Amendment_1_Subparagaph o-page 12 of 48.doc

DOC document 25 KB Posted

Attached to
RECOVERY - CUSTER NATIONAL FOREST, FY09 West Fork Rock Creek Road Reconstruction
Solicitation number
AG-0355-S-09-0004
Issued by

About this file

Amendment 1, Section C, subparagraph (o) changes

View the file

Other files

File Type Posted
AMENDMENT 4_West Fork_SF_30.doc DOC document
AMENDMENT 3_West Fork_SF_30.doc DOC document
Amd 3 Sch of Items.pfd.pdf PDF
Geotech_ Attachments.pdf PDF
Amendment 2_Section J_Page 31 of 48.doc DOC document
Phase 4 Revised D-8.pdf PDF
Phase 4 REVISED C-3_Amendment_2.pdf PDF
Phase 3_D-11 Grade Sag_Amendment_2.pdf PDF
Phase 4_Revised D-15_Amendment_2.pdf PDF
Phase 3 Revised D-2.pdf PDF
Atch 2 Ph III page 20_amendment_2.doc DOC document
Amendment 2_WEST FORK_COVER_SHEET.doc DOC document
AMENDMENT 2_West Fork_SF_30.doc DOC document
Amendment_2_SF1442.doc DOC document
Phase 4 Spec_403.01 page 39.doc DOC document
Amendment_2_Schedule_B.doc DOC document
Q-A_5-7-09.doc DOC document
Pre-bid meeting.PDF PDF
Amendment_1_SF1442-Pre-Bid_Mtg_amendment_1.doc DOC document
Amendment 1_Section J_Page 31 of 48.doc DOC document
Amendment 1_SEC F_FAR 52.211-10_Page 14 of 48.doc DOC document
Amendment 1_ATCH 18_FINAL ROAD LOG PHASE 3.xls XLS spreadsheet
Amendment 1_WEST FORK_COVER_SHEET.doc DOC document
Amendment 1 ATCH 3 Spec 156.04 page 17.doc DOC document
Amendment 1_PHASE IV_Spec 255.02.6_Page_29.doc DOC document
Amendment 1_FAR 52.204-11.doc DOC document
Amendment 1_Revised Phase 4_D-10.pdf PDF
WEST FORK_COVER_SHEET.doc DOC document
ATCH_1_wage_determination_HWY.doc DOC document
ATCH_10_Phase3.pdf PDF
ATCH_3_Phase4.doc DOC document
ATCH_5_Map.pdf PDF
ATCH_6_Phase3.pdf PDF
ATCH_17_OF-17.pdf PDF
ATCH_8_Phase3.pdf PDF
ATCH_14_Phase4.pdf PDF
ATCH_11_Phase3.pdf PDF
ATCH_7_Phase3.pdf PDF
ATCH_16_Phase4.pdf PDF
CONSTRUCTION_IFB.doc DOC document
ATCH_13_Phase4.pdf PDF
ATCH 4_sf24_f.pdf PDF
ATCH_15_Phase4.pdf PDF
ATCH_2_Phase3.doc DOC document
ATCH_12_Phase4.pdf PDF
ATCH_9_Phase3.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 1

AG-0355-S-09-0004

April 15, 2009

Custer National Forest, Beartooth Ranger District

Recovery – FY09 Cascade West Fork Rock Creek Road #2071 Phases III & IV Road Reconstruction

(m) Asbestos Containing Materials – The Contractor shall not use during construction or incorporate into the final construction product any material or product that contains more than 1% asbestos by dry volume as determined by the Polar Light Microscopy Method (less than 1% shall be considered under these specifications as “Asbestos Free”).

(n) Security and Protection – Security is the Contractor’s responsibility. Limit access to the construction area to persons involved in the work. Provide secure storage for materials that are stored on site. Secure completed work as required to prevent loss.

Barricades, warning signs, and lights shall comply with standards and code requirements for erection of structurally adequate barricades. All road warning signs, barricades, and traffic control devices shall conform to MUTCD. Where appropriate and needed, provide lighting, including flashing red or amber warning lights.

(o) PHASE III ONLY: Maintenance of Traffic – The Contractor shall have all temporary construction signs and traffic control measures in place prior to beginning work. Contractor shall have an approved Traffic Control Plan in place prior to beginning work.

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to limitations and authorizations designated in Road Order(s), as Shown On The Drawings, or specified under this contract, when such use will not damage the roads or National Forest resources and when traffic can be accommodated safely.

Before shutting down operations, take all necessary precautions to prevent damage to the project, such as temporary detours, approaches, crossings, or intersections; and provide for normal drainage and minimization of erosion.

The Contractor shall follow proper food storage restrictions available at the Beartooth District Office.

Any emergency vehicles shall be allowed immediate passage.

The road shall be open to public traffic from 7:00 PM to 7:00 AM, 1100 AM to 12 00 PM and 3:00 PM to 4:00 PM. The Contractor shall make reasonable effort to limit the amount of closure time. Larger culverts requiring longer road closures shall be approved in writing by the CO prior to installation. Information must be detailed in how the closures will be accomplished in the traffic control plan.

(p) Protection of Improvements – The Contractor shall complete sequences of construction activity in order to prevent damage to equipment, material, and articles incorporated into the work covered by this contract.

(q) Water – There is no potable water available on this job. Water for earthwork, surfacing, and incidental construction may be pumped from the West Fork Rock Creek at locations SHOWN ON THE DRAWINGS as Fire Engine Access.