This document is Addendum #4 to EWEB ITB 22-069-PW, a Request for Proposals (RFP) for the Oak Grove Lake Harriet Pole Replacement project in Clackamas County and Oregon City, Oregon. The addendum provides additional information and clarifies that there are no steel poles in the project design. It also states that the contractor is responsible for their own equipment storage. The closing date for the RFP remains May 17, 2022 and this addendum constitutes a material change to the original solicitation.
The RFP is for the replacement of damaged transmission poles in the Clackamas County area. Contractors are responsible for delivering all materials and equipment to the staging yard near the job site, and then transporting it to the structure locations. Questions should be directed to the Purchasing Analyst, Sandra Hahn, at sandra.hahn@eweb.org.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
May 10, 2022
ADDENDUM # 4
Title: Oak Gove Lake Harriet Pole Replacement
RFP # 22-069-PW
This addendum adds additional information to the original ITB document.
QUESTION & ANSWER
Q1. Do you have cut sheets for the steel poles? We need to know the weights, how many pieces the poles are in and if they are pre-drilled.
A2. There are no steel poles in the design so if you are reading that anywhere in the bid document, please let me know. The following is from the BOM, pdf page 159 DF for Douglas Fir:
Q2. Are we to assume that all the material and poles will be delivered to our staging yard somewhere near the job sit? So, we would only be responsible for moving that material from that site out to the structure locations?
A2. The Contractor is generally responsible for their equipment storage.
CLOSING DATE AND TIME
The closing date remains: May 17, 2022.
This addendum constitutes a MATERIAL CHANGE to the Request for Proposals.
Addendum prepared by:
Sandra Hahn Purchasing Analyst
File details come from the government source that posted it. Updated .