Addendum 3 Attachment B Revised Drawing Sheets.pdf
PDF 750 KB Posted
- Solicitation number
- S-63400-00011304
- Issued by
- Tillamook County, Moro City, Oregon
About this file
This document is an addendum to technical drawings and specifications for the construction of 5 staff cabins at Nehalem Bay State Park in Oregon, which is being procured by the Oregon Parks and Recreation Department. The project includes the cabin building structures, wooden stairs/cabin approaches, and footings, with the general excavation, earthwork, and paving work being installed separately by others. The drawings provide structural details, design criteria, and construction requirements for the cabin buildings. The project is part of a larger State and local contract opportunity with the ITB 10654 solicitation for the Nehalem Bay State Park Staff Housing Cabin Buildings Project.
The contract will require the successful bidder to meet State and local building code requirements. Pricing, set asides, and funding details were not included in this technical document. The contract term and any renewal options were also not specified.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment C Structural Calculations~2.pdf | ||
| ITB 10654 Nehalem Bay Staff Housing Cabins Building Project.docx | DOCX document | |
| Attachment A Technical Specifications~1.docx | DOCX document | |
| BID TABULATION~4.docx | DOCX document | |
| Attachment B Drawings~14.pdf | ||
| Addendum 2 to ITB 10654 Nehalem Bay Staff Housing Cabins Building Project.docx | DOCX document | |
| Attachment E Nehalem Bay Site Improvement Plans.pdf | ||
| RFP HVAC Aug 2024.doc | DOC document | |
| Pre-Bid sign-in sheet.docx | DOCX document | |
| Addendum 1 to ITB 10654 Nehalem Bay Staff Housing Cabins Building Project.docx | DOCX document | |
| Attachment D Tillamook County Dune Permit.pdf | ||
| Addendum 3 to ITB 10654 Nehalem Bay State Park Staff Cabin Project.docx | DOCX document | |
| Intent to Award~11.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STRUCTURAL NOTES
ORPD CABINS NEHALEM STATE PARK - VLMK JOB #20220299
DIVISION 1 - GENERAL
A. GENERAL
1. THESE DRAWINGS HAVE BEEN PREPARED SOLELY FOR USE IN THE CONSTRUCTION OF:
A. OREGON PARKS AND RECRETATION DEPARTMENT NEHALEM CABINS
B. 34600 GAREY ST, NEHALEM, OR 97131
C. POSSESSION OF THESE DRAWINGS DOES NOT GRANT A LICENSE TO CONSTRUCT OR
FABRICATE THE WHOLE, OR PARTS OF THIS PROJECT IN OTHER LOCATIONS.
2. THESE NOTES SET MINIMUM STANDARDS FOR CONSTRUCTION. THE DRAWINGS GOVERN OVER
THE GENERAL NOTES TO THE EXTENT SHOWN.
3. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS ON DRAWINGS AND IN FIELD.
COORDINATE LOCATIONS OF OPENINGS THROUGH FLOORS, ROOFS AND WALLS WITH
ARCHITECTURAL, MECHANICAL AND ELECTRICAL DRAWINGS. NOTIFY ENGINEER OF ANY
DISCREPANCIES OR IF ACTUAL CONDITIONS DIFFER FROM THOSE SHOWN OR NOTED.
4. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE DESIGN AND INSTALLATION OF ALL
TEMPORARY BRACING, SHORING, ANCHORS, ETC., INCLUDING, BUT NOT LIMITED TO, WALL AND ROOF BRACING, LIFTING AND HANDLING INSERTS AND DEVICES, TRENCH SHORING, FORMS, ETC.
5. CONTRACTOR SHALL CONSIDER CONSTRUCTION LOADS WHENEVER SUCH LOADS ARE IN EXCESS OF NORMAL DESIGN LOADS. PARTICULAR ATTENTION SHOULD BE GIVEN TO CRANES, FORKLIFTS, WORKMAN, WHEEL LOADS, STORAGE OF MATERIALS, ETC. CONTRACTOR SHALL BE SOLELY
RESPONSIBLE FOR ALL SHORING, BRACING, CRIBBING, ETC. REQUIRED TO SUPPORT
CONSTRUCTION LOADS.
