Plumbing_Compiled.pdf

PDF 3 MB Posted

Attached to
Building 26 Remodel, Fort Missoula
Solicitation number
AG-03R6-S-14-0058
Issued by

About this file

19 - Drawings (Plumbing)

View the file

Other files

File Type Posted
S140058FinalAmendment0007QAs.pdf PDF
S140058FinalAmendment0006ScheduleB.pdf PDF
S140058FinalAmendment0005QAs.pdf PDF
S140058FinalAmendment0004QAs.pdf PDF
S140058FinalAmendmen0003QAs.pdf PDF
S140058FinalAmendmen0002QAs.pdf PDF
S140058FinalAmendmen0001QAs.pdf PDF
20140812SignInSheet.PDF PDF
SpecsVolume1B.pdf PDF
MT140064WageDeter.pdf PDF
Arch_Compiled_Part6.pdf PDF
Electrical_Compiled_Part1.pdf PDF
Structural_Compiled.pdf PDF
SpecsVolume2B.pdf PDF
Security_Compiled.pdf PDF
Arch_Compiled_Part4.pdf PDF
Mechanical_Compiled.pdf PDF
Electrical_Compiled_Part2.pdf PDF
Fire_Protection_Compiled.pdf PDF
Arch_Compiled_Part3.pdf PDF
Arch_Compiled_Part5.pdf PDF
FinalAG03R6S140058ShortSetBuild26ConsRFP.pdf PDF
FinalAG03R6S140058CompletePkgBuild26ConsRFP.pdf PDF
Arch_Compiled_Part2.pdf PDF
SpecsVolume2A.pdf PDF
Arch_Compiled_Part1.pdf PDF
SpecsVolume1C.pdf PDF
SpecsVolume1A.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WHWH

WH

WH BOILER

BOILER

DF DF

STAIR

RESTROOM

MECH / ELECT

TELE/DATA

ELEVATOR

MACHINE

ELEVATOR

VESTIBULE VESTIBULE

001.1

001.3

UP UP

UP

DOWN 17"

DOWN

17"

DOWN

17"

DOWN 17"

UP UP

UP

UP

003.1

ELECTRICAL

UP

002.1

004.1

008.1

APPROXIMATE

CONSTRUCTION

AREA OF WORK

FUTURE AREA OF

PHASED WORK.

FUTURE AREA OF

PHASED WORK.

PLANNED CONSTRUCTION PHASES:

1. THESE CONSTRUCTION DOCUMENTS ARE LIMITED

TO THE CONSTRUCTION IDENTIFIED AS

APPROXIMATE CONSTRUCTION AREA. NOTE THAT

SOME OF THE PLUMBING WORK REQ'D FOR THIS

PHASE OF CONSTRUCTION EXTENDS INTO

FUTURE AREAS. COORD. W/ GEN. CONT'R.

2. CONSTRUCTION AREAS INDICATED "FUTURE"

CONSTRUCTION ARE FOR REFERENCE ONLY AND

ARE NOT PART OF THIS CONTRACT. NOTE THAT

SOME OF THE PLUMBING WORK REQ'D FOR THIS

PHASE OF CONSTRUCTION EXTENDS INTO

FUTURE AREAS. COORD. W/ GEN. CONT'R.

A D E F G H KCB J 1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO

COORDINATE WITH EACH OTHER AND VERIFY THAT THERE ARE NO

CONFLICTS IN LOCATION OF DUCTS, CONDUITS, DIFFUSERS,

BOXES AND OTHER ITEMS THROUGHOUT THIS PROJECT BEFORE

FINAL PLACEMENT OF MATERIALS.

2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE FIELD

VERIFIED. THESE DRAWINGS REPRESENT SCHEMATIC SYSTEMS.

3. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND PIPING

SYSTEMS WITH OTHER TRADES. REFER TO ARCHITECTURAL,

STRUCTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS AND

FIRE PROTECTION SHOP DRAWINGS FOR ADDITIONAL DETAILS

NECESSARY FOR COORDINATION.

4. ALL GRAYSCALE DUCTWORK/PIPING/EQUIPMENT IS TO LEFT

ALONE. BLACK IS TO BE REMOVED.

5. COORDINATE ALL CONCRETE PENETRATIONS WITH STRUCTURAL

DRAWINGS TO VERIFY HOW AND WHERE CONCRETE CAN BE CUT.

6. COORDINATE REMOVAL OF PIPING WITH ASBESTOS ABATEMENT

CONTRACTOR.

BA

SE

M

EN

T D

EM

O

P

LA

N

KEY NOTES:

USFS BUILDING 26 - BASEMENT 16

DP2.0 : DP2.0 1/8" = 1'-0"

NORTH

DP2.0

1. NEW FLOOR SINK TO BE INSTALLED IN THIS LOCATION. SAW CUT

FLOOR AS REQUIRED TO FIND NEAREST UNDERSLAB WASTE

PIPING. CONTRACTOR TO FIELD VERIFY ALL SLABS TO BE CUT.

CONTRACTOR TO MAINTAIN INTEGRITY OF ALL UNDERSLAB PIPING

INCLUDING WASTE, VENT, AND RADON.

2. EXISTING WATER HEATER AND ASSOCIATED PIPING IN ROOM TO

BE REMOVED.

3. EXISTING WATER SERVICE AND ASSOCIATED PIPING SHALL BE

REMOVED. PREP FOR CONNECTION TO NEW PIPING TO NEW

WATER SERVICE ENTRANCE LOCATED IN MECHANICAL ROOM.

4. EXISTING DOMESTIC WATER AND WASTE PIPING SERVING

FIXTURES ABOVE SHALL BE REMOVED.

5. EXISTING SEWER DOWN THROUGH SLAB. CUT PIPING MINIMUM

ONE FOOT FROM FLOOR AND PREP FOR CONNECTION OF NEW

BATHROOM FIXTURES ABOVE.

6. EXISTING RADON SYSTEM SHALL REMAIN IN PLACE.

BU

IL

D

IN

G

P H

A

SE

SO

U

T H

W

IN

G R

EN

O

V A

T

IO

N

U S

FO

R

ES

T

S

ER

V

IC

E, N

O R

T H

ER

N

R

EG

IO

N

R

EG

IO

N A

L O

FF

IC

E www.aearchitects.com

O W

N E

R

ISSUE DATE

REVISIONS

P R

O

JE

C T

D R

A W

IN

G

PROJECT No 13104.00 7.14.14

6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 59101

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

ARCHITII ECTSP

C

GENERAL NOTES:

2014 MORRISON-MAIERLE, INC.

DOWN DOWN

DOWN DOWN

DOWNDOWN

UP UP

RAMP

DOWN

RAMP

DOWN

RAMP

DOWN

DOWN DOWN

UP UP

(E)

SWR

FUTURE AREA OF

PHASED WORK.

APPROXIMATE

CONSTRUCTION

AREA OF WORK

APPROXIMATE

CONSTRUCTION

AREA OF WORK

PLANNED CONSTRUCTION PHASES:

1. THESE CONSTRUCTION DOCUMENTS ARE LIMITED

TO THE CONSTRUCTION IDENTIFIED AS

APPROXIMATE CONSTRUCTION AREA. NOTE THAT

SOME OF THE PLUMBING WORK REQ'D FOR THIS

PHASE OF CONSTRUCTION EXTENDS INTO

FUTURE AREAS. COORD. W/ GEN. CONT'R.

