Amendment_No_5_-_INRC.pdf

PDF 145 KB Posted

Attached to
Construction of Interagency Natural Resource Center (Idaho Panhandle NF)
Solicitation number
AG-0343-S-17-0016
Issued by

About this file

Amendment 5 - INRC

View the file

Other files

File Type Posted
Amendment_8_-_Questions_&_Answers.pdf PDF
Amendment_No_8_-_INRC.pdf PDF
170511_RFI_123_Repsonse_-_Sketch.pdf PDF
Amendment_7_Questions_&_Answers.pdf PDF
Amendment_No_7_-_INRC.pdf PDF
Amendment_No_6_-_INRC.pdf PDF
Amendment_6_Questions_&_Answers.pdf PDF
170504_Drawing_Revision_1.pdf PDF
170504_EX-1_Curb_and_Gutter_Sketch.pdf PDF
52.208-9_-_Contractor_Use_of_Mandatory_Sources_of_Supply_or_Services.pdf PDF
2017_05-04_13083_INRC_Warehouse_Phase_2_Amendment_5_(rev.1).pdf PDF
Amendment_5_Questions_&_Answers.pdf PDF
170504_Revised_Hardware_Set.pdf PDF
170504_Revised_Door_Index.pdf PDF
2017_05-04_13083_INRC_Warehouse_Phase_1_Amendment_5_(rev.1).pdf PDF
170504_87000_Door_Hardware_Specification.pdf PDF
Amendment_No_4_-_INRC.pdf PDF
AG-0343-S-17-0016_(Revised._2).pdf PDF
Meeting_Minutes_-_Site_Visit.doc DOC document
Amendment_No_3_-_INRC.pdf PDF
Amendment_3_Questions-Answers.xlsx XLSX spreadsheet
Site_Visit_-_Vendor_Sign-In_Sheet.pdf PDF
AG-0343-S-17-0016_(Revised_2).pdf PDF
014130A_SF_-_Testing_Log_Phase_1.xlsx XLSX spreadsheet
014130A_SF_-_Testing_Log_Phase_2.xlsx XLSX spreadsheet
AG-0343-S-17-0016_(Revised).pdf PDF
Past-Performance-Questionnaire_(Revised).doc DOC document
013300A_SF_-_Submittal_Log_Phase_1.xlsx XLSX spreadsheet
Amendment_No_2_-_INRC.pdf PDF
013300A_SF_-_Submittal_Log_Phase_2.xlsx XLSX spreadsheet
Amendment_1_-_INRC.pdf PDF
State_of_Idaho_Certificate_of_Verification_of_Workers_Compensation_Insurance.docx DOCX document
2017_03-01_13083_INRC_Phase_2_CDs_Drawings.pdf PDF
Past-Performance-Questionnaire.doc DOC document
2017_03-01_13083_INRC_Phase_1_CDs_Project_Manual.pdf PDF
Davis_Bacon_WD_-_INRC.docx DOCX document
2017_03-01_13083_INRC_Phase_1_CDs_Drawings.pdf PDF
2017_03-01_13083_INRC_Phase_2_CDs_Project_Manual.pdf PDF
AG-0343-S-17-0016_-_Construction_of_INRC.pdf PDF
SF24_-_Bid_Bond_Form.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 1

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

5 5-5-2017

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

USDA, Forest Service Idaho-Montana Acquisition Team (IMAT) 3815 N. Schreiber Way Coeur d’Alene, ID 83815

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

AG-0343-S-17-0016

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copy to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

Construction of Interagency Natural Resource Center (INRC)

The purpose of this amendment is to do the following:

1) Attach “Amendment 5 Questions & Answers.” Additional questions will be addressed in a subsequent amendment.

2) Attach revised drawings for Phase 1 & 2. Information from this amendment will be identified as Revision 1 in the revised drawings.

In addition, a document entitled “Drawing Revision 1” is included that gives an overview of the changes to the drawings.

3) Attach the following documents: Revised Hardware Set, Revised Door Index, 87000 Door Hardware Specification, and EX-1 Curb and Gutter Sketch.

4) Remove language from Request for Proposal that states that funds are not available. Funds have been made available for this solicitation.

5) Include clause 52.208-9 – Contractor Use of Mandatory Sources of Supply or Services. Mandatory sources from this clause will apply to Section 087110 - Door Hardware of Phase 1 & 2 Technical Specifications. The clause and information on its use are included as an attachment to this amendment.

6) Extend the due date for offers to 5/16/2017 at 1500 PST.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

File details come from the government source that posted it. Updated .