6. INSPECTION AND/OR JOB SUPERVISION IS NOT PROVIDED BY ENGINEER.
7. WHERE REFERENCE IS MADE TO ASTM, AISC, ACI, ASCE OR OTHER STANDARDS, THE LATEST
ISSUE SHALL APPLY.
8. ALL WORK SHALL BE IN STRICT COMPLIANCE WITH:
A. 2022 OREGON STRUCTURAL SPECIALTY CODE.
(BASED ON THE 2021 INTERNATIONAL BUILDING CODE)
B. ALL OTHER STATE AND LOCAL BUILDING REQUIREMENTS THAT APPLY.
9. DESIGN CRITERIA:
a. FLOOR LIVE LOADS (PER IBC 1603.1.1)
CABIN FLOOR 40 PSF
b. ROOF LIVE LOADS (PER IBC 1603.1.2)
MINIMUM 20 PSF
c. ROOF SNOW LOAD (PER IBC 1603.1.3)
FLAT-ROOF SNOW LOAD (Pf) 25 PSF SNOW DRIFT SURCHARGE AND WIDTH (Pd, W) SEE DWGS SNOW EXPOSURE FACTOR (Ce) 1.0 SNOW LOAD IMPORTANCE FACTOR (Is) 1.0 THERMAL FACTOR (Ct) 1.0
d. WIND LOAD (PER IBC 1603.1.4) ULTIMATE DESIGN WIND SPEED (Vult) 135 MPH NOMINAL DESIGN WIND SPEED (Vasd) 105 MPH
RISK CATEGORY II
WIND EXPOSURE C
INTERNAL PRESSURE COEFFICIENT (GCpi) ±0.18
e. EARTHQUAKE DESIGN DATA (PER IBC 1603.1.5) SEISMIC IMPORTANCE FACTOR (Ie) 1.0
RISK CATEGORY II
MAPPED SPECTRAL RESPONSE ACCELERATIONS Ss = 1.28 S1 = 0.67
SITE CLASS D
DESIGN SPECTRAL RESPONSE COEFFICIENTS Sds = 0.85 Sd1 = 0.76
SEISMIC DESIGN CATEGORY D
BASIC SEISMIC-FORCE-RESISTING SYSTEM LIGHT FRAME WOOD SHEAR WALLS
ANALYSIS PROCEDURE USED EQUIVALENT LATERAL FORCE
10. MECHANICAL EQUIPMENT, MECHANICAL AND SPRINKLER PIPING LARGER THAN 2 INCHES IN
DIAMETER OR ANY OTHER ITEMS PRODUCING A HANGER OR SUPPORT LOAD OF OVER 50
POUNDS SHALL BE HUNG BY A SYSTEM APPROVED BY ENGINEER. ANY HANGER OR SUPPORT
PRODUCING A LOAD OVER 200 POUNDS SHALL HAVE ADDITIONAL FRAMING INSTALLED TO
TRANSFER THESE LOADS TO THE MAIN STRUCTURAL BEAMS OR WALL UNLESS OTHERWISE
APPROVED.
11. WHERE REQUIRED, SEISMIC BRACING FOR MECHANICAL AND ELECTRICAL EQUIPMENT,
SPRINKLER PIPING OR OTHER NON-STRUCTURAL COMPONENTS SHALL BE PROVIDED BY THE
CONTRACTOR IN ACCORDANCE WITH CHAPTER 13 OF ASCE 7. STRUCTURAL CALCULATIONS AND
DETAILS STAMPED BY A LICENSED ENGINEER SHALL BE SUBMITTED TO ENGINEER FOR REVIEW.
12. PROVIDE SHOP DRAWINGS FOR ALL STRUCTURAL PRODUCTS DELIVERED TO THE PROJECT.
ENGINEER WILL REVIEW AND MARK-UP ELECTRONIC SUBMITTALS IN PDF FORMAT OR A MAXIMUM
OF THREE HARD COPIES OF SUBMITTALS. THE CONTRACTOR WILL BE RESPONSIBLE FOR
DUPLICATING MARK-UPS IF ADDITIONAL COPIES ARE REQUIRED. SUBMITTALS WILL BE REVIEWED
AND RETURNED TO THE GENERAL CONTRACTOR WITHIN TWO WEEKS. ALL SUBMITTALS SHALL BE
REVIEWED AND STAMPED BY THE CONTRACTOR PRIOR TO SUBMITTAL TO THE ENGINEER.
