIA PVC VENTS INSTALLED IN
THIS CHIMNEY. (2) ARE FOR BLR1 & BLR 2, (2) ARE FOR
FUTURE BLR3 & BLR4. CAP PIPING FOR 3 & 4 IN BOILER
ROOM READY FOR FUTURE CONNECTION.
8. EXISTING PLASTER CEILING IN THESE AREAS TO REMAIN.
PIPING, DUCTWORK OR EQUIPMENT ABOVE THESE
AREAS MUST BE ROUTED BETWEEN JOISTS. COORD.
CUTTING OF CEILING PLASTER W/ GEN. CONT'R.
9. ELECTRIC HEATER (AS SCHEDULED) MOUNTED LOW ON
WALL. REFER TO DETAIL.
10. ELECTRIC HEATER (AS SCHEDULED) MOUNTED LOW ON
WALL. REFER TO DETAIL. NOTE: THIS IS A FIRE-RATED
WALL, FIRE-CAULK AROUND HEATER PENETRATIONS AS
REQUIRED. REFER TO SPECIFICATIONS.
11. ROUTE REFRIGERANT PIPING UP AND BETWEEN FLOOR
JOISTS. ROUTE PIPING OVER STRUCTURAL BEAM(S).
12. CORE-DRILL REFRIG. PIPING THRU CONC. WALL.
13. SYSTEM #2 REFRIG. PIPING DOWN IN CHASE TO MECH.
RM. WHERE IT IS TO SERVE BRANCH SELECTOR BOXES
BS104 & BS106. NOTE THIS BRANCH OF REFRIG. PIPING
MUST BE ROUTED AS SHOWN IN ORDER TO PROVIDE
PROPER REFRIG. BALANCE OF SYSTEM.
A D E F G H KCB J
FI
R
ST
F
LO
O
R M
EC
H
A N
IC
A
L
PL
A N
1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED
TO COORDINATE WITH EACH OTHER AND VERIFY THAT
THERE ARE NO CONFLICTS IN LOCATION OF DUCTS,
CONDUITS, DIFFUSERS, BOXES AND OTHER ITEMS
THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT
OF MATERIALS.
2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE
FIELD VERIFIED. THESE DRAWINGS REPRESENT
SCHEMATIC SYSTEMS
3. PROVIDE SEISMIC BRACING OF ALL EQUIPMENT, PIPING,
AND DUCTWORK AS REQUIRED BY LOCAL CODES.
4. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND
PIPING SYSTEMS WITH OTHER TRADES. REFER TO
ARCHITECTURAL, STRUCTURAL, PLUMBING, AND
ELECTRICAL DRAWINGS AND FIRE PROTECTION SHOP
DRAWINGS FOR ADDITIONAL DETAILS NECESSARY FOR
COORDINATION.
5. ALL DUCT AND PIPING IS SCHEMATICALLY DRAWN AND
COORDINATION BETWEEN TRADES MUST BE DONE FOR
PROPER EQUIPMENT, PIPING, AND DUCTWORK PLACEMENT
AND DESIGN.
6. FOLLOW MANUFACTURES WRITTEN INSTALLATION
INSTRUCTION FOR RUNNING THE COMBUSTION AIR AND
VENT PIPING AS WELL AS THE TERMINATION THROUGH THE
ROOF. FOLLOW ALL SAFETY INSTRUCTIONS.
7. COORDINATE ALL CONCRETE PENETRATIONS WITH
STRUCTURAL DRAWINGS TO VERIFY HOW AND WHERE
CONCRETE CAN BE CUT.
8. ALL PIPING THAT IS EXPOSED MUST BE PAINTED TO MATCH
SURROUNDINGS.
9. MECHANICAL CONTRACTOR SHALL FIRE SEAL ALL PIPING
AND DUCTWORK PASSING THROUGH RATED
CONSTRUCTION.
KEY NOTES:
USFS BUILDING 26 - FIRST FLOOR MECHANICAL PLAN16
M2.1 : M2.1 1/8" = 1'-0"
NORTH
M2.1
BU
IL
D
IN
G
P H
A
SE
SO
U
T H
W
IN
G R
EN
O
V A
T
IO
N
U S
FO
R
ES
T
S
ER
V
IC
E, N
O R
T H
ER
N
R
EG
IO
N
R
EG
IO
N A
L O
FF
IC
E www.aearchitects.com
O W
N E
R
ISSUE DATE
REVISIONS
P R
O
JE
C T
D R
A W
IN
G
PROJECT No 13104.00 7.14.14
6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 59101
PH 4 0 6 . 2 4 8 . 2 6 3 3
FAX 4 0 6 . 2 4 8 . 2 4 2 7
2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 59802
PH 4 0 6 . 7 2 1 . 5 6 4 3
FAX 4 0 6 . 7 2 1 . 1 8 8 7
ARCHITII ECTSP
C
DOWNDOWN
DOWNDOWN
DOWN
DOWNDOWN
DOWN
DOWN PHASE 1
FUTURE
FUTURE
FC200B
FC200A
FC200C
FC201
FC200D
FC200E
FC200F
FC203
FC204
FC202A FC202E
FC202B FC202F
FC202C FC202G
FC202D
FC202H
T205
FC205A FC205B 4
T T
T206
BS206
BS202
FC206
BS204
BS203
BS201
T
T
T
TYP. 8
T202
BS200
T
TYP. 6
VENT
CHASE
EXIST.
CHIMNEY
OFFICE
OFFICE
OFFICE
SMALL
CONFERENCE
SMALL
CONFERENCE
SMALL
CONFERENCE
OPEN
OFFICE
(23 STAFF)
OPEN
OFFICE
(22 STAFF)
STAIR
ELEVATOR
A
TELE/DATA
ELECTRICAL
STEAM RADIATOR
TYP. (TO REMAIN)
4 FC205C 4
BS205
T
EH5
NEW
CHASE
1. CORE-DRILL REFRIGERANT PIPING THRU CONC.
WALL.
2. VRF SYSTEM #2: REFRIGERANT LINES IN CHASE
FROM FIRST FLOOR BELOW. REFER TO M2.1 FOR
CONTINUATION. REFER TO VRF SYSTEM SCHEMATIC
FOR PIPE SIZES.
3. VRF SYSTEM HEATING/COOLING FAN-COIL UNIT:
CEILING-MOUNTED CASSETTE.
4. VRF SYSTEM HEATING/COOLING FAN-COIL UNIT:
FLOOR-MOUNTED CONSOL. NOTE: REFRIG. PIPING
FOR ALL FLOOR-MOUNTED FAN-COILS FROM FIRST
FLOOR BELOW. REFER TO M2.1 FOR PIPING LAYOUT.
5. VRF SYSTEM HEATING/COOLING FAN-COIL UNIT:
HIGH-WALL MOUNTED UNIT.
6. VRF SYSTEM ZONE REFRIGERANT LINE BRANCH
SELECTOR BOX. IN ACCESSIBLE LOCATION ABOVE
LAY-IN CEILING.
7. BOILER VENTS FROM BASEMENT MECH. ROOM IN
CHIMNEY AND UP THRU ROOF. REFER TO DETAIL.
REFER TO M2.1 & M2.0 FOR CONTINUATION. THERE
ARE TO BE A TOTAL OF (4) PAIRS OF 4"-DIA PVC
VENTS INSTALLED IN THIS CHIMNEY. (2) ARE FOR
BLR1 & BLR 2, (2) ARE FOR FUTURE BLR3 & BLR4. CAP
PIPING FOR 3 & 4 IN BOILER ROOM READY FOR
FUTURE CONNECTION.
