2026-06-05 NVARNG ACC Gate Cutsheet Package.pdf
PDF 19 MB Posted
- Attached to
- ACC Gate Replacement
- Solicitation number
- 43ADG-S4000
- Issued by
- Clark County, Fish Springs CDP, Nevada
About this file
Summary
This is a product information and installation documentation package for the Nevada Army National Guard (NVARNG) ACC Gate Replacement project at the Anthony Cometa Complex (SCS Project No. 2024-015), prepared by the Department of Administration State Public Works Division. The project involves modifying and retrofitting an existing manual sliding entry gate to an automated, access-controlled system with structural, electrical, and trenching work. The primary product specified is a HySecurity SlideDriver automated gate operator system, with six models available ranging from 1,500 to 20,000 pounds gate capacity. Technical specifications include hydraulic drive systems, variable operating speeds from 1 to 3 feet per second, multiple voltage configurations (115V to 480V single and three-phase), and integrated Smart Touch control systems with programmable relay settings. The documentation package includes detailed installation instructions covering site design, concrete pad requirements (minimum 20" x 30" x 16" depth), drive rail alignment, limit ramp positioning, electrical wiring specifications with corresponding wire gauge charts, and safety protocols including grounding and personnel protection measures.
The documentation also includes supplemental specifications for D-Series Size 0 LED area luminaires from Lithonia Lighting, featuring high-efficacy LED technology with expected service life exceeding 100,000 hours, multiple distribution patterns and color temperature options (2700K to 5000K), and control options including motion sensors and dimming capabilities. Installation requirements encompass pole mounting configurations, electrical load specifications, and photometric performance data across various packages. All equipment is manufactured in the United States with corrosion-resistant finishes, coastal construction options available, and compliance with relevant safety standards including UL 325, NEC, NFPA 780, and ASTM specifications. The automated gate system includes integrated security features such as vehicle detection loops, access control integration, edge sensors, and emergency operation capabilities suitable for military facility access control applications.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRODUCT INFORMATION
for
Department of Administration
State Public Works Division
NVARNG ACC GATE REPLACEMENT –
ANTHONY COMETA COMPLEX
SCS Project No. 2024-015
Date: June 05, 2026
Powerful:
Move gates up to 20,000 lb.
Tough:
Secure steel chassis and taper resistant cover.
Reliable:
UPS models remain functional during a power outage.
Programmable:
Configure for specific site requirements.
Fast:
1-3 ft/s operating speed.
Emergency fast operate at 3 ft/s.
Smart:
Integrated primary/ secondary controls and preprogrammed relay settings.
All weather performance:
Wide temperature range without heater.
Durable:
Decades long life and low maintenance.
Made in USA:
Designed, tested and built within USA from globally sourced materials.
20K
Features:
SlideDriver™
Maximum security combined with extreme durability The most secure slide gate operator with power to move any gate, customizable for every unique application.
Technical Specifications SmartTouch powered by
SlideDriver™ models
FAST FAST
1,500 lb gates 1 ft/s
3,000 lb gates
1.7 ft/s
4,000 lb gates 1 ft/s
5,000 lb gates
2.2 ft/s or 3 ft/s
8,000 lb gates 1 ft/s
20,000 lb gates 1 ft/s
Model SlideDriver 15 SlideDriver 30F SlideDriver 40 SlideDriver 50VF2/3 SlideDriver 80 SlideDriver 200
Part # 222 SS ST 222 EX 1.7 ST 222 E ST 222 X3 ST 222 X1 ST 444 XS ST
Duty Cycle Continuous
Horsepower 1 hp UPS model: 2 hp 2 hp 1 hp
UPS model: 2 hp 2 hp 2 hp 5 hp
UPS model: 4 hp
Drive Hydraulic
Drive Wheels Two 6 inch (15 cm) AdvanceDrive wheels
Two 6 inch (15 cm) AdvanceDrive wheels
Two 6 inch (15 cm) AdvanceDrive wheels
Two 8 inch (20 cm) AdvanceDrive wheels
One 8 inch (20 cm) AdvanceDrive wheel, One 8 inch XtremeDrive wheel and
27 ft (8 m) of rack
Two 8 inch (20 cm) AdvanceDrive wheels, Two 8 inch XtremeDrive wheels and 52 ft (16 m) of rack
Gate Weight Max. 1,500 lb (680 kg) 3,000 lb (1,361 kg) 4,000 lb (1,814 kg) 5,000 lb (2,268 kg) 8,000 lb (3,629 kg) 20,000 lb (9,072 kg)
Gate Length Max. Limited only by weight
Drawbar Pull 300 lb (136 kg) 300 lb (136 kg) 300 lb (136 kg) 300 lb (136 kg) 600 lb (272 kg) 1,200 lb (544 kg)
Rate of Travel 1 ft/s (30 cm/s) 1.7 ft/s (50 cm/s) 1 ft/s (30 cm/s)
Field adjustable, 2.2 ft/s (70 cm/s) or 3 ft/s (91 cm/s) Emergency Fast Operate
3 ft/s (91 cm/s)
1 ft/s (30 cm/s) 1 ft/s (30 cm/s)
Temperature Rating -40º to 158º F (-40º to 70º C)
1 Phase Power 115/208/230V 60 Hz 110/220V 50 Hz***
208/230V 60 Hz 220V 50 Hz***
115/208/230V 60 Hz 110/220V 50 Hz***
208/230V 50/60 Hz 208/230V 60 Hz 220V 50 Hz***
230V 60 Hz 220V 50 Hz***
3 Phase Power 208/230/460V 60Hz; 220/380/440V 50Hz*** 208/230V 50/60Hz or 380/460V 50/60Hz 208/230/460V; 220/380/440V 50Hz***
Included
Accessories One premium EMX IRB-MON photo eye, one 5-foot premium ASO edge sensor and a pre-wired Hy2NC adapter
Pre-wired Hy2NC adapter
Communication RS-232, RS-485
User Controls Smart Touch Controller with 70+ confi gurable settings, programmed via the keypad and display or a PC using S.T.A.R.T. software.
Relay Three confi gurable user relays: one 30VDC, 3A solid state and two 250VAC, 10A electromechanical; Optional Hy8Relay™ for 8 additional relay outputs
Finish Zinc plated with powder coating
ETL Listed (UL 325) Usage Class I, II, III, IV Usage Class III, IV Usage Class I, II, III, IV Usage Class III, IV Usage Class III, IV Usage Class III, IV
Warranty 5 year w/product registration
UPS Battery Backup Power and Additional Models
DC Power Supply* † with HyCharger DC SlideDriver 15 UPS SlideDriver 30F UPS SlideDriver 40 UPS – SlideDriver 80 UPS SlideDriver 200 UPS**
AC Power Supply with HyInverter AC*
SlideDriver 15 with HyInverter AC – SlideDriver 40 with HyInverter AC SlideDriver 50VF2/3 with HyInverter AC – –
Correctional Facility – SlideDriver 30F-C SlideDriver 40-C SlideDriver 50VF2/3-C SlideDriver 80-C SlideDriver 200-C
Modular SlideDriver 15-M SlideDriver 30F-M SlideDriver 40-M SlideDriver 50VF2/3-M SlideDriver 80-M –
****3,000 ft/hr expected duty cycle. The operator’s normal duty cycle and the actual number of gate cycles available from battery depends upon gate resistance to travel, cycle length, battery size, state of charge and health, ambient temperature, acces-sory power draw and frequency of gate cycles during power outage.