2. CONSTRUCTION AREAS INDICATED "FUTURE"

CONSTRUCTION ARE FOR REFERENCE ONLY AND

ARE NOT PART OF THIS CONTRACT. NOTE THAT

SOME OF THE PLUMBING WORK REQ'D FOR THIS

PHASE OF CONSTRUCTION EXTENDS INTO

FUTURE AREAS. COORD. W/ GEN. CONT'R.

A D E F G H KCB J

FI

R

ST

F

LO

O

R D

EM

O

P

LA

N

1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO

COORDINATE WITH EACH OTHER AND VERIFY THAT THERE ARE NO

CONFLICTS IN LOCATION OF DUCTS, CONDUITS, DIFFUSERS,

BOXES AND OTHER ITEMS THROUGHOUT THIS PROJECT BEFORE

FINAL PLACEMENT OF MATERIALS.

2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE FIELD

VERIFIED. THESE DRAWINGS REPRESENT SCHEMATIC SYSTEMS.

3. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND PIPING

SYSTEMS WITH OTHER TRADES. REFER TO ARCHITECTURAL,

STRUCTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS AND

FIRE PROTECTION SHOP DRAWINGS FOR ADDITIONAL DETAILS

NECESSARY FOR COORDINATION.

4. ALL GRAYSCALE DUCTWORK/PIPING/EQUIPMENT IS TO LEFT

ALONE. BLACK IS TO BE REMOVED.

5. COORDINATE ALL CONCRETE PENETRATIONS WITH STRUCTURAL

DRAWINGS TO VERIFY HOW AND WHERE CONCRETE CAN BE CUT.

6. COORDINATE REMOVAL OF PIPING WITH ASBESTOS ABATEMENT

CONTRACTOR.

KEY NOTES:

USFS BUILDING 26 - FIRST FLOOR 16

DP2.1 : DP2.1 1/8" = 1'-0"

NORTH

DP2.1

1. ALL EXISTING PLUMBING SHALL BE REMOVED FROM THIS FLOOR

AS APPLICABLE DURING PHASE 1. NOT ALL PLUMBING IS

IDENTIFIED ON THIS PLAN.

2. EXISTING PLUMBING FIXTURES AND ASSOCIATED PIPING IN THIS

AREA SHALL BE REMOVED. CAP WASTE AND VENT LINES AS

REQUIRED.

3. EXISTING SINK, FAUCET, AND ASSOCIATED DOMESTIC WATER

PIPING TO BE REMOVED. IF WASTE AND VENT PIPING ARE IN

GOOD WORKING CONDITION, LINES SHALL REMAIN FOR

CONNECTION TO NEW SINK. FIELD VERIFY.

BU

IL

D

IN

G

P H

A

SE

SO

U

T H

W

IN

G R

EN

O

V A

T

IO

N

U S

FO

R

ES

T

S

ER

V

IC

E, N

O R

T H

ER

N

R

EG

IO

N

R

EG

IO

N A

L O

FF

IC

E www.aearchitects.com

O W

N E

R

ISSUE DATE

REVISIONS

P R

O

JE

C T

D R

A W

IN

G

PROJECT No 13104.00 7.14.14

6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 59101

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

ARCHITII ECTSP

C

DOWNDOWN

DOWN

DOWNDOWN

DOWNDOWN

DOWN

DOWNDOWN

DOWN

DOWN

(E)

SWR

APPROXIMATE

CONSTRUCTION

AREA OF WORK

FUTURE AREA OF

PHASED WORK.

FUTURE AREA OF

PHASED WORK.

PLANNED CONSTRUCTION PHASES:

1. THESE CONSTRUCTION DOCUMENTS ARE LIMITED

TO THE CONSTRUCTION IDENTIFIED AS

APPROXIMATE CONSTRUCTION AREA. NOTE THAT

SOME OF THE PLUMBING WORK REQ'D FOR THIS

PHASE OF CONSTRUCTION EXTENDS INTO

FUTURE AREAS. COORD. W/ GEN. CONT'R.

2. CONSTRUCTION AREAS INDICATED "FUTURE"

CONSTRUCTION ARE FOR REFERENCE ONLY AND

ARE NOT PART OF THIS CONTRACT. NOTE THAT

SOME OF THE PLUMBING WORK REQ'D FOR THIS

PHASE OF CONSTRUCTION EXTENDS INTO

FUTURE AREAS. COORD. W/ GEN. CONT'R.

A D E F G H KCB JA D E F G H KCB J

SE

C

O N

D F

LO

O

R D

EM

O

P

LA

N

1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO

COORDINATE WITH EACH OTHER AND VERIFY THAT THERE ARE NO

CONFLICTS IN LOCATION OF DUCTS, CONDUITS, DIFFUSERS,

BOXES AND OTHER ITEMS THROUGHOUT THIS PROJECT BEFORE

FINAL PLACEMENT OF MATERIALS.

2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE FIELD

VERIFIED. THESE DRAWINGS REPRESENT SCHEMATIC SYSTEMS.

3. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND PIPING

SYSTEMS WITH OTHER TRADES. REFER TO ARCHITECTURAL,

STRUCTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS AND

FIRE PROTECTION SHOP DRAWINGS FOR ADDITIONAL DETAILS

NECESSARY FOR COORDINATION.

4. ALL GRAYSCALE DUCTWORK/PIPING/EQUIPMENT IS TO LEFT

ALONE. BLACK IS TO BE REMOVED.

5. COORDINATE ALL CONCRETE PENETRATIONS WITH STRUCTURAL

DRAWINGS TO VERIFY HOW AND WHERE CONCRETE CAN BE CUT.

6. COORDINATE REMOVAL OF PIPING WITH ASBESTOS ABATEMENT

CONTRACTOR.

KEY NOTES:

USFS BUILDING 26 - SECOND FLOOR 16

DP2.2 : DP2.2 1/8" = 1'-0"

NORTH

DP2.2

1. REMOVE ALL PLUMBING FIXTURES AND ASSOCIATED PIPING IN

THIS WING.

2. NO DEMOLITION WORK ON THIS FLOOR IN THIS PHASE OF THE

PROJECT. ALL PLUMBING PIPING TO FIXTURES ON THIS FLOOR

SHALL BE REMOVED ON THE FIRST FLOOR.

3. EXISTING PLUMBING FIXTURES AND ASSOCIATED PIPING IN THIS

AREA SHALL BE REMOVED. CAP WASTE AND VENT LINES AS

REQUIRED.

4. EXISTING SINK, FAUCET, AND ASSOCIATED DOMESTIC WATER

PIPING TO BE REMOVED. IF WASTE AND VENT PIPING ARE IN

GOOD WORKING CONDITION, LINES SHALL REMAIN FOR

CONNECTION TO NEW SINK. FIELD VERIFY.

