Addendum__8.__QA_for_walk_on_11-5-25.pdf
PDF 1 MB Posted
- Attached to
- FPCM-CIM-I-001123-M001A-KM/ Complete Roof System
- Solicitation number
- 0000037690
- Issued by
- San Bernardino County, California
About this file
This addendum to an Invitation for Bid (IFB) is issued by the State of California Department of Corrections and Rehabilitation for a complete roof system project at the California Institution for Men in Chino, California. The solicitation number is FPCM-CIM-I-001123-M001-SW, and this represents Addendum 08, issued following a mandatory re-walk conducted on November 5, 2025, at 8:00 a.m. The project involves providing pictures from the roof walk and RFI 010 for the taper system as a substitute for a construction bulletin. Vendors must bid fire-rated expansion joints over occupied sections of the roof. Sealed bids are due by 2:00 p.m. on December 30, 2025, and must be delivered to Kim Morden, Procurement Officer, at the Sacramento office address or submitted electronically to Kim.Morden@cdcr.ca.gov. The bid opening is scheduled for 2:00 p.m. on the same date.
The addendum includes questions and answers from the re-walk, addressing clarifications on tapered insulation, structural slopes, membrane application methods, and sheet metal gutters containing lead. Responders are referred to RFI 010 for slope clarification and to the Construction Manager and/or Architect for submittal review responses regarding PVC membrane termination at drains and gutter elimination over occupied spaces. Bidders must comply with all IFB terms, conditions, and attachments and meet minimum specification requirements. The procurement authority derives from California Penal Code Sections 7000-7001. Bidders may claim California Certified Small Business preference, 25% small business subcontractor participation, or Disabled Veteran Business Enterprise incentives. All bidders must execute declarations of compliance with non-discrimination and labor relations requirements under penalty of perjury.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF CALIFORNIA
Department of Corrections and Rehabilitation
INVITATION FOR BID
Rev. 04/25/24
DUE DATE:
12/30/2025
Responses must be delivered to:
Procurement Support
Attn: Kim Morden, Procurement Officer
9838 Old Placerville Road, Suite B
Sacramento, CA 95827 by no later than 2:00 pm on the due date.
DELIVERY TIME ARO:
(After Receipt of Order)
Supplier name and address:
Contact:
Phone: ( ) Fax: ( )
Email: ________________________________
Solicitation No. Rev. # Date
FPCM-CIM-I-001123-M001-SW 08 12/22/2025
Ship to:
California Institution for Men
Attn: Russ Hovis, CS II
5405 Eucalyptus Avenue
Chino, CA 91710
ARE YOU CLAIMING PREFERENCE AS A
CALIFORNIA CERTIFIED SMALL BUSINESS?
Yes _________ No ________
ARE YOU A NON-SMALL BUSINESS
CLAIMING AT LEAST 25% SMALL BUSINESS
SUBCONTRACTOR PREFERENCE?
ARE YOU CLAIMING INCENTIVE AS A
DISABLED VETERAN BUSINESS ENTERPRISE
(DVBE) OR A NON-DVBE CLAIMING DVBE
SUBCONTRACTOR INCENTIVE?
Name (Print)
Title:
Signature:
➢ ________________________ Date: ________
Federal Employer Identification Number:
California Seller’s Permit Number:
Return bid to:
(Electronic Mail)
Department of Corrections & Rehabilitation
Procurement Support
Kim.Morden@cdcr.ca.gov
(Courier)
Department of Corrections & Rehabilitation
Procurement Support
Attn: Kim Morden, Procurement Officer
9838 Old Placerville Road, Suite B
Sacramento, CA 95827
Section 14838 et seq. Of the California government code requires that a 5% preference be given to bidders who qualify as a small business as a non-small business claiming 25% California certified small business participation for requirements see title 2, California code of regulations section 1896 et seq. The requirements for nonprofit veteran service agencies qualifying as a small business are contained in section 999.50 et sec. Of the military and veterans code.
The purchasing authority for this acquisition is under the jurisdiction of California penal code 7000 (a)(b) and 7001 meeting the criteria as part of the master plan. conferred by statute upon the department of general services and the department – (refer to document 11 of the procurement file).
DELCARATIONS UNDER PENALTY OF PERJURY; By signing above, with inclusion of the date of signature, the above signed bidder DECLARES UNDER PENALTY OF PERJURY under the laws of the State of
California as follows: (1) (STATEMENT OF COMPLIANCE). The above signed has complied with the non-discrimination program requirements of Government Code 12990 and Title 2, California Administrative Code
Section 8103, and such declaration is true and correct. (2) The National Labor Relations Board declaration set forth in Paragraph 43 of the General Provisions is true and correct. (3) If a claim is made for the small business preference, the information set forth within is true and correct.
This is a product only purchase for delivery to California Institution for Men. Authority for this purchase is per Penal Code Sections 7000-7001.