** SlideDriver 200 UPS has a 2,000 ft/hr (610 m/hr) expected duty cycle. Actual duty cycle depends on site specifi c conditions and gate confi guration.
***Refer to Installed Options on pricing for all 50Hz voltages, which are special order.
† 115V DC Power Supply requires a 30A branch circuit. Choose voltage with care as chargers are not fi eld convertible.
SlideDriver™
Maximum security combined with extreme durability
948109606 Rev-B 05/2023 D0504 support.hysecurity.com
Niceforyou.com ©2023 Nice North America LLC. HySecurity is a registered trademark of Nice North America LLC. All rights reserved.
All trademarks, logos and brand names are the property of their respective owners.
Nice/HySecurity is an industry leader of automated gate and perimeter security solutions.
The HySecurity brand provides high-quality, ultra-reliable industrial gate operators and crash-rated, Hostile Vehicle Mitigation (HVM) vehicle barriers designed to secure and protect critical infrastructure and facilities worldwide.
MX3629-01 Rev. C
Models SlideDriver 15 222 SS ST 1,500 lb (680 kg) 1 ft/s (30 cm/s)
SlideDriver 30F 222 EX 1.7 ST 3,000 lb (1,361 kg) 1.7 ft/s (50 cm/s)
SlideDriver 40 222 E ST 4,000 lb (1,814 kg) 1 ft/s (30 cm/s)
SlideDriver 50VF2/3 222 X3 ST 5,000 lb (2.268 kg) 2.2 ft/s (70 cm/s) or
3 ft/s (91 cm/s)
SlideDriver 80 222 X1 ST 8,000 lb (3,629 kg) 1 ft/s (30 cm/s)
SlideDriver 200 444 XS ST 20,000 lb (9,072 kg) 1 ft/s (30 cm/s)
SlideDriver 30F
Installation Instructions
The World’s Most Rugged and Reliable High Security Slide Gate Operator 800-321-9947 • www.hysecurity.com
© 2017 www.hysecurity.com SlideDriver Installation and Assembly MX3629-01 Rev. C Page 3 a company of TheNiceGroup
SlideDriver: Plan Site Design
Read & Plan Read and follow the Important Safety Information provided in the Programming and Operations Manual prior to installing the SlideDriver. Read and follow these installation instructions and make sure to conform to site specifications and all local and federal regulations and codes.
Measure and Calculate Determine site placement. Pay attention to clearance around the gate operator’s location and gate condition (hardware, ease of travel, and access). Consider right handing and left handing.
Use the illustrations for concrete pad dimensions, gate operator placement and drive rail alignment.
Design Vehicle Loops
Inside and Outside obstruction loops (IOLD and OOLD) are recommended to help prevent vehicle hits. IOLD and OOLD loops are required for tail gating logic.
Install conduit for communication and power
For high voltage, low voltage, (loops and peripherals), ground wire, and dual or interlocked gates.
NOTE: Loop layout is dependent on uni- or bi-directional traffic and length of gate and width of roadway. Vehicle must move from one loop to the next without loss of detection. The site design shown on this page is for illustrative purposes only.
CAUTION
If you cut, drill or alter the chassis, you will void the Warranty.
DANGER
Know what’s below! Many states subscribe to 811. Call the local utility number so underground utility lines can be marked before excavating.
NOTE: Design shown for illustrative purposes only.
Drawings are NOT TO SCALE.
Minimum conduit required No. Min. Size cm
AC Main power (incoming) 1 1 inch 2.5
Low voltage comm wires 1 3/4 inch 2
Ground 1 3/4 inch 2
Loop wires 1 3/4 inch 2
Addt’l conduit may be needed for: No. Min. Size cm
DC cables or hydraulic hoses 1 2 inch 5
Dual gate connection for low voltage wiring 1 1 inch 2.5
Emergency release options 1 3/4 inch 2
SL
ID
EDRIV
ER
Mounting bolt location Four (4) ½ x 4-inch anchor bolts
FACE OF GATE
OBSTRUCTED AREA: Area must remain clear.
Hydraulic motor location
MINIMUM CONCRETE DIMENSIONS
20” Wide x 30” Length x 16” Depth minimum* (51 x 76 x 41 cm) *Or, Frost line whichever is greater.
Refer to local code for appropriate depth.
2" (5 cm)
5" (13 cm)
12½" (32 cm) 7¼" (18 cm)
1¼" (3 cm)
1¼" (3 cm) 2" (5 cm)8"
(20 cm)
13" (33 cm) 26" (66 cm)
1¼" (3 cm)
CONDUIT
AREA
Conduit cutout area for electrical access.
Cut out dimensions: 8 x 7¼" (20 x 18 cm)
Distance between gate face and rear chassis: 1½ ± ⅛ inch (38 mm ± 3 mm)
WARNING
Be sure the WARNING signs are visible from either side of the gate in clear view of approaching vehicles. For your records, take a photograph of the completed installation site.
Key or card reader Mount access control devices at least 6 ft (183 cm) beyond gate.
Photo eye
Photo eye
SlideDriver
Left handing
Outside Obstruction Loop
Photo eye
V track Pedestrian gate within 25 ft (762 cm) of vehicular gate opening
Inside Obstruction Loop or Free Exit
Gate edge sensor
Gate edge sensor
Physical travel stop
Edge sensor
Support posts
External Stop / Reset
Safety Mesh Gap between vertical bars must be less than (2¼-inch, 57 mm) up to a minimum height of 6 ft (1.8 m). Refer to ASTM F2200.
14½" (368 mm)
NOTE: Chassis cover adds ½" (13 mm).
Total depth with cover = 15" (38 cm)
SlideDriver Left handing shown
High voltage (Incoming AC power)
Low voltage/ communication wires
Dual gates Vehicle loop wires
For clarity, safety mesh is not shown
CONCRETE PAD
CONCRETE PAD
Cut away view
Gate
Safety mesh Per UL 325 and ASTM F2200, all openings in a sliding gate up to 72 inch height (6 ft or 183 cm) must be guarded or screened.
Wheel cover
Grooved drive rail
Gate face* Use shims as needed
Support post
Wheel cover
Drive rail
Limit ramps
Height from top of drive rail to bottom of gate operator. All models: 9¼” (23.5 cm)
NOTE: XtremeDrive™ mount drive rail ¼ to ½” (6 to 13 mm) higher.
All models (except SD 200):
26” (66 cm)
SlideDriver 200:
33½” (85 cm)
Support post
Low voltage/communication wires
Conduit
Distance: 1½" (38 mm) Gap
Clearance Cover removal and access: 15” minimum (38 cm)
U bolt
© 2017 www.hysecurity.com SlideDriver Installation and Assembly MX3629-01 Rev. C Page 4
SlideDriver: Site Prep
Operator Handing
Tools Required
Drawings NOT to Scale
SlideDriver 200 series
Post Mount for HydraSupply or DC / UPS Cabinet
| • | Standard socket set with extension |
| • | Standard hex key set |
| • | Combination wrench set |
| • | Standard pliers and needle-nose pliers |
| • | Set of Phillips head and flat-head screwdrivers |
| • | Wire strippers & wire crimper |
| • | Digital Volt-Ohm meter |
| • | Level and measuring tape |
| • | Electric drill and drill bits (Unibit or Stepdrill) |
| • | Metal cutting saw |
For the full recommended list of tools and hardware, see the SlideDriver Programming and Operations Manual.
When you first apply power to the operator, it is locked in Menu mode and prompts appear on the display. The gate will not move and the controls will not function until the prompts have been answered. The prompts include:
| • | Usage Class setting (UC) |
| • | Gate operator handing (Set Handing: SH) |
See page 9 for more information.