8. EXISTING PLASTER CEILING IN THESE AREAS TO
REMAIN. PIPING, DUCTWORK OR EQUIPMENT ABOVE
THESE AREAS MUST BE ROUTED BETWEEN JOISTS.
COORD. CUTTING OF CEILING PLASTER W/ GEN.
CONT'R.
9. REFRIG. PIPING IN UNCONDITIONED ATTIC SPACE.
INSULATE PIPING IN ACCORDANCE WITH
MANUFACTURE'S RECOMMENDATIONS.
10. REFRIG. PIPING DOWN (FROM ATTIC SPACE) IN
FRAMED WALL TO FLOOR-MOUNTED FAN COIL UNIT(S)
11. ROUTE REFRIGERANT PIPING UP AND BETWEEN
FLOOR JOISTS. ROUTE PIPING OVER STRUCTURAL
BEAM(S).
12. CORE-DRILL REFRIGERANT PIPING THROUGH
CONCRETE WALL.
13. ELECTRIC HEATER (AS SCHEDULED) MOUNTED LOW
ON WALL. REFER TO DETAIL. NOTE: THIS IS A
FIRE-RATED WALL, FIRE-CAULK AROUND HEATER
PENETRATIONS AS REQUIRED. REFER TO
SPECIFICATIONS.
A D E F G H KCB J
SE
C
O N
D F
LO
O
R M
EC
H
A N
IC
A
L
PL
A N
USFS BUILDING 26 - SECOND FLOOR MECHANICAL PLAN16
M2.2 : M2.2 1/8" = 1'-0"
NORTH
M2.2
BU
IL
D
IN
G
P H
A
SE
SO
U
T H
W
IN
G R
EN
O
V A
T
IO
N
U S
FO
R
ES
T
S
ER
V
IC
E, N
O R
T H
ER
N
R
EG
IO
N
R
EG
IO
N A
L O
FF
IC
E www.aearchitects.com
O W
N E
R
ISSUE DATE
REVISIONS
P R
O
JE
C T
D R
A W
IN
G
PROJECT No 13104.00 7.14.14
6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 59101
PH 4 0 6 . 2 4 8 . 2 6 3 3
FAX 4 0 6 . 2 4 8 . 2 4 2 7
2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 59802
PH 4 0 6 . 7 2 1 . 5 6 4 3
FAX 4 0 6 . 7 2 1 . 1 8 8 7
ARCHITII ECTSP
C
2014 MORRISON-MAIERLE, INC.
1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED
TO COORDINATE WITH EACH OTHER AND VERIFY THAT
THERE ARE NO CONFLICTS IN LOCATION OF DUCTS,
CONDUITS, DIFFUSERS, BOXES AND OTHER ITEMS
THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT
OF MATERIALS.
2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE
FIELD VERIFIED. THESE DRAWINGS REPRESENT
SCHEMATIC SYSTEMS.
3. PROVIDE SEISMIC BRACING OF ALL EQUIPMENT, PIPING,
AND DUCTWORK AS REQUIRED BY LOCAL CODES.
4. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND
PIPING SYSTEMS WITH OTHER TRADES. REFER TO
ARCHITECTURAL, STRUCTURAL, PLUMBING, AND
ELECTRICAL DRAWINGS AND FIRE PROTECTION SHOP
DRAWINGS FOR ADDITIONAL DETAILS NECESSARY FOR
COORDINATION.
5. ALL DUCT AND PIPING IS SCHEMATICALLY DRAWN AND
COORDINATION BETWEEN TRADES MUST BE DONE FOR
PROPER EQUIPMENT, PIPING, AND DUCTWORK PLACEMENT
AND DESIGN.
6. FOLLOW MANUFACTURES WRITTEN INSTALLATION
INSTRUCTION FOR RUNNING THE COMBUSTION AIR AND
VENT PIPING AS WELL AS THE TERMINATION THROUGH THE
ROOF. FOLLOW ALL SAFETY INSTRUCTIONS.
7. COORDINATE ALL CONCRETE PENETRATIONS WITH
STRUCTURAL DRAWINGS TO VERIFY HOW AND WHERE
CONCRETE CAN BE CUT.
8. ALL PIPING THAT IS EXPOSED MUST BE PAINTED TO MATCH
SURROUNDINGS.
9. MECHANICAL CONTRACTOR SHALL FIRE SEAL ALL PIPING
AND DUCTWORK PASSING THROUGH RATED
CONSTRUCTION.
KEY NOTES:
STAIR
RESTROOM
MECH / ELECT
ELECT/DATA
ELEVATOR
MACHINE
ELEVATOR
A
VESTIBULE
VESTIBULE
PHASE 1
FC108G
(ABOVE)FC108C
(ABOVE)
FC108E
(ABOVE)
FC108F
(ABOVE)
FC108A
(ABOVE)
FC108D
(ABOVE)
FC108B
(ABOVE)
FC106A
(ABOVE)
FC106B
(ABOVE)
5 5 5
1 1 1
5 4
5 5
1 1
11 6 11
EF3
T
1. CONDENSATE DRAIN FROM VRF SYSTEM FAN COIL UNIT.
2. CONDENSATE DRAIN PIPING DOWN TO FLOOR SINK.
REFER TO PLUMB. PLANS FOR EXACT SINK LOCATION.
3. CONDENSATE DRAIN FROM ENVIRONMENTAL CONTROL
UNIT ECU1 TO FLOOR SINK.
4. CORE-DRILL REFRIG. & CONDENSATE PIPING THRU
CONC. WALL.
5. ROUTE REFRIGERANT AND CONDENSATE PIPING UP AND
BETWEEN FLOOR JOISTS.
6. 2" CONDENSATE PIPING DOWN TIGHT TO WALL TO
FLOOR SINK. REFER TO PLUMB. PLANS FOR EXACT
FLOOR SINK LOCATION.
7. CONDENSATE DRAIN PIPING IN CHASE FROM FLOORS
ABOVE. REFER TO M3.1 & M3.2.
8. CONDENSATE DRAIN PIPING FROM FIRST FLOOR ABOVE.
REFER TO M3.1.
9. ROUTE CONDENSATE PIPING FULL-SIZED TO FLOOR
DRAIN OR APPROVED RECEPTOR WITHIN BOILER ROOM.
10. MOUNT PIPING AS TIGHT TO BOTTOM OF STRUCTURE AS
POSSIBLE.
11. CONDENSATE PIPING DROP FROM MAIN FLOOR ABOVE.
REFER TO M3.1 FOR CONTINUATION.
12. ROUTE EXHAUST FROM ELEVATOR EQUIPMENT ROOM
TO ADJACENT ROOM WITH WALL-MOUNTED GRILLE
(MOUNT HIGH), PROVIDE A SEPARATE INTAKE GRILLES
FOR MAKE-UP AIR (MOUNT 12" AFF) BOTH SIDES OF
WALL.
A D E F G H KCB J
BA
SE
M
EN
T C
O N
D
EN
SA
T
E
PI
PI
N
G P
LA
N
1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED
TO COORDINATE WITH EACH OTHER AND VERIFY THAT
THERE ARE NO CONFLICTS IN LOCATION OF DUCTS,
CONDUITS, DIFFUSERS, BOXES AND OTHER ITEMS
THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT
OF MATERIALS.
2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE
FIELD VERIFIED. THESE DRAWINGS REPRESENT
SCHEMATIC SYSTEMS.
3. PROVIDE SEISMIC BRACING OF ALL EQUIPMENT, PIPING,
AND DUCTWORK AS REQUIRED BY LOCAL CODES.
4. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND
PIPING SYSTEMS WITH OTHER TRADES. REFER TO
ARCHITECTURAL, STRUCTURAL, PLUMBING, AND
ELECTRICAL DRAWINGS AND FIRE PROTECTION SHOP
DRAWINGS FOR ADDITIONAL DETAILS NECESSARY FOR
COORDINATION.
5. ALL DUCT AND PIPING IS SCHEMATICALLY DRAWN AND
COORDINATION BETWEEN TRADES MUST BE DONE FOR
PROPER EQUIPMENT, PIPING, AND DUCTWORK PLACEMENT
AND DESIGN.
6. FOLLOW MANUFACTURES WRITTEN INSTALLATION
INSTRUCTION FOR RUNNING THE COMBUSTION AIR AND
VENT PIPING AS WELL AS THE TERMINATION THROUGH THE
ROOF. FOLLOW ALL SAFETY INSTRUCTIONS.
7. COORDINATE ALL CONCRETE PENETRATIONS WITH
STRUCTURAL DRAWINGS TO VERIFY HOW AND WHERE
CONCRETE CAN BE CUT.
8. ALL PIPING THAT IS EXPOSED MUST BE PAINTED TO MATCH
SURROUNDINGS.
9. MECHANICAL CONTRACTOR SHALL FIRE SEAL ALL PIPING
AND DUCTWORK PASSING THROUGH RATED
CONSTRUCTION.
USFS BUILDING 26 - BASEMENT CONDENSATE PIPING PLAN16
M3.0 : M3.0 1/8" = 1'-0"
NORTH
M3.0
KEY NOTES:
BU
IL
D
IN
G
P H
A
SE
SO
U
T H
W
IN
G R
EN
O
V A
T
IO
N
U S
FO
R
ES
T
S
ER
V
IC
E, N
O R
T H
ER
N
R
EG
IO
N
R
EG
IO
N A
L O
FF
IC
E www.aearchitects.com
O W
N E
R
ISSUE DATE
REVISIONS
P R
O
JE
C T
D R
A W
IN
G
PROJECT No 13104.00 7.14.14
6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 59101
PH 4 0 6 . 2 4 8 . 2 6 3 3
FAX 4 0 6 . 2 4 8 . 2 4 2 7
2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 59802
PH 4 0 6 . 7 2 1 . 5 6 4 3
FAX 4 0 6 . 7 2 1 . 1 8 8 7
ARCHITII ECTSP
C
PHASE 1
FUTURE PHASE 1
PRIVATE
OFFICE
HR
CONFERENCE
OFFICE
OFFICE
OPEN
OFFICE
(12 STAFF)
OPEN
OFFICE
(16 STAFF)
ENTRY
HALL
RECEPTION
(2 STAFF)
BREAK
PRIVATE
OFFICE
JANITOR
WOMENS
RESTROOM
MENS
RESTROOM
EXECUTIVE
ASSISTANT
(2 STAFF)
REGIONAL
FORESTER
DEPUTY
REGIONAL
FORESTER
DEPUTY
REGIONAL
FORESTER
COFFEE / COPY
LARGE
CONFERENCE
PRINT / COPY / FAX
CONFERENCE
ENTRY
ELEVATOR
A
STAIR
15 2
1 1
FC102B
FC102A
FC101C
FC100A
FC102D
FC102C
FC103
FC105A
FC101B
FC100C
FC101A
FC101D
FC105B
EF1
TELE/DATA
T
FC100B
FC107B FC107CFC107A
FC107D FC107FFC107E
FSD
-6
-10
10 6
- 10
10 6
6 6
1. CORE-DRILL DUCT AND PIPING PENETRATIONS THRU
CONC. WALL. ALSO REFER TO M2.1 FOR REFRIGERANT
PIPING.
2. ROUTE DUCTWORK UP AND BETWEEN FLOOR JOISTS.
ROUTE DUCTWORK OVER STRUCTURAL BEAM(S).
3. CONDENSATE DRAIN DOWN IN NEW FRAMED WALL TO
BASEMENT CEILING BELOW. CORE-DRILL THRU CONC.
FLOOR AS REQ'D. REFER TO M3.0 FOR CONTINUATION.
4. CONDENSATE DRAIN DOWN IN CHASE TO BASEMENT
CEILING BELOW AND THEN SLOPE TO MECH ROOM.
ROUTE PIPING FULL-SIZED TO NEAREST FLOOR DRAIN
OR APPROVED RECEPTOR WITHIN MECH ROOM.
5. CONDENSATE DRAIN DOWN IN CHASE TO BASEMENT
MECH. ROOM. ROUTE PIPING FULL-SIZED TO NEAREST
FLOOR DRAIN OR APPROVED RECEPTOR. REFER TO
M3.0.
6. EXISTING PLASTER CEILING IN THIS AREA. DO NOT
ROUTE DUCTWORK OR CONDENSATE PIPING.
7. CONDENSATE DRAIN FROM VRF SYSTEM FAN COIL UNIT.
8. CONDENSATE DRAIN DOWN IN NEW WALL TO SINK DRAIN.
REFER TO DETAIL 14/M9.7. 1-1/2" CONDENSATE DRAIN UP
TO 2ND FLOOR CEILING. REFER TO M3.2 FOR
CONTINUATION.
9. FIRE/SMOKE DAMPER AT FIRE-RATED WALL.
10. TRANSFER AIR GRILLE DUCTED TO CEILING OF
ADJACENT AREA. ROUTE SHORT SECTION OF
DUCTWORK THRU FULL-HEIGHT WALL AND OVER TO
ADJACENT AREA AS SHOWN. LINE DUCTWORK 1" DUCT
LINER. REFER TO DETAIL 12/M9.7.
A D E F G H KCB J
FI
R
ST
F
LO
O
R V
EN
T
IL
A
T
IO
N A
N D
C O
N D
EN
SA
T E
PI
PI
N G
P
LA
N
1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED
TO COORDINATE WITH EACH OTHER AND VERIFY THAT
THERE ARE NO CONFLICTS IN LOCATION OF DUCTS,
CONDUITS, DIFFUSERS, BOXES AND OTHER ITEMS
THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT
OF MATERIALS.
2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE
FIELD VERIFIED. THESE DRAWINGS REPRESENT
SCHEMATIC SYSTEMS.
3. PROVIDE SEISMIC BRACING OF ALL EQUIPMENT, PIPING,
AND DUCTWORK AS REQUIRED BY LOCAL CODES.
4. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND
PIPING SYSTEMS WITH OTHER TRADES. REFER TO
ARCHITECTURAL, STRUCTURAL, PLUMBING, AND
ELECTRICAL DRAWINGS AND FIRE PROTECTION SHOP
DRAWINGS FOR ADDITIONAL DETAILS NECESSARY FOR
COORDINATION.
5. ALL DUCT AND PIPING IS SCHEMATICALLY DRAWN AND
COORDINATION BETWEEN TRADES MUST BE DONE FOR
PROPER EQUIPMENT, PIPING, AND DUCTWORK PLACEMENT
AND DESIGN.
6. FOLLOW MANUFACTURES WRITTEN INSTALLATION
INSTRUCTION FOR RUNNING THE COMBUSTION AIR AND
VENT PIPING AS WELL AS THE TERMINATION THROUGH THE
ROOF. FOLLOW ALL SAFETY INSTRUCTIONS.
7. COORDINATE ALL CONCRETE PENETRATIONS WITH
STRUCTURAL DRAWINGS TO VERIFY HOW AND WHERE
CONCRETE CAN BE CUT.
8. ALL PIPING THAT IS EXPOSED MUST BE PAINTED TO MATCH
SURROUNDINGS.
