ADDENDUM #9.pdf
PDF 104 KB Posted
- Attached to
- Snowden Administration Building Facade
- Solicitation number
- ANC-C-27-0001
- Issued by
- Anchorage Municipality, Alaska
About this file
Addendum #9 is a contract modification document issued by the Alaska Court System, Facilities Department for the Snowden Administration Building Facade Project (ITB ANC-C-27-0001) dated September 3, 2026. This addendum addresses clarifications and responses to bidder questions regarding specifications and design details for the exterior siding replacement project. The submittal date and time remain unchanged at September 16, 2026 at 12:00 p.m. Key clarifications include: the liquid applied air barrier specifications are located in section 07-27-00, paragraph 2.01.B; unlabeled renderings must be clearly marked as obsolete concept drawings with the 100% bid set drawings governing the project; the SOA Seal location per Alternative #2 is shown on drawing A1/A2.2 with final dimensions to be determined; the existing concrete apron around the building perimeter does not require demolition and the new concrete wall base curb will be installed accordingly per detail A4.1; and the protection board at the planter area shall be based on CCW MiraDRAIN or equivalent product specifications.
This addendum does not modify pricing, contract award dates, or other substantive bid terms. It serves solely as a clarification document responding to questions submitted by plan holders including Cadence General, LLC and YH Constructors, ensuring all bidders have consistent and accurate information regarding design intent and specifications. The modifications become fully incorporated into the contract documents as if originally contained therein, with all other terms, conditions, and specifications of the original Invitation to Bid remaining unchanged.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ADDENDUM #8.pdf | ||
| ADDENDUM #5.pdf | ||
| ADDENDUM #7.pdf | ||
| ADDENDUM #3.pdf | ||
| ADDENDUM #6.pdf | ||
| ADDENDUM #10.pdf | ||
| 00 3000 Bid Schedule.pdf | ||
| ADDENDUM #11.pdf | ||
| Pre-bid Walkthrough Attenandees.pdf | ||
| ADDENDUM #2.pdf | ||
| ADDENDUM #4.pdf | ||
| Snowden Facade ITB ANC-C-27-0001.pdf | ||
| snowden-facade-repair_100pct_arch_specs.pdf | ||
| ADDENDUM #1.pdf | ||
| snowden-facade-repair_100pct_dwgs.pdf | ||
| snowden-facade_OPTION 4-R1 (003).pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM #9
Snowden Administration Building Facade Project No. ANC-C-27-0001
Date: September 3, 2026
To All Plan Holders:
The following changes, additions, clarifications, and/or deletions are hereby made a part of the Contract Documents for the above noted project, fully and completely as if the same were fully contained therein. All other terms, conditions, and specifications of the original Invitation to Bid remain unchanged.
This amendment must be acknowledged in the space provided on the Bid Schedule.
The Submittal Date and Time is UNCHANGED. It remains: September16, 2026 at 12:00 p.m
The modifications directed by this Addendum #9 are described on this page.
Addendum #9
Question from Dalton Flemming, Cadence General, LLC
1) Is there any specific product for the liquid applied vapor barrier on the CMU?
Response: The specifications for the liquid applied air barrier is located in the specifications under section 07- 27-00; paragraph 2.01.B
Questions from Nolan Youngmun, YH Constructors
1. There is a rendering that is unlabeled that is inconsistent with the new signage shown on A1/A2.2.
Please confirm which is accurate.
Response: If any original concept rendering is included in the posting, they need to be clearly named as such, and noted that anything they show may now be obsolete and that the 100% bid set drawings govern. Recently posted by addendum.
2. Please show the location of SOA Seal per Alt. 2 on the new signage detail A1/A2.2.
Response: Unclear, A1/A2.2 clearly shows seal. Final dims TBD since seal was not defined.
3. A2.1 shows a new concrete wall base curb round the working p;erimter of the building. At the site visit it was discovered that there is an existing concrete apron around the building that is ~12” wide. Is the new concrete wall base to be installed on top of this existing concrete apron or is the concrete apron to be sawcut and demolished?
Response: Details on A4.1 call out as (E) concrete strip and do not say to demolish it.
4. A3/A3.2 calls for protection board at the planter area. Please provide a specification/basis of design material.
Response: Protection/Drainage Board basis of design: CCW MiraDRAIN or similar.
END OF ADDENDUM #9
File details come from the government source that posted it. Updated .