MINIMUM CONCRETE DIMENSIONS
20” Wide x 47” Length x 16” Depth minimum* (51 x 119 x 41 cm) *Or, Frost line whichever is greater. Refer to local code for appropriate depth.
6½" (16.5 cm)
1¼" (3 cm)
2" (5 cm)
Conduit cutout area for electrical access.
Cut out dimensions: 8 x 6½" (20 x 16.5 cm)
10" (25 cm)
Distance between gate face and rear chassis:
1½ ± ⅛ inch (38 mm ± 3 mm)
43" (109 cm)
47" (119 cm) minimum
2" (5 cm)
5" (13 cm)
12½" (32 cm)
NOTE: Chassis cover adds ½" (13 mm).
Total depth with cover = 15" (38 cm).
1¼" (3 cm)
14½" (37 cm)
Mounting bolt locations Nine (9) ½ x 4" anchor bolts.
Required: A minimum 2 bolts fastened per cross support.
17¾" (45 cm) 22¾" (58 cm)
8" (20 cm)
Clearances
Modular and DC / UPS options shown:
Post-mounted.
U-bolts mounted to Unistrut on back of cabinet.
Cabinet may also be wall-mounted with anchor bolts.
SlideDriver:
Side Access: Minimum 24 inches (61 cm) Front Access: Allow 30 inches (76 cm)
Concrete pad extends 2 inch (5 cm) minimum beyond side and front of gate operator chassis’ footprint. Conduit runs between gate operator and cabinet.
Leave enough space between cabinet and chassis to avoid pinch point and access issues. Conduit runs below ground between the two units.
Offset 3 inches (7.6 cm) from the surface of the support posts to rear of SlideDriver chassis.
Cabinet:
Modular, DC / UPS options
SlideDriver
Gate panel
Fence
Drive rail
ROADWAY
Chassis base cut out for conduit
Cabinet (Modular):
Front Access: Minimum 36 inches (92 cm) Rear Access: Allow 24 inches (61 cm)
Cabinet (DC / UPS):
Door Swing: Minimum 30 inches (76 cm) Rear Access: Allow 24 inches (61 cm)
Front access
Door swing clearance:
Minimum
36 inches (91 cm)
Side access
Left hand gate
OPEN
Right hand gate
OPEN
SlideDriver viewed from the secure side
SlideDriver viewed from the secure side
Cabinet option
For DC / UPS or Modular options, wall or post-mount the cabinet.
If planning a post mount, mounting holes need to be drilled (U-bolts, fasteners, and unistrut are not provided).
Cabinet may also be wall-mounted with anchor bolts.
NOTE: The mounting holes on the top and bottom flanges are 5/16-inch diameter. Mounting posts and hardware are not provided by HySecurity.
13½” (34 cm)
1⅞” (5 cm)
1¼” (3 cm)
Door clip
C/L C/L
Flange
Flange
Unistrut U-bolt 30¾” (78 cm)
Offset 4½" (11 cm) Face of Gate panel and cabinet
Gate panel face
SlideDriver
Cabinet
For more information, refer to the supplemental manuals that accompany the product.
SLIDEDRIVER
Drive rail
Gate post
Gate panel
Concrete pad
Wheel covers required for cantilevered gates: UL 325
FENCE LINE
ROADWAY
Right handing gate operator
Allow 12 to 16 inches (30 to 41 cm)
Minimum clearance for cover removal:
15 inches (38 cm)
© 2017 www.hysecurity.com SlideDriver Installation and Assembly MX3629-01 Rev. C Page 5
Set up and Assembly Unpack the SlideDriver
Phillips head screws Loosen, DO NOT remove.
Drawings NOT to Scale
1. Loosen two Phillips head screws.
NOTE: Leave sufficient overhead clearance to remove cover and open the control box.
2. Remove the cover by tilting it slightly toward you while lifting it up off the top of the operator.
NOTE: Use the supplied keys to release the lock if your model includes that option.
3. Remove the foam pieces around the motor and the red spring.
4. Remove the ship with kit plastic bag.
Replace the Vent Plug
WARNING
Obtain help before lifting or moving the operator. SlideDriver models can weigh over 260 lbs (118 kg). Failure to comply may result in serious injury to personnel, damage to the equipment, or both.
1. Align the operator. Locate rear panel 1½-inch from the face of vertical uprights.
2. Install concrete anchors (½ x 4-inch minimum)
3. Tighten the nuts, but leave room for adjustments.
4. Level the operator. Shim with plastic or aluminum to prevent corrosion.
Mark the Anchor Bolt Locations
CAUTION
Replace the vent plug with the breather cap before operating the SlideDriver.
Air pressure vents through the cap instead of through the pump seal and helps prevent rust by allowing condensation to evaporate. If you do not replace the vent plug with the breather cap, you will void the Warranty.
After you remove the operator, cut out the anchor bolt template on the side of the SlideDriver box.
Use the template to mark the location of the anchor bolts that will secure the SlideDriver to the concrete pad.
CAUTION
Review the dimensions on page 4. Proper alignment of the SlideDriver operator and its drive rail is critical.
FA
C
E O
F G
ATE
FA
C
E O
F G
ATE
CONDUIT
CUT-OUT
Mounting Template
Gate Side -Puerta Lado-
Gate Side -Puerta Lado-
-CONDUCTO
CORTAR-
CAUTION
Do NOT fully tighten the anchor bolts until after the drive rail is installed. See page 4.
4 Install the Chassis
Install the Earth Ground5
DANGER
The potential for lightning discharge exists with all gates, fences and gate operators. National Electric Code (NEC) - Article 250 requires a separate earth ground in addition to the required equipment ground.
The gate operator must be grounded per NEC, NFPA 780 and local building standards and codes.
CAUTION
DO NOT pick the operator up by its sides or tip it. Hydraulic fluid can leak or damage to the chassis may occur and void the Warranty.
26-inches (660 mm)
14½-inches (368 mm) 1½-inch (38 mm)
Level
Optional base riser
Side view
Anchor bolts (½ x 4-inch, min.)
Minimum 4 anchor bolts (6 bolts required for heavy gates: 80 and 200 operators.)
Lock (optional)
Cover
Breather cap
Quick disconnects (QDs)
Option:
SlideDriver Base Riser (most models) Inches: 26W x 12H x 14½D Centimeters: 66W x 30H x 36.8D Option:
SlideDriver Base Riser (200 series): Same H & D, with 47"W (109 cm)
Ground lug
Limit switch
Toggle handle
Earth ground
Consult local codes for proper depth
Grade level
Cut away view
Conduit
SlideDriver chassis
Control Box
3 ft (91 cm)
Maximum distance
Concrete pad
Rear panel
Minimum depth 16" (41 cm) or frost line. See local codes.
Concrete pad conduit, not shown
© 2017 www.hysecurity.com SlideDriver Installation and Assembly MX3629-01 Rev. C Page 6 a company of TheNiceGroup Assemble, Align & Install Drive Rail
Drawings NOT to Scale
Connect sections of the drive rail.
Use roll pins to join the sections of the drive rail. To prevent the pins from moving during assembly, crimp the pin channels with a pliers.
Secure the toggle handle.
Disengage the drive wheels by pulling on the toggle handle.
Wire the toggle handle clamp open so the wheel doesn't fall closed when you insert the drive rail through the chassis
WARNING
Be careful where you place your hands and fingers when you disengage the drive wheels. The compression spring at the base of the clamp causes the handle to drop suddenly which can cause serious injury.