9. MECHANICAL CONTRACTOR SHALL FIRE SEAL ALL PIPING
AND DUCTWORK PASSING THROUGH RATED
CONSTRUCTION.
KEY NOTES:
USFS BUILDING 26 - FIRST FLOOR VENTILATION AND CONDENSATE PIPING PLAN16
M3.1 : M3.1 1/8" = 1'-0"
NORTH
M3.1
BU
IL
D
IN
G
P H
A
SE
SO
U
T H
W
IN
G R
EN
O
V A
T
IO
N
U S
FO
R
ES
T
S
ER
V
IC
E, N
O R
T H
ER
N
R
EG
IO
N
R
EG
IO
N A
L O
FF
IC
E www.aearchitects.com
O W
N E
R
ISSUE DATE
REVISIONS
P R
O
JE
C T
D R
A W
IN
G
PROJECT No 13104.00 7.14.14
6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 59101
PH 4 0 6 . 2 4 8 . 2 6 3 3
FAX 4 0 6 . 2 4 8 . 2 4 2 7
2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 59802
PH 4 0 6 . 7 2 1 . 5 6 4 3
FAX 4 0 6 . 7 2 1 . 1 8 8 7
ARCHITII ECTSP
C
DOWNDOWN
DOWNDOWN
DOWN
DOWNDOWN
DOWN
DOWN
PHASE 1
FUTURE
FUTURE
OFFICE
OFFICE
OFFICE
SMALL
CONFERENCE
SMALL
CONFERENCE
SMALL
CONFERENCE
OPEN
OFFICE
(23 STAFF)
OPEN
OFFICE
(22 STAFF)
STAIR
ELEVATOR
A
TELE/DATA
ELECTRICAL
15 2
1 2
FC200B
FC200A
FC200C
FC200D
FC200E
FC200F
FC203
FC204
FC202A FC202E
FC202B FC202F
FC202C FC202G
FC202D
FC202H
EF2
T
FC201
HRV1
(ATTIC)
7 7
44 4
1FC206
1010 10
1. CORE-DRILL DUCT AND PIPING PENETRATIONS THRU
CONC. WALL. ALSO REFER TO M2.2 FOR REFRIGERANT
PIPING.
2. SAWCUT OR CORE-DRILLE PENETRATIONS THRU
CONC. FLOOR AS REQ'D FOR NEW DUCTWORK.
3. TERMINATE SHORT SECTION OF DUCT WITH VOLUME
DAMPER FOR CONNECTION TO FUTURE RESTROOM
EXHAUST GRILLES. BALANCE EACH BRANCH AS
INDICATED.
4. DUCTWORK CONTINUED IN ATTIC ABOVE. REFER TO M3.3
FOR DUCTWORK PLAN.
5. CONDENSATE DRAIN FROM HRV UNIT IN ATTIC ABOVE.
REFER TO M3.3. REFER TO CONDENSATE DRAIN DETAIL
16/M9.7.
6. CONDENSATE DRAIN DOWN IN NEW FRAMED WALL TO
FIRST FLOOR CEILING BELOW. CORE-DRILL THRU CONC.
FLOOR AS REQ'D. REFER TO M3.1 FOR CONTINUATION.
7. CONDENSATE DRAIN FROM VRF SYSTEM FAN COIL UNIT.
8. CONDENSATE DRAIN DOWN IN NEW WALL TO SINK DRAIN.
REFER TO DETAIL 14/M9.7.
9. CONDENSATE DRAIN DOWN IN CHASE TO BASEMENT
MECH. ROOM. REFER TO M3.0 FOR CONTINUATION
10. EXISTING PLASTER CEILING IN THIS AREA. DO NOT
ROUTE DUCTWORK OR CONDENSATE PIPING.
11. TRANSFER AIR GRILLE DUCTED TO CEILING OF
ADJACENT AREA. ROUTE SHORT SECTION OF
DUCTWORK THRU FULL-HEIGHT WALL AND OVER TO
ADJACENT AREA AS SHOWN. LINE DUCTWORK 1" DUCT
LINER. REFER TO DETAIL 12/M9.7.
A D E F G H KCB J
1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED
TO COORDINATE WITH EACH OTHER AND VERIFY THAT
THERE ARE NO CONFLICTS IN LOCATION OF DUCTS,
CONDUITS, DIFFUSERS, BOXES AND OTHER ITEMS
THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT
OF MATERIALS.
2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE
FIELD VERIFIED. THESE DRAWINGS REPRESENT
SCHEMATIC SYSTEMS.
3. PROVIDE SEISMIC BRACING OF ALL EQUIPMENT, PIPING,
AND DUCTWORK AS REQUIRED BY LOCAL CODES
4. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND
PIPING SYSTEMS WITH OTHER TRADES. REFER TO
ARCHITECTURAL, STRUCTURAL, PLUMBING, AND
ELECTRICAL DRAWINGS AND FIRE PROTECTION SHOP
DRAWINGS FOR ADDITIONAL DETAILS NECESSARY FOR
COORDINATION.
5. ALL DUCT AND PIPING IS SCHEMATICALLY DRAWN AND
COORDINATION BETWEEN TRADES MUST BE DONE FOR
PROPER EQUIPMENT, PIPING, AND DUCTWORK PLACEMENT
AND DESIGN.
6. FOLLOW MANUFACTURES WRITTEN INSTALLATION
INSTRUCTION FOR RUNNING THE COMBUSTION AIR AND
VENT PIPING AS WELL AS THE TERMINATION THROUGH THE
ROOF. FOLLOW ALL SAFETY INSTRUCTIONS.
7. COORDINATE ALL CONCRETE PENETRATIONS WITH
STRUCTURAL DRAWINGS TO VERIFY HOW AND WHERE
CONCRETE CAN BE CUT.
8. ALL PIPING THAT IS EXPOSED MUST BE PAINTED TO MATCH
SURROUNDINGS.
9. MECHANICAL CONTRACTOR SHALL FIRE SEAL ALL PIPING
AND DUCTWORK PASSING THROUGH RATED
CONSTRUCTION.
KEY NOTES:
USFS BUILDING 26 - SECOND FLOOR VENTILATION AND CONDENSATE PIPING PLAN16
M3.2 : M3.2 1/8" = 1'-0"
NORTH
M3.2
BU
IL
D
IN
G
P H
A
SE
SO
U
T H
W
IN
G R
EN
O
V A
T
IO
N
U S
FO
R
ES
T
S
ER
V
IC
E, N
O R
T H
ER
N
R
EG
IO
N
R
EG
IO
N A
L O
FF
IC
E www.aearchitects.com
O W
N E
R
ISSUE DATE
REVISIONS
P R
O
JE
C T
D R
A W
IN
G
PROJECT No 13104.00 7.14.14
6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 59101
PH 4 0 6 . 2 4 8 . 2 6 3 3
FAX 4 0 6 . 2 4 8 . 2 4 2 7
2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 59802
PH 4 0 6 . 7 2 1 . 5 6 4 3
FAX 4 0 6 . 7 2 1 . 1 8 8 7
ARCHITII ECTSP
C
2014 MORRISON-MAIERLE, INC.
GENERAL NOTES:
SE
C
O N
D F
LO
O
R V
EN
T
IL
A
T
IO
N A
N D
C O
N D
EN
SA
T E
PI
PI
N G
P
LA
N
L1L2
NOTE:
ATTIC IS UNCONDITIONED. ALL DUCTWORK
IS TO BE INSULATED WITH R-8 DUCT WRAP.
REFER TO DUCT MATERIAL SCHEDULE.
