AG-03R6-S-10-0051
South Fork Fish Creek Stewardship IRSC / Lolo NF Appendix A-4, Page 1 of 1
APPENDIX A-4
STEWARDSHIP CONTRACT
ROAD STORAGE AND DECOMMISSIONING
Unless otherwise agreed to in writing by the Contracting Officer, the Contractor shall perform services according to the following requirements:
1. Haul Road Storage and Decommissioning (SCHEDULE OF ITEMS B.1.10)
(a) This is a Mandatory Item.
(b) The Contractor shall perform haul road storage and decommissioning services in accordance with all of the requirements of this contract, including, but not limited to the Supplemental Specifications and Drawings attached to this Appendix.
2. Hanger Road Storage and Decommissioning (SCHEDULE OF ITEMS B.1.11)
(a) This is a Mandatory Item.
(b) The Contractor shall perform hanger road storage and decommissioning services in accordance with all of the requirements of this contract, including, but not limited to the Supplemental Specifications and Drawings attached to this Appendix.
3. O'Neil Creek Road Storage and Decommissioning (SCHEDULE OF ITEMS B.1.12)
(a) This is a Optional Item (Government Option).
(b) The Contractor shall perform culvert removal, road storage and decommissioning services in accordance with all of the requirements of this contract, including, but not limited to the Supplemental Specifications and Drawings attached to this Appendix.
4. Quality assurance surveillance plan / performance requirements summary
The following describes the major items in the contract with the incentives and deductions for the work described. Items below are included here as requirements.
5. Attachments to Appendix A-4
(a) Supplemental Specifications, 23 pages
(b) Drawings, 17 pages
Work Statement Performance Standard
Government Method of Assessment
Incentive/ deduction
Road/Hanger Road Decommissioning/Culvert Removals
Meets requirements of Appendix A-4.
COR/ER or Inspector conduct periodic monitoring and visual inspection.
• Rework is required if Contractor fails to meet standard.
• The Contractor’s quality will be reflected in the performance assessment either positive or negative.
• If the Contractor fails to meet standards, work may be suspended or put in Default for failure to take corrective action immediately. Result in adverse performance assessment.