Addendum #4 Form.docx
DOCX document 22 KB Posted
- Attached to
- CCTV SYSTEM CORRECTIVE MAINTENANCE
- Solicitation number
- ARFQ-0512-WSH2600000002-5
- Issued by
- Lewis County, West Virginia
About this file
This document is an Addendum (#4) for Solicitation Number WSH2600000002, issued by a state government procurement entity. The addendum's primary purpose is to attach the pre-bid sign-in sheet for the solicitation and provide vendors with an opportunity to acknowledge receipt of the addendum. Vendors are instructed that failure to acknowledge the addendum may result in bid disqualification, and they must complete an Addendum Acknowledgement Form that requires company information, an authorized signature, and the date of acknowledgment.
The addendum includes standard terms and conditions, specifically noting that all previous solicitation provisions remain in effect and that only written addenda are considered binding. The document provides a structured approach for vendors to confirm their receipt of the addendum, with checkboxes for multiple potential addenda (numbered 1-10). Vendors are explicitly warned that verbal representations made during discussions are not binding, and only written, official addenda can modify the original solicitation terms.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum #2.docx | DOCX document | |
| Final_ARFQ_0512_WSH2600000002_5_WV_ARFQ_FORM.PDF | ||
| Final_ARFQ_0512_WSH2600000002_2_WV_ARFQ_FORM.PDF | ||
| TCA.pdf | ||
| Addendum #1.docx | DOCX document | |
| Addendum #3 Form.docx | DOCX document | |
| OSA pAffidavit.pdf | ||
| Pre-Bid Sign-In Sheet.pdf | ||
| OSAFederalFundsContractClauseAddendum.pdf | ||
| Final_ARFQ_0512_WSH2600000002_1_WV_ARFQ_FORM.PDF | ||
| WV36.pdf | ||
| Final_ARFQ_0512_WSH2600000002_3_WV_ARFQ_FORM.PDF | ||
| Addendum #1 Form.docx | DOCX document | |
| Addendum #3.docx | DOCX document | |
| WV43.pdf | ||
| RFQ Specifications.docx | DOCX document | |
| Final_ARFQ_0512_WSH2600000002_4_WV_ARFQ_FORM.PDF | ||
| Addendum #2 Form.docx | DOCX document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NUMBER: WSH2600000002
Addendum Number: 4 The purpose of this addendum is to modify the solicitation identified as WSH2600000002 (“Solicitation”) to reflect the change(s) identified and described below.
Applicable Addendum Category:
[ ] Modify bid opening date and time
[ ] Modify specifications of product or service being sought
[ ] Attachment of vendor questions and responses
[ X ] Attachment of pre-bid sign-in sheet
[ ] Correction of error
[ ] Other
Description of Modification to Solicitation: To attach the pre-bid sign-in sheet.
Additional Documentation: Documentation related to this Addendum (if any) has been included herewith as Addendum #1 and is specifically incorporated herein by reference.
Terms and Conditions:
1. All provisions of the Solicitation and other addenda not modified herein shall remain in full force and effect.
2. Vendor should acknowledge receipt of all addenda issued for this Solicitation by completing an Addendum Acknowledgment, a copy of which is included herewith. Failure to acknowledge addenda may result in bid disqualification. The addendum acknowledgement should be submitted with the bid to expedite document processing.
ADDENDUM ACKNOWLEDGEMENT FORM
SOLICITATION NO.: WSH2600000002
Instructions: Please acknowledge receipt of all addenda issued with this solicitation by completing this addendum acknowledgment form. Check the box next to each addendum received and sign below. Failure to acknowledge addenda may result in bid disqualification.
Acknowledgment: I hereby acknowledge receipt of the following addenda and have made the necessary revisions to my proposal, plans and/or specification, etc.
Addendum Numbers Received:
(Check the box next to each addendum received)
[ ] Addendum No. 1 [ ] Addendum No. 6
[ ] Addendum No. 2 [ ] Addendum No. 7
[ ] Addendum No. 3 [ ] Addendum No. 8
[ ] Addendum No. 4 [ ] Addendum No. 9
[ ] Addendum No. 5 [ ] Addendum No. 10
I understand that failure to confirm the receipt of addenda may be cause for rejection of this bid. I further understand that that any verbal representation made or assumed to be made during any oral discussion held between Vendor’s representatives and any state personnel is not binding. Only the information issued in writing and added to the specifications by an official addendum is binding.
Company
Authorized Signature
| ____________________________________________ | |
| Date |
NOTE: This addendum acknowledgement should be submitted with the bid to expedite document processing.
File details come from the government source that posted it. Updated .