BU

IL

D

IN

G

P H

A

SE

SO

U

T H

W

IN

G R

EN

O

V A

T

IO

N

U S

FO

R

ES

T

S

ER

V

IC

E, N

O R

T H

ER

N

R

EG

IO

N

R

EG

IO

N A

L O

FF

IC

E www.aearchitects.com

O W

N E

R

ISSUE DATE

REVISIONS

P R

O

JE

C T

D R

A W

IN

G

PROJECT No 13104.00 7.14.14

6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 59101

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

ARCHITII ECTSP

C

WHWH

WH

WH BOILER

BOILER

DF DF

STAIR

RESTROOM

MECH / ELECT

TELE/DATA

ELEVATOR

MACHINE

ELEVATOR

VESTIBULE VESTIBULE

UP UP

UP

DOWN 17"

DOWN

17"

DOWN

17"

DOWN 17"

UP UP

UP

UP

ELECTRICAL

UP

WATER

SERVICE

FIRE SPRINKLER

RISER

4" SAN 4" SAN 4" SAN 2" SAN

2" S

A N

4" S

A N

4" SAN

4" SAN

2" SAN

2" SAN

4" S

A N

4" S

A N

2" S

A N

2" V

2" V

2" V 2"

V

2" V UP

1" H

W R

1/

2" C

W

1/

4" H

W

2 1/2" CW 1-1/2" HW 1" HWR

2" S

A N

78 8

10 11

1/ 2"

H W

R

3/ 4"

H W

3/ 4"

C W

WH-1

15 15

FIRE

PROTECTION

MAINS (WET &

DRY)

211515

2" V

2" V

2" V

FS1

DHWP-12 1/2" CW 1-1/2" HW

1" HWR

2" CW

WS-1

3/ 4"

C W

3/4" CW

HB1

2" C

W

SP-1

FS1

FUTURE AREA OF

PHASED WORK.

FUTURE AREA OF

PHASED WORK.

PLANNED CONSTRUCTION PHASES:

1. THESE CONSTRUCTION DOCUMENTS ARE LIMITED

TO THE CONSTRUCTION IDENTIFIED AS

APPROXIMATE CONSTRUCTION AREA. NOTE THAT

SOME OF THE PLUMBING WORK REQ'D FOR THIS

PHASE OF CONSTRUCTION EXTENDS INTO

FUTURE AREAS. COORD. W/ GEN. CONT'R.

2. CONSTRUCTION AREAS INDICATED "FUTURE"

CONSTRUCTION ARE FOR REFERENCE ONLY AND

ARE NOT PART OF THIS CONTRACT. NOTE THAT

SOME OF THE PLUMBING WORK REQ'D FOR THIS

PHASE OF CONSTRUCTION EXTENDS INTO

FUTURE AREAS. COORD. W/ GEN. CONT'R.

APPROXIMATE

CONSTRUCTION

AREA OF WORK

CBV SET

AT .5 GPM

G M

N G

(E

NG (E)NG (E)

2" NG

A D E F G H KCB J

004.1

2" S

A N

2" V

FS1

F

BA

SE

M

EN

T P

LU

M

BI

N

G P

LA

N

1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO COORDINATE

WITH EACH OTHER AND VERIFY THAT THERE ARE NO CONFLICTS IN LOCATION

OF DUCTS, CONDUITS, DIFFUSERS, BOXES AND OTHER ITEMS THROUGHOUT

THIS PROJECT BEFORE FINAL PLACEMENT OF MATERIALS.

2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE FIELD VERIFIED.

THESE DRAWINGS REPRESENT SCHEMATIC SYSTEMS.

3. PROVIDE SEISMIC BRACING OF ALL EQUIPMENT, PIPING, AND DUCTWORK AS

REQUIRED BY LOCAL CODES.

4. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND PIPING SYSTEMS WITH

OTHER TRADES. REFER TO ARCHITECTURAL, STRUCTURAL, MECHANICAL, AND

ELECTRICAL DRAWINGS AND FIRE PROTECTION SHOP DRAWINGS FOR

ADDITIONAL DETAILS NECESSARY FOR COORDINATION.

5. ABSOLUTELY NOT FITTINGS OR PIPING CONNECTIONS ARE ALLOWED UNDER

THE CONCRETE SLAB.

6. ALL NATURAL GAS PIPING IS TO BE WELDED IN CONCEALED SPACES.

7. PROVIDE TRAP PRIMERS FOR ALL FLOOR DRAINS.

8. REFER TO THE PLUMBING FIXTURE SCHEDULE FOR PIPE SIZES TO INDIVIDUAL

FIXTURES.

9. COORDINATE ALL CONCRETE PENETRATIONS WITH STRUCTURAL DRAWINGS

TO VERIFY HOW AND WHERE CONCRETE CAN BE CUT.

10. ALL PIPING THAT IS EXPOSED MUST BE PAINTED TO MATCH SURROUNDINGS.

11. PLUMBING CONTRACTOR SHALL FIRE SEAL ALL PIPING AND DUCTWORK

PASSING THROUGH RATED CONSTRUCTION.

KEY NOTES:

USFS BUILDING 26 - BASEMENT 16

P2.0 : P2.0 1/8" = 1'-0"

NORTH

P2.0

1. NEW SANITARY WASTE TO BE CONNECTED TO EXISTING WASTE AT THIS

LOCATION.

2. DOMESTIC COLD WATER, HOT WATER, HOT WATER RECIRC, AND VENT. UP TO

FIRST FLOOR THROUGH WALL CHASE AT THIS LOCATION.

3. UP TO EWC-1 ON FIRST FLOOR, SEE SHEET P2.1 FOR CONTINUATION.

4. UP TO FD1 ON FIRST FLOOR, SEE SHEET P2.1 FOR CONTINUATION.

5. UP TO MULTIPLE L1'S ON FIRST AND SECOND FLOORS, SEE SHEET P2.1 FOR

CONTINUATION.

6. UP TO S1 ON FIRST FLOOR, SEE SHEET P2.1 FOR CONTINUATION.

7. UP TO MULTIPLE UR1'S ON FIRST AND SECOND FLOORS, SEE SHEET P2.1 FOR

CONTINUATION.

8. UP TO WC1 ON FIRST FLOOR, SEE SHEET P2.1FOR CONTINUATION.

9. UP TO WC2 ON FIRST FLOOR, SEE SHEET P2.1FOR CONTINUATION.

10. UP TO WCO ON FIRST FLOOR, SEE SHEET P2.1 FOR CONTINUATION.

11. UP TO FCO ON FIRST FLOOR, SEE SHEET P2.1 FOR CONTINUATION.

12. WASTE FROM FIRST FLOOR CEILING SPACE DOWN THROUGH WALL CAVITY

TO THIS LOCATION. SEE SHEET P2.1 FOR CONTINUATION.

13. EXISTING RADON SYSTEM SHALL REMAIN IN PLACE.

14. NEW WASTE AND VENT PIPING TO BE ROUTED IN SAW CUT AREA. WASTE TO

CONNECT TO EXISTING UNDERSLAB WASTE. CONTRACTOR TO MAINTAIN

INTEGRITY OF ALL UNDERSLAB PIPING INCLUDING WASTE, VENT, AND RADON.

15. PIPING TO PENETRATE CONCRETE WALL AT THIS LOCATION.

16. SEE SHEET F2.0 FOR DETAILS AND COORDINATION.

17. FUTURE FIRE RISER AT THIS LOCATION.

18. PROVIDE SHEET METAL DRAIN PAN UNDER ALL PLUMING PIPES IN THIS

ROOM. DRAIN PAN TO DRAIN TO FLOOR SINK IN SPACE. SEE DRAIN PAN

DETAIL.

19. 3/4" SOFTENED WATER OUT TO COOLING TOWER. COORDINATE FINAL

LOCATION OF COOLING TOWER AND INSTALL DEPTH OF PIPE WITH

MECHANICAL CONTRACTOR. PROVIDE SLEEVE UNDER SIDEWALK.

20. CONNECT SANITARY WASTE INTO EXISTING WASTE LINE IN CORNER OF

ROOM. FIELD VERIFY EXISTING CONDITIONS.

21. FIRE PROTECTION MAINS. COORDINATE POTENTIAL CONFLICTS WITH FIRE

PROTECTION CONTRACTOR. SEE FIRE PROTECTION PLANS FOR MORE

DETAILS.