DIVISION 2 - SITE WORK (NOT USED)
DIVISION 4 - MASONRY - NOT USED
DIVISION 3 - CONCRETE AND REINFORCING (NOT USED)
DIVISION 5 - METAL
A. GENERAL
1. ALL STRUCTURAL MEMBERS TO BE DETAILED, FABRICATED AND ERECTED IN ACCORDANCE
WITH THE LATEST EDITION OF AISC STANDARDS.
B. MATERIALS
1. ANCHOR BOLTS AND WOOD CONNECTIONS TO BE A307. PROVIDE STANDARD PLATE WASHERS
UNDER ALL BOLT HEADS AND NUTS IN CONTACT WITH WOOD.
2. ANCHOR RODS TO BE ASTM F1554, GRADE 36 UNLESS OTHERWISE NOTED.
3. LAG BOLTS IN WOOD TO BE SAE J429 GRADE 1 WITH MINIMUM DIMENSIONS MEETING ANSI/ASME B.18.2.1.
C. POST-INSTALLED ANCHOR BOLTS:
1. UNLESS A SPECIFIC ANCHOR PRODUCT IS NOTED IN THE DRAWINGS, POST-INSTALLED
ANCHORS MAY USE ONE OF THE ANCHORS LISTED BELOW FOR THE REQUIRED TYPE AND BASE
MATERIAL. OTHER ANCHORS ARE ACCEPTABLE ONLY WITH PRIOR WRITTEN APPROVAL OF THE
ENGINEER.
2. INSTALL ALL ANCHORS PER MANUFACTURER'S INSTRUCTIONS AND PRODUCT EVALUATION
REPORTS.
3. EMBEDMENT SPECIFIED ON DRAWINGS FOR ADHESIVE ANCHORS ARE ‘EFFECTIVE’ EMBEDMENT.
‘NOMINAL’ EMBEDMENT IS SPECIFIED FOR EXPANSION AND SCREW ANCHORS, UNLESS
OTHERWISE NOTED. REFERENCE MANUFACTURER LITERATURE FOR MEASURING TOTAL
EMBEDMENT AND HOLE DEPTH REQUIREMENTS.
4. NOTE THAT ADHESIVE ANCHOR INSTALLATION TEMPERATURES AND CURE TIMES VARY BY
PRODUCT. CONSULT MANUFACTURER LITERATURE FOR SPECIFIC REQUIREMENTS.
5. ALL EXPANSION AND SCREW ANCHORS SPECIFIED AT EXTERIOR LOCATIONS OR EXPOSED TO
THE ELEMENTS SHALL BE THE STAINLESS STEEL VERSION PER EACH APPROVED
MANUFACTURER. EPOXY ANCHORS SPECIFIED AT EXTERIOR LOCATIONS OR EXPOSED TO THE
ELEMENTS SHALL USE STAINLESS STEEL OR HOT DIPPED GALVANIZED THREADED ROD.
6. SPECIAL INSPECTION OF ANCHOR INSTALLATION IS REQUIRED UNLESS SPECIFICALLY NOTED
OTHERWISE IN DRAWINGS. SEE SPECIAL INSPECTION AND MATERIALS TESTING PROGRAM AND
NOTES.
7. NO STEEL REINFORCEMENT SHALL BE CUT TO INSTALL ANCHORS WITHOUT THE PRIOR WRITTEN
APPROVAL OF THE ENGINEER.