1. HEAT RECOVERY VENTILATION UNIT, HRV1 TO BE
MOUNTED IN INSULATED ATTIC ENCLOSURE. HRV UNIT
TO BE SUSPENDED FROM EXISTING ROOF FRAMING
ABOVE WITH THREADED RODS AND VIBRATION
ISOLATORS. ENCLOSURE TO BE CONSTRUCTED BY GEN.
CONT'R. OF WOOD-FRAMED WALLS AND SHEATHED WITH
PLYWOOD. 2"-THK RIGID "BLUE BOARD" INSULATION IS
TO BE ADHERED TO THE ENTIRE TOP AND 4 SIDES.
EXISTING CEILING INSULATION IN THE ATTIC IS TO BE
REMOVED IN THE AREA BELOW THE ENCLOSURE TO
ALLOW HEAT FROM THE CONDITIONED SPACE BELOW TO
RISE INTO ENCLOSURE. HINGED ACCESS DOORS ARE TO
BE PROVIDED FOR UNIT MAINTENANCE. COORD.
MAINTENANCE ACCESS REQUIREMENTS WITH GEN.
CONT'R. ROUTE CONDENSATE DRAIN AS SHOWN ON
M3.2.
2. CUT 12X12 OPENING THRU EXIST. CEILING TO ALLOW
CONDITIONED ROOM AIR FROM CEILING PLENUM BELOW
TO TRANSFER UP INTO HRV ENCLOSURE. TRANSFER
GRILLE MOUNTED TO TOP SURFACE.
3. EXISTING GLASS TO BE REMOVED FROM THE DORMER'S
CENTER WINDOW. NEW LOUVER TO BE MOUNTED IN THE
WINDOW OPENING. COORD. WITH GEN. CONT'R.
4. FRESH AIR VENTILATION BRANCH DOWN TO SUPPLY
GRILLE IN 2ND FLOOR CEILING BELOW. REFER TO M3.2
FOR CONTINUATION.
5. 14"Ø DUCT DOWN IN CHASE BELOW TO FIRST FLOOR
VENTILATION. REFER TO M3.1 FOR CONTINUATION.
6. BOILER VENTS FROM BASEMENT MECH. ROOM IN
CHIMNEY AND UP THRU ROOF. REFER TO DETAIL 9/M9.7.
THERE ARE TO BE A TOTAL OF (4) PAIRS OF 4"-DIA PVC
VENTS INSTALLED IN THIS CHIMNEY. (2) ARE FOR BLR1 &
BLR 2, (2) ARE FOR FUTURE BLR3 & BLR4. CAP PIPING
FOR 3 & 4 IN BOILER ROOM READY FOR FUTURE
CONNECTION.
A D E F G H KCB J
A T
T
IC
V
EN
T
IL
A T
IO
N
P
LA
N
1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED
TO COORDINATE WITH EACH OTHER AND VERIFY THAT
THERE ARE NO CONFLICTS IN LOCATION OF DUCTS,
CONDUITS, DIFFUSERS, BOXES AND OTHER ITEMS
THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT
OF MATERIALS.
2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE
FIELD VERIFIED. THESE DRAWINGS REPRESENT
SCHEMATIC SYSTEMS.
3. PROVIDE SEISMIC BRACING OF ALL EQUIPMENT, PIPING,
AND DUCTWORK AS REQUIRED BY LOCAL CODES.
4. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND
PIPING SYSTEMS WITH OTHER TRADES. REFER TO
ARCHITECTURAL, STRUCTURAL, PLUMBING, AND
ELECTRICAL DRAWINGS AND FIRE PROTECTION SHOP
DRAWINGS FOR ADDITIONAL DETAILS NECESSARY FOR
COORDINATION.
5. ALL DUCT AND PIPING IS SCHEMATICALLY DRAWN AND
COORDINATION BETWEEN TRADES MUST BE DONE FOR
PROPER EQUIPMENT, PIPING, AND DUCTWORK PLACEMENT
AND DESIGN.
6. FOLLOW MANUFACTURES WRITTEN INSTALLATION
INSTRUCTION FOR RUNNING THE COMBUSTION AIR AND
VENT PIPING AS WELL AS THE TERMINATION THROUGH THE
ROOF. FOLLOW ALL SAFETY INSTRUCTIONS.
7. COORDINATE ALL CONCRETE PENETRATIONS WITH
STRUCTURAL DRAWINGS TO VERIFY HOW AND WHERE
CONCRETE CAN BE CUT.
8. ALL PIPING THAT IS EXPOSED MUST BE PAINTED TO MATCH
SURROUNDINGS.
9. MECHANICAL CONTRACTOR SHALL FIRE SEAL ALL PIPING
AND DUCTWORK PASSING THROUGH RATED
CONSTRUCTION.
KEY NOTES:
USFS BUILDING 26 - ATTIC VENTILATION PLAN16
M3.3 : M3.3 1/8" = 1'-0"
NORTH
M3.3
BU
IL
D
IN
G
P H
A
SE
SO
U
T H
W
IN
G R
EN
O
V A
T
IO
N
U S
FO
R
ES
T
S
ER
V
IC
E, N
O R
T H
ER
N
R
EG
IO
N
R
EG
IO
N A
L O
FF
IC
E www.aearchitects.com
O W
N E
R
ISSUE DATE
REVISIONS
P R
O
JE
C T
D R
A W
IN
G
PROJECT No 13104.00 7.14.14
6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 59101
PH 4 0 6 . 2 4 8 . 2 6 3 3
FAX 4 0 6 . 2 4 8 . 2 4 2 7
2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 59802
PH 4 0 6 . 7 2 1 . 5 6 4 3
FAX 4 0 6 . 7 2 1 . 1 8 8 7
ARCHITII ECTSP
C
DUCT MATERIAL SCHEDULE
SHAPE FUNCTION DESCRIPTION MATERIAL GAUGE INSULATION R-VALUE NOTES
RECT. OUTSIDE AIR OUTSIDE TO HRV (IN ATTIC) SHEET METAL 24 GA. WRAP R-8 1
RECT. RELIEF AIR RELIEF FROM HRV (IN ATTIC) SHEET METAL 24 GA. NONE - -
RECT. EXHAUST
EXH. FROM RESTROOMS TO
HRV (ATTIC) SHEET METAL 24 GA. WRAP R-8 1
RECT. EXHAUST
EXH. FROM RESTROOMS TO
HRV (CONDITIONED SPACE) SHEET METAL 24 GA. NONE - -
ROUND EXHAUST
EXH. FROM RESTROOMS TO
HRV (CONDITIONED SPACE) <12"=SNAPPY DUCT, >12" SPIRAL SHEET METAL 24 GA. NONE - -
RECT. SUPPLY SUPPLY FROM HRV (IN ATTIC) SHEET METAL 24 GA. WRAP R-8 1
RECT. SUPPLY
SUPPLY FROM HRV
(CONDITIONED SPACE) SHEET METAL 24 GA. WRAP R-5 1
ROUND SUPPLY SUPPLY FROM HRV (IN ATTIC) <12"=SNAPPY DUCT, >12" SPIRAL SHEET METAL 24 GA. WRAP R-8 1
ROUND SUPPLY
SUPPLY FROM HRV
(CONDITIONED SPACE) <12"=SNAPPY DUCT, >12" SPIRAL SHEET METAL 24 GA. WRAP R-5 1
ROUND SUP./RET. 4' LENGTH MAX - AT GRD'S FLEX N/A INTEGRAL -- --
NOTES:
