Amendment_2_Schedule_B.doc

DOC document 232 KB Posted

Attached to
RECOVERY - CUSTER NATIONAL FOREST, FY09 West Fork Rock Creek Road Reconstruction
Solicitation number
AG-0355-S-09-0004
Issued by

About this file

Schedule B

View the file

Other files

File Type Posted
AMENDMENT 4_West Fork_SF_30.doc DOC document
AMENDMENT 3_West Fork_SF_30.doc DOC document
Amd 3 Sch of Items.pfd.pdf PDF
Geotech_ Attachments.pdf PDF
Amendment 2_Section J_Page 31 of 48.doc DOC document
Phase 4 Revised D-8.pdf PDF
Phase 4 REVISED C-3_Amendment_2.pdf PDF
Phase 3_D-11 Grade Sag_Amendment_2.pdf PDF
Phase 4_Revised D-15_Amendment_2.pdf PDF
Phase 3 Revised D-2.pdf PDF
Atch 2 Ph III page 20_amendment_2.doc DOC document
Amendment 2_WEST FORK_COVER_SHEET.doc DOC document
AMENDMENT 2_West Fork_SF_30.doc DOC document
Amendment_2_SF1442.doc DOC document
Phase 4 Spec_403.01 page 39.doc DOC document
Q-A_5-7-09.doc DOC document
Pre-bid meeting.PDF PDF
Amendment_1_SF1442-Pre-Bid_Mtg_amendment_1.doc DOC document
Amendment 1_Section J_Page 31 of 48.doc DOC document
Amendment 1_SEC F_FAR 52.211-10_Page 14 of 48.doc DOC document
Amendment 1_ATCH 18_FINAL ROAD LOG PHASE 3.xls XLS spreadsheet
Amendment 1_WEST FORK_COVER_SHEET.doc DOC document
Amendment_1_Subparagaph o-page 12 of 48.doc DOC document
Amendment 1 ATCH 3 Spec 156.04 page 17.doc DOC document
Amendment 1_PHASE IV_Spec 255.02.6_Page_29.doc DOC document
Amendment 1_FAR 52.204-11.doc DOC document
Amendment 1_Revised Phase 4_D-10.pdf PDF
WEST FORK_COVER_SHEET.doc DOC document
ATCH_1_wage_determination_HWY.doc DOC document
ATCH_10_Phase3.pdf PDF
ATCH_3_Phase4.doc DOC document
ATCH_5_Map.pdf PDF
ATCH_6_Phase3.pdf PDF
ATCH_17_OF-17.pdf PDF
ATCH_8_Phase3.pdf PDF
ATCH_14_Phase4.pdf PDF
ATCH_11_Phase3.pdf PDF
ATCH_7_Phase3.pdf PDF
ATCH_16_Phase4.pdf PDF
CONSTRUCTION_IFB.doc DOC document
ATCH_13_Phase4.pdf PDF
ATCH 4_sf24_f.pdf PDF
ATCH_15_Phase4.pdf PDF
ATCH_2_Phase3.doc DOC document
ATCH_12_Phase4.pdf PDF
ATCH_9_Phase3.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 2

AG-0355-S-09-0004

May 7, 2009

Custer National Forest, Beartooth Ranger District

Recovery – FY09 Cascade West Fork Rock Creek Road #2071 Phases III & IV Road Reconstruction

