INRC Solicitation Questions
RFI # Question Response
Received after May 1st.
95 Spec section 072100 calls out for Polyisocyanurate Foam Plastic Board. Please advise where this is located on the prints. See details 4/A2.0 & 8/A2.0 in Phase 1. See detail 14/A2.1 in Phase 2.
96 Doors in rooms 142 & 146 have no Door Number. See revised revised Architectural sheets issued in Amendment #5, they show revised door numbers and revised door schedule.
97 Doors 122A.1 and 122B.1 are not listed in the door schedule on A9.1. See revised revised Architectural sheets issued in Amendment #5, they show revised door numbers and revised door schedule.
98 Door 146.7 is shown on A2.1 but not listed in the schedule A9.1. See revised revised Architectural sheets issued in Amendment #5, they show revised door numbers and revised door schedule.
99 Door 142.5 is listed in HW Group 7 in 087100, but is not shown on the floor plan or in the door schedule. See revised revised Architectural sheets issued in Amendment #5, they show revised door numbers and revised door schedule.
100 Door 122C.1 is listed in HW Group 1 in 087100, but is not shown on the floor plan or in the door schedule. See revised revised Architectural sheets issued in Amendment #5, and revised
087100A Door Hardware Index.
101 Door 143.4 is not shown in the hardware schedule spec. Door 143.4 shall be Hardware Set #04. Door Hardware Index shows door #
142.4 has hardware set #4. Ignore this reference. Door 142.4 should be 143.4.
102 Confirm Phase 1 door 116.1 in Room 116 (A2.0 Ph. 1) is to be changed to door 122B.2 (A2.1 Ph. 2) if Phase 2 is accepted.
Also, if door 122B.2 is to be used in Phase 2, please add it to the door schedule on A9.1.
Yes, confirmed. Ignore reference to 122.B.2 in Phase 2. Door 116.1 will just stay for Phase 2.
103 Key note “30” on F9.1 refers to sheet F2.2, which was not issued. Please provide. Please ignore reference to F2.2. No sheet exists.
104 Is a CAD file of the existing and new site elevations be available for bidding purposes? No CAD files will be provided for bidding purposes.
105 Soil Prep section 329115-2.1.A indicates we are to stockpile existing on-site soils including the duff layer. Where does
USFS want the stockpile placed?
No stockpile of soils. Contractor shall remove all stockpile of soils, including the duff layer, from site.
106 Furniture spec 125900-2.1.A indicates “a laptop tray is to be priced as a separate option,” but no option for this scope is provided on the bid form. Are the laptop trays to be included in the base bid?
Yes. Include laptop trays in the base bid.
107 At the Entry #101/Reception #102 there is profiled solid stock wood cladding @ rainscreen wall. Can you tell me the profile and what the wood is?
See RFI #46 above in Amendment #5
108 I see that there is a spec for interior signage and it calls for a sign schedule in the drawings, which it is not in the drawings.
Similarly, there is no size specifications for the cast letter signage for the Phase I building.
See 13/A6.1 on revised Architectural drawings issued in Amendment #5
109 On phase II drawings (A4.2 detail 5) calls for vinyl wall graphic signs, but no other reference is indicated. No technical specification available at this time. GC to provide for vinyl wall decal, applied to surface of overhead door. Provide for 4' tall graphic identifying each overhead door bay. Doors shall be numbered 1,2,3 and so forth. Color shall be light grey or white.
110 Are 35” high panels acceptable against the windows? If not 35” high, are 32” high panels acceptable 32 inch panels are acceptable as long as they do not block or interfere with the windows. 35 inch high panels are not acceptable.
111 Can the overhead doors recede on top of the case instead of inside the case? Would you accept a sliding door on front instead of flip up door?
This is method is acceptable.
112 Can there be an intermediary step down panel between the 60” panels and the 30” panels. Most manufacturers will not allow a connection between these height due to structural issues. Is it alright if there is an intermediary ~53” panel in between the two to eliminate any structural issues?
An intermediary step down panel (for structural issues) is acceptable in the NE corner and East wall of room 129 only. If a step down panel is required;
tempered glass shall bring the step down panel to its required full height.
113 Is it OK if there are segmented tackable/acoustical tiles on the monolithic panels? If the tiles do not go full height it will be necessary to have 2 tiles per frame.
Yes, this is acceptable.
114 The Architectural Site Plan Legend on sheet A1.0 is not correct for the Phasing considerations. The Architectural Site Plan Legend should have an additional and separate hatching for Phase 2.