1. ALL SERVICE INSULATION JACKET IS TO BE SEALED AT THE EXPOSED SEAMS/EDGES/CORNERS.
2. ALL DUCTWORK DIMENSIONS SHOWN ON PLAN ARE INSIDE CLEAR FREE AREA DIMENSIONS.
REMARKS:
1. PROVIDE SEISMIC BRACING OF ALL DUCTWORK AS REQUIRED BY LOCAL CODES.
2. INTERNALLY LINE WITH NON FIBROUS DUCT LINER.
HVAC LEGEND
PIPING
REFRIGERANT
CONDENSATE
RISE / FALL IN PIPING
FITTINGS
DUCTWORK
SUPPLY/RETURN DUCTWORK
VERTICAL TRANSITION SUPPLY DUCT
VERTICAL TRANSITION RETURN DUCT
CEILING SUPPLY AIR DIFFUSER
CEILING RETURN GRILLE
CEILING EXHAUST GRILLE
FLOOR REGISTER
AIR DEVICE NUMBER & CFM
DUCT TURNING VANES
MANUAL VOLUME DAMPER
BACKDRAFT DAMPER
FIRE/SMOKE DAMPER
HRV
EXHAUST FAN
CONTROLS
THERMOSTAT
PRESSURE SENSOR
DUCT MOUNTED SMOKE DETECTOR
WALL SWITCH
CONTROL PANEL FOR B.A.S.
PROJECT INFORMATION
PROJECT LOCATION: MISSOULA MT
PROJECT ALTITUDE: 3209 FEET ABOVE SEA LEVEL
SUMMER DESIGN TEMP: 91°F DRY BULB, 62°F WET BULB (ASHRAE 99% DESIGN)
ALL MECHANICAL AND PLUMBING EQUIPMENT SHALL BE SEISMICALLY BRACED
PER THE 2009 INTERNATIONAL BUILDING CODE. SEISMIC DESIGN
REQUIREMENTS FOR THE PROJECT ARE AS FOLLOWS:
SEISMIC DESIGN CATEGORY: D
IMPORTANCE FACTOR (Ip): 1.0
IMPORTANCE FACTOR FOR GAS PIPING: 1.5
THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE TO INCLUDE BRACING
AND RESTRAINTS. BRACING & RESTRAINT DETAILS SHALL BE INCLUDED IN SHOP
DRAWING SUBMITTAL FOR REVIEW AND BY THE ENGINEER.
SEISMIC NOTES
HVAC PIPING LEGEND
SYMBOL DESCRIPTION
ELBOW
TEE
SYSTEM PUMP
CIRCULATOR PUMP
BALL VALVE
CONTROL VALVE - 2 WAY
CONTROL VALVE - 3 WAY
CHECK VALVE
HOSE END DRAIN
STRAINER
CIRCUIT BALANCING VALVE
AUTOMATIC AIR VENT -
INSTALL AT ALL HIGH POINTS IN
SYSTEM
TEMPERATURE GAUGE
PRESSURE GAUGE
FLOW METER
TEMPERATURE SENSOR
PRESSURE SENSOR
F
T
P
DIRECT DIGITAL CONTROL POINTS
HARDWARE POINTS SOFTWARE POINTS
NOTES
POINT NAME AI AO BI BO AV BV ADJ. SCH. TRD. ALM. DISP.
SYSTEM PUMPS (P1, P2, P3)
SYSTEM PUMP 1 STATUS X X X
SYSTEM PUMP 2 STATUS X X X
SYSTEM PUMP 3 STATUS X X X
SYSTEM PUMP 1 START/ STOP X X X
SYSTEM PUMP 2 START/ STOP X X X
SYSTEM PUMP 2 START/ STOP X X X
SYSTEM PUMP 1 FAILURE X
SYSTEM PUMP 2 FAILURE X
SYSTEM PUMP 3 FAILURE X
SYSTEM PUMP 1 RUNTIME EXCEEDED X
SYSTEM PUMP 2 RUNTIME EXCEEDED X
SYSTEM PUMP 3 RUNTIME EXCEEDED X
BOILERS (BLR1, BLR2)
HOT WATER SUPPLY TEMP. X X X BAS
HOT WATER RETURN TEMP. X X X BAS
BOILER 1 STATUS X X X BAS
BOILER 2 STATUS X X X BAS
BOILER PUMP 1 STATUS X X X BAS
BOILER PUMP 2 STATUS X X X BAS
BOILER PUMP 1 START/ STOP X X X BAS
BOILER PUMP 2 START/ STOP X X X BAS
BOILER 1 ENABLE X X BAS
BOILER 2 ENABLE X X BAS
OUTSIDE AIR TEMP. X X BAS
BOILER 1 FAILURE X BAS
BOILER 2 FAILURE X BAS
BOILER PUMP 1 FAILURE X BAS
BOILER PUMP 2 FAILURE X BAS
BOILER 1 RUNTIME EXCEEDED X BAS
BOILER 2 RUNTIME EXCEEDED X BAS
HOT WATER SUPPLY TEMP. LIMIT EXCEEDED X BAS
HEAT PUMPS (HP1, HP2)
REFER TO DAIKIN I-TOUCH CONTROL SPECIFICATIONS FOR POINTS INTERFACE WITH BAS
CONTROL VALVE (CV1, CV2) X X BAS
ALARM CONTACTS X X X X BAS
COOLING TOWER (CT1)
CONDENSER WATER SUPPLY TEMP. X X X COOLING TOWER CONTROL PANEL
CONDENSER WATER RETURN TEMP. X X X COOLING TOWER CONTROL PANEL
DAMPER X X X COOLING TOWER CONTROL PANEL
BYPASS CONTROL VALVE, CV3 X X X BAS
EMERGENCY SHUTDOWN X X X X COOLING TOWER CONTROL PANEL
CONDENSER WATER PUMP STATUS X X X COOLING TOWER CONTROL PANEL
SPRAY PUMP STATUS X X X COOLING TOWER CONTROL PANEL
FAN STATUS X X X COOLING TOWER CONTROL PANEL
FAN VFD FAULT X X X COOLING TOWER CONTROL PANEL
CONDENSATE WATER PUMP START/ STOP X X X COOLING TOWER CONTROL PANEL
SPRAY PUMP START/ STOP X X X COOLING TOWER CONTROL PANEL
FAN START/ STOP X X X COOLING TOWER CONTROL PANEL
MAKEUP VALVE X X X BAS
OUTSIDE AIR TEMP. X X BAS
CONDENSER WATER PUMP FAILURE X COOLING TOWER CONTROL PANEL
SPRAY PUMP FAILURE X COOLING TOWER CONTROL PANEL
LOW CONDENSER WATER SUPPLY TEMP. X COOLING TOWER CONTROL PANEL
HIGH CONDENSER WATER SUPPLY TEMP. X COOLING TOWER CONTROL PANEL
FAN FAILURE X COOLING TOWER CONTROL PANEL
MAKEUP VALVE RUNTIME EXCEEDED X COOLING TOWER CONTROL PANEL
HIGH CONDENSER WATER RETURN TEMP. X COOLING TOWER CONTROL PANEL
HIGH CONDENSER WATER RETURN TEMP. X COOLING TOWER CONTROL PANEL
GLYCOL FEEDER (GF1)
ALARM CONTACTS X X X X
DEFINITIONS:
AI= ANALOG INPUT
AO= ANALOG OUTPUT
BI= BINARY INPUT
BO= BINARY OUTPUT
AV= ANALOG VALUE
BV= BINARY VALUE
REFERENCES:
1. REFER TO SPEC. SECTION 230900
INSTRUMENTATION AND
CONTROL FOR HVAC FOR MORE
INFORMATION.