22. POTENTIAL FIRE RISER LOCATION UP THROUGH BUILDING. COORDINATE

PLUMBING INSTALLATION FOR POTENTIAL FIRE RISER WITH FIRE

PROTECTION CONTRACTOR.

23. PROVIDE NEW WASTE AND VENT PIPING TO BE ROUTED FROM NEW FLOOR

SINK TO NEAREST EXISTING UNDERSLAB WASTE AND NEAREST EXISTING

VENT. CONTRACTOR TO MAINTAIN INTEGRITY OF ALL UNDERSLAB PIPING

INCLUDING WASTE, VENT.

24. FUTURE CONNECTION FOR PHASE 2 &3 CONSTRUCTION. PROVIDE BALL

VALVE AND CAP LINE.

25. UP TO S2 ON FIRST FLOOR, SEE SHEET P2.1 FOR CONTINUATION.

26. UP TO S2 ON FIRST AND SECOND FLOOR, SEE SHEET P2.1 AND P2.2 FOR

CONTINUATION.

27. CONNECT NEW 2" GAS LINE TO EXISTING GAS PIPING NEAR THIS LOCATION.

28. PROVIDE 1 1/4" NATURAL GAS CONNECTION TO EACH BOILER PROVIDE TAP

WITH BALL VALVE AND CAP FOR FUTURE BOILER CONNECTIONS.

BU

IL

D

IN

G

P H

A

SE

SO

U

T H

W

IN

G R

EN

O

V A

T

IO

N

U S

FO

R

ES

T

S

ER

V

IC

E, N

O R

T H

ER

N

R

EG

IO

N

R

EG

IO

N A

L O

FF

IC

E www.aearchitects.com

O W

N E

R

ISSUE DATE

REVISIONS

P R

O

JE

C T

D R

A W

IN

G

PROJECT No 13104.00 7.14.14

6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 59101

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

ARCHITII ECTSP

C

GENERAL NOTES:

2014 MORRISON-MAIERLE, INC.

USFS BUILDING 26 - UNDERSLAB 8

P2.0 : P2.0 1/4" = 1'-0"

G H KJ

HALL

PRIVATE

OFFICE

130 SF

JANITOR

WOMENS

RESTROOM

MENS

RESTROOM

TELE/DATA

ELEVATOR

A

MICRO

(N)

FSR R R R

R R R R

12"Ø

EXHAUST

12"Ø

EXHAUST

6"Ø 8"Ø

WC1

WC2

WC2

UR1

UR1

L1

L1

L1

L1

WC1

WC2

EWC-1

FD1

FD1

SS1

S1

FCO

WCO

WCO

WCO

WCO

FCO

WCO

4" SAN

4" S

A N

4" S

A N

4" S

A N

4" S

A N

2" SAN

2" V

2" V

2" V

2" V

2" V

2" V

2" V

2" V 2" V 2" V

1" HW

1" H

W

3/ 4"

C W

1- 1/

4" C

W 1-

1/ 4"

C W

3/ 4"

H W

1- 1/

2" C

W 1-

1/ 2"

C W

3/ 4"

H W

3/ 4"

C W

1" H

W 2"

C W

1- 1/

2" C

W

2 CW

1" HW

2" CW2" CW

1" HW 1" HW

TP1

TP1

TP2

WHA1

WHA1

WHA1

WC2

45 5

1" H

W

1" HW 2" V

2" V 2" V

2" V

1/2" CW

RF1

FD1

2" V UP

2 1/2" CW UP

1 1/4" HW UP

1 1/4" HW UP

1" HWR UP

PRIVATE

OFFICE

HR

140 SF

CONFERENCE

200 SF

OFFICE

195 SF

OFFICE

195 SF

OPEN

OFFICE

(12 STAFF)

OPEN

OFFICE

(16 STAFF)

ENTRY

HALL

RECEPTION

(2 STAFF)

BREAK

PRIVATE

OFFICE

130 SF

JANITOR

WOMENS

RESTROOM

MENS

RESTROOM

EXECUTIVE

ASSISTANT

(2 STAFF)

REGIONAL

FORESTER

360 SF

DEPUTY

REGIONAL

FORESTER

210 SF

DEPUTY

REGIONAL

FORESTER

210 SF

COFFEE / PRINT

115LARGE

CONFERENCE

COMPACT FRIDGE

MICRO

TELE/DATA

PRINT / COPY / FAX

CONFERENCE

120 SF

ENTRY

ELEVATOR

A

PORCH

STAIR

PORCH

DOWN DOWN

DOWN DOWN

DOWNDOWN

UP UP

RAMP

DOWN

RAMP

DOWN

RAMP

DOWN

DOWN DOWN

UP

MICRO

CONFERENCE

UP

(E)

SWR

(N)

FSR

(N)

FSR R R R

R R R R

12"Ø

EXHAUST

12"Ø

EXHAUST

BOILER

VENT

BOILER

VENT

R

R

R

R

R

R

R

R

R

6"Ø 8"Ø

S2

S2

WC1

WC2

WC2

UR1

UR1

L1

L1

L1

L1

WC1

WC2

EWC-1

FD1

FD1

SS1

S1

FCO

WCO

WCO

WCO

WCO

FCO

WCO

4" SAN

4" S

A N

4" S

A N

4" S

A N

4" S

A N

2" SAN

2" V

2" V

2" V

2" V

2" V

2" V

2" V

2" V 2" V 2" V

1/

2" V

1" HW

1" H

W

3/ 4"

C W

1- 1/

4" C

W 1-

1/ 4"

C W

3/ 4"

H W

1- 1/

2" C

W 1-

1/ 2"

C W

3/ 4"

H W

3/ 4"

C W

1" H

W 2"

C W

1- 1/

2" C

W

2 CW

1" HW

2" CW2" CW

1" HW 1" HW

TP1

TP1

TP2

WHA1

WHA1

WHA1

WC2

1" H

W

1" HW

2" V

2" V 2" V

2" V

1/2" CW

RF1

FUTURE AREA OF

PHASED WORK. APPROXIMATE

CONSTRUCTION

AREA OF WORK

PLANNED CONSTRUCTION PHASES:

1. THESE CONSTRUCTION DOCUMENTS ARE LIMITED

TO THE CONSTRUCTION IDENTIFIED AS

APPROXIMATE CONSTRUCTION AREA. NOTE THAT

SOME OF THE PLUMBING WORK REQ'D FOR THIS

PHASE OF CONSTRUCTION EXTENDS INTO

FUTURE AREAS. COORD. W/ GEN. CONT'R.

2. CONSTRUCTION AREAS INDICATED "FUTURE"

CONSTRUCTION ARE FOR REFERENCE ONLY AND

ARE NOT PART OF THIS CONTRACT. NOTE THAT

SOME OF THE PLUMBING WORK REQ'D FOR THIS

PHASE OF CONSTRUCTION EXTENDS INTO

FUTURE AREAS. COORD. W/ GEN. CONT'R.

FD1

2" V UP

2 1/2" CW UP

1 1/4" HW UP

1 1/4" HW UP

1" HWR UP

A D E FCB

F G

FI

R

ST

F

LO

O

R P

LU

M

BI

N

G P

LA

N

1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO

COORDINATE WITH EACH OTHER AND VERIFY THAT THERE ARE NO

CONFLICTS IN LOCATION OF DUCTS, CONDUITS, DIFFUSERS,

BOXES AND OTHER ITEMS THROUGHOUT THIS PROJECT BEFORE

FINAL PLACEMENT OF MATERIALS.

2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE FIELD

VERIFIED. THESE DRAWINGS REPRESENT SCHEMATIC SYSTEMS.

