s100051_00_short_set_Contract_IRSC_amend_01.pdf

PDF 457 KB Posted

Attached to
Lolo National Forest, South Fork Fish Creek Stewardship IRSC
Solicitation number
AG-03R6-S-10-0051
Issued by

About this file

00 Short Set Solicitatation Pkg (Amendment No. 01)

View the file

Other files

File Type Posted
s100051_17_appendix_b_complete_maps_amend_02.pdf PDF
s100051_16_appendix_a_complete_maps_amend_02.pdf PDF
s100051_00_short_solicitation_pkg_amend_02_changes.pdf PDF
s100051_09_Appendix_C_Road Maintenance_SFF_amend_02_CHANGES.pdf PDF
s100051_00_Main_Contract_IRSC_amend_02_CHANGES.pdf PDF
Amend_02.pdf PDF
s100051_08_Appendix_B_amend_02_CHANGES.pdf PDF
2010_0721_pre-proposal_conf_notes_loren.pdf PDF
Amend_01.pdf PDF
s100051_03_Appendix_A3_Service_amend_01.pdf PDF
s100051_02_Appendix_A2_Service_amend_01.pdf PDF
s100051_15_Attachment_03_amend_01.pdf PDF
s100051_00_Main_Contract_IRSC_amend_01.pdf PDF
s100051_06_Appendix_A4_DWG_amend_01.pdf PDF
s100051_16_appendix_a_complete_maps.pdf PDF
s100051_01_Appendix_A1_Service_amend_01.pdf PDF
s100051_17_appendix_b_complete_maps.pdf PDF
s100051_10_Appendix_D_amend_01.pdf PDF
s100051_08_Appendix_B_amend_01.pdf PDF
Appendix B Maps.pdf PDF
s100051_11_Appendix_D_DWG_1-30.pdf PDF
s100051_06_Appendix_A4_DWG_july7th.pdf PDF
s100051_04_Appendix_A4_Service_SFF_alternate_presentation.pdf PDF
Appendix A Maps.pdf PDF
s100051_10_Appendix_D.pdf PDF
s100051_02_Appendix_A2_Service_SFF_alternate_presentation.pdf PDF
s100051_13_Attachment_02_76-1342_sca.mht MHT file
s100051_08_Appendix_B.pdf PDF
s100051_14_Attachment_02_MT2_dvb.mht MHT file
s100051_09_Appendix_C_Road Maintenance_SFF.pdf PDF
s100051_05_Appendix_A4_SPS's.pdf PDF
s100051_07_Appendix_A5_Service_SFF_alternate_presentation.pdf PDF
s100051_12_Appendix_D_DWG_31-76.pdf PDF
s100051_00_Main_Contract_IRSC_RFP_Construction_SFF.pdf PDF
s100051_00_Short_set_IRSC_RFP_Construction_SFF.pdf PDF
s100051_01_Appendix_A1_Service_SFF_alternate_presentation_changes 6_30.pdf PDF
s100051_15_Attachment_03_DUI_saw_nonsaw_units.pdf PDF
s100051_03_Appendix_A3_Service_SFF_alternate_presentation.pdf PDF
map2_A_draft.pdf PDF
map5_A_draft.pdf PDF
map3_A_draft.pdf PDF
map_B_index.pdf PDF
map8_B_draft.pdf PDF
map1_A_draft.pdf PDF
map4_A_draft.pdf PDF
map10_B_draft.pdf PDF
map9_B_draft.pdf PDF
map6_B_draft.pdf PDF
map7_B_draft.pdf PDF
2010_0514_ltr_timber_purchasers_ptac_.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment No. 01, dated 7/23/2010

SOLICITATION FORMS

(FOR OFFEROR’S USE IN SUBMITTING OFFER)

NOTE: Attached forms must be completed and submitted intact.

Issuing Office:

U.S. Department of Agriculture Forest Service

Western Montana Acquisition Zone Building 24, Fort Missoula

Missoula, MT 59804

Solicitation No.

RFP AG-03R6-S-10-0051

Offers Are Solicited For:

South Fork Fish Creek Stewardship IRSC Lolo National Forest

Ninemile Ranger District Mineral County, Montana

**NOTICE TO OFFEROR**

Return your offer to:

USDA – Forest Service Western Montana Acquisition Zone ATTN: Solicitation No. AG-03R6-S-10-0051 Building 24 – Fort Missoula

IMPORTANT - NOTICE TO OFFEROR

1. Information, Instructions and documents for submission of offers are contained in this packet. It contains only Part I, Sections A and B, and Part IV, Sections K, L, and M. TO ASSURE THAT YOUR OFFER IS RESPONSIVE, ALL DOCUMENTS CONTAINED IN THIS PACKET SHOULD BE COMPLETED AND RETURNED INTACT AS YOUR OFFER. The Offeror’s Copy contains the complete solicitation and should be retained by the Offeror for reference.

2. Before mailing your offer, please recheck the following:

(a) Does your offer set forth full, accurate, and complete information as required by this solicitation including attachments and any amendments which may have been issued?

(b) Have you rechecked your figures, including calculations on your worksheets?

(c) If bid guarantee is required, is it enclosed in proper form and the amount including Power of Attorney?

(d) Have you completed and signed all required documents?

FS-6300-44

Integrated Resource Service Contract (IRSC)—Construction - Amendment No. 01, dated 7/3/2010

OMB Approved No. 9000-0006

SOLICITATION OFFER AND AWARD 1.THIS CONTRACT IS A RATED ORDER RATING PAGE OF

UNDER DPAS (15 CFR 350) 1 78 PAGES

2. CONTRACT NO. 3. SOLICITATION NO. 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE

[ ] SEALED BID (IFB) NO.

AG-03R6-S-10-0051 [X ] NEGOTIATED (RFP) July 12, 2010

7. ISSUED BY CODE 8. ADDRESS OFFER TO (If other than Item 7) USDA – Forest Service Western Montana Acquisition Zone Building 24 – Fort Missoula

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

9. Sealed offers in original and See L. 7 copies for furnishing the supplies or serviced in Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in Building 24 – Fort Missoula, Missoula, MT 59804 until 4:00 P.M. local time August 11, 2010 (Hour) (Date) CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-10. All Offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION A. NAME B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

CALL: Loren Ebner, Admin. Contracting Officer 406-329-3858

11. TABLE OF CONTENTS

() SEC. DESCRIPTION PAGE(S) () SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE PART II - CONTRACT CLAUSES

X A SOLICITATION/CONTRACT FORM 1 X I CONTRACT CLAUSES 14

X B SUPPLIES OR SERVICES AND PRICES/COSTS 19 PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.

X C DESCRIPTION/SPECS./WORK/STATEMENT 2 X J LIST OF ATTACHMENTS 1

D PACKAGING AND MARKING PART IV - REPRESENTATIONS AND INSTRUCTIONS

X E INSPECTION AND ACCEPTANCE 1 X K REPRESENTATIVES, CERTIFICATIONS AND 6

X F DELIVERIES OR PERFORMANCE 3 OTHER STATEMENTS OF OFFERORS

X G CONTRACT ADMINISTRATION DATA 3 X L INSTRS., CONDS., AND NOTICES TO OFFERORS 7

X H SPECIAL CONTRACT REQUIREMENTS 18 X M EVALUATION FACTORS FOR AWARD 3

OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT 10 CALENDAR DAYS 20 CALENDAR DAYS 30 CALENDAR DAYS CALENDAR DAYS (See Section I, Clause No. 52-232-8) % % % %

14. ACKNOWLEDGMENT OF AMENDMENTS AMENDMENT NO. DATE AMENDMENT NO. DATE

(The offeror acknowledges receipt of amend-ments to the SOLICITATION for offerors and related documents numbered and dated.

15A. NAME CODE FACILITY 16. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

AND OFFER (Type or Print)

ADDRESS

OF

OFFEROR

15B. TELEPHONE NO. (Include area 15C. CHECK IF REMITTANCE ADDRESS 17. SIGNATURE 18. OFFER DATE code) IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

10 U.S.C. 2304 (c)

) 41 U.S.C. 142(c) ( ) (4 copies unless otherwise specified)

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EDWARD W. HODGES, CONTRACTING OFFICER

(Signature of Contracting Officer) IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

NSN 7540_01_152_8064 33-133 STANDARD FORM 33 (REV.4-85)

PREVIOUS EDITION NOT USABLE Prescribed by GSA FAR (48 CFR) 53.214(c)

Amendment No. 01, dated 7/23/2010 AG-03R6-S-10-0051 South Fork Fish Creek Stewardship IRSC / Lolo NF

PART I – THE SCHEDULE

SECTION B – SERVICES AND PRICES

Ninemile Ranger District Lolo National Forest

Mineral County, Montana

SCHEDULE OF ITEMS

NOTE

: Price Proposals MUST be provided on ALL Items in Schedules B. 1, Base and Option Work Activities and B. 2, Timber Removal Price Schedule.

B. 1 BASE AND OPTION WORK ACTIVITIES

ITEM

NO.

DESCRIPTION UNIT ESTIMATED

QUANTITY

UNIT

PRICE

TOTAL

B.1.1

Fuels Reduction: Dead lodgepole pine non-saw product removal 7.0”+ diameter at breast height

– tractor harvest system. Services in accordance with Appendices A-1 and B. (NOTE 2 Fuels Reduction (Tractor)

Mandatory Units: 26T, 2T AC 22 $_________ $_______

B.1.2

Fuels Reduction: Dead lodgepole pine non-saw product removal 7.0”+ diameter at breast height

– skyline harvest system. Services in accordance with Appendices A-1 and B. (NOTE 2 Fuels Reduction (Skyline)

Mandatory Units: 2S, 3S AC 38 $_________ $_______

B.1.3

Fuels Reduction: Live lodgepole pine non-saw product removal 5.0 to 5.9”; Dead lodgepole pine non-saw diameter at breast height 5+” – tractor harvest system. Services in accordance with Appendices A-1 and B. ( Fuels Reduction (Tractor)

NOTE 2)

Mandatory Unit: 7 AC 16 $_________ $_______

B.1.4

Fuels Reduction: Live Douglas-fir non-saw product removal 6.0-6.9” diameter at breast height – skyline harvest system. Services in accordance with Appendices A-1 and B. (NOTE 2 Fuels Reduction (Skyline)

Mandatory Units: 14, 26S AC 221 $_________ $_______

B.1.5

Fuels Reduction: Live Douglas-fir non-saw product removal 6.0-6.9” diameter at breast height – tractor harvest system. Services in accordance with Appendices A-1 and B. (NOTE 2 Fuels Reduction (Tractor)

Mandatory Unit: 26T AC 14 $_________ $_______

ITEM

NO.

DESCRIPTION UNIT ESTIMATED

QUANTITY

UNIT

B.1.6

Fuels Reduction: Removal of down and dead unmerchantable material – tractor harvest system.

Services in accordance with Appendices A-1 and B. (NOTE 2 Fuels Reduction (Tractor)

Mandatory Unit: 2T AC 8 $_________ $_______

Fuels Reduction: Removal of down and dead unmerchantable material – skyline harvest system.

Services in accordance with Appendices A-1 and B. (NOTE 2

B.1.7

Fuels Reduction (Skyline) Mandatory Units: none AC

N/A

Fuels Reduction (Skyline) Optional Unit: 2S 14 $_______

Soil De-compaction and Slash Placement. Services in accordance with Appendix A-2.

(NOTE 2

B.1.8

Soil De-compaction, Road Obliteration and Slash Placement Mandatory Unit: 7

AC

Soil De-compaction, Road Obliteration and Slash Placement Optional Units:

none

0 N/A

Dust Abatement (MgCl). Services in accordance with Appendix A-3. (NOTE 2

B.1.9

Dust Abatement (MgCl).

Mandatory Roads: 343 (1st Treatment) Miles

4.55 $_________ $_______

Dust Abatement (MgCl).

Optional Roads: 343 (2nd Treatment) 4.55 $_________ $_______

Haul Road Storage and Decommissioning. Services in accordance with Appendix A-4.

B.1.10

Haul Road Storage and Decommissioning. Mandatory Roads:

See Appendix A-4.

See the Detailed Price Schedules Below. Insert the total for all items identified with B.1.10 here.

Hanger Road Storage and Decommissioning. Services in accordance with

Appendix A-4. (NOTE 2 B.1.11

Hanger Road Storage and Decommissioning.

Mandatory Roads: See Appendix A-4

See the Detailed Price Schedules Below. Insert the total for all items identified with B.1.11 here.

O'Neil Creek Road Storage and Decommissioning. Services in accordance with Appendix A-4.

B.1.12

O'Neil Creek Road Storage and Decommissioning.

Optional Roads: See Appendix A-4.

See the Detailed Price Schedules Below. Insert the total for all items identified with B.1.12 here.

ITEM

NO.

DESCRIPTION UNIT ESTIMATED

QUANTITY

UNIT

PRICE

Machine Fire Line Construction. Services in accordance with Appendix A-5. (NOTE 2

B.1.13

Machine Fire Line Construction.

Mandatory Units: none Miles

N/A

Machine Fire Line Construction.

Optional Units: 12, 14, 23, 26, 92 4.3 $_______

Hand Fire Line Construction. Services in accordance with Appendix A-5. (NOTE 2

B.1.14

Hand Fire Line Construction Mandatory Units: none Miles

N/A

Hand Fire Line Construction Optional Units: 1, 2, 3, 90, 91, 93, 94, 95 5.4 $_______

Thinning and Slashing. Services in accordance with Appendix A-5. (NOTE 2

B.1.15

Thinning and Slashing.

Mandatory Units: none AC

N/A

Thinning and Slashing.

Optional Units: 2, 3, 12, 90, 91, 92, 93, 94, 435 $_______

Hand Piling of Fuels. Services in accordance with Appendix A-5. (NOTE 2

B.1.16

Hand Piling of Fuels Mandatory Units: none

AC

N/A

Hand Piling of Fuels.

Optional Units: 2, 3, 12, 90, 91, 92, 93, 94, 435 $_______

Road Maintenance. Services in accordance with Appendix C. (NOTE 2

B.1.17

Road Maintenance – Entire Contract Area for entire contract time.

Mandatory Units: All

LS 1 $_________ $_______

Road Construction and Reconstruction. Services in accordance with Appendix D. (NOTE 3

B.1.18

Road Construction and Reconstruction Mandatory Roads: See Appendix D

See the Detailed Price Schedules Below. Insert the total for all items identified with B.1.18 here.

B. 2 TIMBER REMOVAL PRICE SCHEDULE

SPECIES

PRODUCT

QUANTITY

UNIT OF

MEASURE

MINIMUM

ACCEPTABLE

OFFER

(FLAT)

ALL

SAW

28463

Ton

$6.88

(NOTE 4

ALL

NONSAW

Ton

$0.33

(NOTE 5

See Timber Removal Project Terms and Specifications in Appendix B.

NOTE 1: THESE SCHEDULES ARE FOR PRICING/PAYMENT PURPOSES. SEE SECTION L FOR

BUSINESS PROPOSAL REQUIREMENTS.

NOTE 2: Service Item. Service Contract Act is applicable to this work.

NOTE 3: Construction Item. Davis-Bacon Act is applicable to this work. Performance and Payment Bonds Required (See Paragraph I.12).

NOTE 4: The Minimum Acceptable Offer identified by the Government in B. 2. for sawtimber was determined by Government analysis of a draft Transaction Evidence appraisal and current market conditions.

NOTE 5: The Minimum Acceptable Offer identified by the Government in B. 2. for non-sawtimber was determined by Government analysis of a draft Transaction Evidence appraisal and current market conditions.

NOTE 6

: The Optional Items identified under B.1.1 – B.1.16 above are Items that may be exercised at the Government’s option in accordance with Paragraphs I. 5 and I. 6 herein.

Detailed Price Schedules for Item No. B.1.10

Haul Road Storage and Decommissioning

ITEM

DESCRIPTION

METHOD of

PAY

UNIT

EST.

QTY.

151(01) Mobilization LSQ Lump Sum 1 XXXXXXX $__________

211(03)3S Roadway Storage, Method 3S DQ Mile 7.12 $_________ $_________

211(03)5 Roadway Decommissioning, Method 5 DQ Mile 0.85 $_________ $_________

622(01)E Equipment Rental, Excavator AQ Hour 2 $_________ $_________

625(01) Seeding, Dry Method without Mulch DQ Acre 13.46 $_________ $_________

ITEM B.1.10 GRAND TOTAL (Insert this total on the Schedule of Items) $________________

Detailed Price Schedules for Item No. B.1.11

Hanger Road Storage and Decommissioning

151(01) Mobilization LSQ Lump Sum 1 XXXXXXX $_________

211(03)3S Roadway Storage, Method 3S DQ Mile 1.61 $_________ $_________

211(03)3D Roadway Decommissioning, Method 3D DQ Mile 0.16 $_________ $_________

211(03)5 Roadway Decommissioning, Method 5 DQ Mile 0.31 $_________ $_________

622(01)E Equipment Rental, Excavator AQ Hour 10 $_________ $_________

625(01) Seeding, Dry Method without Mulch DQ Acre 3.77 $_________ $_________

ITEM B.1.11 GRAND TOTAL (Insert this total on the Schedule of Items) $________________

Detailed Price Schedules for Item No. B.1.12

(Optional) – O’Neil Creek Road Storage and Decommissioning

151(01) Mobilization LSQ Lump Sum 1 XXXXXXX $_________

211(01)MN Removal of Minor Culvert, Disposal Method A AQ Each 2 $_________ $_________

203(01)MJ Removal of Major Culvert, Disposal Method A AQ Each 3 $_________ $_________

211(03)3S Roadway Storage, Method 3S DQ Mile 1.67 $_________ $_________

211(03)3D Roadway Decommissioning, Method 3D DQ Mile 1.28 $_________ $_________

211(03)5 Roadway Decommissioning, Method 5 DQ Mile 0.73 $_________ $_________

211(03)5FP Roadway Decommissioning, Method 5 FP DQ Mile 1.22 $_________ $_________

622(01)E Equipment Rental, Excavator AQ Hour 26 $_________ $_________

625(01) Seeding, Dry Method without Mulch DQ Acre 8.29 $_________ $_________

680(51) Weed Spraying, Pre-Treatment DQ Acre 13.59 $_________ $__________

ITEM B.1.12 GRAND TOTAL (Insert this total on the Schedule of Items) $________________

The following construction items (B.1.18) are estimated between $250,000.00 and $500,000.00. (This is the anticipated price range of this portion of the project (B.1.18), in accordance with FAR 36.204.)

Detailed Price Schedules for Item No. B.1.18

METHOD UNIT

ITEM DESCRIPTION MEASURE UNIT QUANTITY COST COST

151(01) Mobilization (for all items under B.1.18) LSQ LS 1 XXXXXX $_________

Road 343

157(52) Sediment Basin AQ EA 1 $________ $________

202(07) Removal of Individual Trees, Disposal of Tops and Limbs a, b, g, k; Logs I;

Stumps b, c, g.

AQ EA 1 $________ $________

204(20)RB Drainage Excavation, Type, Reshape Catchbasin AQ EA 1 $________ $________

251(10)1 Hand-Placed RipRap, Class 1 DQ CY 1 $________ $________

252(05) Rock Buttress, Hand-Placed DQ CY 1 $________ $________

303(22)B Road Reconditioning, Compaction Method B DQ Mile 4.62 $________ $________

602(50)18 18-Inch Corrugated Metal Pipe, 0.064- Inch Thickness for Steel, 0.060-Inch Thickness for Aluminum, Method B

AQ LF 6 $________ $________

607(08) Cleaning Culverts in Place AQ EA 5 $________ $________

625(55) Seeding, Dry Method, Seed Mix A DQ Acre 0.07 $________ $________

670(50) Slash Filter Windrow AQ LF 865 $________ $________

Total Road 343 $________

Road 490

157(52) Sediment Basin AQ EA 1 $__________ $__________

202(06) Removal of Individual Stumps, Disposal Methods b, c, g. AQ EA 2 $_________ $__________

202(07) Removal of Individual Trees, Disposal of Tops and Limbs a, b, g, k; Logs I; Stumps b, c, g. AQ EA 13 $_________ $__________

203(01)G Removal of Gates AQ EA 1 $_________ $__________

203(01)SN Removal of Signs AQ EA 1 $_________ $__________

204(01) Roadway Excavation, Compaction Method C, Finishing Method A DQ CY 1097 $_________ $__________

204(20)DS Drainage Excavation, Type, Construct Drain Dip AQ EA 4 $_________ $__________

251(10)1 Hand-Placed RipRap, Class 1 DQ CY 0.5 $_________ $__________

303(22)A Road Reconditioning, Compaction Method A DQ Mile 2.67 $_________ $__________

303(52) Construct 4% Outslope for 50 Ft. Ahead AQ EA 7 $_________ $__________

303(53) Reshape Drain Dip AQ EA 2 $_________ $__________

625(55) Seeding, Dry Method, Seed Mix A DQ Acre 2.209 $_________ $__________

633(52) Furnish and Install Sign (Including Posts) AQ EA 1 $_________ $__________

650(01)SG Furnish and Install Standard Gate AQ EA 1 $_________ $__________

660(50)OT Cross Drain, Type, Treated Timber Opentop AQ LF 44 $_________ $__________

670(50) Slash Filter Windrow AQ LF 690 $_________ $__________

Total Road 490 $__________

Road 4212

204(01) Roadway Excavation, Compaction Method C, Finishing Method A DQ CY 104 $_________ $__________

204(20)RB Drainage Excavation, Type, Reshape Catchbasin AQ EA 1 $_________ $__________

251(10)1 Hand-Placed RipRap, Class 1 DQ CY 1 $_________ $__________

252(05) Rock Buttress, Hand-Placed DQ CY 1 $_________ $__________

303(22)A Road Reconditioning, Compaction Method A DQ Mile 0.05 $_________ $__________

625(55) Seeding, Dry Method, Seed Mix A DQ Acre 0.045 $_________ $__________

Total Road 4212 $_________

Road 4218

152(50) Construction Staking, Culverts Only, Precision E, Method 1 AQ EA 2 $_________ $__________

202(07) Removal of Individual Trees, Disposal of Tops and Limbs a, b, g, k; Logs I; Stumps b, c, g. AQ EA 4 $_________ $__________

203(01)C Removal of Culverts AQ EA 2 $_________ $__________

203(01)G Removal of Gates AQ EA 1 $_________ $__________

203(01)OT Removal of Opentops AQ EA 2 $_________ $__________

203(01)RB Removal of Rubberbelts AQ EA 1 $_________ $__________

203(01)SN Removal of Signs AQ EA 2 $_________ $__________

204(02)D Roadway Excavation, Compaction Method D, Finishing Method A DQ Mile 0.02 $_________ $__________

204(20)DS Drainage Excavation, Type, Construct Drain Dip AQ EA 8 $_________ $__________

204(20)RB Drainage Excavation, Type, Reshape Catchbasin AQ EA 6 $_________ $__________

230(50) Roadside Brushing DQ Mile 3.92 $_________ $__________

251(10)1 Hand-Placed RipRap, Class 1 DQ CY 2.5 $_________ $__________

303(22)A Road Reconditioning, Compaction Method A DQ Mile 3.92 $_________ $__________

303(52) Construct 4% Outslope for 50 Ft. Ahead AQ EA 19 $_________ $__________

303(53) Reshape Drain Dip AQ EA 3 $_________ $__________

602(50)18 18-Inch Corrugated Metal Pipe, 0.064-Inch Thickness for Steel, 0.060-Inch Thickness for Aluminum, Method B

AQ LF 52 $_________ $__________

602(51)2028

20-Inch Rise x 28-Inch Span Corrugated Metal Pipe Arch, 0.064-Inch Thickness for Steel, 0.060-Inch Thickness for Aluminum, Method B

AQ LF 26 $_________ $__________

607(08) Cleaning Culverts in Place AQ EA 4 $_________ $__________

622(01) Rental Equipment, Hydraulic Excavator AQ HR 4 $_________ $__________

625(55) Seeding, Dry Method, Seed Mix A DQ Acre 1.479 $_________ $__________

633(52) Furnish and Install Sign (Including Posts) AQ EA 1 $_________ $__________

650(01)SG Furnish and Install Standard Gate, Size 16’ AQ EA 1 $_________ $__________

660(50)OT Cross Drain, Type, Treated Timber Opentop AQ LF 154 $_________ $__________

Total Road 4218 $_________

Road 5570

Precision E, Method 1 AQ EA 3 $_________ $__________

157(52) Sediment Basin AQ EA 3 $_________ $__________

202(07) Removal of Individual Trees, Disposal of Tops and Limbs a, b, g, k; Logs I; Stumps b, c, g. AQ EA 4 $_________ $__________

203(01)C Removal of Culverts AQ EA 1 $_________ $__________

203(01)G Removal of Gates AQ EA 1 $_________ $__________

204(02)C Roadway Excavation, Compaction Method C, Finishing Method A DQ Mile 0.09 $_________ $__________

204(02)D Roadway Excavation, Compaction Method D, Finishing Method A DQ Mile 0.05 $_________ $__________

204(19)D Drainage Excavation, Type, Construct Ditch DQ Feet 3250 $_________ $__________

204(19)LOD Drainage Excavation, Type, Construct Lead- Out Ditch DQ Feet 75 $_________ $__________

204(20)DS Drainage Excavation, Type, Construct Drain Dip AQ EA 2 $_________ $__________

204(20)RB Drainage Excavation, Type, Reshape Catchbasin AQ EA 7 $_________ $__________

211(03) Roadway Obliteration, Method 1 DQ Mile 0.055 $_________ $__________

230(50) Roadside Brushing DQ Mile 4.76 $_________ $__________

251(10)1 Hand-Placed RipRap, Class 1 DQ CY 7.75 $_________ $__________

252(05) Rock Buttress, Hand-Placed DQ CY 7 $_________ $__________

303(22)A Road Reconditioning, Compaction Method A DQ Mile 4.76 $_________ $__________

303(52) Construct 4% Outslope for 50 Ft. Ahead AQ EA 10 $_________ $__________

602(50)18 18-Inch Corrugated Metal Pipe, 0.064-Inch Thickness for Steel, 0.060-Inch Thickness for Aluminum, Method B

AQ LF 128 $_________ $__________

607(08) Cleaning Culverts in Place AQ EA 7 $_________ $__________

622(01) Rental Equipment, Hydraulic Excavator AQ HR 4 $_________ $__________

625(55) Seeding, Dry Method, Seed Mix A DQ Acre 2.81 $_________ $__________

650(01)SG Furnish and Install Standard Gate, Size 16’ AQ EA 1 $_________ $__________

660(50)OT Cross Drain, Type, Treated Timber Opentop AQ LF 44 $_________ $__________

660(50)RB Cross Drain, Type, Rubberbelted AQ LF 88 $_________ $__________

670(50) Slash Filter Windrow AQ LF 920 $_________ $__________

Total Road 5570 $_________

Road 16533

201(04) Clearing and Grubbing, Disposal of Tops and

Limbs a, b, g, k; Logs I; Stumps b, c, g. DQ Acre 0.49 $_________ $__________

204(01)A Roadway Excavation, Compaction Method C, Finishing Method A DQ CY 798 $_________ $__________

204(02)C Roadway Excavation, Compaction Method C, Finishing Method A DQ Mile 0.1 $_________ $__________

204(04) Unclassified Borrow, Compaction Method C, Finishing Method A DQ CY 680 $_________ $__________

204(20)DS Drainage Excavation, Type, Construct Drain Dip AQ EA 6 $_________ $__________

230(50) Roadside Brushing DQ Mile 0.65 $_________ $__________

251(10)1 Hand-Placed RipRap, Class 1 DQ CY 1.25 $_________ $__________

303(22)A Road Reconditioning, Compaction Method A DQ Mile 0.65 $_________ $__________

303(52) Construct 4% Outslope for 50 Ft. Ahead AQ EA 1 $_________ $__________

625(55) Seeding, Dry Method, Seed Mix A DQ Acre 0.83 $_________ $__________

633(50) Furnish and Install Route Marker AQ EA 1 $_________ $__________

670(50) Slash Filter Windrow AQ LF 105 $_________ $__________

Total Road 16533 $_________

Road 17442

202(06) Removal of Individual Stumps, Disposal

Methods b, c, g. AQ EA 3 $_________ $__________

202(07) Removal of Individual Trees, Disposal of Tops and Limbs a, b, g, k; Logs I; Stumps b, c, g. AQ EA 42 $_________ $__________

203(01)RB Removal of Rubberbelts AQ EA 1 $_________ $__________

204(19)D Drainage Excavation, Type, Construct Ditch DQ Feet 340 $_________ $__________

204(19)LOD Drainage Excavation, Type, Construct Lead- Out Ditch DQ Feet 60 $_________ $__________

230(50) Roadside Brushing DQ Mile 0.77 $_________ $__________

303(22)A Road Reconditioning, Compaction Method A DQ Mile 0.77 $_________ $__________

303(52) Construct 4% Outslope for 50 Ft. Ahead AQ EA 4 $_________ $__________

303(53) Reshape Drain Dip AQ EA 1 $_________ $__________

625(55) Seeding, Dry Method, Seed Mix A DQ Acre 0.541 $_________ $__________

660(50)OT Cross Drain, Type, Treated Timber Opentop AQ LF 22 $_________ $__________

Total Road 17442 $__________

Road 17444

Precision E, Method 1 AQ EA 1 $_________ $__________

152(58) Construction Staking, Both Sides, Precision E, Method 1 DQ Mile 0.1 $_________ $__________

201(04) Clearing and Grubbing, Disposal of Tops and Limbs a, b, g, k; Logs I; Stumps b, c, g. DQ Acre 0.4 $_________ $__________

202(06) Removal of Individual Stumps, Disposal Methods b, c, g. AQ EA 1 $_________ $__________

202(07) Removal of Individual Trees, Disposal of Tops and Limbs a, b, g, k; Logs I; Stumps b, c, g. AQ EA 50 $_________ $__________

204(01) Roadway Excavation, Compaction Method C, Finishing Method A DQ CY 893 $_________ $__________

204(19)D Drainage Excavation, Type, Construct Ditch DQ Feet 225 $_________ $__________

204(20)DS Drainage Excavation, Type, Construct Drain Dip AQ EA 5 $_________ $__________

230(50) Roadside Brushing DQ Mile 1.61 $_________ $__________

252(05) Rock Buttress, Hand-Placed DQ CY 1 $_________ $__________

303(22)A Road Reconditioning, Compaction Method A DQ Mile 1.61 $_________ $__________

303(52) Construct 4% Outslope for 50 Ft. Ahead AQ EA 10 $_________ $__________

322(22) Pit Run Aggregate, Maximum Size 2-Inch, Compaction Method C DQ CY 85 $_________ $__________

602(50)18 18-Inch Corrugated Metal Pipe, 0.064-Inch Thickness for Steel, 0.060-Inch Thickness for Aluminum, Method B

AQ LF 40 $_________ $__________

625(55) Seeding, Dry Method, Seed Mix A DQ Acre 1.37 $_________ $__________

660(50)RB Cross Drain, Type, Rubberbelted AQ LF 22 $_________ $__________

670(50) Slash Filter Windrow AQ LF 125 $_________ $__________

Total Road 17444 $_________

Road 20408

152(19) Establish Clearing Limits DQ Mile 0.11 $_________ $__________

204(20)DS Drainage Excavation, Type, Construct Drain Dip AQ EA 2 $_________ $__________

249(50) Composite Road Construction DQ Mile 0.11 $_________ $__________

Total Road 20408 $__________

Road 20409

152(19) Establish Clearing Limits DQ Mile 0.17 $_________ $__________

249(50) Composite Road Construction DQ Mile 0.17 $_________ $__________

660(50)RB Cross Drain, Type, Rubberbelted AQ LF 44 $_________ $__________

Total Road 20409 $_________

Road 34145

152(58) Construction Staking, Both Sides, Precision E, Method 1 DQ Mile 0.42 $_________ $__________

201(03) Clearing and Grubbing, Disposal of Tops and Limbs a, b, g, k; Logs I; Stumps b, c, g. DQ Mile 0.99 $_________ $__________

201(04) Clearing and Grubbing, Disposal of Tops and Limbs a, b, g, k; Logs I; Stumps b, c, g. DQ Acre 2.13 $_________ $__________

204(01) Roadway Excavation, Compaction Method C, Finishing Method A DQ CY 70 $_________ $__________

204(01)A Roadway Excavation, Compaction Method C, Finishing Method A DQ CY 3257 $_________ $__________

204(02)C Roadway Excavation, Compaction Method C, Finishing Method A DQ Mile 1.00 $_________ $__________

204(19)D Drainage Excavation, Type, Construct Ditch DQ Feet 475 $_________ $__________

204(20)DS Drainage Excavation, Type, Construct Drain Dip AQ EA 7 $_________ $__________

211(01) Roadway Obliteration, Method 1 DQ SY 418 $_________ $__________

303(22)A Road Reconditioning, Compaction Method A DQ Mile 0.99 $_________ $__________

303(52) Construct 4% Outslope for 50 Ft. Ahead AQ EA 3 $_________ $__________

622(01) Rental Equipment, Hydraulic Excavator AQ HR 4 $_________ $__________

625(55) Seeding, Dry Method, Seed Mix A DQ Acre 5.177 $_________ $__________

660(50)RB Cross Drain, Type, Rubberbelted AQ LF 66 $_________ $__________

Total Road 34145 $_________

Road 34146

201(03) Clearing and Grubbing, Disposal of Tops and

Limbs a, b, g, k; Logs I; Stumps b, c, g. DQ Mile 0.255 $_________ $__________

204(50) Roadway Excavation, Compaction Method C, Finishing Method A DQ CY 364 $_________ $__________

230(50) Roadside Brushing DQ Mile 0.04 $_________ $__________

303(22)A Road Reconditioning, Compaction Method A DQ Mile 0.26 $_________ $__________

303(52) Construct 4% Outslope for 50 Ft. Ahead AQ EA 1 $_________ $__________

625(55) Seeding, Dry Method, Seed Mix A DQ Acre 0.17 $_________ $__________

Total Road 34146 $_________

Road 34154

Method 1 DQ Mile 0.15 $_________ $__________

201(04) Clearing and Grubbing, Disposal of Tops and Limbs a, b, g, k; Logs I; Stumps b, c, g. DQ Acre 0.92 $_________ $__________

202(06) Removal of Individual Stumps, Disposal Methods b, c, g. AQ EA 5 $_________ $__________

204(01)A Roadway Excavation, Compaction Method C, Finishing Method A DQ CY 1231 $_________ $__________

204(02)C Roadway Excavation, Compaction Method C, Finishing Method A DQ Mile 0.17 $_________ $__________

204(20)DS Drainage Excavation, Type, Construct Drain Dip AQ EA 1 $_________ $__________

211(03) Roadway Obliteration, Method 1 DQ Mile 0.114 $_________ $__________

230(50) Roadside Brushing DQ Mile 0.37 $_________ $__________

303(22)A Road Reconditioning, Compaction Method A DQ Mile 0.37 $_________ $__________

625(55) Seeding, Dry Method, Seed Mix A DQ Acre 1.289 $_________ $__________

660(50)RB Cross Drain, Type, Rubberbelted AQ LF 44 $_________ $__________

Total Road 34154 $__________

Road 34162

152(19) Establish Clearing Limits DQ Mile 0.145 $_________ $__________

Method 1 DQ Mile 0.37 $_________ $__________

201(04) Clearing and Grubbing, Disposal of Tops and Limbs a, b, g, k; Logs I; Stumps b, c, g. DQ Acre 0.56 $_________ $__________

204(01)A Roadway Excavation, Compaction Method C, Finishing Method A DQ CY 564 $_________ $__________

204(02)C Roadway Excavation, Compaction Method C, Finishing Method A DQ Mile 0.15 $_________ $__________

204(20)DS Drainage Excavation, Type, Construct Drain Dip AQ EA 4 $_________ $__________

230(50) Roadside Brushing DQ Mile 0.27 $_________ $__________

249(50) Composite Road Construction DQ Mile 0.145 $_________ $__________

303(22)A Road Reconditioning, Compaction Method A DQ Mile 0.27 $_________ $__________

625(55) Seeding, Dry Method, Seed Mix A DQ Acre 1.00 $_________ $__________

660(50)RB Cross Drain, Type, Rubberbelted AQ LF 88 $_________ $__________

Total Road 34162 $_________

Road 34163

230(50) Roadside Brushing DQ Mile 0.09 $_________ $__________

303(22)A Road Reconditioning, Compaction Method A DQ Mile 0.09 $_________ $__________

303(52) Construct 4% Outslope for 50 Ft. Ahead AQ EA 1 $_________ $__________

625(55) Seeding, Dry Method, Seed Mix A DQ Acre 0.067 $_________ $__________

Total Road 34163 $__________

Road 34168

152(19) Establish Clearing Limits DQ Mile 0.015 $_________ $__________

Limbs a, b, g, k; Logs I; Stumps b, c, g. DQ Mile 0.285 $_________ $__________

204(01) Roadway Excavation, Compaction Method C, Finishing Method A DQ CY 30 $_________ $__________

204(02)C Roadway Excavation, Compaction Method C, Finishing Method A DQ Mile 0.02 $_________ $__________

204(19)D Drainage Excavation, Type, Construct Ditch DQ Feet 390 $_________ $__________

204(20)DS Drainage Excavation, Type, Construct Drain Dip AQ EA 2 $_________ $__________

249(50) Composite Road Construction DQ Mile 0.015 $_________ $__________

303(22)A Road Reconditioning, Compaction Method A DQ Mile 0.285 $_________ $__________

625(55) Seeding, Dry Method, Seed Mix A DQ Acre 0.256 $_________ $__________

Total Road 34168 $__________

Road 34172

Precision E, Method 1 AQ EA 5 $_________ $__________

201(04) Clearing and Grubbing, Disposal of Tops and Limbs a, b, g, k; Logs I; Stumps b, c, g. DQ Acre 0.63 $_________ $__________

202(06) Individual Removal of Stumps, Disposal Methods b, c, g. AQ EA 1 $_________ $__________

202(07) Removal of Individual Trees, Disposal of Tops and Limbs a, b, g, k; Logs I; Stumps b, c, g. AQ EA 15 $_________ $__________

204(01) Roadway Excavation, Compaction Method C, Finishing Method A DQ CY 20 $_________ $__________

204(02)C Roadway Excavation, Compaction Method C, Finishing Method A DQ Mile 0.19 $_________ $__________

204(04) Unclassified Borrow, Compaction Method D, Finishing Method A DQ CY 335 $_________ $__________

204(19)D Drainage Excavation, Type, Construct Ditch DQ Feet 660 $_________ $__________

204(19)LOD Drainage Excavation, Type, Construct Lead- Out Ditch DQ Feet 50 $_________ $__________

204(20)DS Drainage Excavation, Type, Construct Drain Dip AQ EA 1 $_________ $__________

230(50) Roadside Brushing DQ Mile 0.915 $_________ $__________

251(10)1 Hand-Placed RipRap, Class 1 DQ CY 3.00 $_________ $__________

252(05) Rock Buttress, Hand-Placed DQ CY 3.00 $_________ $__________

253(14) Gabions, Welded Wire Baskets AQ CY 92.50 $_________ $__________

303(22)A Road Reconditioning, Compaction Method A DQ Mile 0.915 $_________ $__________

303(52) Construct 4% Outslope for 50 Ft. Ahead AQ EA 2 $_________ $__________

602(50)18 18-Inch Corrugated Metal Pipe, 0.064-Inch Thickness for Steel, 0.060-Inch Thickness for Aluminum, Method B

AQ LF 154 $_________ $__________

622(01) Rental Equipment, Hydraulic Excavator AQ HR 4 $_________ $__________

625(55) Seeding, Dry Method, Seed Mix A DQ Acre 1.675 $_________ $__________

633(50) Furnish and Install Route Marker AQ EA 1 $_________ $__________

660(50)RB Cross Drain, Type, Rubberbelted AQ LF 176 $_________ $__________

670(50) Slash Filter Windrow AQ LF 175 $_________ $__________

Total Road 34172 $__________

Road 34175

Limbs a, b, g, k; Logs I; Stumps b, c, g. DQ Mile 0.08 $_________ $__________

303(22)A Road Reconditioning, Compaction Method A DQ Mile 0.08 $_________ $__________

625(55) Seeding, Dry Method, Seed Mix A DQ Acre 0.048 $_________ $__________

Total Road 34175 $__________

Road 34184

Limbs a, b, g, k; Logs I; Stumps b, c, g. DQ Mile 0.21 $_________ $__________

204(01) Roadway Excavation, Compaction Method C, Finishing Method A DQ C.Y. 80 $_________ $__________

204(02)C Roadway Excavation, Compaction Method C, Finishing Method A DQ Mile 0.08 $_________ $__________

230(50) Roadside Brushing DQ Mile 0.24 $_________ $__________

303(22)A Road Reconditioning, Compaction Method A DQ Mile 0.45 $_________ $__________

625(55) Seeding, Dry Method, Seed Mix A DQ Acre 0.36 $_________ $__________

Total Road 34184 $__________

Road 34254

204(01) Roadway Excavation, Compaction Method C, Finishing Method A DQ CY 5 $_________ $__________

230(50) Roadside Brushing DQ Mile 0.04 $_________ $__________

303(22)A Road Reconditioning, Compaction Method A DQ Mile 0.04 $_________ $__________

625(55) Seeding, Dry Method, Seed Mix A DQ Acre 0.024 $_________ $__________

Total Road 34254 $__________

Road 34297

Limbs a, b, g, k; Logs I; Stumps b, c, g. DQ Mile 0.165 $_________ $__________

204(02)C Roadway Excavation, Compaction Method C, Finishing Method A DQ Mile 0.05 $_________ $__________

204(20)DS Drainage Excavation, Type, Construct Drain Dip AQ EA 1 $_________ $__________

303(22)A Road Reconditioning, Compaction Method A DQ Mile 0.165 $_________ $__________

625(55) Seeding, Dry Method, Seed Mix A DQ Acre 0.19 $_________ $__________

Total Road 34297 $__________

Road 34356

152(19) Establish Clearing Limits DQ Mile 0.57 $_________ $__________

Limbs a, b, g, k; Logs I; Stumps b, c, g. DQ Mile 0.88 $_________ $__________

204(01) Roadway Excavation, Compaction Method C, Finishing Method A DQ CY 25 $_________ $__________

204(02)C Roadway Excavation, Compaction Method C, Finishing Method A DQ Mile 0.31 $_________ $__________

204(19)D Drainage Excavation, Type, Construct Ditch DQ Feet 318 $_________ $__________

204(20)DS Drainage Excavation, Type, Construct Drain Dip AQ EA 7 $_________ $__________

249(50) Composite Road Construction DQ Mile 0.57 $_________ $__________

303(22)A Road Reconditioning, Compaction Method A DQ Mile 0.88 $_________ $__________

303(52) Construct 4% Outslope for 50 Ft. Ahead AQ EA 3 $_________ $__________

625(55) Seeding, Dry Method, Seed Mix A DQ Acre 1.12 $_________ $__________

Total Road 34356 $_________

Road 50000

Method 1 DQ Mile 0.03 $_________ $__________

201(04) Clearing and Grubbing, Disposal of Tops and Limbs a, b, g, k; Logs I; Stumps b, c, g. DQ Acre 0.08 $_________ $__________

204(01)A Roadway Excavation, Compaction Method C, Finishing Method A DQ CY 67 $_________ $__________

625(55) Seeding, Dry Method, Seed Mix A DQ Acre 0.032 $_________ $__________

Total Road 50000 $__________

ITEM B.1.18 GRAND TOTAL (Insert this total on the Schedule of Items) $______________

B. 3 LAND MANAGEMENT ACTIVITIES

Performance of land management activities shall be in accordance with Section C – Description and Specifications. Payment for Land Management Work Activities in Schedule B. 1, will be made in Stewardship Credits in lieu of cash, as defined in Section G. All Base Work Activities shall be performed. Option activities are listed in order of planned priority. Award may be made for option items in any order that the Contracting Officer determines is in the best interest of the Government.

PART IV - REPRESENTATIONS AND INSTRUCTIONS

SECTION K - REPRESENTATIONS, CERTIFICATIONS, AND ACKNOWLEDGEMENTS

K. 1 FAR 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (FEB 2009)

(a) (1) The North American Industry Classification System (NAICS) code for this acquisition is 113310 - Logging.

(2) The small business size standard is 500 employees.

(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.

(b) (1) If the clause at 52.204-7, Central Contractor Registration, is included in this solicitation, paragraph (c) of this provision applies.

(2) If the clause at 52.204-7 is not included in this solicitation, and the offeror is currently registered in CCR, and has completed the ORCA electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:

(i) Paragraph (d) applies.

(ii) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c) (1) The following representations or certifications in ORCA are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless--

(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $100,000.

(iii) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the clause at 52.204-7, Central Contractor Registration.

(iv) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—

(A) Are not set-aside for small business concerns;

(B) Exceed the simplified acquisition threshold; and

(C) Are for contracts that will be performed in the United States or its outlying areas.

(v) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.

(vi) 52.214-14, Place of Performance—Sealed Bidding. This provision applies to invitations for bid except those in which the place of performance is specified by the Government.

(vii) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.

(viii) 52.219-1, Small Business Program Representations (Basic & Alternate I). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.

(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, or the Coast Guard.

(ix) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.

(x) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.

(xi) 52.222-215, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.

(xii) 52.222-38, Compliance with Veterans’ Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.

(xiii) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA-designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.

(xiv) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA-designated items.

(xv) 52.225-2, Buy American Act Certificate. This provision applies to solicitations containing the clause at 52.225-1.

(xvi) 52.225-4, Buy American Act—Free Trade Agreements—Israeli Trade Act Certificate.

(Basic, Alternate I, and Alternate II). This provision applies to solicitations containing the clause at 52.225-3.

(A) If the acquisition value is less than $25,000, the basic provision applies.

(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision with its Alternate I applies.

(C) If the acquisition value is $50,000 or more but is less than $67,826, the provision with its Alternate II applies.

(xvii) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225-5.

(xviii) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan— Certification.

(xix) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to—

(A) Solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions; and

(B) For DoD, NASA, and Coast Guard acquisitions, solicitations that contain the clause at 52.219-23, Notice of Price Evaluation Adjustment for Small Disadvantaged Business Concerns.

(2) The following certifications are applicable as indicated by the Contracting Officer.

(i) 52.219-19, Small Business Concern Representation for the Small Business Competitiveness Demonstration Program.

(ii) 52.219-21, Small Business Size Representation for Targeted Industry Categories Under the Small Business Competitiveness Demonstration Program.

(iii) 52.219-22, Small Disadvantaged Business Status.

(A) Basic.

(B) Alternate I.

(iv) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.

(v) 52.222-48, Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment Certification.

(vi) 52.222-22, Exemption from Application of the Service Contract Act to Contracts for Certain Services—Certification.

(vii) 52.223-9, with its Alternate I, Estimate of Percentage of Recovered Material Content for EPA-Designated Products (Alternate I only).

(viii) 52.223-13, Certification of Toxic Chemical Release Reporting.

(ix) 52.227-6, Royalty Information.

(A) Basic.

(B) Alternate I.

(x) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.

(d) The offeror has completed the annual representations and certifications electronically via the Online Representations and Certifications Application (ORCA) website at http://orca.bpn.gov. After reviewing the ORCA database information, the offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in paragraph (c) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [offeror to insert changes, identifying change by clause number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.

FAR Clause # Title Date Change

Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on ORCA.

K. 2 FAR 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (APR 2010)

(a) Definitions. As used in this provision—

“Administrative proceeding” means a non-judicial process that is adjudicatory in nature in order to make a determination of fault or liability (e.g., Securities and Exchange Commission Administrative Proceedings, Civilian Board of Contract Appeals Proceedings, and Armed Services Board of Contract Appeals Proceedings). This includes administrative proceedings at the Federal and State level but only in connection with performance of a Federal contract or grant. It does not include agency actions such as contract audits, site visits, corrective plans, or inspection of deliverables.

“Federal contracts and grants with total value greater than $10,000,000” means—

(1) The total value of all current, active contracts and grants, including all priced options; and

(2) The total value of all current, active orders including all priced options under indefinite-delivery, indefinite-quantity, 8(a), or requirements contracts (including task and delivery and multiple-award Schedules).

(b) The offeror has does not have current active Federal contracts and grants with total value greater than $10,000,000.

(c) If the offeror checked “has” in paragraph (b) of this provision, the offeror represents, by submission of this offer, that the information it has entered in the Federal Awardee Performance and Integrity Information System (FAPIIS) is current, accurate, and complete as of the date of submission of this offer with regard to the following information:

(1) Whether the offeror, and/or any of its principals, has or has not, within the last five years, in connection with the award to or performance by the offeror of a Federal contract or grant, been the subject of a proceeding, at the Federal or State level that resulted in any of the following dispositions:

(i) In a criminal proceeding, a conviction.

(ii) In a civil proceeding, a finding of fault and liability that results in the payment of a monetary fine, penalty, reimbursement, restitution, or damages of $5,000 or more.

(iii) In an administrative proceeding, a finding of fault and liability that results in—

(A) The payment of a monetary fine or penalty of $5,000 or more; or

(B) The payment of a reimbursement, restitution, or damages in excess of $100,000.

(iv) In a criminal, civil, or administrative proceeding, a disposition of the matter by consent or compromise with an acknowledgment of fault by the Contractor if the proceeding could have led to any of the outcomes specified in paragraphs (c)(1)(i), (c)(1)(ii), or (c)(1)(iii) of this provision.

(2) If the offeror has been involved in the last five years in any of the occurrences listed in (c)(1) of this provision, whether the offeror has provided the requested information with regard to each occurrence.

(d) The offeror shall enter the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the Central Contractor Registration database at http://www.ccr.gov (see 52.204-7).

“Principal” means an officer, director, owner, partner, or a person having primary management or supervisory responsibilities within a business entity (e.g., general manager; plant manager; head of a division or business segment; and similar positions).

K. 3 FAR 52.219-4 NOTICE OF PRICE EVALUATION PREFERENCE FOR HUBZONE

SMALL BUSINESS CONCERNS (JULY 2005) (See full text clause at I. 7)

(c) Waiver of evaluation preference. A HUBZone small business concern may elect to waive the evaluation preference, in which case the factor will be added to its offer for evaluation purposes. The agreements in paragraph (d) of this clause do not apply if the offeror has waived the evaluation preference.

Offeror elects to waive the evaluation preference.

K. 4 FAR 52.223-1 BIOBASED PRODUCT CERTIFICATION (DEC 2007)

As required by the Farm Security and Rural Investment Act of 2002 and the Energy Policy Act of 2005 (7 U.S.C. 8102(c)(3)), the offeror certifies, by signing this offer, that biobased products (within categories of products listed by the United States Department of Agriculture in 7 CFR part 2902, subpart B) to be used or delivered in the performance of the contract, other than biobased products that are not purchased by the offeror as a direct result of this contract, will comply with the applicable specifications or other contractual requirements.

K. 5 AGAR 452.222-70 COMPLIANCE WITH VETERANS EMPLOYMENT REPORTING

REQUIREMENTS (JAN 1999) (DEVIATION) (USDA)

(a) The Offeror represents that, if it is subject to the reporting requirements of 38 U.S.C. 4212 (d) (i.e., the VETS-100 report required by FAR clause 52.222-37, Employment Reports on Disabled Veterans and Veterans of the Vietnam Era), it has , has not , submitted the most recent report required by 38 U.S.C.

4212(d).

(b) An offeror who checks “has not” may not be awarded a contract until the required report is filed.

K. 6 MIGRANT AND SEASONAL AGRICULTURAL WORKER PROTECTION ACT

In accordance with the Migrant Seasonal and Agricultural Worker Protection Act (MSWPA) (29 USC 1801-1872) the offeror states that it:

Has applied for a MSWPA Registration Number Has been issued MSWPA Registration Number Has not applied for a number Will not apply because it does not currently have employees and does not plan to hire employees.

An employer who anticipates hiring employees and who anticipates the possibility of bidding on a federal contract in the future should submit an application to obtain the Registration Number.

Applications for registration numbers should be made on Form WH-510 which is available at your State Employment Service Offices. Questions concerning application should be directed to the State Employment Office or to:

Montana Idaho/Washington:

U.S. Department of Labor U.S. Department of Labor (ESA) Wage and Hour Division Wage and Hour Division Attn: Edith Wilson 71 Stevenson Street, Room 930 Amaceo Smith Fed. Bldg., Suite 800 San Francisco, CA 94105 525 South Griffin Street (415) 975-4521 Dallas, TX 75202-5007 (415) 975-4857

(214) 767-4538

Completed forms should be mailed to the appropriate U.S. Department of Labor Office above.

A valid U.S. Department of Labor Registration Number must be supplied to the Contracting Officer prior to issuance of a Notice to Proceed with the work. Failure to provide such number within 30 days of award is grounds for termination of your contract.

SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

L. 1 FAR 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB

1998)

This solicitation incorporates one or…