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES

SCHEDULE OF ITEMS

RECOVERY - FY09 Cascade West Fork Rock Creek Road #2071

Phases III and IV Road Reconstruction

Custer National Forest, Beartooth Ranger District

PHASE 3 BASE BID

Item Number
Description
Method of Measure
Pay Unit
Estimated Quantity
Unit Price
Total
15100.1
Mobilization
LSQ
LS
ALL
XXXXXXXXXXXXXXXXXXXXX
15200
Construction Surveying and Staking
LSQ
LS
ALL
XXXXXXXXXXXXXXXXXXXXX
00113.1
Equipment Rental (Type Excavator)
AQ
HR
40
00113.2
Equipment Rental (Type End Dump Truck)
AQ
HR
16
00205
Blasting, Individual Rocks
AQ
EA
30
02010.1
Clearing and Grubbing
DQ
AC
5.7
2010.2
Removal of Individual Trees
AQ
EA
1000
02110
Roadway Obliteration, Method 1
DQ
AC
0.3
02120
Road Grading
DQ
Mi
5.5
02220.1
Excavation and Embankment, Compaction Method 3, Construction Tolerance Class C, Finishing Method B
DQ
CY
11281
02220.2
Waste Rock
DQ
CY
1015
02228.1
21" x 15" CMPA Galvanized 16 Gauge Steel (45 culverts)
AQ
LF
1494
02228.2
28" x 20" CMPA Galvanized 16 Gauge Steel (7 culverts)
AQ
LF
260
02228.3
49" x 33" CMPA Galvanized 14 Gauge Steel (1 culverts)
AQ
LF
44
02228.4
57" x 38" CMPA Galvanized 14 Gauge Steel (2 culverts)
AQ
LF
90
02228.5
81" x 59" CMPA Galvanized 12 Gauge Steel (1 culverts)
AQ
LF
54
2239.3
Grade Sags
AQ
EA
5
02240.1
Roadway Aggregate, Roller Compaction
DQ
CY
4153
02240.2
Culvert Pipe Bedding/Aggregate (5 cy per culvert)
DQ
CY
285
02240.3
Roadway Fill, Imported
AQ
CY
100
02510
Riprap (Collected Along Road)
AQ
CY
100
02725.1
Temporary Traffic Control
LSQ
LS
ALL
XXXXXXXXXXXXXXXXXXXXX
02725.2
Remove and Reset Signs
AQ
EA
7
02725.3
Roadway Gate
AQ
EA
1
02851
Install Straw Wattles, 20 linear feet per culvert and as shown on the drawings
AQ
LF
4450
0625.1
Seeding, Hydraulic Method
DQ
ACRE
6
0625.2
Mulching, Hydraulic Method
DQ
ACRE
6

TOTAL BASE BID

PHASE 3 ADDITIVE ITEM #1

Item Number
Description
Method of Measure
Pay Unit
Estimated Quantity
Unit Price
Total
02240.2
Roadway Aggregate, Roller Compaction 2" Aggregate Additional (Sta 0+00 - 169+06.3)
DQ
CY
1910

TOTAL ADDITIVE #1

PHASE 3 ADDITIVE ITEM #2

Item Number
Description
Method of Measure
Pay Unit
Estimated Quantity
Unit Price
Total
02240.3
Roadway Aggregate, Roller Compaction 2" Aggregate Additional (Sta 169+06.3 - 289+20)
DQ
CY
1303