Product(s) must be quoted as described on this Invitation for Bid (IFB). Bids must be in accordance with IFB FPCM-CIM-I-001123-M001-SW and
Attachments I and II (plans and specifications). Bidders must meet the minimum requirements identified in the attached specification in order to be considered for award of the purchase order. A mandatory re-walk for this IFB solicitation will be conducted on November 5, 2025, at 8:00am.
ITEM
NO.
QTY UNIT DESCRIPTION UNIT PRICE EXTENSION
California Institution for Men
FPCM-CIM-I-001123-M001-SW
Addendum #08 has been provided subsequent to the mandatory re-walk conducted on 11/05/2025. Please see next page for additional information.
• PROVIDES PICTURES FROM ROOF WALK
• PROVIDES RFI 010 FOR THE TAPER SYSTEM, IN LIEU OF A CONSTRUCITON BULLETIN
• VENDORS ARE TO BID FIRE-RATED EXPANSION JOINTS OVER OCCUPIED SECTIONS OF ROOF
Both pages must be returned as part of your bid document. All other terms and conditions remain the same. The bid opening remains scheduled for 2:00pm, 12/30/2025.
IFB, Addendum 08
INVITATION FOR BID
CONTINUATION
Supplier Name: Solicitation No.
FPCM-CIM-I-001123-M001-SW
Rev.
ITEM
NO.
QTY UNIT DESCRIPTION UNIT PRICE EXTENSION
CIM Roof Re-Walk (11/05/2025) Q&A
1. QUESTION: Attached are rough shop drawings with tapered insulation and slopes as I understand. Please review and provide information for clarification. Please clarify how the slopes shown could have possibly been built. Are there missing lines where slopes change? I am unclear how the structural slopes could vary so much on the same roof plane without lines of separation.
Please clarify. I have added the two (2) mechanical penthouse roofs and the section from unit 4 with no tapered insulation; assume structural slope on all three (3) areas. Images 1-4 (attached) appear to be all on the same plane or roof surface.
RESPONSE: Refer to RFI 010.
2. QUESTION: Sarnafil recommends using PVC all the way through to the clad metal at the edge and around the drains and those areas can be done in liquid applied and tied into the PVC system in the area where liquid applied membrane is to be applied because of no drain clamp ring at the drain and, therefore, no way to terminate the PVC membrane there.
RESPONSE: CCM and/or A&E to respond in submittal review.
3. QUESTION: Regarding sheet metal gutters that have lead in them, IB recommends eliminating from over occupied space and extending all the way to the edge. Then, if they want gutters to hang at the edge and not on the occupied building space. Then have it trained on the outside instead of through the drains inside the building.
RESPONSE: CCM and/or A&E to respond in submittal review.
IFB, Addendum 08
*++,-./01+2� *++,-./01+2�
345/6++07�89:�*,;<1�=.,/50;>,61�?6+>0:�=3@@�A0B6<1:�@@@�@12+6+4+6<1:�=@C�D;<E0-+�F,/0:�A0G>,-0�A<<H2�ID;<B;,/�D.,20�J�K�LM� AN@O:�PJP�Q,+0:�JRSJSRPRT�F00707�89:�JRSRRSRPRT�==C�D;<EU�O�@KPPJJRV�*SW�D;<EU�O�RRKPXP�?6+>0:�A<<H�A0G>,-0/01+�K�D.,20�J�N,-6>6+9�8�
?.0�2><G02�,17�76;0-+6<12�<H�+.0�+,G0;07�292+0/�2.<G�7;,Y61B2�,;0�,--0G+,5>0�H<;�5<+.�+.0�Y02+�,17�0,2+�,;0,2�<H�+.0�N,-�8�Z16+�R�;<<H2U�?.020�2.<G�7;,Y61B2�.,[0�5001�2.,;07�Y6+.�+.0�-<124>+,1+\�]==*U�]==*�62�61�+.0�G;<-022�<H�G;<[6761B�-<;;0-+07�7;,Y61B2�H<;�+.020�,;0,2�,17�+.62�Y6>>�50�622407�,2�G,;+�<H�,�G01761B�-<12+;4-+6<1�54>>0+61�+<�,77;022�+.0�0;;<;2�,17�</6226<12�61�+.0�3NCK,GG;<[07�-<12+;4-+6<1�7<-4/01+2U� D>,1I2M�3.+SQ0+,6>:�RRKPXP�DBU*RUT\�̂091<+0�JV\�*RU_\�̂091<+0�JJ�3G0-6H6-,+6<1:�FS*�345/6++,>2:�FS*�3.<G�Q;,Y61B2:�Q4G<1+�3.<G�Q;,Y61B2��
D>,1I2M�3.+SQ0+,6>:�FS*�3G0-6H6-,+6<1:�FS*�345/6++,>2:�FS*�3.<G�Q;,Y61B2:�FS*�
D;<74-+�Q,+,:�FS*�C0/<�S�̀0++0;:�FS*�@/,B02:�FS*�a+.0;:�FS*� D;<74-+�Q,+,:�FS*�C0/<�S�̀0++0;:�FS*�@/,B02:�FS*�a+.0;:�FS*�Q,+0:�JRSJRSRPRT�A02G<120�89:�W6>001�?4/>61\�3016<;�*;-.6+0-+���*--022�=</G>6,1-0�A0[60Y�H<;�*++,-./01+:�F<+�A0b46;07�3NC�*GG;<[,>�H<;�*++,-./01+:�A0b46;07�
���������c��������d��$�����"��� �e�f�&�������&�g������� ==C�N60>7�62�;0b402+61B�+<�420�Q4G<1+�?,G0;07�392+0/U�==C��.,2�;0[60Y07�,17�[0;6H607�Q4G<1+�3.<G�Q;,Y61B2�,17�H617�+,G0;07�292+0/�,--0G+,5>0U�D>0,20�,7[620U�
?6/02+,/G�<H�A02G<120:�hN61,>�*SW�A02G<120i�
<̀-,+6<1:�D>,1�30+�RRKPXP\�N*=�8�ZF@?�R�
,-./01 23456789:;<5�6=988�>?�:9@
?A?B�C�D;88�?E:A7B?B @<8F6:FA?5?�GH7I<5:�0:F
A<D<9J�KL�@6;M�68<@?6�C
J;5;J7J6�96�5<:?B�<5�B A9N;5O3
K3PQ�>96?�89F?A�<5�988�A<
<D�9A?963�GRQSRM
R3TAA<N6�;5B;U9:?�B;A?U
:;<5�<D�68<@?3
V30:9OO?A�988�W<;5:�<5�?9
U=�>96?�89F?A63
L3X<<D;5O�Y<5:A9U:<A�6=
<78B�D;?8B�Z?A;DF�;56789:;
<5 89F<7:�@A;<A�:<�6=;@@;5O
�J9:?A;983 P3[9F<7:�;6�6U=?J9:;U�<
58F3�TB9@:�:<�D;?8B�U<5B
;:;<563
\3.9@?A?B�89F<7:�;8876:A
9:?B�<5�:=;6�BA9N;5O�A?]
7;A?6 :=?�;56:988?A�:<�A?76?�@9A
:;98�@;?U?6�<D�;56789:;<53
.=?A?D<A?̂�B;6U9AB;5O�J
<A?�:=95�=98D�<D�9�769>8?
@;?U?�<D�:9@?A?B�;56789:;
<5�95B_<A�<5?�]79A:?A�@ ;?U?
<D�D89:�;56789:;<5�N;88�A?6 78:�;5�9�6=<A:9O?�<D�J9:?
A;98 D<A�F<7A�6F6:?J3
�̀�abc��defaeghbid��̀ jkljbm��ak̀cjabn
��o����p���������o� �������� � ���� ������������q���
������ )�������� ������������� ���������o��� �����q��� � �� ����
� ���� ����������r�(r � &
��������o� �
����������o������
������o� !"��#$��%� ������stuv� wxyz {|}~ ���� ��������� ����� ����� ��������� � ¡¢
,-./01 23456789:;<5�6=988�>?�:9@
?A?B�C�D;88�?E:A7B?B @<8F6:FA?5?�GH7I<5:�0:F
A<D<9J�KL�@6;M�68<@?6�C
J;5;J7J6�96�5<:?B�<5�B A9N;5O3
K3PQ�>96?�89F?A�<5�988�A<
<D�9A?963�GRQSRM
R3TAA<N6�;5B;U9:?�B;A?U
:;<5�<D�68<@?3
V30:9OO?A�988�W<;5:�<5�?9
U=�>96?�89F?A63
L3X<<D;5O�Y<5:A9U:<A�6=
<78B�D;?8B�Z?A;DF�;56789:;
<5 89F<7:�@A;<A�:<�6=;@@;5O
�J9:?A;983 P3[9F<7:�;6�6U=?J9:;U�<
58F3�TB9@:�:<�D;?8B�U<5B
;:;<563
\3.9@?A?B�89F<7:�;8876:A
9:?B�<5�:=;6�BA9N;5O�A?]
7;A?6 :=?�;56:988?A�:<�A?76?�@9A
:;98�@;?U?6�<D�;56789:;<53
.=?A?D<A?̂�B;6U9AB;5O�J
<A?�:=95�=98D�<D�9�769>8?
@;?U?�<D�:9@?A?B�;56789:;
<5�95B_<A�<5?�]79A:?A�@ ;?U?
<D�D89:�;56789:;<5�N;88�A?6 78:�;5�9�6=<A:9O?�<D�J9:?
A;98 D<A�F<7A�6F6:?J3
�̀�abc��defaeghbid��̀ jkljbm��ak̀cjabn
��*����o���������*� �������� � ���� ������������p���
������ q�������� ������������� ���������*��� �����p��� � �� ���� q����������
� ����� ����������r�+r � &
������stuvwxyz {|}~���� ������
| Addendum 08, Question 1, Image 1-4.pdf |
| Addendum 08, Question 1, Image 1.pdf |
| Addendum 08, Question 1, Image 2.pdf |
| Addendum 08, Question 1, Image 3.pdf |
| Addendum 08, Question 1, Image 4.pdf |
File details come from the government source that posted it. Updated .