Standard grooved drive rail
Optional flanged drive rail used for solenoid lock applications.
AdvanceDrive™ and XtremeDrive™ wheels shown.
Use wire to secure the toggle handle so the clamp remains open and the drive wheel doesn't fall closed while you insert the drive rail.
Drive rail
Limit ramp
Limit switch (interior of chassis)
CAUTION
When sliding the drive rail through the cut out in the chassis, DO NOT damage the limit switches. Damage to the limit switches during installation is not covered by the Warranty.
U bolt securing the drive rail.
Compression spring controls drive wheel gripping force
Clamped
Unclamped
Handle Position
Clamp Drive Rail to Gate Identify the gate structure nearest the operator and temporarily clamp the drive rail onto the gate.
Set a String Line, Align Drive Rail and Insert Shims, if needed.
For reference, run a string line along the entire length of the drive rail. Compare the edge of the drive rail with the string line. Place shims between the upright support structure and drive rail to keep the drive rail straight and level.
String line
Gate edge
Limit rampSlideDriver
U bolts fasten drive rail to support posts
Align and Secure Drive Rail Align the top of the drive rail with the label on each side of the operator's chassis. If necessary, loosen the C-clamps and move the drive rail up or down along the length of the gate. Drill holes through the drive rail flange and insert U bolts from the far side.
Install U bolts along the upright support structure, as needed. HySecurity recommends that you attach to a minimum of 3 supports per length of drive rail. Keep drive rail spans straight and level. Distance between attachment points should be less than 10 feet (3 m).
Remove the C clamps when the drive rail is fully secure.
Manually, open and close the gate.
Check and adjust the height of the drive rail.
Label
Drive rail
Triangle tool rafter square
NOTE: DO NOT use through bolts or self-tapping screws because you won't be able to adjust the drive rail at a later date.
Install additional U bolts, as necessary.
NOTE: Make sure the drive wheel will be centered on the drive rail when placed under load.
With the drive rail secure, tighten the chassis anchor bolts.
NOTE: Over its entire length, the drive rail must be level and aligned with the label on the chassis to within ± ¼-inch (6 mm).
When clamped, the red spring should be compressed to a height of 2-inches (5 cm). Adjust the nut at the base of the spring to set the proper tension.
Nut adjusts tension
CAUTION
When drive rail and limit ramps (see page 7) are installed, the drive rail must be aligned and the operator's chassis secure before clamping the drive wheels and adjusting the compression spring.
CAUTION
CONCRETE PAD
Grooved drive rail NOTE: Drill holes to increase traction where drive wheels first engage the drive rail.
Other traction considerations:
HySecurity XtremeDrive™ Wheel System
Gate face* Use shims as needed.
*NOTE: The best material to use for shims is non-corrosive materials, such as aluminum or heavy-duty plastic.
Support post
Wheel cover
Height from top of drive rail to bottom of gate operator. All models: 9¼” (23.5 cm) NOTE: if using XtremeDrive™ wheels mount drive rail ¼” to ½” (6 to 13 mm) higher.
All models (except SD 200):
26” (66 cm)
SlideDriver 200:
33½” (85 cm)
Distance: 1½" (38 mm)
Wheel cover
Roller guide and bracket support
All models: 9¼” (23.5 cm) Exceptions: SD 80 & SD 200 using XtremeDrive™ wheels, 9½” to 9¾” (23.5 to 25 cm)
X tr em eD ri ve
© 2017 www.hysecurity.com SlideDriver Installation and Assembly MX3629-01 Rev. C Page 7 a company of TheNiceGroup Install and Secure Limit Ramps
Drawings NOT to Scale
Determine Limit Ramp Location.
Position the gate fully-closed and mark the drive rail.
NOTE: The toggle handle needs to be in the "unclamped" position. See page 6.
Move the gate 6-inches (15 cm) from the fully closed position.
Determine where to place the Standard Limit Ramp so it will trip the limit switch approximately 6-inches (15cm) before the exact spot where you want the gate to stop (2-inches from the drive wheel).
Mark mounting holes.
Measure and mark the mounting locations for the truss head screws 1-inch (2.5 cm) from the edge of the drive rail.
Drill one ⅜-inch (9.5 mm) mounting hole.
Place one nut in the limit ramp channel. Secure the Standard Stop Limit Ramp by inserting the screw through the drive rail and into nut. Finger-tighten.
Open and close the gate to check the position of the Standard Stop Limit Ramp.
Make adjustments as necessary and drill the remaining mounting hole about 4-inches (10 cm) from the first.
Secure the Standard Stop Limit Ramp to the drive rail with the fasteners provided.
NOTE: If you are installing a SlideDriver 50VF-series gate operator, align the angled edge of the Slow Down Limit Ramp (MX3043 kit) with the edge of the Standard Stop Limit Ramp. Secure it and the remaining limit ramps to the drive rail.
Before installing the limit ramps, review the illustrations on this page.
Adjust the limit switches.
To position the limit switch, loosen the height adjusting screw.
Move the limit switch arm up or down so the top of the roller is about ⅜-inch (9.5mm) from the base of the drive rail.
Secure the limit switch arm by tightening the height adjusting screw. Perform the same steps on the opposite end of the drive rail.
NOTE: Only the limit ramp should trigger the limit switch.
The Standard Limit Ramp is positioned on the drive rail so it will make contact with the limit switch and stop approximately 2-inches (5 cm) from the drive wheel.
| • | Limit ramps are attached to the underside of the drive rail when the gate is fully open and fully closed. |
| Limit ramps install to both ends of the drive rail. | |
| • | Two truss head screws secure each limit ramp to the drive rail. The screws are spaced about 4-inches (10 cm) apart. |
Drive Rail
Standard Stop Limit Ramp
Nut
Truss head ⅜-inch (9.5 mm) screws.
Must be fully tightened and flush before adjusting Limit Switches.
CAUTION
Be sure to securely fasten all limit ramps to the underside of the drive rail at both ends (gate fully open and fully closed).
Failure to do so will void the Warranty.
Align one angled edge of the Slow Down Limit Ramp with the edge of the Standard Limit Ramp.
Make sure its opposite angled edge nests against the remaining limit ramp.
Order 4 Limit Ramp kits for 50VF gate operators: MX3043
Slow down Limit Ramp
Slow down Limit Ramp
Standard Stop Limit Ramp
Nuts inside limit ramps
SlideDriver50VF models add Slow Down Limit Ramps
Clamp drive wheels.
Refer to page 6 for WARNING. Place toggle handle in clamped (load) position.
Toggle Handle Assembly
Compression spring set at 2-inches (5 cm) when drive wheels are clamped on drive rail.
Truss head screws flush on drive rail
Edge of Drive Rail End of Drive Rail
Articulating arm (Tripped position)
Limit Ramp enters chassis cutout Drive Wheel
Drive Wheel
2-inches (5 cm) Limit ramp stopped position
1-inch (2.5 cm)
Standard Stop Limit Ramp Height adjusting screw
Articulating arm (Normal position)
Roller
4-inches (10 cm) Spacing between screws (approximate)
U bolt and fasteners
⅜-inch (9.5mm)
Base of drive rail
Limit Switch inside chassis
Angled edge of Limit Ramp faces chassis cutout and drive wheels
Roller
Chassis
Limit Ramp
Drive Rail
Toggle handle
Stop Limit Ramp on all SlideDriver and 50VF-series Models
Standard Stop Limit Ramp
Slow down Limit Ramps
© 2017 www.hysecurity.com SlideDriver Installation and Assembly MX3629-01 Rev. C Page 8 a company of TheNiceGroup Wiring AC Power
Power connections Size the primary wires, appropriately. Consider the voltage, horsepower, and length of the wire run from the main power panel. The electrical wiring must be properly routed through conduit that enters the gate operator through its base cutout and feeds through one of the knockouts in the control box.