TOTAL ADDITIVE #2

PHASE 4 BASE BID

Item Number
Description
Method of Measure
Pay Unit
Estimated Quantity
Unit Price
Total
15101
Mobilization
LSQ
LS
1
XXXXXXXXXXXXXXXXXXXXX
15211
Construction Surveying and Staking, Method I Precision B
DQ
MI
2.9
15401
Contractor Testing
LSQ
LS
1
XXXXXXXXXXXXXXXXXXXXX
15703
Silt Fence
AQ
FT
4655
20101
Clearing and Grubbing
DQ
AC
16.9
20301
Removal - Existing Signs
AQ
EA
19
20301
Removal - Metal Pipe Gate
AQ
EA
1
20401
Roadway Excavation, Compaction Method C, Construction Tolerance A
DQ
CY
12668
20412
Waste - Rock
AQ
CY
400
20502
Individual Blasting Type Controlled
AQ
EA
15
25507
Mechanically Stabilized Earth Wall - Excavation
AQ
CY
12400
25508
Mechanically Stabilized Earth Wall - Select Backfill
AQ
CY
11500
25509
Mechanically Stabilized Earth Wall - Gabion Basket Placement
AQ
SF
2400
30103
Aggregate Base, grading E
DQ
CY
15215
30111
Aggregate Surface Course
DQ
CY
126
40301
Hot Asphalt Concrete Pavement Class B, Gradation B
AQ
TON
7758
41101
Prime Coat-Grade MC-70
AQ
TON
118
41304
Asphalt Pavement Milling, 100 ft taper to 3 in depth at bridge ends
LSQ
LS
1
55705
Bridge Repair
LSQ
LS
ALL
XXXXXXXXXXXXXXXXXXXXX
60202-15
21 in span, 15 in rise Pipe Arch Culvert 16 Gauge Steel
AQ
LF
1208
60202-20
28 in span, 20 in rise Pipe Arch Culvert 16 Gauge Steel
AQ
LF
324
60202-24
35 in span, 24 in rise Pipe Arch Culvert 14 Gauge Steel
AQ
LF
92
60701
Removing Culvert
AQ
LF
864
61701
Guardrail system G4, type IV, class A
AQ
LF
237.5
61702
Flared Terminal Section - ET Plus
AQ
EA
1
61702
Terminal Section - W Beam One Way Departure
AQ
EA
1
61702
USFS Standard W Beam Bridge Approach Section
AQ
EA
4
61708
Modified Thrie-Beam Metal Guardrail
AQ
LF
800
61709
Thrie-Beam to W Beam Reducer Section
AQ
EA
2
61902
Gate, Metal Pipe
AQ
EA
1
62504
Seeding,Hydraulic Method
DQ
SU
68
62509
Mulching, Hydraulic Method
DQ
SU
68
63301
Furnishing and Installing Signs
AQ
EA
22
63308
Removing and Resetting Signs
AQ
EA
2
63404a
Pavement Markings Type D
DQ
MI
11.52
63501
Temporary Traffic Control
LSQ
LS
ALL
XXXXXXXXXXXXXXXXXXXXX

TOTAL BASE BID

Designated Method of Measurement:

DQ - Designed Quantity; AQ - Actual Quantity; LSQ - Lump Sum Quantity lf - linear foot; cy - cubic yard; sf - square foot; ac - acre; ls - lump sum; su - slurry unit gal - gallon; mi – mile

PHASE 4 SEAL AND COVER ADDITIVE ITEM #3

Item Number
Description
Method of Measure
Pay Unit
Estimated Quantity
Unit Price
Total
Item Number
Description
Method of Measure
Pay Unit
Estimated Quantity
Unit Price
Total
40901a
Surface Treatment Aggregates, Designation 1C
AQ
TON
505
40904a
Emulsified Asphalt, Grade CRS-2
AQ
TON
43

TOTAL ADDITIVE #3

PHASE 4 FROM SKI RUN ROAD TO SILVER RUN TRAIL ITEM #4

Item Number
Description
Method of Measure
Pay Unit
Estimated Quantity
Unit Price
Total
Item Number
Description
Method of Measure
Pay Unit
Estimated Quantity
Unit Price
Total
40901b
Surface Treatment Aggregates, Designation 1C
AQ
TON
310
40904b
Emulsified Asphalt, Grade CRS-2
AQ
TON
26
63404b
Pavement Markings Type D
DQ
MI
6.8

TOTAL ADDITIVE #4

EA - Each

CQ - Contract Quantities

BIDDER'S PRINTED NAME
DATE

AQ - Actual quantities

LSQ - Lump sum quantities

LF - Linear Foot

BIDDER'S SIGNATURE
DATE

CY - Cubic Yard

DQ - Design Quantities

SF - Square foot

AC - Acre

SU - Slurry Unit

Gal - Gallon

Mi - Mile

BASIS OF AWARD: One contract will be awarded to the responsive and responsible bidder offering the best value to the Government. The Bidder must bid on all items. Only unit prices to the nearest $0.01 will be accepted. Where extended unit prices do not agree with totals or subtotals shown by the Bidder, the unit price governs except as provided under Federal Acquisition Regulations (FAR) 14.406, Mistakes in Bids.