s100051_04_Appendix_A4_Service_SFF_alternate_presentation.pdf

PDF 20 KB Posted

Attached to
Lolo National Forest, South Fork Fish Creek Stewardship IRSC
Solicitation number
AG-03R6-S-10-0051
Issued by

About this file

05 - Appendix A-4

View the file

Other files

File Type Posted
s100051_17_appendix_b_complete_maps_amend_02.pdf PDF
s100051_16_appendix_a_complete_maps_amend_02.pdf PDF
s100051_00_short_solicitation_pkg_amend_02_changes.pdf PDF
s100051_09_Appendix_C_Road Maintenance_SFF_amend_02_CHANGES.pdf PDF
s100051_00_Main_Contract_IRSC_amend_02_CHANGES.pdf PDF
Amend_02.pdf PDF
s100051_08_Appendix_B_amend_02_CHANGES.pdf PDF
2010_0721_pre-proposal_conf_notes_loren.pdf PDF
Amend_01.pdf PDF
s100051_03_Appendix_A3_Service_amend_01.pdf PDF
s100051_02_Appendix_A2_Service_amend_01.pdf PDF
s100051_00_short_set_Contract_IRSC_amend_01.pdf PDF
s100051_15_Attachment_03_amend_01.pdf PDF
s100051_00_Main_Contract_IRSC_amend_01.pdf PDF
s100051_06_Appendix_A4_DWG_amend_01.pdf PDF
s100051_16_appendix_a_complete_maps.pdf PDF
s100051_01_Appendix_A1_Service_amend_01.pdf PDF
s100051_17_appendix_b_complete_maps.pdf PDF
s100051_10_Appendix_D_amend_01.pdf PDF
s100051_08_Appendix_B_amend_01.pdf PDF
Appendix B Maps.pdf PDF
s100051_11_Appendix_D_DWG_1-30.pdf PDF
s100051_06_Appendix_A4_DWG_july7th.pdf PDF
Appendix A Maps.pdf PDF
s100051_10_Appendix_D.pdf PDF
s100051_02_Appendix_A2_Service_SFF_alternate_presentation.pdf PDF
s100051_13_Attachment_02_76-1342_sca.mht MHT file
s100051_08_Appendix_B.pdf PDF
s100051_14_Attachment_02_MT2_dvb.mht MHT file
s100051_09_Appendix_C_Road Maintenance_SFF.pdf PDF
s100051_05_Appendix_A4_SPS's.pdf PDF
s100051_07_Appendix_A5_Service_SFF_alternate_presentation.pdf PDF
s100051_12_Appendix_D_DWG_31-76.pdf PDF
s100051_00_Main_Contract_IRSC_RFP_Construction_SFF.pdf PDF
s100051_00_Short_set_IRSC_RFP_Construction_SFF.pdf PDF
s100051_01_Appendix_A1_Service_SFF_alternate_presentation_changes 6_30.pdf PDF
s100051_15_Attachment_03_DUI_saw_nonsaw_units.pdf PDF
s100051_03_Appendix_A3_Service_SFF_alternate_presentation.pdf PDF
map2_A_draft.pdf PDF
map5_A_draft.pdf PDF
map3_A_draft.pdf PDF
map_B_index.pdf PDF
map8_B_draft.pdf PDF
map1_A_draft.pdf PDF
map4_A_draft.pdf PDF
map10_B_draft.pdf PDF
map9_B_draft.pdf PDF
map6_B_draft.pdf PDF
map7_B_draft.pdf PDF
2010_0514_ltr_timber_purchasers_ptac_.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-03R6-S-10-0051

South Fork Fish Creek Stewardship IRSC / Lolo NF Appendix A-4, Page 1 of 1

APPENDIX A-4

STEWARDSHIP CONTRACT

ROAD STORAGE AND DECOMMISSIONING

Unless otherwise agreed to in writing by the Contracting Officer, the Contractor shall perform services according to the following requirements:

1. Haul Road Storage and Decommissioning (SCHEDULE OF ITEMS B.1.10)

(a) This is a Mandatory Item.

(b) The Contractor shall perform haul road storage and decommissioning services in accordance with all of the requirements of this contract, including, but not limited to the Supplemental Specifications and Drawings attached to this Appendix.

2. Hanger Road Storage and Decommissioning (SCHEDULE OF ITEMS B.1.11)

(a) This is a Mandatory Item.

(b) The Contractor shall perform hanger road storage and decommissioning services in accordance with all of the requirements of this contract, including, but not limited to the Supplemental Specifications and Drawings attached to this Appendix.

3. O'Neil Creek Road Storage and Decommissioning (SCHEDULE OF ITEMS B.1.12)

(a) This is a Optional Item (Government Option).

(b) The Contractor shall perform culvert removal, road storage and decommissioning services in accordance with all of the requirements of this contract, including, but not limited to the Supplemental Specifications and Drawings attached to this Appendix.

4. Quality assurance surveillance plan / performance requirements summary

The following describes the major items in the contract with the incentives and deductions for the work described. Items below are included here as requirements.

5. Attachments to Appendix A-4

(a) Supplemental Specifications, 23 pages

(b) Drawings, 17 pages

Work Statement Performance Standard

Government Method of Assessment

Incentive/ deduction

Road/Hanger Road Decommissioning/Culvert Removals

Meets requirements of Appendix A-4.

COR/ER or Inspector conduct periodic monitoring and visual inspection.

• Rework is required if Contractor fails to meet standard.

• The Contractor’s quality will be reflected in the performance assessment either positive or negative.

• If the Contractor fails to meet standards, work may be suspended or put in Default for failure to take corrective action immediately. Result in adverse performance assessment.

File details come from the government source that posted it. Updated .