3. PROVIDE SEISMIC BRACING OF ALL EQUIPMENT, PIPING, AND

DUCTWORK AS REQUIRED BY LOCAL CODES.

4. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND PIPING

SYSTEMS WITH OTHER TRADES. REFER TO ARCHITECTURAL,

STRUCTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS AND

FIRE PROTECTION SHOP DRAWINGS FOR ADDITIONAL DETAILS

NECESSARY FOR COORDINATION.

5. ABSOLUTELY NOT FITTINGS OR PIPING CONNECTIONS ARE

ALLOWED UNDER THE CONCRETE SLAB.

6. ALL NATURAL GAS PIPING IS TO BE WELDED IN CONCEALED

SPACES.

7. PROVIDE TRAP PRIMERS FOR ALL FLOOR DRAINS.

8. REFER TO THE PLUMBING FIXTURE SCHEDULE FOR PIPE SIZES TO

INDIVIDUAL FIXTURES.

9. COORDINATE ALL CONCRETE PENETRATIONS WITH STRUCTURAL

DRAWINGS TO VERIFY HOW AND WHERE CONCRETE CAN BE CUT.

10. ALL PIPING THAT IS EXPOSED MUST BE PAINTED TO MATCH

SURROUNDINGS.

11. PLUMBING CONTRACTOR SHALL FIRE SEAL ALL PIPING AND

DUCTWORK PASSING THROUGH RATED CONSTRUCTION.

KEY NOTES:

USFS BUILDING 26 - FIRST FLOOR 16

P2.1 : P2.1 1/8" = 1'-0"

NORTH

P2.1

1. DOMESTIC COLD WATER, HOT WATER, HOT WATER RECIRC., AND

VENT UP THROUGH WALL CAVITY TO SECOND FLOOR.

2. UP TO FD1 ON SECOND FLOOR, SEE SHEET P2.2 FOR

CONTINUATION.

3. UP TO MULTIPLE L1'S ON FIRST AND SECOND FLOORS, SEE SHEET

P2.2 FOR CONTINUATION.

4. UP TO MULTIPLE UR1'S ON FIRST AND SECOND FLOORS, SEE

SHEET P2.2 FOR CONTINUATION.

5. UP TO WC1 ON SECOND FLOOR, SEE SHEET P2.2 FOR

CONTINUATION.

6. UP TO WC2 ON SECOND FLOOR, SEE SHEET P2.2 FOR

CONTINUATION.

7. UP TO FCO ON SECOND FLOOR, SEE SHEET P2.2 FOR

CONTINUATION.

8. WASTE PIPING DOWN WALL CAVITY TO CEILING SPACE OF

BASEMENT. SEE SEE P2.0 FOR CONTINUATION.

9. VENT UP THROUGH WALL CAVITY TO SPACE ABOVE, SEE SHEET

P2.2 FOR CONTINUATION.

10. FIRE RISER UP THROUGH FLOOR AT THIS LOCATION.

BU

IL

D

IN

G

P H

A

SE

SO

U

T H

W

IN

G R

EN

O

V A

T

IO

N

U S

FO

R

ES

T

S

ER

V

IC

E, N

O R

T H

ER

N

R

EG

IO

N

R

EG

IO

N A

L O

FF

IC

E www.aearchitects.com

O W

N E

R

ISSUE DATE

REVISIONS

P R

O

JE

C T

D R

A W

IN

G

PROJECT No 13104.00 7.14.14

6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 59101

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

ARCHITII ECTSP

C

GENERAL NOTES:

2014 MORRISON-MAIERLE, INC.

FIRST FLOOR RESTROOMS ENLARGED PLAN6

P2.1 : P2.1 1/4" = 1'-0"

OFFICE

170 SF

OFFICE

173 SF

OFFICE

170 SF

SMALL

CONFERENCE

105 SF

SMALL

CONFERENCE

145 SF

OPEN

OFFICE

(23 STAFF)

OPEN

OFFICE

(22 STAFF)

STAIR

ELEVATOR

A

PORCH

PORCH

DOWNDOWN

DOWN

DOWNDOWN

DOWNDOWN

DOWN

DOWNDOWN

DOWN

TELE/DATA

211ELECTRICAL

SMALL

CONFERENCE

105 SF

DOWN

(E)

SWR

(N)

FSR

BOILER

VENT

BOILER

VENT

R

R

R

R R

12"Ø

EXHAUST

12"Ø

EXHAUST

6"Ø 8"Ø

S2

WCO

5 5

3" V

3" V

3" V

3" V

FIRE PROTECTION

RISERS

(WET AND DRY)

3/4" HWR

3/4" HW

2" VENT

1 1/2" SAN

3/4" CW

2" V UP

2" CW UP

1 1/4" HW UP

1" HWR UP

FIRE PROTECTION

RISERS

(WET AND DRY)

FUTURE AREA OF

PHASED WORK.

FUTURE AREA OF

PHASED WORK.

PLANNED CONSTRUCTION PHASES:

1. THESE CONSTRUCTION DOCUMENTS ARE LIMITED

TO THE CONSTRUCTION IDENTIFIED AS

APPROXIMATE CONSTRUCTION AREA. NOTE THAT

SOME OF THE PLUMBING WORK REQ'D FOR THIS

PHASE OF CONSTRUCTION EXTENDS INTO

FUTURE AREAS. COORD. W/ GEN. CONT'R.

2. CONSTRUCTION AREAS INDICATED "FUTURE"

CONSTRUCTION ARE FOR REFERENCE ONLY AND

ARE NOT PART OF THIS CONTRACT. NOTE THAT

SOME OF THE PLUMBING WORK REQ'D FOR THIS

PHASE OF CONSTRUCTION EXTENDS INTO

FUTURE AREAS. COORD. W/ GEN. CONT'R.

APPROXIMATE

CONSTRUCTION

AREA OF WORK

A D E F G H KCB J

SE

C

O N

D F

LO

O

R P

LU

M

BI

N

G P

LA

N

1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO

COORDINATE WITH EACH OTHER AND VERIFY THAT THERE ARE NO

CONFLICTS IN LOCATION OF DUCTS, CONDUITS, DIFFUSERS,

BOXES AND OTHER ITEMS THROUGHOUT THIS PROJECT BEFORE

FINAL PLACEMENT OF MATERIALS.

2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE FIELD

VERIFIED. THESE DRAWINGS REPRESENT SCHEMATIC SYSTEMS.

3. PROVIDE SEISMIC BRACING OF ALL EQUIPMENT, PIPING, AND

DUCTWORK AS REQUIRED BY LOCAL CODES.

4. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND PIPING

SYSTEMS WITH OTHER TRADES. REFER TO ARCHITECTURAL,

STRUCTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS AND

FIRE PROTECTION SHOP DRAWINGS FOR ADDITIONAL DETAILS

NECESSARY FOR COORDINATION.

5. ABSOLUTELY NOT FITTINGS OR PIPING CONNECTIONS ARE

ALLOWED UNDER THE CONCRETE SLAB.

6. ALL NATURAL GAS PIPING IS TO BE WELDED IN CONCEALED

SPACES.

7. PROVIDE TRAP PRIMERS FOR ALL FLOOR DRAINS.

8. REFER TO THE PLUMBING FIXTURE SCHEDULE FOR PIPE SIZES TO

INDIVIDUAL FIXTURES.

9. COORDINATE ALL CONCRETE PENETRATIONS WITH STRUCTURAL

DRAWINGS TO VERIFY HOW AND WHERE CONCRETE CAN BE CUT.