8. ADHESIVE ANCHORS:
BASE MATERIAL PRODUCT REPORT#
CONCRETE SIMPSON SET-XP EPOXY ADHESIVE ANCHOR ICC ESR-2508
CONCRETE SIMPSON AT-XP ADHESIVE ANCHOR APMO ER-263
CONCRETE HILTI HIT-HY 200 ADHESIVE ANCHOR ICC ESR-3187
9. EXPANSION ANCHORS:
BASE MATERIAL PRODUCT REPORT#
CONCRETE SIMPSON STRONG-BOLT 2 WEDGE ANCHOR ICC ESR-3037
CONCRETE HILTI KWIK BOLT TZ ANCHOR ICC ESR-1917
10. SCREW ANCHORS:
BASE MATERIAL PRODUCT REPORT#
CONCRETE SIMPSON TITEN HD SCREW ANCHOR ICC ESR-2713
CONCRETE HILTI KWIK HUS-EZ SCREW ANCHOR ICC ESR-3027
2. PROVIDE FIRE BLOCKING AS REQUIRED AND BLOCKING FOR ALL SPECIFIED WALL-MOUNTED ITEMS
INCLUDING CABINETS, DOORSTOPS, ETC.
3. CONNECTORS:
a. TIE STRAPS, FRAMING ANCHORS, HANGERS, STIRRUPS, COLUMN CAPS, COLUMN BASES, ETC., TO BE SIMPSON AS DETAILED, OR AS APPROVED.
b. FULLY FASTEN ACCORDING TO MANUFACTURER'S SCHEDULE USING LARGEST SIZE SHOWN.
c. ALL BEAMS AND JOISTS NOT BEARING ON ANOTHER MEMBER TO CONNECT WITH 'U' TYPE
HANGERS UNLESS OTHERWISE NOTED ON DRAWINGS.
d. NAILING: ALL NAILS SPECIFIED IN THE DRAWINGS TO BE "COMMON" NAILS UNLESS OTHERWISE
NOTED. ALL NAILING SHALL COMPLY WITH IBC FASTENING SCHEDULE PER CHAPTER 23.
OBTAIN ENGINEERS APPROVAL OF ALL PROPRIETARY NAILING SYSTEMS.
e. NAILS AT ROOF, FLOOR, AND WALL DIAPHRAGMS TO BE DRIVEN SO THAT THEIR HEAD OR
CROWN IS FLUSH WITH THE SURFACE OF THE SHEATHING. CHECK AND RESINK IF NEEDED,
IMMEDIATELY BEFORE ROOFING.
f. BOLTS - SEE DIVISION 5, METAL.
g. CORROSION PROTECTION:
1. CONFIRM REQUIRED CORROSION PROTECTION FOR HARDWARE AND FASTENERS WITH
SPECIFIC RECOMMENDATIONS FROM PRESSURE TREATING MANUFACTURER OR HANGER
MANUFACTURER (USE MOST CONSERVATIVE) FOR SPECIFIC WOOD TREATMENTS USED.
2. MINIMUM CORROSION PROTECTION ON METAL CONNECTORS EXPOSED TO THE
ENVIRONMENT OR PRESSURE TREATED LUMBER TO BE PER ASTM A653 CLASS 185
(SIMPSON ZMAX) OR ASTM A123.
3. FASTENERS FOR PRESSURE TREATED LUMBER MUST BE MINIMUM HOT-DIP GALVANIZED,
STAINLESS STEEL, SILICON BRONZE OR COPPER.
4. HOT-DIP GALVANIZED HARDWARE AND FASTENERS MUST COMPLY WITH ASTM A153,
STAINLESS STEEL FASTENERS TO BE TYPE 304 OR TYPE 316.
5. HARDWARE AND FASTENERS USED TOGETHER MUST BE THE SAME TYPE (E.G. HOT-DIP
GALVANIZED NAILS WITH HOT-DIP GALVANIZED HANGERS).
4. DELIVERY AND STORAGE: ALL LUMBER AND SHEATHING DELIVERED TO THE SITE, SHALL BE
STACKED OR STORED OFF THE GROUND AND PROPERLY PROTECTED AGAINST WEATHER.
5. CUTTING AND NOTCHING OF JOISTS NOT ALLOWED. A 1 INCH DIAMETER HOLE MAY BE DRILLED IN
THE CENTER 1/3 OF THE MEMBER DEPTH. ALL OTHER HOLES TO BE APPROVED BY ENGINEER.
6. STUDS MAY BE NOTCHED IN THE LOWER 1/5 OF THE HEIGHT OF THE STUD FOR ELECTRIC AND PLUMBING PIPES, BUT NO PART OF THE NOTCH IS TO BE DEEPER THAN 25 PERCENT OF THE WIDTH OF THE STUD. HOLES OF DIAMETERS UP TO 1/3 OF WIDTH OF STUD MAY BE DRILLED IN THE STUD.
DIVISION 6 - WOOD
A. ROUGH CARPENTRY
1. LUMBER SPECIES AND GRADES TO BE AS FOLLOWS UNLESS OTHERWISE SHOWN ON DRAWINGS:
JOISTS, BEAMS & STRINGERS: DOUGLAS FIR #2
6 INCH NOMINAL AND GREATER: DOUGLAS FIR #1
BUCKS, BLOCKING, BRIDGING AND MISCELLANEOUS: DOUGLAS FIR OR HEM FIR #3
2x STUDS: DOUGLAS FIR #2
SILLS, LEDGERS, STRIPPING, ETC. IN CONTACT PRESSURE TREATED HEM FIR #2
WITH CONCRETE, AND WOOD CURBS:
FLOOR BEAMS 6 INCH NOMINAL AND GREATER: PRESSURE TREATED HEM FIR #1
PLATES AND HEADERS: KILN DRIED DOUGLAS FIR #2
POSTS, COLUMNS (SAWN): DOUGLAS FIR #1
ROOF, FLOOR AND WALL SHEATHING:
APA RATED SHEATHING, EXPOSURE 1, CONFORMING TO APA PERFORMANCE STANDARD PS
1-95 AND EXCERPT NER-108. SEE DRAWINGS FOR REQUIRED THICKNESS OF SHEATHING
AND/OR SPAN RATING. INSTALL ROOF AND FLOOR SHEATHING WITH LONG DIMENSION
PERPENDICULAR TO SUPPORTS UNLESS OTHERWISE NOTED. USE SPACERS TO PROVIDE 1/8
INCH END AND EDGE JOINTS WHENEVER SHEATHING IS EXPOSED TO WET WEATHER. FILL ANY
JOINT SPACING OVER 3/8 INCH UNLESS OTHERWISE APPROVED BY ENGINEER. INSTALL 2x4
OR THICKER BLOCKING AT UNSUPPORTED JOINTS IN WALL SHEATHING. BLOCK ROOF AND
FLOOR SHEATHING WHERE NOTED ON DRAWINGS.
GLULAM BEAMS:
• Fb = 2,400 PSI, E = 1,800,000 PSI PER ANSI A190.1 SPECIFICATION.
• SIMPLE SPANS COMBINATION: 24F-V4
• CANTILEVER SPANS COMBINATION: 24F-V8
• SUBMIT CERTIFICATE OF CONFORMANCE INDICATING MEMBERS MEET THE REQUIREMENTS
OF ANSI A190.1
.2
.2
10116
36857
S T
A F
F H
O U
S
IN
G P
R O
J E
C T
C A
B
IN
B U
IL
D
IN
G
P L A
N S
N E
H A
L E
M B
A Y
S T
A T
E P
A R
K
B J P
P A R K
SO
N
E G
O R S T A T E
O R E G O N
P A R K S
A N D
R E C R E A
TI
O N
D E P A R
TM
E N T
D E S
IG
N E D
B Y
A P P R O V E D
B Y
C H E C K E D
B Y
D R A W N
B Y
D A T E
R E V
IS
IO
N
D A T E
B Y
SHEET:
OPRIS#: CONTRACT #:
.1
.2
C
A B
IN
V
E B
J P
.2
.2
O P
R D
C O
M M
E N
T S
B J P
.3
.2
O P
R D
C O
M M
E N
T S
R J S
.1
.2
A D
D
B
J P
B J P
J J E
B J P
J J E
/3
/2
S0.0
S T
R U
C T
R U
A L
N O
T E
S
EXP. 12/31/2025
Justin Elliott
1 2 3
C
B
A
11' - 5 1/2" 12' - 0" 6' - 11 1/2"
33 3
NOTE:
ALL DIMENSIONS TO CENTERLINE OF BEAMS ABOVE
H D U
H D U
H D U
H D U
S3.1
TYP
S3.1
S3.1
S3.1
S3.1
AT
CABIN 3
ONLY
AT
CABIN 3
ONLY
CONCRETE FOOTING PER SCHEDULE THIS SHEET
FOUNDATION LEGEND:
H D U X
SIMPSON HOLDOWN PER PLAN
6x6 POST
1. CONTRACTOR TO VERIFY ALL DIMENSIONS AND ELEVATIONS WITH
ARCHITECTURAL DRAWINGS.
