AG-03R6-S-10-0051
South Fork Fish Creek Stewardship IRSC / Lolo NF Appendix A-1, Page 1 of 4
APPENDIX A-1
STEWARDSHIP CONTRACT
FUELS TREATMENT and OTHER SERVICES
Unless otherwise agreed to in writing by the Contracting Officer, the Contractor shall perform services according to the following requirements:
1. Fuels Reduction (Tractor): Dead lodgepole pine non-saw product removal 7.0 +” diameter at breast height – tractor harvest system (SCHEDULE OF ITEMS B.1.1)
(a) This specification applies to the following Mandatory and Optional Units:
Units Acres Mandatory 26T, 2T 22 Optional
(b) The Contractor shall perform fuels reduction and product removal services including, but not limited to felling, yarding, processing, hauling, erosion control and slash treatment services.
(c) Product removal will conform to the utilization standards outlined in Appendix B, Section A2.
(d) The Contractor shall perform product removal services in accordance with all of the requirements of this contract, including, but not limited to those outlined in this Appendix A, and the requirements identified in Appendix B.
2. Fuels Reduction (Skyline): Dead lodgepole pine non-saw product removal 7.0+” diameter at breast height – skyline harvest system (SCHEDULE OF ITEMS B.1.2)
Mandatory 2S, 3S 38 services.
(c) Product removal will conform to the utilization standards outlined in Appendix B, Section A2.
(d) The Contractor shall perform fuels reduction and product removal services in accordance with all of the requirements of this contract, including, but not limited to those outlined in this Appendix A, and the requirements identified in Appendix B.
Appendix A-1, Page 2 of 4
3. Fuels Reduction (Tractor): Live and dead lodgepole pine non-saw product removal 5.0+” diameter at breast height – tractor harvest system (SCHEDULE OF ITEMS B.1.3)
Mandatory 7 16 services.
(c) Product removal will conform to the utilization standards outlined in Appendix B, Section A2.
(d) The Contractor shall perform fuels reduction and product removal services in accordance
4. Fuels Reduction (Skyline): Live Douglas-fir non-saw product removal 6.0-6.9” diameter at breast height – skyline harvest system (SCHEDULE OF ITEMS B.1.4)
Mandatory 14 141 services.
(c) Product removal will conform to the utilization standards outlined in Appendix B, Section A2.
(d) The Contractor shall perform fuels reduction and product removal services in accordance
5. Fuels Reduction (Tractor): Live Douglas-fir non-saw product removal 6.0-6.9” diameter at breast height – tractor harvest system (SCHEDULE OF ITEMS B.1.5)
Mandatory 26T 14
Appendix A-1, Page 3 of 4 services.
(c) Product removal will conform to the utilization standards outlined in Appendix B, Section A2.
(d) The Contractor shall perform fuels reduction and product removal services in accordance
6. Fuels Reduction (Tractor): Removal of down and dead unmerchantable material – tractor harvest system (SCHEDULE OF ITEMS B.1.6)
Mandatory 2T 8
(b) Product removal will conform to the following standards:
Species
Estimated Ton/ac
Diameter inside bark at large end
(inches)
Minimum Pieces per unit
Piece-length (feet) at small end
% sound
ALL
5.0
50%
(c) Material will be yarded to the designated landing and piled as per Appendix B, K-G.7#.
(d) The Contractor shall perform product removal services including, but not limited to yarding, processing, erosion control and slash treatment services.
(e) The Contractor shall perform fuels reduction and product removal services in accordance
7. Fuels Reduction (Skyline): Removal of down and dead unmerchantable material – skyline harvest system (SCHEDULE OF ITEMS B.1.7)
Mandatory Optional 2S 14
Appendix A-1, Page 4 of 4
(b) Product removal will conform to the following standards:
Species
Estimated Ton/ac at large end
Pieces per unit
Piece-length (feet) at small end
% sound
ALL
5.0
50%
(c) Material will be yarded to the designated landing and piled as per Appendix B, K-G.7#.
(d) The Contractor shall perform product removal services including, but not limited to yarding, processing, erosion control and slash treatment services.
(e) The Contractor shall perform fuels reduction and product removal services in accordance
8. Quality assurance surveillance plan / performance requirements summary
APPENDIX A-1
QASP / Performance requirements summary (PRS)
The following describes the major items in the contract with the incentives and deductions for the work described. Items below are included here as requirements.
Work Statement Performance Standard
Government Method of
Assessment Incentive/Deduction
Non-saw product removal Meets 100% Removal Standards
Appendix B Requirements
Final Fuels Condition
COR or Inspector conduct periodic monitoring and visual inspection.
• Rework is required if Contractor fails to meet standard.
• The Contractor’s quality will be reflected in the performance assessment either positive or negative.
• If the Contractor fails to meet standards, work may be suspended or put in Default for failure to take corrective action immediately. Result in adverse performance assessment.
Yarding of unmerchantable material
Meets 100% Removal Standards
COR or Inspector conduct periodic monitoring and visual inspection
• Rework is required if Contractor fails to meet standard.
• The Contractor’s quality will be reflected in the performance assessment either positive or negative.
• If the Contractor fails to meet standards, work may be suspended or put in Default for failure to take corrective action immediately. Result in adverse performance assessment.
File details come from the government source that posted it. Updated .