Amendment 1_ATCH 18_FINAL ROAD LOG PHASE 3.xls

XLS spreadsheet 38 KB Posted

Attached to
RECOVERY - CUSTER NATIONAL FOREST, FY09 West Fork Rock Creek Road Reconstruction
Solicitation number
AG-0355-S-09-0004
Issued by

About this file

Amendment 1 - Atch 18 - Phase III Road Log and Culvert Table

View the file

Other files

File Type Posted
AMENDMENT 4_West Fork_SF_30.doc DOC document
AMENDMENT 3_West Fork_SF_30.doc DOC document
Amd 3 Sch of Items.pfd.pdf PDF
Geotech_ Attachments.pdf PDF
Amendment 2_Section J_Page 31 of 48.doc DOC document
Phase 4 Revised D-8.pdf PDF
Phase 4 REVISED C-3_Amendment_2.pdf PDF
Phase 3_D-11 Grade Sag_Amendment_2.pdf PDF
Phase 4_Revised D-15_Amendment_2.pdf PDF
Phase 3 Revised D-2.pdf PDF
Atch 2 Ph III page 20_amendment_2.doc DOC document
Amendment 2_WEST FORK_COVER_SHEET.doc DOC document
AMENDMENT 2_West Fork_SF_30.doc DOC document
Amendment_2_SF1442.doc DOC document
Phase 4 Spec_403.01 page 39.doc DOC document
Amendment_2_Schedule_B.doc DOC document
Q-A_5-7-09.doc DOC document
Pre-bid meeting.PDF PDF
Amendment_1_SF1442-Pre-Bid_Mtg_amendment_1.doc DOC document
Amendment 1_Section J_Page 31 of 48.doc DOC document
Amendment 1_SEC F_FAR 52.211-10_Page 14 of 48.doc DOC document
Amendment 1_WEST FORK_COVER_SHEET.doc DOC document
Amendment_1_Subparagaph o-page 12 of 48.doc DOC document
Amendment 1 ATCH 3 Spec 156.04 page 17.doc DOC document
Amendment 1_PHASE IV_Spec 255.02.6_Page_29.doc DOC document
Amendment 1_FAR 52.204-11.doc DOC document
Amendment 1_Revised Phase 4_D-10.pdf PDF
WEST FORK_COVER_SHEET.doc DOC document
ATCH_1_wage_determination_HWY.doc DOC document
ATCH_10_Phase3.pdf PDF
ATCH_3_Phase4.doc DOC document
ATCH_5_Map.pdf PDF
ATCH_6_Phase3.pdf PDF
ATCH_17_OF-17.pdf PDF
ATCH_8_Phase3.pdf PDF
ATCH_14_Phase4.pdf PDF
ATCH_11_Phase3.pdf PDF
ATCH_7_Phase3.pdf PDF
ATCH_16_Phase4.pdf PDF
CONSTRUCTION_IFB.doc DOC document
ATCH_13_Phase4.pdf PDF
ATCH 4_sf24_f.pdf PDF
ATCH_15_Phase4.pdf PDF
ATCH_2_Phase3.doc DOC document
ATCH_12_Phase4.pdf PDF
ATCH_9_Phase3.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

West Fork Rock Creek Road #2071
Road LogCULVERT TABLECulvert Table
1/23/0921"x15" CMPA28"x20" CMPA49"x33" CMPA57"x38" CMPA81"x59" CMPACMPA Lengths (ft)by Diameter Size
StationMP from Pavement EndDescriptionStationMP from Pavement EndDesign LengthAs-Built LengthDesign LengthAs-Built LengthDesign LengthAs-Built LengthDesign LengthAs-Built LengthDesign LengthAs-Built Length21"x15"28x2049x3357x3881x59
213+341.39Existing 18"x31' culvert, remove and replace with 49"x33"x44' cmpa(Live Water) Riprap inlet & outlet213+341.394444
188+33.51.85Existing 57"x38" cmap. Place riprap on channel bank, approximately 10 CY188+33.51.85
181+421.98Install new 28"x20"x32' cmpa with 30' leadoff ditch (State Land Section Erosion )181+421.983232
183+54.62.09Existing 18" culvert, remove and replace with 21"x15"x28' cmpa183+54.62.092828
2.21Centerline Bridge - No Work2.21
161+94.5Install new 28"x20"x46 cmpa, riprap inlet & outlet.161+94.54646
158+722.41Existing 18" culvert, remove and replace with 21"x15"x28' cmpa158+722.412828
154+512.49Install new 21"x15"x36' cmpa154+512.493636
151+852.54Install new 21"x15"x28' cmpa(at low spot)151+852.542828
146+67.92.62Existing 18" culvert, remove and replace with 21"x15"x40' cmpa(at 25 mph sign)146+67.92.624040
143+512.68Install new 21"x15"x26' cmpa (at low spot)143+512.682626
141+81Install new 21"x15"x20' cmpa approach culvert141+812020
140+93.72.73Existing 18" culvert, remove and replace with 28"x20"x32' cmpa140+93.72.733232
137+762.79Install new 28"x20"x32' cmpa, outslope road, new grade sag, 3' flat bottom ditch to Cascade Creek (station 137+26.2), 40 yds riprap slope. Live water137+762.793232
137+26.22.81Cascade Creek, Existing 48"x32' culvert, remove and replace with 81"x 59"x 54' cmpa, live water.137+26.22.815454
133+12.92.88Existing 18" culvert, remove and replace with 21"x15"x36' cmpa133+12.92.883636
129+84.22.94Existing 18" culvert, remove and replace with 21"x15"x30' cmpa129+84.22.943030
127+85Install new 21"x15"x30' cmpa127+853030
125+433.00Install new approach culvert 21"x15"x26' cmpa125+433.002626
122+003.08Existing 18" culvert, remove and replace with 21"x15"x28' cmpa122+003.082828
112+41.33.26Existing 18" culvert, remove and replace with 21"x15"x36' cmpa112+41.33.263636
106.81.13.37Existing 18" culvert, remove and replace with 21"x15"x30' cmpa106.81.13.373030
3.49Centerline of Bridge - No Work3.49
95+79.73.57Existing 18" culvert, remove and replace with 21"x15"x28' cmpa95+79.73.572828
92+18.83.63Existing 18" culvert, remove and replace with 21"x15"x30' cmpa92+18.83.633030
3.76Centerline of Bridge - No Work3.76
75+86.33.94Existing 24" culvert, remove and replace with 28"x20"x44' cmpa75+86.33.944444
72+52.84.00Existing 18" culvert, remove and replace with 21"x15"x34' cmpa72+52.84.003434
69+364.06Install new 28"x20" x 44' culvert, live stream. Rechannel approximately 40' to creek and 20' toward Rock Creek 5 cy riprap69+364.064444
4.07Camp Senia Turnoff Left4.07
65+50Install new 21"x15"x30' cmpa65+503030
63+23.6Place existing wateline through 40 ft of 6" schedule 40 pvc sleeve63+23.6
62+204.19Existing 18" culvert, remove and dispose62+204.19
62+00Install new 21"x15"x36' cmpa62+003636
60+91.34.22Existing 12" culvert, remove and replace with new 21"x15"x26' cmpa60+91.34.222626
58+364.26Existing 18" culvert, remove and replace with 21"x15"x36' cmpa58+364.263636
56+774.29Construct new grad sag56+774.29
55+474.31Install new 21"x15"x36' cmpa55+474.313636
53+88.74.35Senia Creek, remove existing culvert, Install new 57"x 38" x 40' cmpa, live stream. 20 cy riprap53+88.74.354040
50+194.42Install new 21"x15"x36' cmpa50+194.423636
48+87.44.44Existing 18" culvert, remove and replace with 21"x15"x40' cmpa48+87.44.444040
48+35.7Install new 21"x15"x22' cmpa approach culvert48+35.72222
21"x15" CMPA28"x20" CMPA49"x33" CMPA57"x38" CMPA81"x59" CMPA
StationMP from Pavement EndDescriptionStationMP from Pavement EndDesign LengthAs-Built LengthDesign LengthAs-Built LengthDesign LengthAs-Built LengthDesign LengthAs-Built LengthDesign LengthAs-Built Length
46+53.34.48Existing 18" culvert, remove and replace with 21"x15"x40' cmpa. Place existing waterline in 40 ft of 6" schedule 40 pvc sleeve. Offset 10' from culvert.46+53.34.484040
45+474.5Install new 21"x15"x36' cmpa45+474.53636
43+66.74.53Existing 18" culvert, remove and replace with 21"x15"x30' cmpa43+66.74.533030
39+18.24.62Existing 18" culvert, remove and replace with 21"x15"x30' cmpa39+18.24.623030
37+81Install new 21"x15"x34' approach culvert37+813434
37+.054.65Remove and replace with 28"x 20" x 30' live stream, place riprap37+.054.653030
36+474.67Ex 18" Cross Drain, remove and replace with 21"x15"x40'36+474.674040
34+74.9Reset existing 18" cmp approach culvert.34+74.9
33+87.44.71Existing 18" culvert, remove and replace with 21"x15"x30' cmpa33+87.44.713030
31+21.14.77Existing 18" culvert, remove and replace with 21"x15"x38' cmpa31+21.14.773838
30+94.74.775Install new 21"x15"x40' cmpa, live water, 20 cy surfacing30+94.74.7754040
30+19.14.78Existing 18" culvert, remove and replace with 21"x15"x40' cmpa30+19.14.784040
27+274.84Install new 21"x15"x36' cmpa (live water)27+274.843636
26+74.54.85Existing 18" culvert, remove and replace with 21"x15"x30' cmpa26+74.54.853030
25+56.84.87Existing 18" culvert, remove and replace with 21"x15"x32' cmpa25+56.84.873232
22+34.54.93Existing 18" culvert, remove and replace with 21"x15"x38' cmpa22+34.54.933838
17+595.02Install new 21"x15"x40' cmpa17+595.024040
14+09.75.08Existing 18" culvert, remove and replace with 21"x15"x34' cmpa14+09.75.083434
13+30Install new 21"x15"x24' cmpa approach culvert13+302424
10+21.65.15Existing 18" culvert, remove and replace with 21"x15"x38' cmpa10+21.65.153838
3+89.45.26Existing 18" culvert, remove and replace with 21"x15"x38' cmpa3+89.45.263838
2+835.28Install new 21"x15"x50' cmpa2+835.285050
1+69.45.29Existing 31"x30' cmp, remove and replace with 57"x38"x50' cmpa, 20 cy surfacing, new grade sag, 40 cy riprap. Live stream. Riprap inlet & outlet1+69.45.295050
TOTAL LENGTH1494260449054Total Lengths by Diameter
NOTE: 1. Contractor shall be required to divert water at all live stream crossings and implement erosion control measures for full compliance with permits.1494260449054
NOTE: 2. Design lengths for culverts are approximate. Contractor shall survey and measure each culvert in the field to determine actual length, gradient, and alignment prior to ordering materials.
NOTE: 3. All removed culverts shall become the property of the Contractor and shall be removed and disposed of in a lawfull manner off of National Forest System Lands.

&LAmendment 1 April 15, 2009&CATCH 18&RAG-0355-S-09-0004 &C&P