10. ALL PIPING THAT IS EXPOSED MUST BE PAINTED TO MATCH

SURROUNDINGS.

11. PLUMBING CONTRACTOR SHALL FIRE SEAL ALL PIPING AND

DUCTWORK PASSING THROUGH RATED CONSTRUCTION.

KEY NOTES:

USFS BUILDING 26 - SECOND FLOOR 16

P2.2 : P2.2 1/8" = 1'-0"

NORTH

P2.2

1. DOMESTIC COLD WATER, HOT WATER, HOT WATER RECIRC.,

AND VENT UP THROUGH WALL CHASE AT THIS LOCATION.

2. CONNECT DOMESTIC HOT WATER TO DOMESTIC HOT WATER

RECIRC. TO COMPLETE THE RECIRC. LOOP. MAKE PIPING

CONNECTION ACCESSIBLE FOR CHANGES IN THE FOLLOWING

PHASES.

3. CONNECT VENT PIPING TO ANY VENT 3" OR LARGER IN THE

VICINITY.

4. 2" VENT UP THROUGH WALL CHASE FROM FLOOR BELOW.

CONNECT 2" VENT PIPING TO ANY VENT 3" OR LARGER IN THE

VICINITY.

5. WASTE PIPE FOR FUTURE FLOOR CLEANOUT. STUB AND CAP

INTO SPACE.

6. WASTE PIPE FOR FUTURE WATER CLOSETS. STUB AND CAP INTO

SPACE.

7. WASTE PIPE FOR FUTURE LAVATORIES. STUB AND CAP INTO

SPACE.

8. WASTE PIPE FOR FUTURE SERVICE SINK. STUB AND CAP INTO

SPACE.

9. WASTE PIPE FOR FUTURE FLOOR DRAIN. STUB AND CAP INTO

SPACE.

10. WASTE PIPE FOR FUTURE URINALS. STUB AND CAP INTO SPACE.

BU

IL

D

IN

G

P H

A

SE

SO

U

T H

W

IN

G R

EN

O

V A

T

IO

N

U S

FO

R

ES

T

S

ER

V

IC

E, N

O R

T H

ER

N

R

EG

IO

N

R

EG

IO

N A

L O

FF

IC

E www.aearchitects.com

O W

N E

R

ISSUE DATE

REVISIONS

P R

O

JE

C T

D R

A W

IN

G

PROJECT No 13104.00 7.14.14

6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 59101

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

ARCHITII ECTSP

C

PIPE SCHEDULE

SYSTEM PIPE MATERIAL SIZE INSULATION THICKNESS REMARKS

COLD WATER SERVICE - BELOW GRADE EXISTING

DOM. COLD WATER - ABOVE GRADE TYPE L COPPER ALL 1/2" PRO-PRESS OR SWEAT

DOM. COLD WATER - MAIN SUPPLY

TYPE L COPPER OR

AQUATHERM (GREEN) ALL 1/2" PRO-PRESS OR SWEAT, OR HEAT FUSION (AQUATHERM)

DOM. HOT WATER - ABOVE GRADE TYPE L COPPER ALL 1" PRO-PRESS OR SWEAT

DOM. HOT WATER - MAIN SUPPLY

TYPE L COPPER OR

AQUATHERM (GREEN) ALL 1" PRO-PRESS OR SWEAT, OR HEAT FUSION (AQUATHERM)

WASTE PVC ALL NONE NEW SANITARY WASTE

VENT PVC ALL NONE NEW VENT PIPING

NATURAL GAS PIPING STEEL ALL NONE - -

NOTE:

1. INSULATION THICKNESS IS BASED ON A CONDUCTIVITY NOT EXCEEDING .27 BTU PER INCH/H * FT^2 * °F

2. PLASTIC PIPE SHALL NOT BE INSTALL WITHIN THE FIRST 18" OF A WATER HEATER.

PLUMBING FIXTURE SCHEDULE

MARK DESCRIPTION MOUNTING TYPE MANUFACTURER MODEL NUMBER WASTE VENT COLD HOT ACCESSORIES

BP1 BACKFLOW PREVENTOR PIPE REDUCED PRESSURE WATTS 009QT N/A N/A LINE SIZE N/A DOMESTIC WATER SERVICE ENTRANCE - PIPE RELIEF TO DRAIN

BV1 BALL VALVE PIPE BRONZE - FULL PORT WATTS B6081 N/A N/A VARIES VARIES 2 PIECE

EWC1 ELECTRIC WATER COOLER WALL DUAL HEIGHT ELKAY LZSTLG8WS 2" 1 12" 1

2" N/A ADA DUAL HEIGHT, WITH BOTTLE FILLING STATION.

FCO FLOOR CLEAN OUT FLOOR CAST IRON J.R. SMITH 4031 SERIES 2"-4" N/A N/A N/A ADJUSTABLE WITH NICKEL BRONZE TOP

FD1 FLOOR DRAIN FLOOR CAST IRON J.R. SMITH 2005 2" 2" N/A N/A ADJUSTABLE WITH PRO-SET TRAP GUARD, TRAP PRIMER CONNECTION

FS1 FLOOR SINK FLOOR CAST IRON J.R. SMITH 3420-Y 2" 2" N/A N/A HALF GRATE, NO HUB, TRAP PRIMER CONNECTION

L1 LAVATORY COUNTERTOP VITREOUS CHINA AMERICAN STANDARD MEZZO 9960.001 2" 1 12" 1 2" 1

2" MEZZO, CENTER HOLE WITH MAC FAUCETS #FA400-109 FAUCET (AC), CHROME, WITH .5 GPM AERATOR

HB1 HOSE BIB WALL BRASS MATCO NORCA 646BV04LF N/A N/A 3

4" N/A PROVIDE WITH GARDEN HOSE CUT TO LENGTH, FOR FILL OF GLYCOL FEEDER

MV1 MIXING VALVE PIPE BRASS SYMMONS 7-900 N/A N/A 1-12" 1-12" .5-30 GPM, ADJUSTABLE TEMPERATURE SETTING, THERMOMETER ON HOT AND COLD AND MIXED PIPING.

PRV1 PRESSURE REDUCING VALVE PIPE BRONZE WATTS U5-Z3 N/A N/A LINE SIZE N/A --

RF1 REFRIGERATOR ICE BOX WALL PLASTIC LSP OB-509 N/A N/A 1

2" N/A --

S1 SINK COUNTER TOP STAINLESS STEEL JUST DL-ADA-1933-A-GR 2" 1 1/2" 1

2" 1

2" MOEN 7735 ADA FAUCET

S2 SINK COUNTER TOP STAINLESS STEEL JUST SL-2125-A-GR 2" 1 1/2" 1

2" 1

2" MOEN 7735 ADA FAUCET

SS1 SERVICE SINK FLOOR MOLDED STONE FIAT MSB-2424 3" 1 12" 3

4" 3

4" FIAT MODEL #830-AA FAUCET & HOSE, MOP BRACKETS, WALL GAURD

TP2 TRAP PRIMER PIPE BRONZE SIOUX CHIEF 695-01 N/A N/A 1

2" N/A PRESSURE OPERATED - PROVIDE WYE FITTING & (2) FOUR 1

2" FIP BRANCH CONNECTORS

UR1 URINAL WALL - ADA-LIP 17", NON ADA-LIP 24" VITREOUS CHINA KOHLER K-4904-ET 2" 1-12" 3 4" N/A WITH J.R. SMITH CARRIER MODEL #0637 & MOEN #8316AC (0.125 gpf) AC-POWERED FLUSH VALVE

