Amendment 1_PHASE IV_Spec 255.02.6_Page_29.doc

DOC document 31 KB Posted

Attached to
RECOVERY - CUSTER NATIONAL FOREST, FY09 West Fork Rock Creek Road Reconstruction
Solicitation number
AG-0355-S-09-0004
Issued by

About this file

Amendment 1 - Atch 3, Phase IV - Spec 255.02.6 change

View the file

Other files

File Type Posted
AMENDMENT 4_West Fork_SF_30.doc DOC document
AMENDMENT 3_West Fork_SF_30.doc DOC document
Amd 3 Sch of Items.pfd.pdf PDF
Geotech_ Attachments.pdf PDF
Amendment 2_Section J_Page 31 of 48.doc DOC document
Phase 4 Revised D-8.pdf PDF
Phase 4 REVISED C-3_Amendment_2.pdf PDF
Phase 3_D-11 Grade Sag_Amendment_2.pdf PDF
Phase 4_Revised D-15_Amendment_2.pdf PDF
Phase 3 Revised D-2.pdf PDF
Atch 2 Ph III page 20_amendment_2.doc DOC document
Amendment 2_WEST FORK_COVER_SHEET.doc DOC document
AMENDMENT 2_West Fork_SF_30.doc DOC document
Amendment_2_SF1442.doc DOC document
Phase 4 Spec_403.01 page 39.doc DOC document
Amendment_2_Schedule_B.doc DOC document
Q-A_5-7-09.doc DOC document
Pre-bid meeting.PDF PDF
Amendment_1_SF1442-Pre-Bid_Mtg_amendment_1.doc DOC document
Amendment 1_Section J_Page 31 of 48.doc DOC document
Amendment 1_SEC F_FAR 52.211-10_Page 14 of 48.doc DOC document
Amendment 1_ATCH 18_FINAL ROAD LOG PHASE 3.xls XLS spreadsheet
Amendment 1_WEST FORK_COVER_SHEET.doc DOC document
Amendment_1_Subparagaph o-page 12 of 48.doc DOC document
Amendment 1 ATCH 3 Spec 156.04 page 17.doc DOC document
Amendment 1_FAR 52.204-11.doc DOC document
Amendment 1_Revised Phase 4_D-10.pdf PDF
WEST FORK_COVER_SHEET.doc DOC document
ATCH_1_wage_determination_HWY.doc DOC document
ATCH_10_Phase3.pdf PDF
ATCH_3_Phase4.doc DOC document
ATCH_5_Map.pdf PDF
ATCH_6_Phase3.pdf PDF
ATCH_17_OF-17.pdf PDF
ATCH_8_Phase3.pdf PDF
ATCH_14_Phase4.pdf PDF
ATCH_11_Phase3.pdf PDF
ATCH_7_Phase3.pdf PDF
ATCH_16_Phase4.pdf PDF
CONSTRUCTION_IFB.doc DOC document
ATCH_13_Phase4.pdf PDF
ATCH 4_sf24_f.pdf PDF
ATCH_15_Phase4.pdf PDF
ATCH_2_Phase3.doc DOC document
ATCH_12_Phase4.pdf PDF
ATCH_9_Phase3.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 1

Atch 3 AG-0355-S-09-0004

April 15, 2009

Recovery - West Fork Rock Creek Road #2071 Phase 4

255.02.4 Rock

Rock for the facing section of gabion units shall be hard, angular to round, durable and of such quality that they shall not disintegrate on exposure to water or weathering during the life of the structure, in accordance with ASTM D6711. The rocks shall range between 4 inches (100 mm) and 8 inches (200 mm). Each range of sizes may allow for a variation of 5% oversize rock by number of particles, or 5% undersize rock by number of particles, or both. The size of any oversize rock shall allow for the placement of minimum of three layers of rock must be achieved when filling the 3 feet (1 m) high units and a minimum of two layers for the 1.5 feet (0.50 m) high units.

255.02.5 MSE Wall Select Backfill

Mechanically stabilized earth structures shall be made of a good quality, well graded, free draining, and granular material. Backfill to consist of the following gradation or approved alternate:

Select Granular Backfill Gradation

Sieve Size
Percent by Mass Passing Designated Sieve (AASHTO T 27 & T 11)
4 inch
100
No. 4
25 – 75
No. 200
0 – 10

Submittal: Submitt laboratory test results conforming to Table 255-07

255.02.6 Geotextile & Drain Pipe

Place 4” diameter perforated pipe within 18” x18” drainage fill wrapped with geotextile filter fabric. Slope pipe at 1/8” per foot minimum and discharge every 100’ maximum at low points.

Geotextile to be utilized between Gabion Baskets and MSE wall backfill shall be a Non-woven drainage geotextile conforming to the following specification:

Property
Test Method
Value
Units
Unit Weight
ASTM D3776
6
oz./yd2
Grab Strength
ASTM D4632
150
lbs
Trapezoidal Tear Strength
ASTM D4533
65
lbs