Amendment 3 Questions & Answers

View the file

Other files

File Type Posted
Amendment_8_-_Questions_&_Answers.pdf PDF
Amendment_No_8_-_INRC.pdf PDF
170511_RFI_123_Repsonse_-_Sketch.pdf PDF
Amendment_7_Questions_&_Answers.pdf PDF
Amendment_No_7_-_INRC.pdf PDF
Amendment_No_6_-_INRC.pdf PDF
Amendment_6_Questions_&_Answers.pdf PDF
170504_Drawing_Revision_1.pdf PDF
170504_EX-1_Curb_and_Gutter_Sketch.pdf PDF
52.208-9_-_Contractor_Use_of_Mandatory_Sources_of_Supply_or_Services.pdf PDF
2017_05-04_13083_INRC_Warehouse_Phase_2_Amendment_5_(rev.1).pdf PDF
Amendment_5_Questions_&_Answers.pdf PDF
170504_Revised_Hardware_Set.pdf PDF
170504_Revised_Door_Index.pdf PDF
2017_05-04_13083_INRC_Warehouse_Phase_1_Amendment_5_(rev.1).pdf PDF
170504_87000_Door_Hardware_Specification.pdf PDF
Amendment_No_5_-_INRC.pdf PDF
Amendment_No_4_-_INRC.pdf PDF
AG-0343-S-17-0016_(Revised._2).pdf PDF
Meeting_Minutes_-_Site_Visit.doc DOC document
Amendment_No_3_-_INRC.pdf PDF
Site_Visit_-_Vendor_Sign-In_Sheet.pdf PDF
AG-0343-S-17-0016_(Revised_2).pdf PDF
014130A_SF_-_Testing_Log_Phase_1.xlsx XLSX spreadsheet
014130A_SF_-_Testing_Log_Phase_2.xlsx XLSX spreadsheet
AG-0343-S-17-0016_(Revised).pdf PDF
Past-Performance-Questionnaire_(Revised).doc DOC document
013300A_SF_-_Submittal_Log_Phase_1.xlsx XLSX spreadsheet
Amendment_No_2_-_INRC.pdf PDF
013300A_SF_-_Submittal_Log_Phase_2.xlsx XLSX spreadsheet
Amendment_1_-_INRC.pdf PDF
State_of_Idaho_Certificate_of_Verification_of_Workers_Compensation_Insurance.docx DOCX document
2017_03-01_13083_INRC_Phase_2_CDs_Drawings.pdf PDF
Past-Performance-Questionnaire.doc DOC document
2017_03-01_13083_INRC_Phase_1_CDs_Project_Manual.pdf PDF
Davis_Bacon_WD_-_INRC.docx DOCX document
2017_03-01_13083_INRC_Phase_1_CDs_Drawings.pdf PDF
2017_03-01_13083_INRC_Phase_2_CDs_Project_Manual.pdf PDF
AG-0343-S-17-0016_-_Construction_of_INRC.pdf PDF
SF24_-_Bid_Bond_Form.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Amendment 3 Questions & Answers
QuestionActionResponse
RFI #QuestionContactDatePersonDateDisciplineResponse
AWill CPARS/CCASS reports be acceptable in lieu of Past Performance Questionnaires?Rich Williams, 509-535-8718, Evco Sound & Electronics4/18/17Prinzing4/26/17ELECPlease see the information in L-4. The Past Performance Questionnaire can be used for references that are identified in the Offeror's proposal. CPARS/PPIRS evaluations may also be used by the Government to collect past performance information.
BAfter reviewing Amendment 2 it looks as though a lot of the same information in the “a) technical approach” is the same as the “b) experience and capability” section. Both sections ask for “how the work will be organized and performed in accordance with the specifications, drawings, terms and conditions of the solicitation” as well wanting a “project work plan” and a “progress schedule.” It appears the only difference between these two section is the Experience and Capability section also wants a Quality Control Plan. I’m assuming you’re not wanting duplicate information in both sections
Rich Williams, 509-535-8718, Evco Sound & Electronics4/18/17Prinzing4/26/17ELECSection L-4 updated to change the language for Technical Approach and Experience and Capability. Please see revised sections L and M in revised RFP.
CIn B-2 of the revised solicitation, it reads “Either option item 1 or option item 2 will be exercised…..” Does that mean that option item 2 should include the price of option item 1? Or is it meant that, the government may choose option item 1 OR option item 1 & 2?Section B-2 language updated. Please see revised RFP. In addition, the period for the Government to exercise the Option Items has been updated to 5/1/2017.
1E0.1 Electrical Symbol Legend: System Plans lists the symbol for the speakers, and I assume that covers the masking speakers, but it doesn’t identify what the different symbols are that are shown on the drawings. An example, on drawing E2.4 there are “S” symbols shown as S1, S2 and with no subscripts and some with subscripts a and b. Can those be identified as to speaker differences/types and/or manufacturer model numbers?Rich Williams, 509-535-8718, Evco Sound & Electronics4/18/17Prinzing4/26/17ELECGeneral Note C on plans describes speaker notations on floor plans. Model numbers are given on speaker riser diagram in detail sheets. References to these were added to symbols sheets for Phases 1 & 2.No fee charge
2E9.5 Phase 1 Warehouse 1-line block diagram there are sound masking devices shown on the 2nd floor but no 2nd floor, floor plan exists in the bid set. Is the 2nd floor part of the project, if so is there a floor plan available and are there sound masking devices on that floor?Rich Williams4/18/17Prinzing4/26/17ELECNo speakers or sound masking on 2nd floor. Networking equipment still resides in Mezzanine room 202 as shown in diagram.No fee charge
3There is a discrepancy in the design loads. The specifications call for IBC 2012 with a 40 PSF Ground Snow Load and a 90 Mph wind load while the state of Idaho requires the IBC 2015 building code with a 115 mph wind load and a 43 PSF Ground Snow Load. Which should we use?Jake Marrujo, Northcon ,208-772-60034/19/17Prinzing4/26/17STRUCTDesign Criteria Clarification: For Roof Design, please use weight of materials + 5 psf collateral + 40 psf roof snow (non-reducible). For Lateral Design Wind, please 115 MPH, Exposure C.
4Please provide a spec for the flagpole indicated on #6/C1.3.Jake Marrujo4/19/17Prinzing4/26/17CIVILFlagpole has an actual product associated with it and must be equal or better. The Sentry Flagpole has minimum requirements that must be met.No fee charge
5Please confirm all asphalt areas to be 3” over 8” per 11/C9.1 (parking, drive aisle, bike path, etc.)Jake Marrujo4/19/17Prinzing4/26/17CIVILAsphalt sections should all be per 11/C9.1
6What is the depth of the gravel in the NW parking lot shown on C1.3?Jake Marrujo4/19/17Prinzing4/26/17CIVILGravel depth should be 12" depthNo fee charge
7What will the Phase 2 pad area be finished as if only Phase 1 Base Bid is accepted?Jake Marrujo4/19/17Prinzing4/26/17CIVILPhase 2 Pad area should be finished as 8" thick 3/4" crushed aggregate Base Course. Same material as is used under the asphalt.
8Will Landscape drawings be issued?Jake Marrujo4/19/17Prinzing4/26/17ARCHNo Landscaping to be completed in Phase 1 & 2. Landscaping to be part of Phase 3.
9Does the concrete paving extend into the Generator Enclosure shown on 11/A3.0?Jake Marrujo4/19/17Prinzing4/26/17CIVILNo this should be concrete.No fee charge
1011/A3.0, 7/A3.0 & 8/A3.0 refers to Civils for elevations and slopes. These were not shown.Jake Marrujo4/19/17Prinzing4/26/17ARCH - CIVILDisregard references to Civil drawings on Architectural Sheets. Slabs shall be flat with no slope.No fee charge
115/S0.2 indicates an 8” slab at the trash enclosure, but 11/A3.0 indicates a 4” slab. Which is correct?Jake Marrujo4/19/17Prinzing4/26/17STRUCT - ARCHStructural governs, please 8" slab as shown on Structural.No fee charge
123/S0.2 indicates a 4’0” thick, 9’-0” square pad at the radio tower, but 7/A3.0 indicates a 4” thick, 10’6”x10’6” pad. Which is correct?Jake Marrujo4/19/17Prinzing4/26/17STRUCT - ARCHStructural governs, please us 0'-4" thick, 9'-0" square as shown on StructuralNo fee charge
137/A3.0 says to refer to the Structurals for switchgear pad. This is not shown.Jake Marrujo4/19/17Prinzing4/26/17ARCHDisregard reference to Stuctural. Provide 6" concrete pad, with reinforcing, per switchgear manufactures recommendations.No fee charge
14#1/S0.2 indicates a 6” thick concrete SOG for the BLM trailers, but 13/C1.3 shows asphalt under the trailer locations. Which is correct?Jake Marrujo4/19/17Prinzing4/26/17STRUCT - CIVILProvide asphalt paving under BLM trailers, disregard Structural keynote #1 on S0.2No fee charge
15Please confirm the notes on 10/S0.2 should read “13/A1.1” in lieu of “13/A3.0.”Jake Marrujo4/19/17Prinzing4/26/17STRUCTYes, confirmed. It should read 13/A1.1No fee charge
16Please confirm the radio tower is to be “by others” per note on 7/A3.0.Jake Marrujo4/19/17Prinzing4/26/17ELECRadio tower is required as part of Phase 1 work Section 261018. Disregarding note on 7/A3.0.No fee charge
17What Pre-Engineered Metal Building Manufacturer (PEMB) is the structural foundation plan based on?Michael Lusich4/20/17Prinzing4/26/17STRUCT(see response below to question #18)
18Is there a cost for re-engineering the foundation if necessary due to alternate PEMB manufacturer requirements. Who pays?Michael Lusich4/20/17Prinzing4/26/17STRUCTFinal Foundation Design: Bid documents foundation package based on a generic footing and pier design with the specific bay spacings, internal column locations and general endwall column locations. Project engineer to provide a stamped final foundation package based on the successful steel building suppliers final, approved reactions and base plate details. Pier sizes will be revised according to final column base plate sizes.
19On sheet A5.2, detail #12, it says to reference #7 on sheet A5.3 for a sill detail. There is no 7 on sheet A5.3.Matt Peplinski, TML Construction,4/20/17Prinzing4/26/17ARCHDetail should reference detail #10 on A5.3No fee charge
20Dispatch furniture is specified but not systems (125900-3). Specifics are missing for modular furniture in the Hot Shot offices.Brandon Richards, RJS, 509-731-8814.4/20/17Prinzing4/26/17FURNThe systems furniture is described generically under Part B with no reference to manufacturer, because of the height requirements. See Section 125900No fee charge
21Merchantable timber-3111000-2 says sold by contractor. C-6 of solicitation says sold by government.Brandon Richards4/20/17Shoup4/20/17C.O.C-6 is correct. Delete specification section 311000-3.5A.
22Mecho shades in specification; Hunter Douglas in finish schedule. Which is correct?Brandon Richards4/20/17Prinzing4/26/17ARCHBoth products are acceptable.No fee charge
23Sidewalk on C1.3A pare of base bid or Option 1?Brandon Richards4/20/17Shoup4/20/17C.O.Included in base bid. See phasing plan sheet C1.2.
24Any chance start date to be moved earlier than August 1st.Brandon Richards4/20/17Shoup4/20/17C.O.The performance period start date is dependent on variable factors related to the award process, permitting, etc. The August 1st start date is an estimate. It is feasible that the starting date will be later than August.
25Detail 7/A5.3 is missing. Is it supposed to be 10/A5.3?Brandon Richards4/20/17Prinzing4/26/17ARCHYes, confirmed. Detail reference should be 10/A5.3No fee charge
2610/S0.2 says work closely with 13/A3.0. There is no 13/A3.0.Brandon Richards4/20/17Prinzing4/26/17STRUCT - ARCHnote on 10/S0.2 should read "work closely with details on sheet A1.1"No fee charge
27Concrete pad size on S0.2 for trailers does not match C1.3 size.Brandon Richards4/20/17Prinzing4/26/17STRUCT - CIVILNo concrete pad, provide asphalt paving under BLM Trailer area. See RFI question #14No fee charge
28No mention of what to do with stumps?Brandon Richards4/20/17Shoup4/20/17C.O.Stump removal is addressed in section 311000.
29Limits of clearing and grubbing compared to preservation plan CP1.1. Are we not to clear the areas shown in the dotted lines on CP1.1.Brandon Richards4/20/17Shoup4/20/17C.O.Add the following to note 5 on sheet CP1.1: "Preserve all trees inside the General Tree Protection Area".
30Change all references in the specifications that show Government, Owner, or Contracting Officer provided testing.Mike Shoup4/20/17Shoup4/26/17C.O.All tests and Quality Control tests shall be completed by the contractor using an independent, certified, third party testing agency. Forward all test results to the contracting officer upon contractor receipt of the test results.No fee charge
31The landscape drawing shown in on the Sheet CV-1 does not match the sheet number.Mike Shoup4/20/17Prinzing4/26/17ARCHC1.18 should be CP1.1.No fee charge
32Spec 283111, para. 1.6.D requires detector performance requirements and design criteria, including analysis data, signed and sealed by the responsible FPE. Please clarify if this is still a requirement since the system has been designed by an Electrical Engineer.Larry Nipp, EVCO Electronics, 509-535-87184/21/17Prinzing4/26/17ELECThis is not required. Remove paragraph 1.6.D from specification 283111.
33Spec 283111, para. 1.10.B requires installation shall be by a NICET level III technician. Most Field Technicians that are qualified NICET are level II, with levels III and IV geared more towards project management and design. Please clarify if level II or III is required for installation.Larry Nipp, EVCO Electronics, 509-535-87184/21/17Prinzing4/26/17ELECNICET Level II technician is acceptable.No fee charge
34Spec 283111, para. 2.4.3 requires audible clear plastic covers for all pull stations but covers are not shown on fire alarm plans, please clarify if covers are desired.Larry Nipp4/21/17Prinzing4/26/17ELECProvide covers for all pull stations.No fee charge
35Change all specification sections that refer to specific manufacturers to include language that confirms that acceptable manufacturers are not limited to the listed manufacturers. Equivalent products and manufacturers that meet all of the performance requirements in the specifications are acceptable. (Except for section 125900, which requires specific manufacturers for Dispatch functions).Mike Shoup4/21/17Kevitt4/26/17C.O.Reference section I-2 clause FAR 52.236-5 Material and Workmanship. "The Contractor may, at its option, use any equipment, material, article, or process that, in the judgment of the Contracting Officer, is equal to that named in the specifications, unless otherwise specifically provided in this contract."
36A2.0 indicates corner guard CG-2 which is not listed on the schedule A9.0. Please provide.Jake Marrujo4/19/17PrinzingARCHThis will be addressed in a forthcoming amendment.No fee charge
37Do not see any fire extinguisher cabinets or extinguishers in plans. What are the requirement?Brandon Richards4/20/17PrinzingARCHThis will be addressed in a forthcoming amendment.No fee charge
38Womens room 114 is missing an accessible shower and the east wall of room 114 and 115.Brandon Richards4/20/17PrinzingARCHThis will be addressed in a forthcoming amendment.No fee charge
39Where are the reception desk details referenced on 3/A6.1?Brandon Richards4/20/17PrinzingARCHThis will be addressed in a forthcoming amendment.No fee charge
40The testing log in section 014130 is incomplete and the testing log posted as with amendment 2 is incomplete. Please provide a comprehensive testing log that matches the specifications.Mike Shoup4/25/17PrinzingARCHThis will be addressed in a forthcoming amendment.
41There is no detail for the location, sizes (letters and sign), and color and if brail is required for the interior room identification. There is also no detail for fire extinguishers.Matt Peplinski4/21/17PrinzingARCHThis will be addressed in a forthcoming amendment.No fee charge
42There is also no detail for the ceiling framing in the rooms (material type, correct spacing, etc.) which would also be helpful.Matt Peplinski4/21/17PrinzingSTRUCTThis will be addressed in a forthcoming amendment.
43On sheet S9.1, detail 16, it shows a ½” recess and to see detail 5 on sheet S5.1. This page does not exist.Matt Peplinski4/21/17PrinzingSTRUCTThis will be addressed in a forthcoming amendment.
44In regards to spec section 083113- Access doors and frames, there is no location on the prints as to where they are located or how many there are.Matt Peplinski4/24/17PrinzingARCHThis will be addressed in a forthcoming amendment.
45The width of the monument sign wall on 13/A1.1 does not match what is shown on 10/S0.2. Which is correct?Jake Marrujo4/19/17PrinzingSTRUCT - ARCHThis will be addressed in a forthcoming amendment.
46What kind of wood material are we suppose to figure for the interior wood trim for the storefront sill. Refer to detail 10 on sheet A5.3. There is also a spec section for plastic paneling in both phases yet there is nowhere on the prints that indicate where it should go.Matt Peplinski4/25/17PrinzingARCHThis will be addressed in a forthcoming amendment.
47What is the F5 footing thickness? Schedule on S1.0 is blank.Jake Marrujo4/25/17PrinzingSTRUCTThis will be addressed in a forthcoming amendment.
485/A4.0 calls out Keynote #3, but the schedule on this page says #3 is not used. Please clarify.Jake Marrujo4/25/17PrinzingARCHThis will be addressed in a forthcoming amendment.
49Window schedule on A9.0 shows window #117, which is not indicated on the elevations. Also, the elevations indicate windows 118 & 119 which are not shown on the window schedule. Please clarify. (A4.0)Jake Marrujo4/25/17PrinzingThis will be addressed in a forthcoming amendment.
508/A3.0 refers to section callout 19/A4.1 which does not exist. Please clarify this should read 10/A4.1.Jake Marrujo4/25/17PrinzingARCHThis will be addressed in a forthcoming amendment.
51Please provide wall type callouts on A2.2 Mezzanine Plan.Jake Marrujo4/25/17PrinzingARCHThis will be addressed in a forthcoming amendment.
521/A6.5 shows a TA-10 accessory, but TA-10 is not listed in the 102800 spec.Jake Marrujo4/25/17PrinzingARCHThis will be addressed in a forthcoming amendment.
533/A6.5 shows a TA-11 accessory, but TA-11 is not listed in the 102800 spec.Jake Marrujo4/25/17PrinzingARCHThis will be addressed in a forthcoming amendment.
54How has the Stormwater runoff during and post construction been mitigated for this project? We have not found an Erosion Control Plan or Stormwater Plan included in the Contract Documents. Will the contractor be required to file an NOI with the US EPA for compliance with the NPDES Permit?Jake Marrujo4/25/17PrinzingCIVILThis will be addressed in a forthcoming amendment.
55Is there a manufacturer’s basis of design for the 062013 exterior horizontal wood slat siding?Jake Marrujo4/25/17PrinzingARCHThis will be addressed in a forthcoming amendment.
565/A5.2 calls for the CP wall panel to be a 29ga Bridger Tuf-Rib panel, but 074213.13-2.2.B calls for the CP panel to be a 24ga Fabral panel. Which is correct?Jake Marrujo4/25/17PrinzingARCHThis will be addressed in a forthcoming amendment.
57Is there further specification on tilt away gate opener? Clarification info added 4/26/17. I was referring to the new gate shown on 5/C9.6. I was just wondering if there was going to be any additional specifications provided on the gate. Like a model number or something. The current specifications just directs you to look at the drawing.Brandon Richards4/20/17PrinzingELECThis will be addressed in a forthcoming amendment.No fee charge
58Relating to the retaining wall shown on 5/C9.7: What material is the retaining wall to be constructed of? Please provide a cut section through the wall. Please provide a detail for the handrail.Jake Marrujo4/19/17PrinzingCIVILThis will be addressed in a forthcoming amendment.No fee charge
59No curb type designations (C9.1) were found on the site plans. Please indicate where the various curb types are to be installed.Jake Marrujo4/19/17PrinzingCIVILThis will be addressed in a forthcoming amendment.No fee charge
60Which asphalt patch type (M-11/C9.2) will be required for patch work on Kathleen Ave?Jake Marrujo4/19/17PrinzingCIVILThis will be addressed in a forthcoming amendment.No fee charge
613/CP1.1 shows a Gabion / CMU retaining wall. No spec was provided for these items, please provide.Jake Marrujo4/19/17PrinzingCIVILThis will be addressed in a forthcoming amendment.No fee charge