WC1 ADA HEIGHT WATER CLOSET FLOOR - 17" TO TOP OF SEAT VITREOUS CHINA KOHLER K-4405 4" 2" 1" N/A WITH ELONGATED BOWL, KOHLER K-4670-CA SEAT, MOEN #8311AC12 AC POWERED FLUSH VALVE

WC2 STANDARD HEIGHT WATER CLOSET FLOOR VITREOUS CHINA KOHLER K-4406 4" 2" 1" N/A WITH ELONGATED BOWL, KOHLER K-4670-CA SEAT, MOEN #8311AC12 AC POWERED FLUSH VALVE

WCO WALL CLEAN OUT WALL/PIPE CAST IRON SMITH 4402 2" N/A N/A N/A WITH STAINLESS STEEL WALL COVER

WHA1 WATER HAMMER ARRESTOR PIPE COPPER SIOUX CHIEF 655-BS N/A N/A 11

2" N/A WITH 1" CONNECTION

WM WATER METER PIPE TURBINE BY UTILITY BY UTILITY N/A N/A 2" N/A SUPPLIED BY OTHERS - FEES AND INSTALLATION BY CONTRACTOR

WS1 WATER SOFTENER FLOOR COMPUTERIZED DEMAND NORTH STAR NSC30UD N/A N/A 1" N/A COMPUTERIZED DEMAND WITH RATED EFFICIENCY FO 5120 GRAINS/LB @ 2.3 LBS SALT DOSE

DOMESTIC WATER HEATER SCHEDULE

MARK MFGR MODEL

NUMBER DESCRIPTION

STORAGE

CAPACITY

(GAL)

STORAGE

TEMP (F)

HEIGHT

(IN)

DIAMETER

(IN)

GPH @

100F RISE

ENERGY

FACTOR

ELECTRICAL DATA

REMARKS

VOLTAGE PHASE KW

WH1 A.O. SMITH DRE-80-18 ELECTRIC TANK TYPE

WATER HEATER 80 140 60 1/4" 25 1/2" 74 -- 208V 3 18 SEE NOTES

NOTES: ASME TEMPERATURE AND PRESSURE RELIEF VALVE, TEMPERATURE AND PRESSURE GAUGE AND 4"X6" CLEAN-OUT PORT. MOUNT HEATER ON 4" TALL CONCRETE HOUSE KEEPING

PAD. INSTALL SEISMIC BRACING PER CODE. PIPE T&P RELIEF VALVE TO FLOOR SINK .

PUMP SCHEDULE

MARK MFGR MODEL SERVICE

FLOW RATE

(GPM) HEAD (FT) FLUID

ELECTRICAL DATA

REMARKS

VOLTAGE PHASE HP

DHWP-1 TACO 006-PNP-IFC DOMESTIC HOT WATER

SYSTEM 5 5 WATER 120 1 1/40 SEE NOTE 1.

SP-1 LITTLE

GIANT 5-MSP ELEVATOR SUMP 16.7 10 WATER 120 1 1

6 SEE NOTES 2.

NOTES: 1. PROVIDE IN-LINE PUMP WITH INTEGRAL DIGITAL TIME CLOCK, STRAP ON AQUA-STAT, AND LINE CORD.

NOTES: 2. PROVIDE LINE CORD, AND 50 FT HOSE.

DOMESTIC THERMAL EXPANSION TANK SCHEDULE

MARK MFGR MODEL SERVICE TOTAL VOLUME (GAL) ACCEPTANCE VOLUME (GAL) PRECHARGE PRESSURE (PSI) REMARKS

DET-1 AMTROL ST-12 DOMESTIC HOT WATER

SYSTEM 4.4 3.2 80 SEE NOTES

NOTES: PROVIDE ASME RATED EXPANSION TANK NSF RATED FOR USE IN POTABLE DOMESTIC WATER SYSTEMS.

DOMESTIC COLD WATER

DOMESTIC HOT WATER

DOMESTIC HOT WATER RETURN

SANITARY SEWER

SANITARY VENT

FIRE PROTECTION

PIPE LEGEND

M.E.P. COORDINATION SCHEDULE

MARK LOCATION DESCRIPTION

ELECTRICAL DATA CONTROL

NOTES

STARTER/ DISCONNECT

LOAD VOLT-PH TYPE DIV TYPE DIV

CONTROL TYPE DIVISION OF RESPONSIBILITIES:

BAS

C

CO2

L

PS

T

UC

NA

FACP

BUILDING AUTO CONTROL

CARBON MONOXIDE DETECTORS

CONTINUOUS OPERATION

LIGHT SWITCH

PRESSURE SWITCH

THEMOSTAT

UNIT CONTROLLER - TIED TO B.A.S.

NOT APPLICABLE

FIRE ALARM CONTROL PANEL

22/22 22/26 23/23 23/26 26/26

FURNISHED AND INSTALLED BY DIV. 22, WIRED BY DIV. 22

FURNISHED AND INSTALLED BY DIV. 22, WIRED BY DIV. 26

FURNISHED AND INSTALLED BY DIV. 23, WIRED BY DIV. 23

FURNISHED AND INSTALLED BY DIV. 23, WIRED BY DIV. 26

FURNISHED AND INSTALLED BY DIV. 26, WIRED BY DIV. 26

STARTER/DISCONNECT TYPE NOTES:

FD

CSFD

RVSS

VFD

MSS

MOCP

FW

NA

FUSED DISCONNECT

COMBINATION STARTER/DISCONNECT - HOA

REDUCED VOLTAGE SOLID-STATE

VARIABLE FREQUENCY DRIVE - HOA

MANUAL STARTER SWITCH

MOTOR OVER-CURRENT PROTECTION

FACTORY-WIRED SINGLE PT. CONNECTION

NOT APPLICABLE

1.

2.

3.

4.

5.

6.

7.

8.

INTEGRAL DISCONNECTS AND OVERLOADS

INTEGRAL OVERLOADS

INTEGRAL OVERLOADS, RECEPTACLE

RECEPTACLE

SINGLE POINT CONNECTION

PROVIDE RECEPTACLE AND DATA CONNECTION FOR PANEL

MOUNT ON UNI-STRUT IN FRONT OF UNIT

UNIT PROVIDED WITH REMOTE, FACTORY-WIRED CONTROL

PANEL. DIV 26 TO PROVIDE FIELD-INTERCONNECT CIRCUITS,

PER MANUFACTURER REQUIREMENTS.

GENERAL NOTES:

1. ALL DUCT SMOKE DETECTORS FURNISHED BY DIV. 26, INSTALLED BY DIV. 23 AND WIRED BY DIV. 26. DIV 26 SHALL

WIRE ALL FANS TO SHUT DOWN WHEN ALARM IS INITIATED BY ANY DUCT SMOKE DETECTOR.

