Addendum No. 1 to the ACC Gate Replacement Project bid documents, issued by the State of Nevada Adjutant General, corrects an omission in the original bid package by adding the required Bid Bond Form (Section 00 41 20). The project, located at 4500 W. Silverado Ranch Boulevard in Las Vegas, Nevada, involves retrofitting an existing manual sliding entry gate to an automated, access-controlled system. Bids are due September 24, 2026, with a non-mandatory pre-bid meeting scheduled for September 15, 2026. The project is estimated at $250,000 with a contract duration of 45 calendar days. All contractors must acknowledge receipt of this addendum on their bid proposal form and ensure that all subcontractors account for the changes in their bid amounts.

Bidders must submit a bid bond equal to five percent (5%) of the total bid amount, including all bid alternates, using the form provided in this addendum. Alternative bid security in the form of a certified check, cashier's check, or cash is permitted in place of a bid bond. The bid bond must include a certified copy of the surety representative's current Power of Attorney, and non-standard bid bond forms require written approval from the State of Nevada Adjutant General prior to the bid deadline. A standard AIA or substitute bid-bond form will not be accepted without prior written approval. The bond becomes enforceable should the principal fail to execute the Owner-Contractor Agreement and required Performance and Payment Bonds within 15 calendar days of receiving the agreement from the Owner.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NO. 1

Project Identification Project Name: ACC Gate Replacement Project Address: 4500 W. Silverado Ranch Blvd. Las Veas, NV 89139 ADG Project No.: 43ADG-S4000

Owner State of Nevada, Adjutant General 2460 Fairview Dr.

Carson City, NV 89701

Consultant Simpson Coulter Studios 151 E. Warm Springs RD #222 Las Vegas, Nevada 89119 702-435-1150

Addendum Issue Date: 9/11/2026

Addendum Acknowledgment:

The Contractor shall acknowledge receipt of this addendum on the Bid Proposal Form. All terms and provisions of the Bid Documents shall apply to this addendum. The Contractor is responsible for ensuring that all changes identified in this addendum are fully understood by him and by his subcontractors, that all changes are accounted for in the bid amount, and that each of the subcontractors utilized in preparation of his bid received the addendum and accounted for the addendum in their bid amount.

Addendum Items:

The following changes and/or corrections shall be made to the Bid Documents:

1. Section 00 41 20 – Bid Bond

Section 00 41 20 – Bid Bond was identified in the Table of Contents and referenced in the Instructions to Bidders but was inadvertently omitted from the Final Bid Package. The Bid Bond Form attached to this Addendum is hereby added to and incorporated into the Bid Documents.

A bidder electing to provide a bid bond shall use the attached form and submit a properly executed bid bond equal to five percent (5%) of the total bid amount, including all bid alternates. The bid bond must include a certified copy of the surety representative’s current Power of Attorney.

A standard AIA or other substitute bid-bond form will not be accepted unless approved in writing by the State of Nevada, Adjutant General before the bid deadline.

As otherwise permitted by the Bid Proposal Form and Instructions to Bidders, a bidder may provide a certified check, cashier’s check or cash in place of a bid bond. Alternative bid security must equal at least five percent (5%) of the total bid amount, including all bid alternates.

Attachment: Section 00 41 20 – Bid Bond Form

State of Nevada, Adjutant General Page 1 of 2 Revised 8/25/2026 004120 – Bid Bond

BID BOND

(Required for Bids exceeding $100,000)

Project Identification Project Name: ACC Gate Replacement Project Address: 4500 W. Silverado Ranch Blvd, Las Vegas, NV 89139 ADG Project No.: 43ADG-S4000

Owner State of Nevada, Adjutant General 2460 Fairview Dr.

Carson City, Nevada 89701

(775) 884-8457

Percentage of Bid Amount: 5% of Total Bid Amount Bond

Number:

Principal Name:

Principal Address:

Telephone No.:

Surety Name:

Surety Address:

Telephone No.:

The Principal and the Surety jointly and severally are held and firmly obligated to the Owner (as Obligee) for the sum stipulated above.

Should the Principal fail to execute the Owner-Contractor Agreement and the required Performance and Payment Bonds within 15 calendar days after receiving the Owner-Contractor Agreement from the Owner, the Principal and his Surety shall pay to the Owner the difference between the amount of the bid and the amount for which the Owner legally contracts with another party to perform the Work. The amount that the Principal and his Surety shall be responsible to pay shall include any additional costs and expenditures which the Owner necessarily incurs as actual damages resulting from the failure of the Bidder to execute the Owner-Contractor Agreement and the required Performance and Payment Bonds within the stipulated time. In no event shall the Principal or his Surety be required to forfeit any sum in excess of the amount of his bid bond.

State of Nevada, Adjutant General Page 2 of 2 Revised 8/25/2026 004120 – Bid Bond

Principal Nevada Licensed Agent (Contractor as Principal) (Resident or Non-Resident)

By: By:

Print: Print:

Title: Title:

Date: Date:

Notary Public Notary Public

By: By:

Date: Date:

Surety Surety’s Corporate Seal

By:

Print:

Title:

Date:

Notary Public

By:

Date:

addendum #1 - ACC Gate - Bid Bond.pdf
00 41 20 Bid Bond (Required for bids over $100,000 per NAC Section 341.077).pdf
BID BOND
Project Identification
Owner

File details come from the government source that posted it. Updated .