Verify you have the proper input voltage and conversion of voltage taps at the motor and transformer. Measure the line voltage with a volt meter to distinguish between 208V and 240V branch circuits or between 390V and 480V branch circuits.
Check that the primary tap on the control transformer matches the line voltage and frequency that you are connecting to the operator. The site voltage and operator set voltage must be the same and match the voltage on the operator motor's nameplate. A label on top of the transformer identifies the various voltage taps. See illustration.
1. Connect to Power: Three pig tails and a ground are available for connection to a 1 Phase (1Ø) and 3 Phase (3Ø) power sources.
2. Connect AC Power: Wire nut the incoming power wires to their appropriate pig tails on the control transformer. Attach the ground wire to the chassis.
Wiring of gate operators must conform to NFPA and NEC standards �and comply with all local codes. When the installation is compliant and� complete, turn on AC power at the source and at the control box. For Variable Frequency (VF) operators, make sure the connection wires match the voltage found on the operator’s nameplate.
DANGER
Turn OFF AC power at the source (circuit breaker panel) before accessing the wires in the gate operator. Follow facility Lock Out/Tag Out procedures. Make sure all power switches are in the OFF �position. Follow all electrical code standards and regulations.
Site Considerations for AC Power
HySecurity gate operators are intended for permanent installation. Make sure to review all the information in this manual and prepare the site with the following considerations:
• Make sure all electrical wiring is properly routed via conduits.
• Check the distance of the wire run from the main panel to the gate operator. Make sure the wire size of the branch circuit supplying power to the gate operator is large enough to avoid excess voltage drop. See the wire size charts below.
• Make sure the available power source matches the electrical requirements specified on the voltage nameplate.
WARNING
Each gate operator is built to run on a specific line power voltage and phase.
Failure to ensure that the source voltage, phase and frequency match as specified on the equipment may result in severe damage to the equipment. See "Changing Electrical Connections in the Field" on page 9.
• Make sure a 20A circuit (minimum) protected with a 20A Inverse Time Breaker is provided for all AC power connections.
• Verify that the operator is electrically grounded per NFPA 780 and NEC Article 250, and local codes. Refer to the illustration on page 5.
NOTE: Refer to the SlideDriver Programming and Operations manual for Safety, programming, troubleshooting, maintenance and general information. Note that DC operators do not have a control transformer. For DC gate operators, refer to the DC Power Supply with HyCharger supplemental manual provided with the DC Power Supply cabinet.
Drawings NOT to Scale
Blue - 480 VAC
Orange - 240 VAC
Red - 208 VAC
Black - Common
White - 120 VAC*
CAUTION * Variable Frequency (VF) or 2 hp gate operators:
Never connect to the white 120V wire. Make sure the connection wires match the voltage found on the operator’s nameplate.
Control Transformer
SD50VF - series
Turning the Power Switch ON The AC power disconnect switch (ON/OFF switch) is located on the same enclosure (control box) where the electrical components, Smart Touch Controller, transformer, power module, etc., are found.
When power is turned ON, a green status light (D4) on the Smart Touch Controller blinks. The status light appears below the coin battery and indicates that the processor is receiving power.
Green LED flashes indicating processor is receiving power.
DO NOT USE
PHOTO EYE
OPEN DIRECTION
DO NOT USE
PHOTO EYE
CLOSE DIRECTION
DO NOT USE
CHARGER
AC LOSS
LOCK INTERLOCK
EMERG CLOSE
FIRE DEPT OPEN
Smart Touch Controller
LIMIT DUAL GATE RADIO OPTIONS
VEHICLE DETECTO
R
SHADOW
RESET
W
IEGAND
HySecurity
MX000585
VERSION
S/N
RS232
DISPLAY
VEHICLE DETECTO
R
COM COMA B
RPM
COMOPEN EDGE+24V +24V
STATUS
LED
Reset switch ON/OFF switch
Input taps
SlideDriver Wire Size & Distance Run - 115V 1Ø hp ½ ¾ 1 2
Amps 10 11.6 14.4 27.2
12 90 (27m) 75 (23m) 60 (18m) 30 (9m)
10 140 (43m) 120 (37m) 100 (30m) 50 (15m)
8 220 (67m) 190 (58m) 155 (47m) 80 (24m)
6 350 (107m) 300 (91m) 245 (75m) 130 (40m)
4 555 (169m) 480 (146m) 385 (117m) 205 (62m)
2 890 (271m) 765 (233m) 620 (189m) 330 (101m)
SlideDriver Wire Size & Distance Run – 208V 1Ø
½ ¾ 1 2 3
5.5 6.1 7.6 14.2 16.2
290 (88m) 260 (79m) 205 (62m) 110 (33m) 100 (30m)
460 (140m) 415 (126m) 330 (101m) 175 (53m) 155 (47m)
725 (221m) 650 (198m) 525 (160m) 280 (85m) 245 (74m)
1150 (350m) 1040 (317m) 835 (254m) 445 (135m) 390 (119m)
1825 (556m) 1645 (501m) 1320 (402m) 710 (216m) 620 (189m)
2920 (890m) 2630 (801m) 2110 (643m) 1130 (344m) 1000 (305m)
SlideDriver Wire Size & Distance Run – 230V 1Ø hp ½ ¾ 1 2 3 5
Amps 5.0 5.8 7.2 13.6 14.8 27.0
12 350 (107m) 300 (91m) 245 (75m) 130 (40m) 120 (37m) 65 (20m)
10 560 (171m) 480 (146m) 385 (117m) 205 (62m) 190 (58m) 105 (32m)
8 880 (268m) 760 (232m) 610 (186m) 325 (99m) 300 (91m) 165 (50m)
6 1400 (427m) 1120 (341m) 975 (297m) 515 (157m) 475 (145m) 260 (79m)
4 2220 (670m) 1915 (584m) 1550 (472m) 815 (248m) 750 (229m) 410 (125m)
2 3550 (1082m) 3080 (939m) 2465 (751m) 1305 (398m) 1200 (366m) 650 (198m)
W ir e G au g e
W ir e G au g e
Wire Size Charts The maximum distance shown for each wire gauge run is from the operator to the AC power source panel box that has adequate capacity to support the motor load. The values are for one operator, with no other loads applied to the branch circuit. Always, avoid placing more than one operator to a circuit. If, for any reason, more than one operator is connected, reduce the maximum allowed wire run distance by half.
Make sure the proper wire gauge is being used. The charts here list the maximum allowable wire run from the power source to a single phase SlideDriver gate operator.
Wiring charts for 3Ø and the SlideDriver 50VF-series are found in the SlideDriver Programming and Operations Manual.
NOTE: Distance shown in U.S. Standard “feet.” Metric equivalents are shown in parentheses.
D is ta nc e D is ta nc e
All (Excluding SD50VF)
© 2017 www.hysecurity.com SlideDriver Installation and Assembly MX3629-01 Rev. C Page 9 a company of TheNiceGroup Complete the Installation
Left Handing: Swapping Hydraulic Hose Positions
Initial Setup: Menu Mode
Drawings NOT to Scale
Changing Electrical Connections in the Field
For in-field conversions, the NEC requires that the voltage label on the motor be changed to match the new configuration. Contact HySecurity for a replacement label.
