CONSTRUCTION_IFB.doc

DOC document 501 KB Posted

Attached to
RECOVERY - CUSTER NATIONAL FOREST, FY09 West Fork Rock Creek Road Reconstruction
Solicitation number
AG-0355-S-09-0004
Issued by

About this file

Solicitation AG-0355-S-09-0004

View the file

Other files

File Type Posted
AMENDMENT 4_West Fork_SF_30.doc DOC document
AMENDMENT 3_West Fork_SF_30.doc DOC document
Amd 3 Sch of Items.pfd.pdf PDF
Geotech_ Attachments.pdf PDF
Amendment 2_Section J_Page 31 of 48.doc DOC document
Phase 4 Revised D-8.pdf PDF
Phase 4 REVISED C-3_Amendment_2.pdf PDF
Phase 3_D-11 Grade Sag_Amendment_2.pdf PDF
Phase 4_Revised D-15_Amendment_2.pdf PDF
Phase 3 Revised D-2.pdf PDF
Atch 2 Ph III page 20_amendment_2.doc DOC document
Amendment 2_WEST FORK_COVER_SHEET.doc DOC document
AMENDMENT 2_West Fork_SF_30.doc DOC document
Amendment_2_SF1442.doc DOC document
Phase 4 Spec_403.01 page 39.doc DOC document
Amendment_2_Schedule_B.doc DOC document
Q-A_5-7-09.doc DOC document
Pre-bid meeting.PDF PDF
Amendment_1_SF1442-Pre-Bid_Mtg_amendment_1.doc DOC document
Amendment 1_Section J_Page 31 of 48.doc DOC document
Amendment 1_SEC F_FAR 52.211-10_Page 14 of 48.doc DOC document
Amendment 1_ATCH 18_FINAL ROAD LOG PHASE 3.xls XLS spreadsheet
Amendment 1_WEST FORK_COVER_SHEET.doc DOC document
Amendment_1_Subparagaph o-page 12 of 48.doc DOC document
Amendment 1 ATCH 3 Spec 156.04 page 17.doc DOC document
Amendment 1_PHASE IV_Spec 255.02.6_Page_29.doc DOC document
Amendment 1_FAR 52.204-11.doc DOC document
Amendment 1_Revised Phase 4_D-10.pdf PDF
WEST FORK_COVER_SHEET.doc DOC document
ATCH_1_wage_determination_HWY.doc DOC document
ATCH_10_Phase3.pdf PDF
ATCH_3_Phase4.doc DOC document
ATCH_5_Map.pdf PDF
ATCH_6_Phase3.pdf PDF
ATCH_17_OF-17.pdf PDF
ATCH_8_Phase3.pdf PDF
ATCH_14_Phase4.pdf PDF
ATCH_11_Phase3.pdf PDF
ATCH_7_Phase3.pdf PDF
ATCH_16_Phase4.pdf PDF
ATCH_13_Phase4.pdf PDF
ATCH 4_sf24_f.pdf PDF
ATCH_15_Phase4.pdf PDF
ATCH_2_Phase3.doc DOC document
ATCH_12_Phase4.pdf PDF
ATCH_9_Phase3.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OMB APPROVAL NO. 2700-0042

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

AG-0355-S-09-0004

2. TYPE OF SOLICITATION

FORMCHECKBOX

SEALED BID (IFB)

FORMCHECKBOX

NEGOTIATED (RFP)

3. DATE ISSUED

April 1, 2009

PAGE OF PAGES

IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

5. REQUISITION/PURCHASE REQUEST NO.

240340

6. PROJECT NO.

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

Eastside Acquisition Zone Lewis & Clark National Forest

1101 15th Street North

Great Falls, MT 59401 Same as Block 7.

9. FOR INFORMATION

CALL:

A. NAME

Jan Wenaas B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS) 406-791-7717

SOLICITATION

NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

Recovery – FY09 Cascade West Fork Rock Creek Road #2071 Phases III and IV Road Reconstruction Custer National Forest, Beartooth Ranger District, Red Lodge, Montana Price Range: The Government's estimate: between $1,000,000 and $5,000,000.

1. SF1442, SF1442 Back

2. Part I The Schedule, Section B: Supplies or Services and Prices/Costs

3. Section C: Project Description, Specifications and Statement of Work

4. Section E: Inspection and Acceptance

5. Section F: Deliveries or Performance

6. Section G: Contract Administration Data

7. Section H: Special Contract Requirements

8. Part II Contract Clauses, Section I: Contract Clauses

9. Part III List of Documents, Exhibits, and Other Attachments, Section J: List of Documents, Exhibits, and Other Attachments

10. Part IV Representations and Instructions, Section K: Representations, Certifications, and Other Statements of Bidders

11. Section L: Instructions, Conditions, and Notice to Bidders

12. Section M: Evaluation Factors for Award

The Contractor shall begin performance within 10 calendar days and complete it within See Sec C-1(f) calendar days after receiving FORMCHECKBOX award, FORMCHECKBOX notice to proceed. This performance period is FORMCHECKBOX mandatory, FORMCHECKBOX negotiable. (See SECTION C-1.)

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If “YES,” indicate within how many calendar days after award in Item 12B.)

FORMCHECKBOX

YES

FORMCHECKBOX

NO

12B. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A.

Sealed offers in original and 1 copies to perform the work required are due at the place specified in Item 8 by 2:00 PM (hour) local time May 5, 2009 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.

B.

An offer guarantee

FORMCHECKBOX

is, FORMCHECKBOX is not required.

C.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D.

Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212

1442-101

STANDARD FORM 1442 (REV. 4-85)

Computer Generated

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE

FACILITY CODE

17.

The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each

AMENDMENT NO.
DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

20B. SIGNATURE

20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

FORMCHECKBOX

10 U.S.C. 2304(c)( )

FORMCHECKBOX

41 U.S.C. 253(c)( )

26. ADMINISTERED BY

CODE

27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

FORMCHECKBOX

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration slated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.

FORMCHECKBOX

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE

30C. DATE

31B. UNITED STATES OF AMERICA

BY

31C. AWARD DATE

Computer Generated

STANDARD FORM 1442 BACK (REV. 4-85)

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES

SCHEDULE OF ITEMS

RECOVERY - FY09 Cascade West Fork Rock Creek Road #2071

Phases III and IV Road Reconstruction

Custer National Forest, Beartooth Ranger District

PHASE 3 BASE BID

Item Number
Description
Method of Measure
Pay Unit
Estimated Quantity
Unit Price
Total
15100.1
Mobilization
LSQ
LS
ALL
XXXXXXXXXXXXXXXXXXXXX
15200
Construction Surveying and Staking
LSQ
LS
ALL
XXXXXXXXXXXXXXXXXXXXX
00113.1
Equipment Rental (Type Excavator)
AQ
HR
40
00113.2
Equipment Rental (Type End Dump Truck)
AQ
HR
16
00205
Blasting, Individual Rocks
AQ
EA
30
02010.1
Clearing and Grubbing
DQ
AC
5.7
2010.2
Removal of Individual Trees
AQ
EA
600
02110
Roadway Obliteration, Method 1
DQ
AC
0.3
02120
Road Grading
DQ
Mi
5.5
02220.1
Excavation and Embankment, Compaction Method 3, Construction Tolerance Class C, Finishing Method B
DQ
CY
11281
02220.2
Waste Rock
DQ
CY
1015
02228.1
21" x 15" CMPA Galvanized 16 Gauge Steel (45 culverts)
AQ
LF
1494
02228.2
28" x 20" CMPA Galvanized 16 Gauge Steel (7 culverts)
AQ
LF
260
02228.3
49" x 33" CMPA Galvanized 14 Gauge Steel (1 culverts)
AQ
LF
44
02228.4
57" x 38" CMPA Galvanized 14 Gauge Steel (2 culverts)
AQ
LF
90
02228.5
81" x 59" CMPA Galvanized 12 Gauge Steel (1 culverts)
AQ
LF
54
2239.3
Grade Sags
AQ
EA
5
02240.1
Roadway Aggregate, Roller Compaction
DQ
CY
4153
02240.2
Culvert Pipe Bedding/Aggregate (5 cy per culvert)
DQ
CY
285
02240.3
Roadway Fill, Imported
AQ
CY
100
02510
Riprap (Collected Along Road)
AQ
CY
100
02725.1
Temporary Traffic Control
LSQ
LS
ALL
XXXXXXXXXXXXXXXXXXXXX
02725.2
Remove and Reset Signs
AQ
EA
7
02725.3
Roadway Gate
AQ
EA
1
02851
Install Straw Wattles, 20 linear feet per culvert and as shown on the drawings
AQ
LF
4450
0625.1
Seeding, Hydraulic Method
DQ
ACRE
6
0625.2
Mulching, Hydraulic Method
DQ
ACRE
6

TOTAL BASE BID

PHASE 3 ADDITIVE ITEM #1

Item Number
Description
Method of Measure
Pay Unit
Estimated Quantity
Unit Price
Total
02240.2
Roadway Aggregate, Roller Compaction 2" Aggregate Additional (Sta 0+00 - 169+06.3)
DQ
CY
1910

TOTAL ADDITIVE #1

PHASE 3 ADDITIVE ITEM #2

Item Number
Description
Method of Measure
Pay Unit
Estimated Quantity
Unit Price
Total
02240.3
Roadway Aggregate, Roller Compaction 2" Aggregate Additional (Sta 169+06.3 - 289+20)
DQ
CY
1303