2. CONTRACTOR TO VERIFY ALL FOOTING ELEVATIONS WITH THE
FOLLOWING CRITERIA: TOP OF FOOTING TO BE MINIMUM 12"
BELOW FINISH GRADE AND FINISH FLOOR. BOTTOM OF FOOTING
TO BE A MINIMUM OF 18" BELOW FINISH GRADE.
3. SEE GEOTECHNICAL REPORT FOR SUBGRADE PREPARATION AND
COMPACTION TO SUPPORT FOUNDATIONS AND CONCRETE SLAB
ON GRADE.
FOUNDATION NOTES:
1 2 3
C
B
A
PT 6x12 PT 6x12 PT 6x10
PT 6x10PT 6x12PT 6x12
P T x
P T x
PT 6x12 PT 6x12 PT 6x10
2x10 AT 24" O.C.
(TYPICAL U.O.N.)
P T x
P T x
P T x
P T x
P T x
A
A
B
B
(3) 2x6
JA
M B S
TU
D S
(3) 2x6
JA
M B S
TU
D S
(3 ) 2 x6
JA
M
B S
TU
D S
(3) 2x6
JA
M
B S
TU
D S
H D U
H D U
H D U
H D U
4x6
S3.1
S3.1
S3.1
S3.1
SIMPSON 'HU612TF'
HANGER, TYPICAL
AT 6x12 BEAMS
SIMPSON 'HU610TF'
HANGER, TYPICAL
AT 6x10 BEAMS
5 5
5 5
2x6 DOUG FIR #2 STUDS AT 16" O.C. TYPICAL U.O.N.
ON PLAN. ALIGN JOISTS WITH STUDS
FOOTING BELOW PER FOUNDATION PLAN
FLOOR FRAMING LEGEND:
WOOD POST PER FOUNDATION PLAN
X
SHEAR WALL TYPE PER SCHEDULE THIS SHEET. ALL
EXTERIOR WALLS TO BE TYPE 'A' SHEAR WALLS
UNLESS OTHERWISE NOTED
TYPICAL HEADER TO BE PER FLOOR FRAMING NOTESHDR
FLOOR FRAMING NOTES:
1. CONTRACTOR TO VERIFY ALL DIMENSIONS AND ELEVATIONS
WITH ARCHITECTURAL DRAWINGS.
2. FLOOR DESIGN CRITERIA:
DEAD LOAD = 15 PSF
LIVE LOAD = 40 PSF
DEFLECTION = SMALLER OF LL/360, TL/240
3. FLOOR SHEATHING TO BE T&G APA RATED STURD-I-FLOOR
SHEATHING WITH A MINIMUM SPAN RATING OF 24oc AND
MINIMUM THICKNESS OF 3/4". GLUE WITH CONTINUOUS WAVY
3/8" BEAD AT ALL SUPPORTS AND NAIL AS INDICATED BELOW.
ORIENT STRONG AXIS OF SHEATHING PERPENDICULAR TO
SUPPORTS.
4. FLOOR NAILING TO BE 10d RING OR SCREW SHANK NAILS WITH A
MINIMUM 1 5/8" PENETRATION. NAIL AT 6" O.C. AT ALL
SUPPORTED EDGES AND AT 12" O.C. AT INTERMEDIATE
SUPPORTS. BLOCKING IS NOT REQUIRED.
5. SPLICE DOUBLE TOP PLATE AT ALL EXTERIOR WALLS AND
SHEARWALLS BY LAPPING 6'-0" MINIMUM AND NAILING WITH 16d
AT 4" O.C. STAGGERED.
6. TYPICAL HEADERS (HDR) TO BE PER , U.O.N.
7. AT BEAM TO POST CONNECTIONS USE SIMPSON 'AC' OR 'ACE'
POST CAP TYPICAL, U.O.N.