EWC1 HALL 106 WATER COOLER 4.2 A 115-1 NA 22/26 - -

L1 RESTROOM 109, 110 LAVATORY FAUCET FRACT. 115-1 NA 22/22 4 - -

UR1 RESTROOM 110 URINAL FLUSH VALVE FRACT. 12V NA 22/26 - -

WC1 RESTROOM 109, 110 W.C. FLUSH VALVE FRACT. 12V NA 22/26 - -

WC2 RESTROOM 109, 110 W.C. FLUSH VALVE FRACT. 12V NA 22/26 - -

WS1 005 MECH/ELECT WATER SOFTNER FRACT. 120-1 NA 22/22 4 - -

WH1 005 MECH/ELECT WATER HEATER 50 A 208-3 T 22/26 FD 26/26

DHWP1 005 MECH/ELECT DHW RECIRC. PUMP FRACT. 120-1 UC 22/22 4 - -

SP1 ELEVATOR SUMP PUMP 1/6 HP 120-1 NA 22/22 4 - -

SC

H

ED

U

LE

S

P9.1

BU

IL

D

IN

G

P H

A

SE

SO

U

T H

W

IN

G R

EN

O

V A

T

IO

N

U S

FO

R

ES

T

S

ER

V

IC

E, N

O R

T H

ER

N

R

EG

IO

N

R

EG

IO

N A

L O

FF

IC

E www.aearchitects.com

O W

N E

R

ISSUE DATE

REVISIONS

P R

O

JE

C T

D R

A W

IN

G

PROJECT No 13104.00 7.14.14

6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 59101

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

ARCHITII ECTSP

C

CLEANOUT TEE

FLOOR LINE

CONNECT TO WASTE LINE

STAINLESS STEEL

WALL COVER

AND SCREW

WALL

EXTEND WASTE OR VENT

LINE WHERE INDICATED HANGER ROD

TURN BUCKLE (AS

REQUIRED)

INSULATION

PIPE

SHEET METAL

SADDLE INSERT

CLEVIS TYPE HANGER FOR PIPE

2" & LARGER

HANGER ROD

TURN BUCKLE (AS

REQUIRED)

INSULATION

PIPE

SHEET METAL

SADDLE INSERT

PIPE STRAP TYPE HANGER FOR

PIPE LESS THAN 2"

7 WALL CLEANOUT DETAIL PIPE HANGER DETAIL8

ELEVATOR SUMP DETAIL11

GFI OUTLET

FINISHED FLOOR

ELECTRICAL POWER CORD

2'X2'X2' SUMP PIT

WITH GRATE COVER

AT CONTRACTORS OPTION:

PROVIDE A FIBERGLASS BASIN

WITH COVER

SUITABLE FOR SUMP PUMP

ELEVATOR

SHAFT FLOOR CHECK VALVE

SUMP PUMP:

MANUAL OPERATION

10' POWER CORD 115V

ELECTRICAL SWITCH

FINISHED

FLOOR

TERMINATE SUMP PUMP DISCHARGE

ABOVE FINISHED FLOOR ELEVATION

WITH 3/4" HOSE BIBB CONNECTION

1" PVC OR COPPER

DISCHARGE

ELEVATOR SHAFT

P9.1: P9.1 NO SCALE

STACK WASTE DETAIL12

P9.1: P9.1 NO SCALE

WATER SERVICE ENTRANCE10

WALL CLEANOUT

WALL CLEANOUT

VENT PIPING

LAVATORY (TYP.)

BUILDING WALL

TRANSITION

HDPE

TO COPPER

AT 1-0" A.F.F.

FOUNDATION

WALL

DCW SERVICE - SEE CIVIL

DRAWINGS FOR

CONTINUATION

PIPE AIR GAP TO FLOOR DRAIN

BYPASS WITH LOCKING HANDLE

STRAINER (ST)

REDUCED PRESSURE BACKFLOW PREVENTOR (BP1)

BALL VALVE (BV1) - TYP.

PRESSURE REDUCING VALVE (PRV1)

DCW TO BUILDING

PRESSURE GAUGE (PG1) - TYP.

WATER METER (WM1) WITH PULSE SIGNAL

FOR MONITORING

NOTE:

REMOTE WATER METER READER(S)

LOCATED AS DIRECTED BY UTILITY.

NOTES:

1. PROVIDE REMOTE WATER METER READER AND LOCATE AS REQUIRED BY LOCAL UTILITY.

2. PROVIDE LOCKING SHUTOFF VALVES ON BYPASS LINE. BYPASS LINE MAY BE SMALLER THAN MAIN LINE

(GENERALLY 1

2 MAIN LINE). BYPASS MUST HAVE SAME TYPE OF BACKFLOW PROTECTION AS MAIN LINE.

3. BACK FLOW PREVENTORS SHALL BE MOUNTED 18" MIN ABOVE FLOOR AND NO MORE THAT 48" MAX ABOVE

FLOOR MIN. 6" FROM WALLS, ECT. MUST BE ACCESSIBLE WITH NO OBSTRUCTIONS

1/2'' CW TO TRAP

CONNECT AS REQ'D

FLOOR DRAIN OR FLOOR SINK W/TRAP

PRIMER CONNECTION

FIN FLOOR

"LOCKABLE" ACCESS

PANEL

1/2'' CW

UNION

WALL FRAMING

BOX. SECURE TO

FRAMED WALL

CONNECT TO CW

PIPE IN WALL

TRAP PRIMER IN WALL

1/2'' GV

TRAP PRIMER DETAIL1

PVC SLEEVE

WATER HEATER DETAIL2

A.S.M.E. T&P

RELIEF VALVE

PIPE RELIEF VALVE

DISCHARGE LINE FULL SIZE

TO FLOOR DRAIN OR

APPROVED RECEPTOR

SEISMIC BRACING PER

CODE

4" CONCRETE HOUSE

KEEPING PAD

WH-1

MANUAL FLOW BALANCE

VALVE (TYP)

1" DCW

120° DHW

1/2" DHWRC

T

RECIRC PUMP DHWP-1

TEMP GAUGE (TYP)

CHECK VALVE (TYP)

THERMOSTATIC MIXING VALVE

SET TO 120F

STRAINER

1" C

W

P

DHW

T&P PORT (TYP)

PRESSURE GAUGE

140° DHW

1" DCW

NOTE!

PIPE THERMOSTATIC MIXING VALVE

AS PER MANUFACTURER'S WRITTEN

INSTALLATION INSTRUCTIONS

NOTES

1. FIELD VERIFY EXACT LOCATION OF SHEETMETAL DRAIN.

SERVER ROOM

OVERHEAD PIPING

2" SHEETMETAL SIDEWALLS

2. CONTRACTOR TO DETERMINE SIZE OF SHEET METAL PAN.

2" D

R A

IN

FLOOR SINK

DRAIN PAN DETAIL3

3. DRAIN PAN TO BE PIPED TO NEAREST FLOOR DRAIN.

WATER SOFTENER DETAIL6

P9.1: P9.1 NO SCALEP9.1: P9.1 NO SCALE

P9.1: P9.1 NO SCALE

P9.2: P9.2 NO SCALE P9.2: P9.2 NO SCALE P9.2: P9.2 NO SCALE

P9.2: P9.2 NO SCALE

BOILER DRAIN FOR

SEASONAL DRAIN DOWN

AND BLOWOUT

BALL VALVE, NO

BYPASS BALL VALVE, NC

BALL VALVE, NO

WATER SOFTENER

ELECTRICAL OUTLET

WITHIN 5'

ET-1

MV1

D

ET

A

IL

S

P9.2

BU

IL

D

IN

G

P H

A

SE

SO

U

T H

W

IN

G R

EN

O

V A

T

IO

N

U S

FO

R

ES

T

S

ER

V

IC

E, N

O R

T H

ER

N

R

EG

IO

N

R

EG

IO

N A

L O

FF

IC

E www.aearchitects.com

O W

N E

R

ISSUE DATE

REVISIONS

P R

O

JE

C T

D R

A W

IN

G

PROJECT No 13104.00 7.14.14

6 0 8 N O R T H 2 9 T H B I L L I N G S, M T 59101

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

2 2 2 N O R T H H I G G I N S M I S S O U L A, M T 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

ARCHITII ECTSP

C

File details come from the government source that posted it. Updated .