TOTAL ADDITIVE #2

PHASE 4 BASE BID

Item Number
Description
Method of Measure
Pay Unit
Estimated Quantity
Unit Price
Total
15101
Mobilization
LSQ
LS
1
XXXXXXXXXXXXXXXXXXXXX
15211
Construction Surveying and Staking, Method I Precision B
DQ
MI
2.9
15401
Contractor Testing
LSQ
LS
1
XXXXXXXXXXXXXXXXXXXXX
15703
Silt Fence
AQ
FT
4655
20101
Clearing and Grubbing
DQ
AC
16.9
20301
Removal - Existing Signs
AQ
EA
19
20301
Removal - Metal Pipe Gate
AQ
EA
1
20401
Roadway Excavation, Compaction Method C, Construction Tolerance A
DQ
CY
12668
20412
Waste - Rock
AQ
CY
400
20502
Individual Blasting Type Controlled
AQ
EA
15
25507
Mechanically Stabilized Earth Wall - Excavation
AQ
CY
12400
25508
Mechanically Stabilized Earth Wall - Select Backfill
AQ
CY
11500
25509
Mechanically Stabilized Earth Wall - Gabion Basket Placement
AQ
SF
10200
30103
Aggregate Base, grading E
DQ
CY
15215
30111
Aggregate Surface Course
DQ
CY
126
40301
Hot Asphalt Concrete Pavement Class B, Gradation B
AQ
TON
7758
41101
Prime Coat-Grade MC-70
AQ
TON
118
41304
Asphalt Pavement Milling, 100 ft taper to 3 in depth at bridge ends
LSQ
LS
1
55705
Bridge Repair
LSQ
LS
ALL
XXXXXXXXXXXXXXXXXXXXX
60202-15
21 in span, 15 in rise Pipe Arch Culvert 16 Gauge Steel
AQ
LF
1208
60202-20
28 in span, 20 in rise Pipe Arch Culvert 16 Gauge Steel
AQ
LF
324
60202-24
35 in span, 24 in rise Pipe Arch Culvert 14 Gauge Steel
AQ
LF
92
60701
Removing Culvert
AQ
LF
864
61701
Guardrail system G4, type IV, class A
AQ
LF
237.5
61702
Flared Terminal Section - ET Plus
AQ
EA
1
61702
Terminal Section - W Beam One Way Departure
AQ
EA
1
61702
USFS Standard W Beam Bridge Approach Section
AQ
EA
4
61708
Modified Thrie-Beam Metal Guardrail
AQ
LF
800
61709
Thrie-Beam to W Beam Reducer Section
AQ
EA
2
61902
Gate, Metal Pipe
AQ
EA
1
62504
Seeding,Hydraulic Method
DQ
SU
68
62509
Mulching, Hydraulic Method
DQ
SU
68
63301
Furnishing and Installing Signs
AQ
EA
22
63308
Removing and Resetting Signs
AQ
EA
2
63404a
Pavement Markings Type D
DQ
MI
11.52
63501
Temporary Traffic Control
LSQ
LS
ALL
XXXXXXXXXXXXXXXXXXXXX

TOTAL BASE BID

Designated Method of Measurement:

DQ - Designed Quantity; AQ - Actual Quantity; LSQ - Lump Sum Quantity lf - linear foot; cy - cubic yard; sf - square foot; ac - acre; ls - lump sum; su - slurry unit gal - gallon; mi – mile

PHASE 4 SEAL AND COVER ADDITIVE ITEM #3

Item Number
Description
Method of Measure
Pay Unit
Estimated Quantity
Unit Price
Total
Item Number
Description
Method of Measure
Pay Unit
Estimated Quantity
Unit Price
Total
40901a
Surface Treatment Aggregates, Designation 1C
AQ
TON
505
40904a
Emulsified Asphalt, Grade CRS-2
AQ
TON
43

TOTAL ADDITIVE #3

PHASE 4 FROM SKI RUN ROAD TO SILVER RUN TRAIL ITEM #4

Item Number
Description
Method of Measure
Pay Unit
Estimated Quantity
Unit Price
Total
Item Number
Description
Method of Measure
Pay Unit
Estimated Quantity
Unit Price
Total
40901b
Surface Treatment Aggregates, Designation 1C
AQ
TON
310
40904b
Emulsified Asphalt, Grade CRS-2
AQ
TON
26
63404b
Pavement Markings Type D
DQ
MI
6.8

TOTAL ADDITIVE #4

EA - Each

CQ - Contract Quantities

BIDDER'S PRINTED NAME
DATE

AQ - Actual quantities

LSQ - Lump sum quantities

LF - Linear Foot

BIDDER'S SIGNATURE
DATE

CY - Cubic Yard

DQ - Design Quantities

SF - Square foot

AC - Acre

SU - Slurry Unit

Gal - Gallon

Mi - Mile

BASIS OF AWARD: One contract will be awarded to the responsive and responsible bidder offering the best value to the Government. The Bidder must bid on all items. Only unit prices to the nearest $0.01 will be accepted. Where extended unit prices do not agree with totals or subtotals shown by the Bidder, the unit price governs except as provided under Federal Acquisition Regulations (FAR) 14.406, Mistakes in Bids

SECTION C--DESCRIPTION/SPECIFICATIONS

C-1

PROJECT DESCRIPTION AND LOCATION

(a) Description of Work for PHASE 3

This Phase of the road work shall have a separate set of drawings and specifications that differ from Phase 4. Phase 3 shall be CSI formatted specifications.

This phase shall consist of work associated with West Fork Rock Creek Road (Forest Service Road #2071). Work will consist of, but not be limited to: temporary traffic control; clearing and grubbing; individual tree removal; reestablishing survey control (Station 0+00 to 169+06.3); slope staking the road (Station 0+00 to 169+06.3); slope staking all culverts by hand to ensure proper alignment and lengths; reconstructing the road (Station 0+00 to 169+06.3); excavation; furnishing and placing crushed aggregate; furnishing and installation of signs; furnishing and installation of a roadway gate; hydroseeding; furnishing and placing certified weed free straw wattles; road grading (Station 0+00 to 289+20); collecting and placing riprap; constructing grade sags (see road log);. Culverts placed in live springs shall have water diverted before installing new culverts. Contractor shall comply with all permits.

NOTE: Stations 147+91.9 to 169+00 is on Right Of Way through State owned land. All work shall stay within the Right Of Way markers. All merchantable and non-merchantable timber within these stations shall remain the property of the State and shall be decked on State Land.

NOTE: Culvert extensions shall not be allowed. Disregard all notes on Drawings that indicate extensions. All existing culverts shall be removed and replaced. Contractor shall field survey and stake all culverts prior to ordering materials.

Other construction activities may be occurring simultaneously with this project. It is the contractor’s responsibility to work with other contractors in the vicinity.

Description of Work for PHASE IV

This Phase of the road work shall have a separate set of drawings and specifications that differ from Phase 3. Phase 4 shall be FP-03 Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects.

This phase consists of work associated with reconstruction of West Fork Rock Creek Road (Forest Service Road #2071), Phase IV. Work will consist of, but not be limited to: clearing and grubbing; excavation, haul and placement of embankment material; construction of a mechanically stabilized earth retaining wall with gabion face; furnishing hauling and placing crushed aggregate base and hot asphalt concrete pavement surfacing; furnishing and installing steel culverts and extensions; chip sealing; pavement marking; guardrail; minor bridge repair; seeding; and furnishing and installing traffic signs. Associated work will require temporary traffic control and placement of temporary erosion control devices. The project length is approximately 2.88 miles.

NOTE: Culvert extensions shall not be allowed. Disregard all notes on Drawings that indicate extensions. All existing culverts shall be removed and replaced. Contractor shall field survey and stake all culverts prior to ordering materials.

Other construction activities may be occurring simultaneously with this project. It is the contractor’s responsibility to work with other contractors in the vicinity.

(b) Project Location. The West Fork of Rock Creek Road is located in the Beartooth Ranger District, Custer National Forest. Phase 3 extends west from the end of existing pavement near Basin Campground to the trailhead. Phase 4 extends from Silver Run Trialhead to the end of the pavement at Basin Campground.

(c) Price Range. Between $1,000,000 and $5,000,000,

(d) Pre-Bid Tour. A pre-bid tour will be conducted on April 22nd, 2009 at 10:00 a.m at the Beartooth Ranger District, 6811 Hwy 212, Red Lodge, MT. Interested parties wishing to attend must call the Contracting Office by noon on April 20th, 2009. (406) 791-7717. Due to the time of year, Phase 4 will only be viewed unless weather allows Phase 3 to be accessed. Bidders are encouraged to visit the sites. Persons interested in viewing the project on their own may obtain directional information from the District Office in Red Lodge, MT, telephone (406) 446-2103.

(e) Start Work – It is estimated work will begin in late May, 2009.

(f) Period of Performance – Work is to be completed by September 11, 2009 for Phase 3, with the exception of Seeding, which shall be completed during the seeding season in October 2009. Work is to be completed by July 30, 2010 for Phase 4 with the exception of Seeding, which shall be completed during the seeding season October 2009 through May 15, 2010.

(g) Safety Plan – Contractor shall provide adequate safety briefings and ensure safe practices are followed by all personnel involved in the project. Emergency contact numbers shall be readily available on site. A safety plan shall be submitted to the CO prior to starting work.

(h) Government Furnished Materials:– RipRap to be collected along the roadway by the Contractor.

(i) Submittals - The contractor shall submit Work Schedule, Traffic Control Plan, and Safety Plan to the CO one week prior to starting work. Contractor shall not start work until Traffic Control Plan, Work Schedule, and Safety Plan have been approved in writing. Contractor shall submit all test results, testing samples, and other submittals for approval. Contractor shall submit aggregate testing results. Contractor shall submit Blasting plan prior to any blasting activities.

(j) Disturbances – The Contractor may not work Memorial Weekend (Saturday – Monday), July 4th, or Labor Day Weekend (Saturday – Monday). Additional traffic control may be required to accommodate weekend traffic.

(k) Staging Area – Shall be approved by the CO.

(l) Electrical – There is no on-site electrical available.

(m) Asbestos Containing Materials – The Contractor shall not use during construction or incorporate into the final construction product any material or product that contains more than 1% asbestos by dry volume as determined by the Polar Light Microscopy Method (less than 1% shall be considered under these specifications as “Asbestos Free”).

(n) Security and Protection – Security is the Contractor’s responsibility. Limit access to the construction area to persons involved in the work. Provide secure storage for materials that are stored on site. Secure completed work as required to prevent loss.

Barricades, warning signs, and lights shall comply with standards and code requirements for erection of structurally adequate barricades. All road warning signs, barricades, and traffic control devices shall conform to MUTCD. Where appropriate and needed, provide lighting, including flashing red or amber warning lights.

(o) Maintenance of Traffic – The Contractor shall have all temporary construction signs and traffic control measures in place prior to beginning work. Contractor shall have an approved Traffic Control Plan in place prior to beginning work.

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to limitations and authorizations designated in Road Order(s), as Shown On The Drawings, or specified under this contract, when such use will not damage the roads or National Forest resources and when traffic can be accommodated safely.

Before shutting down operations, take all necessary precautions to prevent damage to the project, such as temporary detours, approaches, crossings, or intersections; and provide for normal drainage and minimization of erosion.

The Contractor shall follow proper food storage restrictions available at the Beartooth District Office.

Any emergency vehicles shall be allowed immediate passage.

The Contractor will be allowed to close the road up to three hours maximum per culvert installation. All other closures shall be limited to one hour. Road closures shall not be allowed between 1800 (6:00 p.m.) – 0800 (8:00 a.m.). The Contractor shall make reasonable effort to limit the amount of closure time. Larger culverts requiring longer road closures shall be approved in writing by the CO prior to installation. Information must be detailed in how the closures will be accomplished in the traffic control plan.

(p) Protection of Improvements – The Contractor shall complete sequences of construction activity in order to prevent damage to equipment, material, and articles incorporated into the work covered by this contract.

(q) Water – There is no potable water available on this job. Water for earthwork, surfacing, and incidental construction may be pumped from the West Fork Rock Creek at locations SHOWN ON THE DRAWINGS as Fire Engine Access.

(r) Toilet Facilities – The Contractor shall supply portable toilets to the project site.

(s) Underground Utilities – The Contractor shall call Montana One Call Prior to digging.

AGAR 452.211-72 Statement Of Work/Specifications (FEB 1988) The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.

AGAR 452.211-73 Attachments To Statement Of Work/Specifications (FEB 1988) The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

SECTION D--PACKAGING AND MARKING

{For this Solicitation, there are NO clauses in this Section}

SECTION E--INSPECTION AND ACCEPTANCE

FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.246-12 Inspection of Construction (AUG 1996)

SECTION F--DELIVERIES OR PERFORMANCE

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.242-14 Suspension of Work (APR 1984)

FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) Alternate I (APR 1984) The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than September 11, 2009 (Phase III with exception of Seeding) and July 30, 2010 (Phase IV with exception of Seeding). The time stated for completion shall include final cleanup of the premises.

The completion date is based on the assumption that the successful offeror will receive the notice to proceed by May 26, 2009 or earlier. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.

52.211-12 -- Liquidated Damages – Construction (Sep 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $573.36 for the first day of delay and $502.08 for subsequent days of delay for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

AGAR 452.236-75 Maximum Workweek – Construction Schedule (NOV 1996) Within 14 calendar days after receipt of a written request from the Contracting Officer, the Contractor must submit the following information in writing for approval:

(a) A schedule as required by FAR clause 52.236-15, Schedules for Construction Contracts, and

(b) The hours (including the daily starting and stopping times) and days of the week the Contractor proposed to carry out the work.

The maximum workweek that will be approved is to be coordinated with the COR and approved by the Contracting Officer.

SECTION G--CONTRACT ADMINISTRATION DATA

GOVERNMENT-FURNISHED PROPERTY

The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause contained elsewhere in the contract.

RipRap to be collected along the roadway by the Contractor.

AGAR 452.215-73 Post Award Conference (NOV 1996) A post award conference with the successful offeror is required. It will be scheduled and held within 14 days after the date of contract award. The conference will be held at the Custer National Forest Supervisor’s Office, 1310 Main Street, Billings, Montana 59105.

SECTION H--SPECIAL CONTRACT REQUIREMENTS

H-1 NOXIOUS WEED CONTROL

In order to prevent the potential spread of noxious weeds the Contractor shall be required to certify the equipment coming to the project to be weed-free. This cleaning shall remove all dirt and plant parts and material that may carry noxious weed seeds into the construction area. All subsequent move-ins shall be treated the same as the initial move-in. Prior to move-in the contractor shall make equipment available for Forest Service inspection at an agreed location and give the COR 48 hours advance notice.

H-2 SECURITY AND PROTECTION

(a) Security and Protection – Security is the Contractor’s responsibility. Limit access to the construction area to persons involved in the work. Provide secure storage for materials that are stored on site. Secure completed work as required to prevent loss.

Barricades, warning signs and light shall comply with standards and code requirements for erection of structurally adequate barricades. All road warning signs, barricades, and traffic control devices shall conform to MUTCD. Paint with appropriate colors, graphics, and warning signs to inform personnel and the public of the hazard being protected against. Where appropriate and needed, provide lighting, including flashing red or amber lights.

(b) Maintenance of Traffic – The Contractor is authorized to use roads under the jurisdiction of the Forest Service, and open to public travel, for all activities necessary to complete this contract, subject to limitations and authorizations shown on the drawings or specified under this contract when such use will not damage the roads or national forest resources and when traffic can be accommodated safely.

Except as allowed in the contract, trailheads and roads shall remain open throughout the construction project. Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a plan for satisfactorily handling the traffic has been approved.

Before shutting down operations, take all necessary precautions to prevent damage to the project, such as temporary detours, approaches, crossings, or intersections; and provide for normal drainage and minimization of erosion. Leave all travel ways in a condition suitable for traffic.

(c) Protection of Improvements – The Contractor shall complete sequences of construction activity in order to prevent damage to equipment, material, and articles incorporated into the work covered by this contract.

PART II--CONTRACT CLAUSES

SECTION I--CONTRACT CLAUSES

FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

www.arnet.gov/far/ www.usda.gov/procurement/policy/agar.html

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.202-1 Definitions (JUL 2004)

52.203-3 Gratuities (APR 1984)

52.203-5 Covenant Against Contingent Fees (APR 1984)

52.203-6 Restrictions on Subcontractor Sales to the Government (SEP 2006)

52.203-7 Anti-Kickback Procedures (JUL 1995)

52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (JAN 1997)

52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (JAN 1997)

52.203-12 Limitation on Payments to Influence Certain Federal Transactions (SEP 2007)

52.204-4 Printed or Copied Double- Sided on Recycled Paper (AUG 2000)

52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (MAY 2008)

52.211-18 Variation in Estimated Quantity (APR 1984)