To reconnect the electric motor and the 24V control transformer, refer to the motor connection diagram found either on the motor's nameplate or inside the motor connection box. Be sure to read the WARNINGS below if planning to convert from 1Ø to 3Ø, or vice versa. The electric motor will need to be replaced.
WARNING
In-Field, Variable Frequency Drive Connections: SlideDriver operators are field re-configurable for 1Ø or 3Ø, 208/230VAC input power without changing the VFD. However, if reconfiguring from 208/230VAC to 460/480VAC the VFD Motor Controller in a 208/230VAC unit must be replaced with a VFD Motor Controller manufactured for the higher (460/480VAC) voltage input. Any electrical damage occurring to the operator will not be covered by the Warranty.
WARNING
SlideDriver 50VF-series and all 2 hp operators CANNOT be connected to 115/120VAC, 1Ø power or 575V, 3Ø power. If any attempts are made to do so, serious injury and possible electrical shock may result. Any electrical damage occurring to the operator will not be covered by the Warranty.
UC 2
USAGE CLASS
HYSECURITY
GATE STOPPED
SH R (RIGHT)
GATE HANDING
When the SlideDriver is installed, power connections made, and the operator turned ON, a setup menu appears. The gate will not move and the controls will not function until the prompts have been answered. The prompts include:
• Usage Class. Set the usage class to I, II, III, IV depending on the site.
Four different vehicular usage classes are defined by UL 325.
Information about the classes can be found in the safety section of the SlideDriver Programming and Operations Manual, online through DASMA Technical Data Sheets www.dasma.com or UL 325 gate safety standards www.ul.com
• Set Handing. SH 0 = gate disabled, SH L = Left hand, SH R = Right hand
Gate handing is determined by viewing the gate opening from the secure side. If the gate opens to the left, the gate must be set for left handing.
NOTE: All SlideDrivers are set at the factory for right handing. If the gate has left handing, you must swap the position of the hydraulic hoses. See the illustration this page.
Keypad Navigation To navigate within Menu mode, use the following chart:
Menu Mode Navigational Buttons
To edit the Menu To navigate through the selections
To choose what is on the display
To navigate between menus
Press Select Two left characters blink indicating the display is ready to accept a menu change.
Press Next or Previous Continue pressing Next to view all selections
Press Select Blinking characters become static
Press Next or Previous Advance = press Next
Previous = press Previous
For More Information Brake valve adjustment is described on the yellow tag (MX001853) wire tied to the gate operator.
Review the SlideDriver Programming and Operations Manual for information regarding gate operator programming configurations, user relays, troubleshooting, safety considerations, maintenance, and other requirements.
Replace red vent plug with breather cap
Concrete pad Ground rod
Consult local codes for proper depth
Cut-away view
Grade level
SlideDriver
3 ft (91.4 cm) Maximum distance
Operator is shipped hydraulically configured for “right hand” operation.
Swap hydraulic hoses for left handing operators.
Left hand gate
OPEN
Right hand gate
OPEN
SlideDriver viewed from the secure side
MX3629-01 Rev. C
SlideDriver 50VF2/3
800-321-9947 • www.hysecurity.com
One Lithonia Way • Conyers, Georgia 30012 • Phone: 1-800-705-SERV (7378) • www.lithonia.com © 2011-2024 Acuity Brands Lighting, Inc. All rights reserved.
DSX0-LED
Rev. 11/15/24
COMMERCIAL OUTDOOR
D-Series Size 0 LED Area Luminaire
Specifications
Catalog Number
Notes
Type
Introduction The modern styling of the D-Series features a highly refined aesthetic that blends seamlessly with its environment. The D-Series offers the benefits of the latest in LED technology into a high performance, high efficacy, long-life luminaire.
The photometric performance results in sites with excellent uniformity, greater pole spacing and lower power density. D-Series outstanding photometry aids in reducing the number of poles required in area lighting applications, with typical energy savings of 70% and expected service life of over 100,000 hours.
EPA: 0.44 ft2
(0.04 m2)
Length: 26.18" (66.5 cm)
Width: 14.06" (35.7 cm)
Height H1: 2.26" (5.7 cm)
Height H2: 7.46" (18.9 cm)
Weight: 23 lbs (10.4 kg)
Hit the Tab key or mouse over the page to see all interactive elements.
Ordering Information EXAMPLE: DSX0 LED P6 40K 70CRI T3M MVOLT SPA NLTAIR2 PIRHN DDBXD
DSX0 LED
Series LEDs Color temperature 2 Color Rendering Index 2 Distribution Voltage Mounting
DSX0 LED Forward optics P1 P5 P2 P6 P3 P7 P4 Rotated optics P10 1 P12 1
P11 1 P13 1
(this section 70CRI only) 30K 3000K 40K 4000K 50K 5000K (this section 80CRI only, extended lead times apply) 27K 2700K 30K 3000K 35K 3500K 40K 4000K 50K 5000K
70CRI
70CRI
70CRI
80CRI
80CRI
80CRI
80CRI
80CRI
AFR Automotive front row
T1S Type I short T2M Type II medium T3M Type III medium T3LG Type III low glare 3
T4M Type IV medium T4LG Type IV low glare 3
TFTM Forward throw medium
T5M Type V medium T5LG Type V low glare T5W Type V wide BLC3 Type III backlight control 3
BLC4 Type IV backlight control 3
LCCO Left corner cutoff 3
RCCO Right corner cutoff 3
MVOLT (120V-277V) 4
HVOLT (347V-480V) 5,6
XVOLT (277V-480V) 7,8
120 16, 24
208 16, 24
240 16, 24
277 16, 24
347 16, 24
480 16, 24
Shipped included SPA Square pole mounting (#8 drilling, 3.5" min. SQ pole) RPA Round pole mounting (#8 drilling, 3" min. RND pole)
SPA5 Square pole mounting (#5 drilling. 3" min. SQ pole) 9
RPA5 Round pole mounting (#5 drilling, 3" min. RND pole) 9
SPA8N Square narrow pole mounting (#8 drilling, 3" min. SQ pole)
WBA Wall bracket 10
MA Mast arm adapter (mounts on 2 3/8" OD horizontal tenon)
Control options Other options Finish (required)
Shipped installed NLTAIR2 PIRHN nLight AIR gen 2 enabled with bi-level motion / ambient sensor, 8-40' mounting height, ambient sensor enabled at 2fc. 11, 12, 18, 19
PIR High/low, motion/ambient sensor, 8-40’ mounting height, ambient sensor enabled at 2fc 13, 18, 19
PER NEMA twist-lock receptacle only (controls ordered separate) 14
PER5 Five-pin receptacle only (controls ordered separate) 14, 19
PER7 Seven-pin receptacle only (controls ordered separate) 14, 19
FAO Field adjustable output 15, 19
BL30 Bi-level switched dimming, 30% 16, 19
BL50 Bi-level switched dimming, 50% 16, 19
DMG 0-10v dimming wires pulled outside fixture (for use with an external control, ordered separately) 17
Shipped installed HS Houseside shield (black finish standard) 20
L90 Left rotated optics 1
R90 Right rotated optics 1
CCE Coastal Construction 21
HA 50°C ambient operation 22
BAA Buy America(n) Act and/or Build America Buy America Qualified SF Single fuse (120, 277, 347V) 24
DF Double fuse (208, 240, 480V) 24
Shipped separately EGSR External Glare Shield (reversible, field install required, matches housing finish) BSDB Bird Spikes (field install required)
DDBXD Dark Bronze DBLXD Black DNAXD Natural Aluminum DWHXD White DDBTXD Textured dark bronze DBLBXD Textured black DNATXD Textured natural aluminum DWHGXD Textured white
L
H1
W
H2
L
H1
W
H2 Items marked by a shaded background qualify for the Design Select program and ship in 15 days or less. To learn more about Design Select, visit www.acuitybrands.com/designselect.
*See ordering tree for detailsDesign Select options indicated by this color background.
http://www.lithonia.com http://www.acuitybrands.com/resources/tools-and-documents/architectural-colors http://www.acuitybrands.com/designselect ksolidum Highlight
DSX0 LED
ksolidum Highlight P1 ksolidum Highlight 40K ksolidum Highlight
70CRI
ksolidum Highlight T4M ksolidum Highlight
MVOLT
© 2011-2024 Acuity Brands Lighting, Inc. All rights reserved.
DSX0-LED
Rev. 11/15/24
COMMERCIAL OUTDOOR
1.750" for aluminum poles 2.750" - for other poles type
Drilling
Ordering Information
Accessories Ordered and shipped separately.
DLL127F 1.5 JU Photocell - SSL twist-lock (120-277V) 23
DLL347F 1.5 CUL JU Photocell - SSL twist-lock (347V) 23
DLL480F 1.5 CUL JU Photocell - SSL twist-lock (480V) 23
DSHORT SBK Shorting cap 23
DSX0HS P# House-side shield (enter package number P1-7, P10-13 in place of #)
DSXRPA (FINISH) Round pole adapter (#8 drilling, specify finish)
DSXRPA5 (FINISH) Round pole adapter #5 drilling (specify finish)
DSXSPA5 (FINISH) Square pole adapter #5 drilling (specify finish)
DSX0EGSR (FINISH) External glare shield (specify finish)
DSX0BSDB (FINISH) Bird spike deterrent bracket (specify finish)
Shield Accessories
NOTES
| 1 | Rotated optics available with packages P10, P11, P12 and P13. Must be combined with option L90 or R90. |
| 2 | 30K, 40K, and 50K available in 70CRI and 80CRI. 27K and 35K only available with 80CRI. Contact Technical Support for other possible combinations. |
| 3 | T3LG, T4LG, BLC3, BLC4, LCCO, RCCO not available with option HS. |
| 4 | MVOLT driver operates on any line voltage from 120-277V (50/60 Hz). |
| 5 | HVOLT driver operates on any line voltage from 347-480V (50/60 Hz). |
| 6 | HVOLT not available with package P1, P2 and P10 when combined with option NLTAIR2 PIRHN or option PIR. |
| 7 | XVOLT operates with any voltage between 277V and 480V (50/60 Hz). |
| 8 | XVOLT not available in packages P1, P2 or P10. XVOLT not available with fusing (SF or DF). |
| 9 | SPA5 and RPA5 for use with #5 drilling only (Not for use with #8 drilling). |
| 10 | WBA cannot be combined with Type 5 distributions plus photocell (PER). |
| 11 | NLTAIR2 and PIRHN must be ordered together. For more information on nLight Air 2. |
| 12 | NLTAIR2 PIRHN not available with other controls including PIR, PER, PER5, PER7, FAO, BL30, BL50 and DMG. NLTAIR2 PIRHN not available with P1, P2 and |
P10 using HVOLT. NLTAIR2 PIRHN not available with P1, P2 and P10 using XVOLT. NLTAIR2 PIRHN not available with P1 using MVOLT.
13 PIR not available with NLTAIR2, PER, PER5, PER7, FAO BL30, BL50 and DMG. PIR not available with P1, P2 and P10 using HVOLT. PIR not available with P1, P2 and P10 using XVOLT. PIR not available with P1 using MVOLT.
14 PER/PER5/PER7 not available with NLTAIR2, PIR, BL30, BL50. Photocell ordered and shipped as a separate line item from Acuity Brands Controls. See accessories. Shorting Cap included.
| 15 | FAO not available with other dimming control options NLTAIR2 PIRHN, PIR, PER5, PER7, BL30, BL50, or DMG. |
| 16 | BL30 and BL50 are not available with NLTAIR2 PIRHN, PIR, PER, PER5, PER7, FAO and DMG. BL30 or BL50 must specify 120 or 277V. |
| 17 | DMG not available with NLTAIR2 PIRHN, PIR, PER, PER5, PER7, BL30, BL50 and FAO. |
| 18 | Reference Motion Sensor Default Settings table on page 4 to see functionality. |
| 19 | Reference Controls Options table on page 4. |
| 20 | Option HS not available with T3LG, T4LG, BLC3, BLC4, LCCO and RCCO distribution. Also available as a separate accessory; see Accessories information. |
| 21 | CCE option not available with option BS and EGSR. Contact Technical Support for availability. |
| 22 | Option HA not available with performance packages P6, P7, P12 and P13. |
| 23 | Requires luminaire to be specified with PER, PER5 or PER7 option. See Controls Table on page 4. |
| 24 | Single fuse (SF) requires 120V, 277V, or 347V. Double fuse (DF) requires 208V, 240V or 480V. XVOLT not available with fusing (SF or DF). |
Top of Pole
0.563"
1.325" 0.400"
(2 PLCS)
Template #8
A Handhole
B
C
D
HANDHOLE ORIENTATION
(from top of pole)
2.650"
Tenon Mounting Slipfitter Tenon O.D. Mounting Single Unit 2 @ 180 2 @ 90 3 @ 90 3 @120 4 @ 90
2-3/8" RPA AS3-5 190 AS3-5 280 AS3-5 290 AS3-5 390 AS3-5 320 AS3-5 490
2-7/8" RPA AST25-190 AST25-280 AST25-290 AST25-390 AST25-320 AST25-490
4" RPA AST35-190 AST35-280 AST35-290 AST35-390 AST35-320 AST35-490
External Glare Shield (EGSR) House Side Shield (HS)
Fixture Quantity & Mounting Configuration Single DM19 2 @ 180 DM28 2 @ 90 DM29 3 @ 90 DM39 3 @ 120 DM32 4 @ 90 DM49
Mounting Type
DSX0 with SPA 0.44 0.88 0.96 1.18 --- 1.16
DSX0 with SPA5, SPA8N 0.51 1.02 1.06 1.26 --- 1.29
DSX0 with RPA, RPA5 0.51 1.02 1.06 1.26 1.24 1.29
DSX0 with MA 0.64 1.28 1.24 1.67 1.70 1.93
DSX0 Area Luminaire - EPA *Includes luminaire and integral mounting arm. Other tenons, arms, brackets or other accessories are not included in this EPA data.
Minimum Acceptable Outside Pole Dimension
SPA #8 3.5" 3.5" 3.5" 3.5" 3.5"
RPA #8 3" 3" 3" 3" 3" 3"
SPA5 #5 3" 3" 3" 3" 3"
RPA5 #5 3" 3" 3" 3" 3" 3"
SPA8N #8 3" 3" 3" 3" 3"
Mounting Option Drilling Template Single 2 @ 180 2 @ 90 3 @ 90 3 @ 120 4 @ 90
Head Location Side B Side B & D Side B & C Side B, C & D Round Pole Only Side A, B, C & D
Drill Nomenclature #8 DM19AS DM28AS DM29AS DM39AS DM32AS DM49AS http://www.lithonia.com
© 2011-2024 Acuity Brands Lighting, Inc. All rights reserved.
DSX0-LED
Rev. 11/15/24
COMMERCIAL OUTDOOR
To see complete photometric reports or download .ies files for this product, visit Lithonia Lighting’s homepage. Photometric Diagrams Isofootcandle plots for the DSX0 LED P7 40K 70CRI. Distances are in units of mounting height (20').