DEFINITIONS:
ADJ. = ADJUSTABLE
SCH. = SCHEDULE
TRD. = TREND
ALM. = ALARM
DISP. = DISPLAY
BAS = BUILDING AUTOMATION SYST.
REFERENCES:
2. REFER TO SPEC. SECTION 230993
SEQUENCE OF OPERATIONS FOR
HVAC CONTROL FOR MORE
INFORMATION.
PIPE MATERIAL SCHEDULE
SYSTEM MATERIAL SIZES INSULATION THICKNESS** ADD'L DETAILS
HYDRONIC SUPPLY/RETURN (BOILER) 'L' COPPER / STEEL
<=11
2" 11
2" WRAP WITH ASJ SEE BELOW
>11
2" 2" WRAP WITH ASJ
HEAT PUMP WATER SUPPLY/RETURN -
CONDITIONED SPACE
'L' COPPER / STEEL /
AQUATHERM BLUE PIPE
(SDR11)
ALL NONE SEE BELOW
COMBUSTION AIR & VENT PIPING SCHEDULE 40 PVC ALL NONE SEE BELOW
CHILLED WATER - CONDITIONED SPACE
'L' COPPER / STEEL /
AQUATHERM BLUE PIPE
(SDR11)
ALL 11
2" WRAP WITH ASJ SEE BELOW
CHILLED WATER -BURIED
AQUATHERM BLUE PIPE
(SDR 11) ALL NONE
6-FT MIN. BURIAL
DEPTH, 2-FT MIN.
HORIZ. SEPARATION
REFRIGERANT PIPING REFER TO SPECIFICATIONS. ALSO REFER TO DAIKIN INSTALLATION INSTRUCTIONS.
NATURAL GAS PIPING THREADED BLACK IRON ALL NONE PAINT ORANGE
CONDENSATE DRAIN PIPING SCHEDULE 40 PVC ALL NONE SEE BELOW
** BASED ON INSULATION HAVING A CONDUCTIVITY
(K) NOT EXCEEDING 0.27 BTU PER INCH/H*FT^2*DEG F
1. PROVIDE SEISMIC BRACING OF PIPING 2 1/2" AND LARGER
OR AS REQUIRED BY LOCAL CODES.
2. INSULATION SHALL BE FIBERGLASS WITH ALL SERVICE
JACKET
3. ALL SERVICE INSULATION JACKET IS TO BE SEALED AT
ALL SEAMS, EDGES, ETC.
4. PROVIDE PVC COATED JACKET OVER INSULATION FOR
MECHANICAL ROOM PIPING.
5. ANY CONNECTIONS THAT ARE DISSIMILAR METALS SHALL
REQUIRE BRASS UNIONS OR FLANGE SEPARATION.
PIPE MATERIAL REMARKS:
FSD
GENERAL CONTROLS NOTE
THIS PROJECT WILL INCLUDE THE INSTALLATION OF A BUILDING AUTOMATION SYSTEM (BAS). SEE SPECIFICATION SECTIONS 230900
"INSTRUMENTATION AND CONTROL FOR HVAC" AND 230993 "SEQUENCE OF OPERATIONS FOR HVAC CONTROLS"
IT SHALL BE THE RESPONSIBILITY OF THE TEMPERATURE CONTROLS CONTRACTOR TO PROVIDE ALL LABOR, MATERIAL, EQUIPMENT AND SOFTWARE NOT SPECIFICALLY REFERRED TO ON THE PLANS OR IN THE SPECIFICATION TO ACHIEVE THE SEQUENCE OF OPERATIONS DESCRIBED IN SPECIFICATION SECTION 230993 "SEQUENCE OF OPERATIONS FOR HVAC CONTROLS", THE SEQUENCES SHOWN ON THE
DRAWINGS OR ANY OTHER LOCATION IN THE CONTRACT DOCUMENTS.
PROVIDE EVERYTHING SHOWN ON THE POINTS LIST AS WELL AS EVERYTHING IN THE SEQUENCES OR ANY OTHER PART OF THE CONTRACT
DOCUEMENTS REGARDLESS OF IF THEY ARE LISTED ON THE POINTS LIST.
M
EC
H A
N
IC
A L
LE
G
EN
D
S
S C
H
ED
U
LE
S
M9.1
2014 MORRISON-MAIERLE, INC.
BU
IL
D
IN
G
P H
A
SE
SO
U
T H
W
IN
G R
EN
O
V A
T
IO
N
U S
FO
R
ES
T
S
ER
V
IC
E, N
O R
T H
ER
N
R
EG
IO
N
R
EG
IO
N A
L O
FF
IC
E www.aearchitects.com
O W
N E
R
ISSUE DATE
REVISIONS
P R
O
JE
C T
D R
A W
IN
G
PROJECT No 13104.00 7.14.14
6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 59101
PH 4 0 6 . 2 4 8 . 2 6 3 3
FAX 4 0 6 . 2 4 8 . 2 4 2 7
2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 59802
PH 4 0 6 . 7 2 1 . 5 6 4 3
FAX 4 0 6 . 7 2 1 . 1 8 8 7
ARCHITII ECTSP
C
ACCESSORIES:
1. FACTORY PROVIDED STRAINERS FOR EACH HEAT PUMP: DAIKIN BWU26A20
2. PROVIDE WITH COOL/HEAT SELECTOR
VARIABLE REFRIGERANT VOLUME HEAT PUMP SCHEDULE
SYSTEM MARK MANUFACTURER ASSEMBLY MODEL
NUMBER
INDIVIDUAL MODEL
NUMBER
COMBINATION SIZING
PERCENTAGE
HEATING DATA COOLING DATA
REFRIGERANT TYPE
UNIT PHYSICAL DATA
REMARKS, ACCESSORIES AND CONTROLSHEATING CAP.
(BTU/H)
HEATING SIZING
CONDITIONS (EWT / LWT) COP
COOLING CAP.
(BTU/H)
FLOW RATE
(GPM)
HEAD
(FT)
COOLING SIZING
CONDITIONS (EWT / LWT) EER WIDTH (IN) HEIGHT (IN) DEPTH (IN) WEIGHT (LBS)
VRF
SYSTEM
#1
HP1(1)
DAIKIN
RWEYQ216PTJU - HR
RWEYQ72PTJU - HR
123% 309,560 70°F / 63.5°F 4.8 222,345 76.2 8.9 75°F / 82.6°F 14.5
R410A 30.7 39.4 21.7 331 SEE BELOW
HP1(2) RWEYQ72PTJU - HR R410A 30.7 39.4 21.7 331 SEE BELOW
HP1(3) RWEYQ72PTJU - HR R410A 30.7 39.4 21.7 331 SEE BELOW
VRF
SYSTEM
#2
HP1(1)
RWEYQ252PTJU - HR
RWEYQ84PTJU - HR
123% 317,738 70°F / 63.5°F 4.5 248,602 76.2 8.9 75°F / 82.6°F 12.8
R410A 30.7 39.4 21.7 331 SEE BELOW
HP1(2) RWEYQ84PTJU - HR R410A 30.7 39.4 21.7 331 SEE BELOW
HP1(3) RWEYQ84PTJU - HR R410A 30.7 39.4 21.7 331 SEE BELOW
VARIABLE REFRIGERANT VOLUME FAN COIL AND BRANCH SELECTOR BOX SCHEDULE
SYSTEM MARK ROOMS SERVED MANF. MODEL NUMBER TYPE
SOUND
(dBA)
SUPPLY FAN EVAPORATOR COIL UNIT PHYSICAL DATA
CONDENSATE
PUMP REMARKS
ASSOCIATED BRANCH SELECTOR
CFM
(COOLING) WORKING FLUID
REQUIRED
SENS. COOL
(BTU/H)
AVAILABLE
TOT. COOL
(BTU/H)
AVAILABLE
SENS. COOL
(BTU/H)
REQUIRED
HEAT.