52.214-27 Price Reduction for Defective Cost or Pricing Data – Modifications – Sealed Bidding (OCT 1997) 52.214-28 Subcontractor Cost or Pricing Data – Modifications – Sealed Bidding (OCT 1997) 52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns (JUL 2005) (Applicable if > $100,000) 52.219-8 Utilization of Small Business Concerns (MAY 2004) 52.219-9 Small Business Subcontracting Plan (APR 2008) – Alternate I (Oct 2001) (Applicable if > $1 Million) 52.219-14 Limitations on Subcontracting (DEC 1996)

52.219-16 Liquidated Damages --Subcontracting Plan (JAN 1999) (Applicable if > $1 Million) 52.219-25 Small Disadvantaged Business Participation Program -- Disadvantaged Status and Reporting (APR 2008) (Applicable if > $1 Million)

52.222-3 Convict Labor (JUN 2003)

52.222-4 Contract Work Hours and Safety Standards Act -- Overtime Compensation (JUL 2005)

52.222-6 Davis-Bacon Act (JUL 2005)

52.222-7 Withholding of Funds (FEB 1988)

52.222-8 Payrolls and Basic Records (FEB 1988)

52.222-9 Apprentices and Trainees (JUL 2005)

52.222-10 Compliance with Copeland Act Requirements (FEB 1988)

52.222-11 Subcontracts (Labor Standards) (JUL 2005) 52.222-12 Contract Termination - Debarment (FEB 1988)

52.222-13 Compliance with Davis-Bacon and Related Act Regulations (FEB 1988)

52.222-14 Disputes Concerning Labor Standards (FEB 1988)

52.222-15 Certification of Eligibility (FEB 1988)

52.222-21 Prohibition of Segregated Facilities (FEB 1999)

52.222-26 Equal Opportunity (MAR 2007)

52.222-27 Affirmative Action Compliance Requirements for Construction (FEB 1999)

52.222-35 Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and other Eligible Veterans (SEP 2006)

52.222-36 Affirmative Action for Workers with Disabilities (JUN 1998)

52.222-37 Employment Reports on Special Disabled Veterans, Veterans of the Vietnam Era, and other Eligible Veterans (SEP 2006)

52.222-50 Combating Trafficking in Persons (SEP 2007)

52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (DEC 2007) 52.223-5 Pollution Prevention and Right-to-Know Information (AUG 2003)

52.223-6 Drug-Free Workplace (MAY 2001)

52.223-14 Toxic Chemical Release Reporting (AUG 2003)

52.223-15 Energy Efficiency in Energy-Consuming Products (DEC 2007) 52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008)

52.227-1 Authorization and Consent (DEC 2007)

52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (DEC 2007)

52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007)

52.228-2 Additional Bond Security (OCT 1997)

52.228-5 Insurance—Work on a Government Installation (JAN 1997)

52.228-11 Pledges of Assets (FEB 1992)

52.228-12 Prospective Subcontractor Requests for Bonds (OCT 1995)

52.228-14 Irrevocable Letter of Credit (DEC 1999)

52.228-15 Performance and Payment Bonds – Construction (NOV 2006)

52.229-3 Federal, State, and Local Taxes (APR 2003)

52.232-5 Payments Under Fixed-Price Construction Contracts (SEP 2002)

52.232-17 Interest (JUN 1996)

52.232-23 Assignment of Claims (JAN 1986)

52.232-27 Prompt Payment for Construction Contracts (OCT 2003)

52.232-33 Payment by Electronic Funds Transfer – Central Contractor Registration (OCT 2003)

52.233-1 Disputes (JULY 2002) 52.233-3 Protest After Award (AUG 1996)

52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004)

52.236-2 Differing Site Conditions (APR 1984)

52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984)

52.236-5 Material and Workmanship (APR 1984)

52.236-6 Superintendence by The Contractor (APR 1984)

52.236-7 Permits and Responsibilities (NOV 1991)

52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR 1984)

52.236-10 Operations and Storage Areas (APR 1984)

52.236-11 Use and Possession Prior to Completion (APR 1984)

52.236-12 Cleaning Up (APR 1984)

52.236-13 Accident Prevention (NOV 1991)

52.236-15 Schedules for Construction Contracts (APR 1984)

52.236-16 Quantity Surveys (APR 1984) Alternate I (APR 1984)

52.236-17 Layout of Work (APR 1984)

52.236-21 Specifications and Drawings for Construction (FEB 1997)

Alternate I (APR 1984)

52.236-26 Preconstruction Conference (FEB 1995)

52.242-13 Bankruptcy (JUL 1995)

52.243-4 Changes (AUG 1987)

52.244-6 Subcontracts for Commercial Items (MAR 2007)

52.245-1 Property Records (JUN 2007) 52.246-21 Warranty of Construction (MAR 1994) Alternate I (APR 1984)

52.248-3 Value Engineering -- Construction (SEP 2006)

52.249-2 Termination for Convenience of the Government (Fixed-Price) (MAY 2004)--Alternate I (SEP 1996)

52.249-10 Default (Fixed-Price Construction) (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991)

AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES

452.232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV 1996)

452.236-71 Prohibition Against the Use of Lead-Paint (NOV 1996)

452.236-72 Use of Premises (NOV 1996)

452.236-73 Archeological or Historic Sites (FEB 1988)

452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996)

452.236-76 Samples and Certificates (FEB 1988)

452.236-77 Emergency Response (NOV 1996)

52.204-7 Central Contractor Registration (APR 2008)

(a) Definitions. As used in this clause—

“Central Contractor Registration (CCR) database” means the primary Government repository for Contractor information required for the conduct of business with the Government.

“Data Universal Numbering System (DUNS) number” means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities.

“Data Universal Numbering System+4 (DUNS+4) number” means the DUNS number means the number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the business concern to establish additional CCR records for identifying alternative Electronic Funds Transfer (EFT) accounts (see the FAR at Subpart 32.11) for the same concern.

“Registered in the CCR database” means that—

(1) The Contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, into the CCR database; and

(2) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS), and has marked the record “Active”. The Contractor will be required to provide consent for TIN validation to the Government as a part of the CCR registration process.

(b)

(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the CCR database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.

(2) The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “DUNS” or “DUNS+4” followed by the DUNS or DUNS+4 number that identifies the offeror’s name and address exactly as stated in the offer. The DUNS number will be used by the Contracting Officer to verify that the offeror is registered in the CCR database.

(c) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.

(1) An offeror may obtain a DUNS number—

(i) Via the internet at http://fedgov.dnb.com/webform or if the offeror does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if located within the United States; or

(ii) If located outside the United States, by contacting the local Dun and Bradstreet office. The offeror should indicate that it is an offeror for a U.S. Government contract when contacting the local Dun and Bradstreet office.

(2) The offeror should be prepared to provide the following information:

(i) Company legal business name.

(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.

(iii) Company physical street address, city, state and Zip Code.

(iv) Company mailing address, city, state and Zip Code (if separate from physical).

(v) Company telephone number.

(vi) Date the company was started.

(vii) Number of employees at your location.

(viii) Chief executive officer/key manager.

(ix) Line of business (industry).

(x) Company Headquarters name and address (reporting relationship within your entity).

(d) If the Offeror does not become registered in the CCR database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror.

(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering. Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.

(f) The Contractor is responsible for the accuracy and completeness of the data within the CCR database, and for any liability resulting from the Government’s reliance on inaccurate or incomplete data. To remain registered in the CCR database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the CCR database to ensure it is current, accurate and complete. Updating information in the CCR does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.

(g)

(1)

(i) If a Contractor has legally changed its business name, “doing business as” name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in Subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day’s written notification of its intention to:

(A) Change the name in the CCR database;

(B) Comply with the requirements of Subpart 42.12 of the FAR;

(C) Agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor must provide with the notification sufficient documentation to support the legally changed name.

(ii) If the Contractor fails to comply with the requirements of paragraph (g)(1)(i) of this clause, or fails to perform the agreement at paragraph (g)(1)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the CCR information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the “Suspension of Payment” paragraph of the electronic funds transfer (EFT) clause of this contract.

(2) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the CCR record to reflect an assignee for the purpose of assignment of claims (see FAR Subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the CCR database. Information provided to the Contractor’s CCR record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the “Suspension of payment” paragraph of the EFT clause of this contract.

(h) Offerors and Contractors may obtain information on registration and annual confirmation requirements via the Internet at http://www.ccr.gov or by calling 1-888-227-2423, or 269-961-5757.

52.214-26 -- Audit and Records -- Sealed Bidding (Mar 2009)

(a) As used in this clause, “records” includes books, documents, accounting procedures and practices, and other data, regardless of type and regardless of whether such items are in written form, in the form of computer data, or in any other form.

(b) Cost or pricing data. If the Contractor has been required to submit cost or pricing data in connection with the pricing of any modification to this contract, the Contracting Officer, or an authorized representative of the Contracting Officer, in order to evaluate the accuracy, completeness, and currency of the cost or pricing data, shall have the right to examine and audit all of the Contractor’s records, including computations and projections, related to --

(1) The proposal for the modification;

(2) The discussions conducted on the proposal(s), including those related to negotiating;

(3) Pricing of the modification; or

(4) Performance of the modification.

(c) Comptroller General. In the case of pricing any modification, the Comptroller General of the United States, or an authorized representative, shall have the same rights as specified in paragraph (b) of this clause and also the right to interview any current employee regarding such transactions.

(d) Availability. The Contractor shall make available at its office at all reasonable times the materials described in paragraph (b) of this clause, for examination, audit, or reproduction, until 3 years after final payment under this contract, or for any other period specified in Subpart 4.7 of the Federal Acquisition Regulation (FAR). FAR Subpart 4.7, Contractor Records Retention, in effect on the date of this contract, is incorporated by reference in its entirety and made a part of this contract.

(1) If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement.

(2) Records pertaining to appeals under the Disputes clause or to litigation or the settlement of claims arising under or relating to the performance of this contract shall be made available until disposition of such appeals, litigation, or claims.

(e) The Contractor shall insert a clause containing all the provisions of this clause, including this paragraph (e), in all subcontracts expected to exceed the threshold in FAR 15.403-4(a)(1) for submission of cost or pricing data.

Alternate I (Mar 2009). As prescribed in 14.201-7(a)(2) substitute the following paragraphs (c) and (e) for paragraphs (c) and (e) of the basic clause:

(c) The Comptroller General of the United States, an appropriated Inspector General appointed under section 3 or 8G of the Inspector General Act of 1978 (5 U.S.C. App.), or an authorized representative of either of the foregoing officials, shall have access to and the right to—

(1) Examine any of the Contractor’s or any subcontractors’ records that pertain to, and involve transactions relating to, this contract or a subcontract hereunder; and

(2) Interview any officer or employee regarding such transactions.

(e)(1) Except as provided in paragraph (e)(2), the Contractor shall insert a clause containing the provisions of this clause, including this paragraph (e), in all subcontracts.

(2) The authority of the Inspector General under paragraph (c)(2) of this clause does not flow down to subcontracts.

52.222-39 NOTIFICATION OF EMPLOYEE RIGHTS CONCERNING PAYMENT OF UNION DUES OR FEES (DEC 2004)

(a) Definition. As used in this clause-

"United States" means the 50 States, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, and Wake Island.

(b) Except as provided in paragraph (e) of this clause, during the term of this contract, the Contractor shall post a notice, in the form of a poster, informing employees of their rights concerning union membership and payment of union dues and fees, in conspicuous places in and about all its plants and offices, including all places where notices to employees are customarily posted. The notice shall include the following information (except that the information pertaining to National Labor Relations Board shall not be included in notices posted in the plants or offices of carriers subject to the Railway Labor Act, as amended (45 U.S.C. 151-188)).

Notice to Employees

Under Federal law, employees cannot be required to join a union or maintain membership in a union in order to retain their jobs. Under certain conditions, the law permits a union and an employer to enter into a union-security agreement requiring employees to pay uniform periodic dues and initiation fees. However, employees who are not union members can object to the use of their payments for certain purposes and can only be required to pay their share of union costs relating to collective bargaining, contract administration, and grievance adjustment.

If you do not want to pay that portion of dues or fees used to support activities not related to collective bargaining, contract administration, or grievance adjustment, you are entitled to an appropriate reduction in your payment. If you believe that you have been required to pay dues or fees used in part to support activities not related to collective bargaining, contract administration, or grievance adjustment, you may be entitled to a refund and to an appropriate reduction in future payments.

For further information concerning your rights, you may wish to contact the National Labor Relations Board (NLRB) either at one of its Regional offices or at the following address or toll free number:

National Labor Relations Board Division of Information 1099 14th Street, N.W.

Washington, DC 20570 1-866-667-6572

1-866-316-6572 (TTY)

To locate the nearest NLRB office, see NLRB's website at http://www.nlrb.gov.

(c) The Contractor shall comply with all provisions of Executive Order 13201 of February 17, 2001, and related implementing regulations at 29 CFR part 470, and orders of the Secretary of Labor.

(d) In the event that the Contractor does not comply with any of the requirements set forth in paragraphs (b), (c), or (g), the Secretary may direct that this contract be cancelled, terminated, or suspended in whole or in part, and declare the Contractor ineligible for further Government contracts in accordance with procedures at 29 CFR part 470, Subpart B-Compliance Evaluations, Complaint Investigations and Enforcement Procedures. Such other sanctions or remedies may be imposed as are provided by 29 CFR part 470, which implements Executive Order 13201, or as are otherwise provided by law.

(e) The requirement to post the employee notice in paragraph (b) does not apply to-

(1) Contractors and subcontractors that employ fewer than 15 persons;

(2) Contractor establishments or construction work sites where no union has been formally recognized by the Contractor or certified as the exclusive bargaining representative of the Contractor's employees;

(3) Contractor establishments or construction work sites located in a jurisdiction named in the definition of the United States in which the law of that jurisdiction forbids enforcement of union-security agreements;

(4) Contractor facilities where upon the written request of the Contractor, the Department of Labor Deputy Assistant Secretary for Labor-Management Programs has waived the posting requirements with respect to any of the Contractor's facilities if the Deputy Assistant Secretary finds that the Contractor has demonstrated that-

(i) The facility is in all respects separate and distinct from activities of the Contractor related to the performance of a contract; and

(ii) Such a waiver will not interfere with or impede the effectuation of the Executive order; or

(5) Work outside the United States that does not involve the recruitment or employment of workers within the United States.

(f) The Department of Labor publishes the official employee notice in two variations; one for contractors covered by the Railway Labor Act and a second for all other contractors. The Contractor shall-

(1) Obtain the required employee notice poster from the Division of Interpretations and Standards, Office of Labor-Management Standards, U.S. Department of Labor, 200 Constitution Avenue, NW, Room N-5605, Washington, DC 20210, or from any field office of the Department's Office of Labor-Management Standards or Office of Federal Contract Compliance Programs;

(2) Download a copy of the poster from the Office of Labor-Management Standards website at http://www.olms.dol.gov; or

(3) Reproduce and use exact duplicate copies of the Department of Labor's official poster.

(g) The Contractor shall include the substance of this clause in every subcontract or purchase order that exceeds the simplified acquisition threshold, entered into in connection with this contract, unless exempted by the Department of Labor Deputy Assistant Secretary for Labor-Management Programs on account of special circumstances in the national interest under authority of 29 CFR 470.3(c). For indefinite quantity subcontracts, the Contractor shall include the substance of this clause if the value of orders in any calendar year of the subcontract is expected to exceed the simplified acquisition threshold. Pursuant to 29 CFR part 470, Subpart B-Compliance Evaluations, Complaint Investigations and Enforcement Procedures, the Secretary of Labor may direct the Contractor to take such action in the enforcement of these regulations, including the imposition of sanctions for noncompliance with respect to any such subcontract or purchase order. If the Contractor becomes involved in litigation with a subcontractor or vendor, or is threatened with such involvement, as a result of such direction, the Contractor may request the United States, through the Secretary of Labor, to enter into such litigation to protect the interests of the United States.

52.225-21 -- Required Use of American Iron, Steel, and Other Manufactured Goods--Buy American Act--Construction Materials (Mar 2009)

(a) Definitions. As used in this clause—

“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .