s100051_02_Appendix_A2_Service_SFF_alternate_presentation.pdf

PDF 22 KB Posted

Attached to
Lolo National Forest, South Fork Fish Creek Stewardship IRSC
Solicitation number
AG-03R6-S-10-0051
Issued by

About this file

03 - Appendix A-2

View the file

Other files

File Type Posted
s100051_17_appendix_b_complete_maps_amend_02.pdf PDF
s100051_16_appendix_a_complete_maps_amend_02.pdf PDF
s100051_00_short_solicitation_pkg_amend_02_changes.pdf PDF
s100051_09_Appendix_C_Road Maintenance_SFF_amend_02_CHANGES.pdf PDF
s100051_00_Main_Contract_IRSC_amend_02_CHANGES.pdf PDF
Amend_02.pdf PDF
s100051_08_Appendix_B_amend_02_CHANGES.pdf PDF
2010_0721_pre-proposal_conf_notes_loren.pdf PDF
Amend_01.pdf PDF
s100051_03_Appendix_A3_Service_amend_01.pdf PDF
s100051_02_Appendix_A2_Service_amend_01.pdf PDF
s100051_00_short_set_Contract_IRSC_amend_01.pdf PDF
s100051_15_Attachment_03_amend_01.pdf PDF
s100051_00_Main_Contract_IRSC_amend_01.pdf PDF
s100051_06_Appendix_A4_DWG_amend_01.pdf PDF
s100051_16_appendix_a_complete_maps.pdf PDF
s100051_01_Appendix_A1_Service_amend_01.pdf PDF
s100051_17_appendix_b_complete_maps.pdf PDF
s100051_10_Appendix_D_amend_01.pdf PDF
s100051_08_Appendix_B_amend_01.pdf PDF
Appendix B Maps.pdf PDF
s100051_11_Appendix_D_DWG_1-30.pdf PDF
s100051_06_Appendix_A4_DWG_july7th.pdf PDF
s100051_04_Appendix_A4_Service_SFF_alternate_presentation.pdf PDF
Appendix A Maps.pdf PDF
s100051_10_Appendix_D.pdf PDF
s100051_13_Attachment_02_76-1342_sca.mht MHT file
s100051_08_Appendix_B.pdf PDF
s100051_14_Attachment_02_MT2_dvb.mht MHT file
s100051_09_Appendix_C_Road Maintenance_SFF.pdf PDF
s100051_05_Appendix_A4_SPS's.pdf PDF
s100051_07_Appendix_A5_Service_SFF_alternate_presentation.pdf PDF
s100051_12_Appendix_D_DWG_31-76.pdf PDF
s100051_00_Main_Contract_IRSC_RFP_Construction_SFF.pdf PDF
s100051_00_Short_set_IRSC_RFP_Construction_SFF.pdf PDF
s100051_01_Appendix_A1_Service_SFF_alternate_presentation_changes 6_30.pdf PDF
s100051_15_Attachment_03_DUI_saw_nonsaw_units.pdf PDF
s100051_03_Appendix_A3_Service_SFF_alternate_presentation.pdf PDF
map2_A_draft.pdf PDF
map5_A_draft.pdf PDF
map3_A_draft.pdf PDF
map_B_index.pdf PDF
map8_B_draft.pdf PDF
map1_A_draft.pdf PDF
map4_A_draft.pdf PDF
map10_B_draft.pdf PDF
map9_B_draft.pdf PDF
map6_B_draft.pdf PDF
map7_B_draft.pdf PDF
2010_0514_ltr_timber_purchasers_ptac_.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-03R6-S-10-0051

South Fork Fish Creek Stewardship IRSC / Lolo NF Appendix A-2, Page 1 of 2

APPENDIX A-2

STEWARDSHIP CONTRACT

SOIL DECOMPACTION AND SLASH PLACEMENT

Unless otherwise agreed to in writing by the Contracting Officer, the Contractor shall perform services according to the following requirements:

1. Soil de-compaction and slash placement (SCHEDULE OF ITEMS B.1.8)

(a) Landings and Skid trails (Excavator ripping (soil de-compaction) and Slash Placement).

Units Acres Mandatory 7 2 Optional

Work identified here shall be performed by the Contractor with an excavator meeting the following description, unless, as a part of an alternate offer, a different solution for achieving the requirements stated below was proposed by the Contractor, and the Contracting Officer accepted that alternate offer (See L. 7(a)(2)):

Excavator shall be equipped with a bucket and thumb and be of sufficient size to break up and rehabilitate compacted soil on old roads and old/new skid trails/landings and place slash on rehabilitated roads and skid trails.

Treatments will be limited to old and new roads, landings and skid trails immediately off the landings. Impacted areas will be de-compacted by roughening the soil to a minimum depth of 6 inches, but not to exceed 12 inches. Soil should not be inverted (mixed) during de-compaction.

Supportive roots of trees shall not be severed. Treated areas shall span the total width of compaction. Once de-compacted, slash shall be placed across 80-85% of the treated surface to a depth of 1- 2 inches. Fine slash material is preferred where available. De-compaction and slash placement shall be completed in one pass to prevent compacting or displacing treated area.

Duff and litter placement will be done with a hand shovel at a rate of 2 shovel full’s per 20 sq ft of rehabilitated area to inoculate the forest floor with micro-organisms to facilitate soil recovery.

Duff and litter removal will be distributed around the site as not to impact one particular area.

AG-03R6-S-10-0051

South Fork Fish Creek Stewardship IRSC / Lolo NF Appendix A-2, Page 2 of 2

2. Quality assurance surveillance plan / performance requirements summary

APPENDIX A-2

QASP / Performance requirements summary (PRS)

The following describes the major items in the contract with the incentives and deductions for the work described. Items below are included here as requirements.

Work Statement Performance Standard

Government Method of

Assessment Incentive/Deduction

Soil de-compaction and slash placement

Meets 100% Rehabilitation Requirements

COR or Inspector conduct periodic monitoring and visual inspection.

• Rework is required if Contractor fails to meet standard.

• The Contractor’s quality will be reflected in the performance assessment either positive or negative.

• If the Contractor fails to meet standards, work may be suspended or put in Default for failure to take corrective action immediately. Result in adverse performance assessment.

File details come from the government source that posted it. Updated .