LEGEND
0.1 fc
0.5 fc
1.0 fc
T1S T2M T3M
-4
-3
-2
-1
4 3 2 1 0 4321
T3LG
T4M TFTM T4LG T5M
T5W T5LG AFR BLC3
BLC4 LCCO RCCO
4 3 2 1 0 43216 5 65
-4 -3
-2
-1
-5
-6
4 3 2 1 0 43216 5 65
-4 -3
-2
-1
-5
-6
4 3 2 1 0 43216 5 65
-4 -3
-2
-1
-5
-6
4 3 2 1 0 43216 5 65
-4 -3
-2
-1
-5
-6
4 3 2 1 0 43216 5 65
-4 -3
-2
-1
-5
-6
4 3 2 1 0 43216 5 65
-4 -3
-2
-1
-5
-6
4 3 2 1 0 43216 5 65
-4 -3
-2
-1
-5
-6
4 3 2 1 0 43216 5 65
-4 -3
-2
-1
-5
-6
4 3 2 1 0 43216 5 65
-4 -3
-2
-1
-5
-6
4 3 2 1 0 43216 5 65
-4 -3
-2
-1
-5
-6
4 3 2 1 0 43216 5 65
-4 -3
-2
-1
-5
-6
4 3 2 1 0 43216 5 65
-4 -3
-2
-1
-5
-6
4 3 2 1 0 43216 5 65
-4 -3
-2
-1
-5
-6
4 3 2 1 0 43216 5 65
-4 -3
-2
-1
-5
-6
4 3 2 1 0 43216 5 65
-4 -3
-2
-1
-5
-6 http://www.lithonia.com/commercial/d-series+area+size+0.html#.V495eZMrLXQ
© 2011-2024 Acuity Brands Lighting, Inc. All rights reserved.
DSX0-LED
Rev. 11/15/24
COMMERCIAL OUTDOOR
Performance Data
Current (A)
Performance Package
LED
Count
Drive Current (mA) Wattage 120V 208V 240V 277V 347V 480V
Forward Optics (Non-Rotated)
P1 20 530 34 0.28 0.16 0.14 0.12 0.10 0.07
P2 20 700 45 0.38 0.22 0.19 0.16 0.13 0.09
P3 20 1050 69 0.57 0.33 0.29 0.25 0.20 0.14
P4 20 1400 94 0.78 0.45 0.39 0.34 0.27 0.19
P5 40 700 89 0.75 0.43 0.38 0.33 0.26 0.19
P6 40 1050 136 1.14 0.66 0.57 0.49 0.39 0.29
P7 40 1300 170 1.42 0.82 0.71 0.62 0.49 0.36
Rotated Optics (Requires L90 or
R90)
P10 30 530 51 0.42 0.24 0.21 0.18 0.15 0.11
P11 30 700 67 0.57 0.33 0.28 0.25 0.20 0.14
P12 30 1050 103 0.86 0.50 0.43 0.37 0.30 0.22
P13 30 1300 129 1.07 0.62 0.54 0.46 0.37 0.27
Electrical Load
Motion Sensor Default Settings Option Unoccupied Dimmed Level High Level
(when occupied) Phototcell Operation Dwell Time Ramp-up Time Dimming Fade Rate
PIR 30% 100% Enabled @ 2FC 7.5 min 3 sec 5 min
NLTAIR2 PIRHN 30% 100% Enabled @ 2FC 7.5 min 3 sec 5 min
Controls Options Nomenclature Description Functionality Primary control device Notes
FAO Field adjustable output device installed inside the luminaire; wired to the driver dimming leads.
Allows the luminaire to be manually dimmed, effectively trimming the light output.
FAO device Cannot be used with other controls options that need the 0-10V leads
DS (not available on DSX0) Drivers wired independently for 50/50 luminaire operation
The luminaire is wired to two separate circuits, allowing for 50/50 operation.
Independently wired drivers Requires two separately switched circuits. Consider nLight AIR as a more cost effective alternative.
PER5 or PER7 Twist-lock photocell receptacle Compatible with standard twist-lock photocells for dusk to dawn operation, or advanced control nodes that provide 0-10V dimming signals.
Twist-lock photocells such as DLL Elite or advanced control nodes such as ROAM.
Pins 4 & 5 to dimming leads on driver, Pins 6 & 7 are capped inside luminaire. Cannot be used with other controls options that need the 0-10V leads.
PIR Motion sensor with integral photocell. Sensor suitable for 8' to 40' mounting height.
Luminaires dim when no occupancy is detected. Acuity Controls rSBG Cannot be used with other controls options that need the 0-10V leads.
NLTAIR2 PIRHN nLight AIR enabled luminaire for motion sensing, photocell and wireless communication.
Motion and ambient light sensing with group response. Scheduled dimming with motion sensor over-ride when wirelessly connected to the nLight Eclypse.
nLight Air rSBG nLight AIR sensors can be programmed and commissioned from the ground using the ClAIRity Pro app. Cannot be used with other controls options that need the 0-10V leads.
BL30 or BL50 Integrated bi-level device that allows a second control circuit to switch all light engines to either 30% or 50% light output
BLC device provides input to 0-10V dimming leads on all drivers providing either 100% or dimmed (30% or 50%) control by a secondary circuit
BLC UVOLT1 BLC device is powered off the 0-10V dimming leads, thus can be used with any input voltage from 120 to 480V
Lumen Ambient Temperature (LAT) Multipliers Use these factors to determine relative lumen output for average ambient temperatures from 0-40°C (32-104°F).
Ambient Lumen Multiplier
0°C 32°F 1.04 5°C 41°F 1.04
10°C 50°F 1.03 15°C 50°F 1.02 20°C 68°F 1.01 25°C 77°C 1.00 30°C 86°F 0.99 35°C 95°F 0.98 40°C 104°F 0.97
Projected LED Lumen Maintenance Data references the extrapolated performance projections for the platforms noted in a 25°C ambient, based on 10,000 hours of LED testing (tested per IESNA LM-80-08 and projected per
IESNA TM-21-11).
To calculate LLF, use the lumen maintenance factor that corresponds to the desired number of operating hours below. For other lumen maintenance values, contact factory.
Operating Hours Lumen Maintenance Factor
0 1.00 25,000 0.94 50,000 0.89
100,000 0.80
70 CRI 80CRI 90CRI
Lumen Multiplier Availability Lumen Multiplier Availability Lumen Multiplier Availability
5000K 102% Standard 92% Extended lead-time 71% (see note)
4000K 100% Standard 92% Extended lead-time 67% (see note)
3500K 100% (see note) 90% Extended lead-time 63% (see note)
3000K 96% Standard 87% Extended lead-time 61% (see note)
2700K 94% (see note) 85% Extended lead-time 57% (see note)
LED Color Temperature / Color Rendering Multipliers
Note: Some LED types are available as per special request. Contact Technical Support for more information.
*Note: Calculated values are based on original performance package data. When calculating new values for given FAO position, use published values for each package based on input watts and lumens by optic type.
FAO Position % Wattage % Lumen Output
8 100% 100% 7 93% 95% 6 80% 85% 5 66% 73% 4 54% 61% 3 41% 49% 2 29% 36% 1 15% 20%
FAO Dimming Settings
© 2011-2024 Acuity Brands Lighting, Inc. All rights reserved.
DSX0-LED
Rev. 11/15/24
COMMERCIAL OUTDOOR
Lumen values are from…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .