Amendment_8_-_Questions_&_Answers.pdf

PDF 189 KB Posted

Attached to
Construction of Interagency Natural Resource Center (Idaho Panhandle NF)
Solicitation number
AG-0343-S-17-0016
Issued by

About this file

Amendment 8 - Questions & Answers

View the file

Other files

File Type Posted
Amendment_No_8_-_INRC.pdf PDF
170511_RFI_123_Repsonse_-_Sketch.pdf PDF
Amendment_7_Questions_&_Answers.pdf PDF
Amendment_No_7_-_INRC.pdf PDF
Amendment_No_6_-_INRC.pdf PDF
Amendment_6_Questions_&_Answers.pdf PDF
170504_Drawing_Revision_1.pdf PDF
170504_EX-1_Curb_and_Gutter_Sketch.pdf PDF
52.208-9_-_Contractor_Use_of_Mandatory_Sources_of_Supply_or_Services.pdf PDF
2017_05-04_13083_INRC_Warehouse_Phase_2_Amendment_5_(rev.1).pdf PDF
Amendment_5_Questions_&_Answers.pdf PDF
170504_Revised_Hardware_Set.pdf PDF
170504_Revised_Door_Index.pdf PDF
2017_05-04_13083_INRC_Warehouse_Phase_1_Amendment_5_(rev.1).pdf PDF
170504_87000_Door_Hardware_Specification.pdf PDF
Amendment_No_5_-_INRC.pdf PDF
Amendment_No_4_-_INRC.pdf PDF
AG-0343-S-17-0016_(Revised._2).pdf PDF
Meeting_Minutes_-_Site_Visit.doc DOC document
Amendment_No_3_-_INRC.pdf PDF
Amendment_3_Questions-Answers.xlsx XLSX spreadsheet
Site_Visit_-_Vendor_Sign-In_Sheet.pdf PDF
AG-0343-S-17-0016_(Revised_2).pdf PDF
014130A_SF_-_Testing_Log_Phase_1.xlsx XLSX spreadsheet
014130A_SF_-_Testing_Log_Phase_2.xlsx XLSX spreadsheet
AG-0343-S-17-0016_(Revised).pdf PDF
Past-Performance-Questionnaire_(Revised).doc DOC document
013300A_SF_-_Submittal_Log_Phase_1.xlsx XLSX spreadsheet
Amendment_No_2_-_INRC.pdf PDF
013300A_SF_-_Submittal_Log_Phase_2.xlsx XLSX spreadsheet
Amendment_1_-_INRC.pdf PDF
State_of_Idaho_Certificate_of_Verification_of_Workers_Compensation_Insurance.docx DOCX document
2017_03-01_13083_INRC_Phase_2_CDs_Drawings.pdf PDF
Past-Performance-Questionnaire.doc DOC document
2017_03-01_13083_INRC_Phase_1_CDs_Project_Manual.pdf PDF
Davis_Bacon_WD_-_INRC.docx DOCX document
2017_03-01_13083_INRC_Phase_1_CDs_Drawings.pdf PDF
2017_03-01_13083_INRC_Phase_2_CDs_Project_Manual.pdf PDF
AG-0343-S-17-0016_-_Construction_of_INRC.pdf PDF
SF24_-_Bid_Bond_Form.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INRC Solicitation Questions

RFI # Question Response

126 Is any 3rd party engineering required for the rain screen, (Knight Wall System) for Phase I? It is not shown in the specifications.

No 3rd party engineering is required by Architect. Manufacturer to fully provide engineered product/system.

127 Can you please clarify where the connection point of the fiber optics would be? The drawings only show a line for the fiber optics, but no connection point. Are we bringing the fiber from the building and terminate at point shown in the drawings? Does the GC need to provide a vault at connection point?

See sheet E1.1. Communications conduit runs from the north side of the site into the Tel/Com 202 telephone terminal board. Fiber by communications utility. Conduit for future fiber runs from the Tel/Com 202 room to the vault on the east side of the building. This conduit route is for future fiber in another phase. The power and communications vault is the contractors responsibility.

128 Structural Drawings S0.1 under Structural Steel notes, note #2 states that the steel fabricator be AWS and AISC certified.

There are very limited steel shops in the area with such certifications, and most of them are not bidding this project. Can we use a 3 rd party welding inspector in lieu of the AWS certification?

Provide AWS or AISC certified steel fabricator, no 3rd party welding inspector permitted.

129 We were informed by one of the pre-engineered metal building manufacture about an issue with the overhangs on both

Phase I & II, and the clearance shown on the drawings (13’-0” clearance). Since the overhang beams are part of the structure of the building, by the time it extends to achieve the required overhang, the clearance form finished floor to bottom of beam would be around 11.5’ clear. This would interfere with the 12’ tall O.H. doors on both phases. Per the manufacturer the recommended solution is to raise the eave heights 1’-6” for both building parts. This would provide a

13’-0” height clearance under the soffit panels, and it would not change the roof slope. This can be achieved with minimal cost impact.

12' high doors and 13' soffits are a must. Manufacturer is allowed to adjust design per these requirements. This issue can be resolved during shop drawings and submittals based on who is awarded the contract. Avoid clear height situations less than the 12 ft required for the O.H. doors.

130 I am getting conflicting drawings and specifications for the following: Line Post size (typically line post are 1-7/8"), Corner

Post size (2-3/8). Detail 10/C9.5 does not show a post size.

Corner Posts and Panel posts shall be 3.5" dia.; Line Posts shall be 1 7/8"

131 Two different styles of Mesh are shown on page C9.5; which one is required? 2 3/8" woven wire mesh (diagonal chain link)

132 Clarify interior room mesh and line post requirements for 5/A6.19 2 3/8" woven wire mesh (diagonal chain link); please match what is used at exterior fence.

133 Please confirm that all Exterior Wall Type B, shown in locations on 7/A2.0 are to be a continuous, full height stud per the wall types, and will attach to a structural member.

Yes, confirmed.

Please confirm where metal framed walls are shown in the same location as Metal building system, these are to be furred walls, inset from the metal building system. There will be no in-filling between Z-girts at these locations.

Yes, refer to details 4/A2.0 and 8/A2.0.

135 Where phase 1 will transition to phase 2, detail 9/A5.0, the metal framing is shown partially inset from the Z-girt system and being framed through the Z-girt system. Please confirm that this wall will terminate at blocking or similar form of solid connection, at the underside of the z-girt.

Yes, confirmed. This wall will stop and form a solid connection

136 In a previous addendum, it was listed to follow exterior wall type B for insulation thickness at exterior walls. R-25 is listed to be roughly 8” thick. This is too large for a 6” stud cavity. Too much compression will result in lowered R-values. Please advise on correct insulation at exterior wall type B

Please provide R-21 cavity insulation in lieu of R-25 at Exterior Wall Type A &

B.

137 Please clarify model # for projector used a Basis of Design. Clarification: Basis of Design for projector, model #: PT-RZ570 (not PT-RZ575 as listed in docuemnts)