(BTU/H)
AVAILABLE
HEAT
(BTU/H)
WIDTH (IN) HEIGHT (IN) DEPTH (IN) WEIGHT (LBS) MARK MODEL DIMENSIONS (WxHxD) WEIGHT (LBS)
V R
F S
Y S
TE
M
FC100A 123 Office DAIKIN FXZQ09MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 29-32 320 40% PROP. GLY. 6.0 8.1 6.5 9.3 11.1 22.6 11.3 22.6 42 YES SEE BELOW
BS100 BSVQ36PVJU 15.3X8.1X12.8 26FC100B 124 Conference DAIKIN FXAQ18PVJU HIGH WALL-MOUNTED 37-43 500 40% PROP. GLY. 9.0 15.4 12.8 10.6 21.0 41.3 11.4 9.3 31 YES SEE BELOW
FC100C 125 Office DAIKIN FXZQ07MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 29-31 320 40% PROP. GLY. 3.6 6.4 5.5 2.6 8.7 22.6 11.3 22.6 42 YES SEE BELOW
FC101A 121 Open Office DAIKIN FXZQ09MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 29-32 320 40% PROP. GLY. 6.5 8.1 6.5 4.5 11.1 22.6 11.3 22.6 42 YES SEE BELOW
BS101 BSVQ60PVJU 13.3X8.1X12.8 26
FC101B 121 Open Office DAIKIN FXZQ09MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 29-32 320 40% PROP. GLY. 6.5 8.1 6.5 4.5 11.1 22.6 11.3 22.6 42 YES SEE BELOW
FC101C 121 Open Office DAIKIN FXZQ09MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 29-32 320 40% PROP. GLY. 6.5 8.1 6.5 4.5 11.1 22.6 11.3 22.6 42 YES SEE BELOW
FC101D 121 Open Office DAIKIN FXZQ09MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 29-32 320 40% PROP. GLY. 6.5 8.1 6.5 4.5 11.1 22.6 11.3 22.6 42 YES SEE BELOW
FC102A 120 Open Office DAIKIN FXZQ15MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 30-36 388 40% PROP. GLY. 9.5 12.8 10.3 7.0 18.1 22.6 11.3 22.6 42 YES SEE BELOW
BS102 BSVQ60PVJU 13.3X8.1X12.8 26
FC102B 120 Open Office DAIKIN FXZQ15MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 30-36 388 40% PROP. GLY. 9.5 12.8 10.3 7.0 18.1 22.6 11.3 22.6 42 YES SEE BELOW
FC102C 120 Open Office DAIKIN FXZQ15MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 30-36 388 40% PROP. GLY. 9.5 12.8 10.3 7.0 18.1 22.6 11.3 22.6 42 YES SEE BELOW
FC102D 120 Open Office DAIKIN FXZQ15MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 30-36 388 40% PROP. GLY. 9.5 12.8 10.3 7.0 18.1 22.6 11.3 22.6 42 YES SEE BELOW
FC103 118 Conference DAIKIN FXZQ07MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 29-31 320 40% PROP. GLY. 2.0 6.4 5.5 - 8.7 22.6 11.3 22.6 42 YES SEE BELOW BS103 BSVQ36PVJU 15.3X8.1X12.8 26
FC107A 103 Break DAIKIN FXAQ09PVJU HIGH WALL-MOUNTED 31-37 280 40% PROP. GLY. 7.0 8.1 7.2 6.8 11.1 31.3 11.4 9.3 26 YES SEE BELOW
BS107 BSVQ60PVJU 13.3x8.1x12.8 26
FC107B 104 Conference DAIKIN FXAQ09PVJU HIGH WALL-MOUNTED 31-37 280 40% PROP. GLY. 6.3 8.1 7.2 5.3 11.1 31.3 11.4 9.3 26 YES SEE BELOW
FC107C 104 Conference DAIKIN FXAQ09PVJU HIGH WALL-MOUNTED 31-37 280 40% PROP. GLY. 6.3 8.1 7.2 5.3 11.1 31.3 11.4 9.3 26 YES SEE BELOW
FC107D 109 Womens Restroom DAIKIN FXAQ07PVJU HIGH WALL-MOUNTED 29-35 260 40% PROP. GLY. 3.1 6.4 6.2 4.1 8.7 31.3 11.4 9.3 26 YES SEE BELOW
FC107E 110 Mens Restroom DAIKIN FXAQ07PVJU HIGH WALL-MOUNTED 29-35 260 40% PROP. GLY. 3.0 6.4 6.2 4.2 8.7 31.3 11.4 9.3 26 YES SEE BELOW
FC107F 111 Janitor DAIKIN FXAQ07PVJU HIGH WALL-MOUNTED 29-35 260 40% PROP. GLY. 2.5 6.4 6.2 3.2 8.7 31.3 11.4 9.3 26 YES SEE BELOW
FC108A 107 Private Office HR DAIKIN FXLQ12MVJU9 FLOOR STANDING 32-36 280 40% PROP. GLY. 3.8 10.2 8.0 3.6 14.0 44.9 23.6 8.7 55 YES SEE BELOW
BS108 BSVQ96PVJU 15.3x8.1x12.8 33
FC108B 108 Private Office DAIKIN FXLQ12MVJU9 FLOOR STANDING 32-36 280 40% PROP. GLY. 3.6 10.2 8.0 3.3 14.0 44.9 23.6 8.7 55 YES SEE BELOW
FC108C 102 Reception DAIKIN FXLQ12MVJU9 FLOOR STANDING 32-36 280 40% PROP. GLY. 4.6 10.2 8.0 3.7 14.0 44.9 23.6 8.7 55 YES SEE BELOW
FC108D 101 Entry (N) DAIKIN FXLQ12MVJU9 FLOOR STANDING 32-36 280 40% PROP. GLY. 2.2 10.2 8.0 3.3 14.0 44.9 23.6 8.7 55 YES SEE BELOW
FC108E 101 Entry (N) DAIKIN FXLQ12MVJU9 FLOOR STANDING 32-36 280 40% PROP. GLY. 2.2 10.2 8.0 3.3 14.0 44.9 23.6 8.7 55 YES SEE BELOW
FC108F 105 Entry (S) DAIKIN FXLQ12MVJU9 FLOOR STANDING 32-36 280 40% PROP. GLY. 2.2 10.2 8.0 3.3 14.0 44.9 23.6 8.7 55 YES SEE BELOW
FC108G 105 Entry (S) DAIKIN FXLQ12MVJU9 FLOOR STANDING 32-36 280 40% PROP. GLY. 2.2 10.2 8.0 3.3 14.0 44.9 23.6 8.7 55 YES SEE BELOW
V R
F S
Y S
TE
M
FC104 117 Dep Rgnl. Forr. DAIKIN FXLQ12MVJU9 FLOOR STANDING 32-36 280 40% PROP. GLY. 5.1 10.3 8.0 3.4 14.0 44.9 23.6 8.7 55 YES SEE BELOW BS104 BSVQ36PVJU 15.3X8.1X12.8 26
FC105A 115/116 Coffee/Exec Asst DAIKIN FXZQ07MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 29-31 320 40% PROP. GLY. 5.5 6.4 5.6 3.3 8.7 22.6 11.3 22.6 42 YES SEE BELOW
BS105 BSVQ36PVJU 15.3X8.1X12.8 26
FC105B 115/116 Coffee/Exec Asst DAIKIN FXZQ07MVJU9 CEILING-MOUNTED…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .