Addendum #3 Summary
This is Addendum #3 to a solicitation issued by the West Virginia Department of Environmental Protection (WVDEP) for the Buffalo Coal AMD Treatment Facility project in Grant and Tucker County, West Virginia, under Agency Solicitation Number ARFQ DEP2200000011. The addendum modifies specifications, provides clarifications, and includes revised plan sheets and bid schedules. The project involves construction of an acid mine drainage (AMD) treatment facility with seven pump stations (numbered 1-7), clarifier systems, and associated infrastructure. Key modifications include removal of the Site Entrance Security bid item and Commodity Line Item 2; clarification that Dominion Energy provides guard services and trailer with electric power; confirmation that directional drilling sizes are per plan specifications rather than the original bid schedule; and direction to use R-19 roof and wall insulation per specifications rather than the alternative R-30/R-20 values shown on drawings. The addendum incorporates responses to pre-bid conference questions conducted on August 24, 2021, addressing equipment manufacturer approvals, material specifications, and supplier scope definitions.
The revised Mobilization and Demobilization specification requires a lump-sum bid that cannot exceed 1% of the total project amount and includes the contractor's construction trailer and security trailer placement near the treatment plant site. The specification establishes a two-phase payment structure with 50% released with the first estimate (no less than 15 days after work begins) and the remaining 50% upon work acceptance. All pump station designs follow the PresMon Precast basis of design, with specifications clarified regarding concrete coatings (coal tar epoxy and xypex treatments) and equipment scope (Brentwoods supplying only clarifier tube settlers and sludge removal systems, excluding pH sensors and sludge blanket level indicators). The addendum requires contractors to provide two spare true union ball valves for 2", 3", and 4" sizes, permits field adjustment of pump stations, and incorporates seven revised pump station plan sheets with detailed materials lists and elevation specifications.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AGENCY SOLICITATION NUMBER – ARFQ DEP2200000011
Addendum Number: __3__
The Purpose of this addendum is to modify the solicitation identified as (“Agency Solicitation”) to reflect the change(s) identified and described below.
Applicable Addendum Category:
[] Modify bid opening date and time
[X] Modify specification of product or service being sought
[X] Attachment of vendor questions and responses
[] Attachment of pre-bid sign-in sheet
[X] Correction of error
[X] Other
Description of Modification to Solicitation:
This Addendum issued to publish and distribute the attached documentation to the vendor community.
1. Questions & answers
2. Clarifications, notes, & changes
3. Revised specifications
4. Revised Plan Sheet
5. Revised Bid Schedule
Additional Documentation: Documentation related to this Addendum (if any) has been included herewith as Attachment A and is specifically incorporated herein by reference.
Terms and Conditions:
1. All provision of the Agency Solicitation and other addenda not modified herein shall remain in full force and effect.
2. Vendor should acknowledge receipt of all addenda issued for this Agency Solicitation by completing an Addendum Acknowledgement, a copy of which is included herewith. Failure to acknowledge addenda may result in bid disqualification. The addendum acknowledgement should be submitted with the bid to expedite document processing.
Addendum #3 Buffalo C1 AMD Treatment Facility
Permits S-2001-86, S-52-80, S-2003-03, S-53-80, S-2001-87
ARFQ DEP 22*11
The following are questions that were identified at the Pre-Bid Conference (PBC) conducted on-site on August 24, 2021, questions provided to the WVDEP Procurement, Project Clarifications, Project Notes, Project changes, Technical Specification Changes, and Project Plan Changes. The answers and clarifications provided herein take precedence over verbal answers at the PBC and previously provided specifications and descriptions provided in the Solicitation should there be any conflicts between the two.
QUESTIONS
Q1. Per Addendum 2, Dominion Energy is providing the guard Services. Nothing is mentioned about the Guard trailer. Is this still to be provided? Dominion reps have not returned any calls, possibly you can clarify on this. Also, due to the extremely volatile market prices and extreme volatility of pipe itself and large quantities, can we bill for stored materials?
A1. Guard Services and trailer will be provided by Dominion Energy. Commodity Line Item 2 has been removed from the Bid Schedule with this Addendum. You cannot bill for stored materials, however in the schedule of values, a percentage may be attributed to the furnished materials/items brought onsite.
Q2. Per addendum 2, the quantities and sizes of the Directional drilling have changed but there are not any new drawings to reflect where the bores are. Is this something that can be provided?
A2. The directional drilling sizes that are listed on the plans, are the correct size, the original sizes on the Bid Schedule were not correct.
Q3. Can Chief Buildings be approved as an acceptable manufacturer for the PEMB? Chief
Buildings has been manufacturing metal buildings since 1966, they are AISC Certified, IAS Accredited and a member of MBMA.
A3. Technical Specification 12-05 provides a Basis of Design, which is defining the minimum quality acceptable for the project. In the event the Contractor would like to use something other than the Basis of Design, the Contractor shall follow the procedure outlined in Special Provision Section 0-13 Engineer Approved Equal.
Q4. Spec Section 12.05 1.2/C/5-6 calls for FM Global, is FM Global required on this project?
A4. No
Q5. Spec Section 12.05 2.1/J calls for R-19 roof insulation and R-19 wall insulation while
Drawing SB-1 states R-30 roof insulation and R-20 wall insulation please clarify which is correct.
A5. Use the R-19 roof insulation and R-19 wall insulation that is listed in the Specification.
Addendum #2
CLARIFICATIONS, NOTES, AND CHANGES
1. Changes have been made in the Pump Stations. The Basis of Design for all Pump
Stations will be the Design provided by PMP, Pres Mon Precast.
2. Bid Item for Site Entrance Security has been removed.
3. Technical Specification 12-73 Precast Concrete Structures & Manholes does have the coal tar epoxy and xypex listed in the specification.
4. Technical Specification 12-01 Cast in Place Concrete does have the xypex listed in the specification but does not say coal tar epoxy. This specification has Engineer approved materials listed in place of the CS-55 or coal tar epoxy. WVDEP will approve the CS-55 or coal tar epoxy for the painting of the inside of the clarifiers or any other cast in place concrete that comes in contact with AMD.
5. Brentwoods scope of supply will be for two (2) clarifier tube settlers and sludge removal system. Brentwoods scope of supply will not include the pH sensors or sludge blanket level indicator as stated on page 1 - Section 12-45.1.0.1.1.B of the specification.
6. All Pump Stations may be field adjusted as needed.
7. Provide two spare true union ball valves for size valve in the Pump Stations. This would be for the 2”, 3” and 4” valves.
REVISED SPECIFICATIONS
1. Revised Technical Specification 1-0 Mobilization and Demobilization
REVISED PLAN SHEETS
Added Plan Sheet for Pump Station 1.
Added Plan Sheet for Pump Station 2.
Added Plan Sheet for Pump Station 3.
Added Plan Sheet for Pump Station 4.
Added Plan Sheet for Pump Station 5.
Added Plan Sheet for Pump Station 6.
Added Plan Sheet for Pump Station 7.
REVISED BID SCHEDULE
1. Line Item 2, Site Entrance Security is now a “No Bid Line Item”
Buffalo Coal Permits S-2001-86, S-5280, S-2003-03, S-5380, S-2011-87
1.0 - 1 Mobilization & Demobilization
1-0 MOBILIZATION AND DEMOBILIZATION
1.0 DESCRIPTION
This work shall consist of the performance of construction preparatory operations, including the movement of personnel and equipment to the project sites and for the establishment of the Contractor’s offices, buildings and other facilities including the construction of all temporary access roads as necessary to begin work on a substantial phase of the contract. The location of Contractor’s office to be established shall be approved by WVLSC. This specification shall also include all demobilization activities involving the removal from the sites of all plant, equipment, supplies and personnel after completion of the work including cleanup of all rubbish and waste materials generated during the construction of this project; and restoration of any damage to existing site improvements resulting from the
Contractor’s activities at the site; and installation of the project sign. It is anticipated that the contractor’s trailer will be located near the proposed treatment plant site, subject to the approval of the WVDEP.
Additionally, a security trailer is anticipated along the C1 road near the existing entry gate. Security will be arranged by the contractor through the Mount Storm Power
Plant operators (Dominion Energy). Dominion Energy are to provide electric power to the security trailer. The contractor shall be responsible for providing the trailer and covering the labor and wages for the security guard in conformance with the requirements of Mount Storm/Dominion Energy.
1.1 PROJECT SIGN
The work to be performed under this Section consists of providing all labor, material and equipment necessary to install a project sign as indicated on the detail included herein and as specified herein.
2.0 MATERIALS
Paint. Paint for the project sign shall be one (1) coat Exterior-Grade Wood Primer- Sealer, and two (2) coats Exterior-Grade Enamel by Glidden or equivalent.
Wood. Sign face shall be ¾” X 4’ X 8’ Marine Exterior plywood, and posts and cross braces shall be treated.
Hardware. All hardware shall be manufactured from good, commercial-quality material and be rust resistant such as galvanized coated.
3.0 EXECUTION
Project Sign. The signboard shall be cut to the dimensions shown on the details herein. The sign shall be painted with one (1) coat of primer and two (2) coats of white enamel. All exterior cut edges shall be smooth sanded prior to painting. All edges shall be double primed. The letters, border and strips shall be painted as shown on the detail drawing.
The Contractor shall bolt the sign to posts and provide required cross bracing. The posts and sign shall be erected and posts set in gravel base, as shown on the drawings. One (1) sign is required and is to be located at the direction of WVLSC.
4.0 METHOD OF CONSTRUCTION
The Contractor shall comply with Special Provisions Section 0-0 Project Information
Section 5.0 Schedule of Work. The Contractor shall provide adequate supervision, labor, tools, equipment, and materials to prosecute the work energetically and complete the work within the time specified. The Contractor shall demonstrate to the
Engineer that sufficient sized and quantity of equipment shall be mobilized to ensure this Project is completed within specified time frames or sooner. The required
Schedule (required in Special Provisions Section 0-0 Project Information Section 5.0
Schedule of Work) shall include a list of said properly sized and quantity of equipment, along with projected earth moving and excavation capabilities as well as hauling, and grading rates to complete the tasks herein specified within stated time frames. The Contractor shall have equipment of suitable size and number to execute the required work to completion within the specified time frame. If in the opinion of the Engineer sufficiently sized and quantity of equipment is not being mobilized, he shall request and the Contractor shall supply properly sized and quantity of
Contractor owned or Contractor rented equipment.
The Contractor shall comply with Standard Specifications Section 13.3 Safety.
The Contractor will be required to comply with all WVDOT rules, regulations, weight limits, and speed limits.
5.0 METHOD OF MEASUREMENT
The method of measurement will be per lump sum.
5.1 BASIS OF PAYMENT
The bid for Mobilization and Demobilization shall be a lump sum and cannot be more than 1% of the “TOTAL AMOUNT BID” for the project, and shall include all costs as descried herein including the contractors construction trailer and a security trailer for the site security guard. The contractor must arrange for electric power to
1.0 - 2 Mobilization & Demobilization his construction trailer. Dominion Energy is to provide electric power to the security trailer. Partial payments for Mobilization and Demobilization will be as follows:
A. One-half of the amount bid will be released to the Contractor with the first estimate payable, not less than 15 days after the start of work at the project site.
B. The final one-half of the amount bid shall be released with the estimate payable after the work is accepted by the WVLSC.
C. Nothing herein shall be construed to limit or preclude partial payments otherwise provided for by the Contract. No deduction will be made, nor will any increase be made, in the lump sum mobilization and demobilization item amount regardless of decreases or increases in the final total contract amount or for any other cause.
5.2 PAY ITEM
“Mobilization and Demobilization” per lump sum. Cannot be more than 1% of the total amount bid of the project.
END OF SECTION
1.0 - 3 Mobilization & Demobilization
4" FL ADT
3381.50
3373.08
3372.00
4" Ø
X
'-8 " S
S
PI
PE
5S
0- 2-
AB
3363.33
" Ø
X
2' -6
" P
UM
P
CA
SI
NG
8'-0" 9'-4"
10'-8"
8'-0"9'-4"10'-8"
4'-0" 5'-0"
6'-0"
9'-8" 10'-8"
11'-8"
5'-0" 6'-0"
7'-0"
4'-0" 5'-0"
6'-0"
5'-0"
17'-2"±
INTERIOR MATERIALS
ID DESCRIPTION
A 3" SS VENT PIPE
B 3" SS 90° ELBOW
C 3" GREEN VENT
D 14" PUMP CASING
E PUMP HOLD DOWN
F 4" SS 90° WELDED PIPE PUMP CONNECTION
G 4" X 4" METRAFLEX FLEXIBLE CONNECTION
H 4" HDPE PIPE
I 4" SS DISCHARGE PIPE
J 12" INFLUENT PIPE
K 4" TRUE UNION BALL VALVE
L PIPE GASKET / BOOT
M 10" HDPE PIG LAUNCH WYE ASSEMBLY
N 8" SS PLUG VALVE
O 4" X 4" X 4" HDPE WYE
P 8" HDPE FORCE MAIN
Q ACCESS LADDER WITH SAFETY HANDLE
R GRATING
S FLOOR DRAIN
T 1" SS BALL VALVE
U SS PIPE SUPPORTS
V 12" OVERFLOW PIPE
W OPENING FOR BACK UP FLOAT
X OPENING FOR TRANSDUCER
C
A
B
R
D
E F G
I
V
J
KH OL L L
L
M N
O
P
E F G H KL NM
72" X 72" HATCH
W/ SAFETY GRATING
36" X 36" HATCH
W/ SAFETY GRATING
QQQC A JR S S
T
T
UU SS
5'-0"
60" X 36" HATCH
W/ SAFETY GRATING
V
W X
P
PIG LAUNCH VAULTVALVE VAULTWET WELL
PresMon Precast, LLC
Office:
170 Old Cheat Road Morgantown, WV
Plant:
490 MillerMine Road Reedsville, WV
PUMP STATION NO. 1
PLAN VIEW1
PUMP STATION NO. 1
PROFILE VIEW2
AutoCAD SHX Text
ESTCODE
AutoCAD SHX Text
ESTCODE
AutoCAD SHX Text
ESTCODE
AutoCAD SHX Text
ESTCODE
AutoCAD SHX Text
ESTCODE
AutoCAD SHX Text
ESTCODE
AutoCAD SHX Text
ESTCODE
AutoCAD SHX Text
ESTCODE
AutoCAD SHX Text
PMP
AutoCAD SHX Text
AutoCAD SHX Text 21-138
AutoCAD SHX Text
PROJECT NUMBER
AutoCAD SHX Text
SHT. OF
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
DRAWING TITLE:
AutoCAD SHX Text
PROJECT TITLE:
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
DESIGN BY:
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
KEN WAUGERMAN
AutoCAD SHX Text
REV.
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text 1/2" = 1'-0"
AutoCAD SHX Text
BUFFALO COAL GRANT & TUCKER COUNTY, WV
AutoCAD SHX Text
PUMP STATION NO. 1
A079377 Text Box
3345.08
3344.00
3352.98
0S
-2
-A B
3" Ø
X
'-0 " S
S
PI
PE
" Ø
X
1' -8
" P
UM
P
CA
SI
NG
3336.00
3" FL ADT 3" FL ADT3" FL ADT
6'-0"
7'-0" 8'-4"
4'-0" 5'-0" 6'-0"
11'-0" 12'-0" 13'-0"
4'-0" 5'-0"
6'-0" 5'-0"
6'-0" 7'-0"
5'-0" 5'-0"
C
A
B
R
D
E F G
I
V
J
KH OL L L
L
M N
O
P
E F G H KL NMQQQ
C
A
JR S S
T
T
UU SS
V
W X
P
INTERIOR MATERIALS
ID DESCRIPTION
A 3" SS VENT PIPE
B 3" SS 90° ELBOW
C 3" GREEN VENT
D 12" PUMP CASING
E PUMP HOLD DOWN
F 3" SS 90° WELDED PIPE PUMP CONNECTION
G 3" X 3" METRAFLEX FLEXIBLE CONNECTION
H 3" HDPE PIPE
I 3" SS DISCHARGE PIPE
J 12" INFLUENT PIPE
K 3" TRUE UNION BALL VALVE
L PIPE GASKET / BOOT
M 12" HDPE PIG LAUNCH WYE ASSEMBLY
N 10" SS PLUG VALVE
O 3" X 3" X 3" HDPE WYE
P 10" HDPE FORCE MAIN
Q ACCESS LADDER WITH SAFETY HANDLE
R GRATING
S FLOOR DRAIN
T 1" SS BALL VALVE
U SS PIPE SUPPORTS
V 12" OVERFLOW PIPE
W OPENING FOR BACK UP FLOAT
X OPENING FOR TRANSDUCER
17'-0"±
72" X 72" HATCH
W/ SAFETY GRATING
36" X 36" HATCH
W/ SAFETY GRATING
48" X 36" HATCH
W/ SAFETY GRATING
PIG LAUNCH VAULTVALVE VAULTWET WELL
6'-0"
7'-0"
8'-4"
PresMon Precast, LLC
Office:
170 Old Cheat Road Morgantown, WV
Plant:
490 MillerMine Road Reedsville, WV
PUMP STATION NO. 2
PLAN VIEW1
PUMP STATION NO. 2
PROFILE VIEW2
AutoCAD SHX Text
PMP
AutoCAD SHX Text
AutoCAD SHX Text
PROJECT NUMBER
AutoCAD SHX Text
SHT. OF
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
DRAWING TITLE:
AutoCAD SHX Text
PROJECT TITLE:
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
DESIGN BY:
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
KEN WAUGERMAN
AutoCAD SHX Text
REV.
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text 1/8" = 1'-0"
AutoCAD SHX Text 21-138
AutoCAD SHX Text
BUFFALO COAL GRANT & TUCKER COUNTY, WV
AutoCAD SHX Text
PUMP STATION NO. 2
A079377 Text Box
A079377 Text Box
3347.90
3355.81
0S
-2
3" Ø
X
'-2 " S
S
PI
PE 12
" Ø
X
'-8 " P
UM
P
CA
SI
NG
3341.60
3" FL ADT
3" FL ADT
5'-0" 5'-0"
6'-0"
7'-0" 8'-4"
4'-0" 5'-0" 6'-0"
9'-0" 10'-0" 11'-0"
4'-0" 5'-0"
6'-0" 5'-0"
6'-0" 7'-0"
C
A
B
R
D
E F G
I
J KH OL L L
L
M N
O
P
E F G H KL NMQQQ
C
A
J
R S S
T
T
UU SS
W X
P
INTERIOR MATERIALS
ID DESCRIPTION
A 3" SS VENT PIPE
B 3" SS 90° ELBOW
C 3" GREEN VENT
D 12" PUMP CASING
E PUMP HOLD DOWN
F 3" SS 90° WELDED PIPE PUMP CONNECTION
G 3" X 3" METRAFLEX FLEXIBLE CONNECTION
H 3" HDPE PIPE
I 3" SS DISCHARGE PIPE
J 12" INFLUENT PIPE
K 3" TRUE UNION BALL VALVE
L PIPE GASKET / BOOT
M 6" HDPE PIG LAUNCH WYE ASSEMBLY
N 4" TRUE UNION BALL VALVE
O 3" X 3" X 3" HDPE WYE
P 4" HDPE FORCE MAIN
Q ACCESS LADDER WITH SAFETY HANDLE
R GRATING
S FLOOR DRAIN
T 1" SS BALL VALVE
U SS PIPE SUPPORTS
V N/A
W OPENING FOR BACK UP FLOAT
X OPENING FOR TRANSDUCER
14'-21 2"±
72" X 72" HATCH
W/ SAFETY GRATING
36" X 36" HATCH
W/ SAFETY GRATING
48" X 36" HATCH
W/ SAFETY GRATING
PIG LAUNCH VAULTVALVE VAULTWET WELL
6'-0"
7'-0"
8'-4"
PresMon Precast, LLC
Office:
170 Old Cheat Road Morgantown, WV
Plant:
490 MillerMine Road Reedsville, WV
PUMP STATION NO. 3
PLAN VIEW1
PUMP STATION NO. 3
PROFILE VIEW2
AutoCAD SHX Text 3"Pipe
AutoCAD SHX Text 3"Pipe
AutoCAD SHX Text 3"Pipe
AutoCAD SHX Text 3"Pipe
AutoCAD SHX Text
PMP
AutoCAD SHX Text
AutoCAD SHX Text
PROJECT NUMBER
AutoCAD SHX Text
SHT. OF
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
DRAWING TITLE:
AutoCAD SHX Text
PROJECT TITLE:
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
DESIGN BY:
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
KEN WAUGERMAN
AutoCAD SHX Text
REV.
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text 1/8" = 1'-0"
AutoCAD SHX Text 21-138
AutoCAD SHX Text
BUFFALO COAL GRANT & TUCKER COUNTY, WV
AutoCAD SHX Text
PUMP STATION NO. 3
A079377 Text Box
A079377 Text Box
3363.10
3371.50
0S
-3
-B B
3" Ø
X
'-4 " S
S
PI
PE
" Ø
X
'-8 " P
UM
P
CA
SI
NG
3356.80
5'-0" 5'-0"
6'-0"
7'-0" 8'-4"
4'-0" 5'-0" 6'-0"
9'-0" 10'-0" 11'-0"
4'-0" 5'-0"
6'-0" 5'-0"
6'-0" 7'-0"
C
A
B
R
D
E F G
I
J KH OL L L
L
M N
O
P
E F G H KL NMQQQ
C
A
J
R S S
T
T
UU SS
W X
P
INTERIOR MATERIALS
ID DESCRIPTION
A 3" SS VENT PIPE
B 3" SS 90° ELBOW
C 3" GREEN VENT
D 12" PUMP CASING
E PUMP HOLD DOWN
F 3" SS 90° WELDED PIPE PUMP CONNECTION
G 3" X 3" METRAFLEX FLEXIBLE CONNECTION
H 3" HDPE PIPE
I 3" SS DISCHARGE PIPE
J 12" INFLUENT PIPE
K 3" TRUE UNION BALL VALVE
L PIPE GASKET / BOOT
M 8" HDPE PIG LAUNCH WYE ASSEMBLY
N 6" SS PLUG VALVE
O 3" X 3" X 3" HDPE WYE
P 6" HDPE FORCE MAIN
Q ACCESS LADDER WITH SAFETY HANDLE
R GRATING
S FLOOR DRAIN
T 1" SS BALL VALVE
U SS PIPE SUPPORTS
V N/A
W OPENING FOR BACK UP FLOAT
X OPENING FOR TRANSDUCER
14'-83 8"±
72" X 72" HATCH
W/ SAFETY GRATING
36" X 36" HATCH
W/ SAFETY GRATING
48" X 36" HATCH
W/ SAFETY GRATING
PIG LAUNCH VAULTVALVE VAULTWET WELL
6'-0"
7'-0"
8'-4"
PresMon Precast, LLC
Office:
170 Old Cheat Road Morgantown, WV
Plant:
490 MillerMine Road Reedsville, WV
PUMP STATION NO. 4
PLAN VIEW1
PUMP STATION NO. 4
PROFILE VIEW2
AutoCAD SHX Text
PMP
AutoCAD SHX Text
AutoCAD SHX Text
PROJECT NUMBER
AutoCAD SHX Text
SHT. OF
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
DRAWING TITLE:
AutoCAD SHX Text
PROJECT TITLE:
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
DESIGN BY:
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
KEN WAUGERMAN
AutoCAD SHX Text
REV.
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text 21-138
AutoCAD SHX Text
BUFFALO COAL GRANT & TUCKER COUNTY, WV
AutoCAD SHX Text
PUMP STATION NO. 4
A079377 Text Box
A079377 Text Box
3310.60
3319.80
5S
0-
4"
Ø X
'-1
0" S
S
PI
PE
3304.30
5'-0" 5'-0"
6'-0"
7'-0" 8'-4"
4'-0" 5'-0" 6'-0"
9'-8" 10'-8" 11'-8"
4'-0" 5'-0"
6'-0" 5'-0"
6'-0" 7'-0"
C
A
B
R
D
E F G
I
J
KH OL L L
L
M N
O
P
E F G H KL NMQQQ
C
A
JR S S
T
T
UU SS
W X
P
INTERIOR MATERIALS
ID DESCRIPTION
A 3" SS VENT PIPE
B 3" SS 90° ELBOW
C 3" GREEN VENT
D 14" PUMP CASING
E PUMP HOLD DOWN
F 4" SS 90° WELDED PIPE PUMP CONNECTION
G 4" X 4" METRAFLEX FLEXIBLE CONNECTION
H 4" HDPE PIPE
I 4" SS DISCHARGE PIPE
J 12" INFLUENT PIPE
K 4" TRUE UNION BALL VALVE
L PIPE GASKET / BOOT
M 10" HDPE PIG LAUNCH WYE ASSEMBLY
N 8" SS PLUG VALVE
O 4" X 4" X 4" HDPE WYE
P 8" HDPE FORCE MAIN
Q ACCESS LADDER WITH SAFETY HANDLE
R GRATING
S FLOOR DRAIN
T 1" SS BALL VALVE
U SS PIPE SUPPORTS
V N/A
W OPENING FOR BACK UP FLOAT
X OPENING FOR TRANSDUCER
15'-6"±
72" X 72" HATCH
W/ SAFETY GRATING
36" X 36" HATCH
W/ SAFETY GRATING
48" X 36" HATCH
W/ SAFETY GRATING
PIG LAUNCH VAULTVALVE VAULTWET WELL
6'-0"
7'-0"
8'-4"
PresMon Precast, LLC
Office:
170 Old Cheat Road Morgantown, WV
Plant:
490 MillerMine Road Reedsville, WV
PUMP STATION NO. 5
PLAN VIEW1
PUMP STATION NO. 5
PROFILE VIEW2
AutoCAD SHX Text
ESTCODE
AutoCAD SHX Text
ESTCODE
AutoCAD SHX Text
ESTCODE
AutoCAD SHX Text
ESTCODE
AutoCAD SHX Text
ESTCODE
AutoCAD SHX Text
ESTCODE
AutoCAD SHX Text
ESTCODE
AutoCAD SHX Text
ESTCODE
AutoCAD SHX Text
PMP
AutoCAD SHX Text
AutoCAD SHX Text
PROJECT NUMBER
AutoCAD SHX Text
SHT. OF
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
DRAWING TITLE:
AutoCAD SHX Text
PROJECT TITLE:
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
DESIGN BY:
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
KEN WAUGERMAN
AutoCAD SHX Text
REV.
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text 21-138
AutoCAD SHX Text
BUFFALO COAL GRANT & TUCKER COUNTY, WV
AutoCAD SHX Text
PUMP STATION NO. 5
A079377 Text Box
A079377 Text Box
6"
FL A
DT
3316.30
3324.11
0S
-3
3" Ø
X
'-5 " S
S
PI
PE12
" Ø
X
'-8 " P
UM
P
CA
SI
NG
3309.90
5'-0" 5'-0"
4'-0" 5'-0"
6'-0" 5'-0"
6'-0" 7'-0"
C
A
B
R
D
E F G
I
JK HO LLL
L
MN
O
P
EFGHK LN M Q Q Q
C
A
J
RSS
T
T
U US S
W X
P
INTERIOR MATERIALS
ID DESCRIPTION
A 3" SS VENT PIPE
B 3" SS 90° ELBOW
C 3" GREEN VENT
D 12" PUMP CASING
E PUMP HOLD DOWN
F 3" SS 90° WELDED PIPE PUMP CONNECTION
G 3" X 3" METRAFLEX FLEXIBLE CONNECTION
H 3" HDPE PIPE
I 3" SS DISCHARGE PIPE
J 12" INFLUENT PIPE
K 3" TRUE UNION BALL VALVE
L PIPE GASKET / BOOT
M 6" HDPE PIG LAUNCH WYE ASSEMBLY
N 4" TRUE UNION BALL VALVE
O 3" X 3" X 3" HDPE WYE
P 4" HDPE FORCE MAIN
Q ACCESS LADDER WITH SAFETY HANDLE
R GRATING
S FLOOR DRAIN
T 1" SS BALL VALVE
U SS PIPE SUPPORTS
V N/A
W OPENING FOR BACK UP FLOAT
X OPENING FOR TRANSDUCER
14'-21 2"±
72" X 72" HATCH
W/ SAFETY GRATING
36" X 36" HATCH
W/ SAFETY GRATING
48" X 36" HATCH
W/ SAFETY GRATING
WET WELLVALVE VAULTPIG LAUNCH VAULT
6'-0"
7'-0"
8'-4"
9'-0" 10'-0" 11'-0"
4'-0" 5'-0" 6'-0"
6'-0"
7'-0"
8'-4"
PresMon Precast, LLC
Office:
170 Old Cheat Road Morgantown, WV
Plant:
490 MillerMine Road Reedsville, WV
PUMP STATION NO. 6
PLAN VIEW1
PUMP STATION NO. 6
PROFILE VIEW2
AutoCAD SHX Text 3"Pipe
AutoCAD SHX Text 3"Pipe
AutoCAD SHX Text
PMP
AutoCAD SHX Text
AutoCAD SHX Text
PROJECT NUMBER
AutoCAD SHX Text
SHT. OF
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
DRAWING TITLE:
AutoCAD SHX Text
PROJECT TITLE:
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
DESIGN BY:
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
KEN WAUGERMAN
AutoCAD SHX Text
REV.
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text 21-138
AutoCAD SHX Text
BUFFALO COAL GRANT & TUCKER COUNTY, WV
AutoCAD SHX Text
PUMP STATION NO. 6
A079377 Text Box
A079377 Text Box
S3
0-
3376.65
3368.90
3360.90
8" Ø
X
0' -8
" P
UM
P
CA
SI
NG
11 2" Ø
X
'-0 " S
S
PI
PE
2" FL ADT
2" FL ADT
INTERIOR MATERIALS
ID DESCRIPTION
A 3" SS VENT PIPE
B 3" SS 90° ELBOW
C 3" GREEN VENT
D 8" PUMP CASING
E PUMP HOLD DOWN
F 11
2" SS 90° WELDED PIPE PUMP CONNECTION
G 11
2" X 2" METRAFLEX FLEXIBLE CONNECTION
H 2" HDPE PIPE
I 11
2" SS DISCHARGE PIPE
J 12" INFLUENT PIPE
K 2" TRUE UNION BALL VALVE
L PIPE GASKET / BOOT
M N/A N N/A
O 2" X 2" X 2" HDPE WYE
P 2" HDPE FORCE MAIN
Q ACCESS LADDER WITH SAFETY HANDLE
R GRATING
S FLOOR DRAIN
T N/A
U SS PIPE SUPPORTS
V N/A
W OPENING FOR BACK UP FLOAT
X OPENING FOR TRANSDUCER
C
A
B
R
D
E F G
I
J
KH OL L
L
OE F G H KL QQ
C
A
J
R S
U S
W X
15'-9"±
72" X 72" HATCH
W/ SAFETY GRATING
36" X 36" HATCH
W/ SAFETY GRATING
6'-0"
7'-0"
8'-4" 5'-0"
6'-0" 7'-0"
6'-0" 7'-0"
8'-4"
4'-0" 5'-0"
6'-0"
4'-0"
WET WELL
VALVE VAULT
PresMon Precast, LLC
Office:
170 Old Cheat Road Morgantown, WV
Plant:
490 MillerMine Road Reedsville, WV
PUMP STATION NO. 7
PLAN VIEW1
PUMP STATION NO. 7
PROFILE VIEW2
AutoCAD SHX Text
PMP
AutoCAD SHX Text
AutoCAD SHX Text
PROJECT NUMBER
AutoCAD SHX Text
SHT. OF
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
DRAWING TITLE:
AutoCAD SHX Text
PROJECT TITLE:
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
DESIGN BY:
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
KEN WAUGERMAN
AutoCAD SHX Text
REV.
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text 21-138
AutoCAD SHX Text
BUFFALO COAL GRANT & TUCKER COUNTY, WV
AutoCAD SHX Text
PUMP STATION NO. 7
A079377 Text Box
A079377 Text Box
| Applicable Addendum Category: |
| Description of Modification to Solicitation: |
| Terms and Conditions: |
| ARFQ DEP2211 Buffalo Coal (C1) Addendum 3 rvs DM.pdf |
| Lift Station 2.pdf |
| Sheets and Views |
| PS 2 |
| Lift Station 1.pdf |
| Sheets and Views |
| PS 1 |
| Lift Station 7.pdf |
| Sheets and Views |
| PS 7 |
| Lift Station 6.pdf |
| Sheets and Views |
| PS 6 |
| Lift Station 5.pdf |
| Sheets and Views |
| PS 5 |
| Lift Station 4.pdf |
| Sheets and Views |
| PS 4 |
| Lift Station 3.pdf |
| Sheets and Views |
| PS 3 |
File details come from the government source that posted it. Updated .