8. ALL SOLID SAWN HEADERS, PLATES (OTHER THAN P.T.) AND
HORIZONTAL MEMBERS TO BE KILN DRIED (K.D.) LUMBER.
9. ALL EXTERIOR WALLS TO BE SHEATHED PER SHEAR WALL TYPE
'A'. SEE SCHEDULE FOR REQUIREMENTS.
10. PROVIDE DOUBLE JOIST BELOW INTERIOR NON-BEARING WALLS
RUNNING PARALLEL WITH JOISTS.
11. SOLID BLOCK AT RIM LOCATIONS WHERE POSTS OR BUILT-UP
STUDS ARE BEARING.
(3/ S3.0)
1 2 3
C
B
A
D
TT2Z
D
TT2Z
S1.0
D
TT2Z
D
TT2Z
11' - 5 1/2" 12' - 0"
11' - 5 1/2" 12' - 0" 6' - 11 1/2"
3 3 3
TYP
NOTE:
ALL DIMENSIONS TO CENTERINE OF BEAMS ABOVE
1 2 3
C
B
A
PT 6x12 PT 6x12
P T x
P T x
PT 6x12 PT 6x12
PT 6x12PT 6x12
PT 6x10
PT 6x10
PT 6x10
P T x
P T x
P T x
(3) 2x6
JA
M B S
TU
D S
(3) 2x6
JA
M B S
TU
D S
4x6
(3 ) 2 x6
JA
M
B S
TU
D S
(3) 2x6
JA
M
B S
TU
S
A
B
BP
T x
P T x
H D U
H D U
H D U
H D U
2x10 AT 24" O.C.
(TYPICAL U.O.N.)
SIMPSON 'HU612TF'
HANGER, TYPICAL
AT 6x12 BEAMS
SIMPSON 'HU610TF'
HANGER, TYPICAL
AT 6x10 BEAMS
S3.1
S3.1
S3.1
S3.1
.2
.2
10116
36857
S T
A F
F H
O U
S
IN
G P
R O
J E
C T
C A
B
IN
B U
IL
D
IN
G
P L A
N S
N E
H A
L E
M B
A Y
S T
A T
E P
A R
K
B J P
P A R K
SO
N
E G
O R S T A T E
O R E G O N
P A R K S
A N D
R E C R E A
TI
O N
D E P A R
TM
E N T
D E S
IG
N E D
B Y
A P P R O V E D
B Y
C H E C K E D
B Y
D R A W N
B Y
D A T E
R E V
IS
IO
N
D A T E
B Y
SHEET:
OPRIS#: CONTRACT #:
.1
.2
C
A B
IN
V
E B
J P
.2
.2
O P
R D
C O
M M
E N
T S
B J P
.3
.2
O P
R D
C O
M M
E N
T S
R J S
.1
.2
D
B
J P
B J P
J J E
B J P
J J E
/0
/2
S1.0
S T
A F
F C
A B
IN
F
O U
N D
A T
IO
N
P L
A N
S1.0 1/4" = 1'-0"
A FOUNDATION PLAN CABINS 1-3
STRUCTURAL FOUNDATION SCHEDULE
Footing Label Column/Wall Type Reinforcing Pier Size Notes
1 BEAM PER
PLAN
2'-0"x2'-0"x12"DEEP (3) #4 EACH WAY
BOTTOM
16" DIA. SEE DETAIL 2/S2.1
2 BEAM PER
PLAN
2'-6"x2'-6"x12"DEEP (4) #4 EACH WAY
BOTTOM
16" DIA. SEE DETAIL 1/S2.1
3 BEAM PER
PLAN
3'-0"x3'-0"x12"DEEP (4) #4 EACH WAY
BOTTOM
16" DIA. SEE DETAIL 1/S2.1
4 BEAM PER
PLAN
3'-6"x3'-6"x12"DEEP 2 (5) #4 EACH WAY
BOTTOM
16" DIA. SEE DETAIL 1/S2.1
5 CONCRETE
WALL 8"
1'-6" WIDE x 12" DEEP x CONT (2) #4 CONT. TOP
& BOTTOM
N/A SEE DETAIL
S1.0 1/4" = 1'-0"
C FLOOR FRAMING PLAN CABINS 1-3
S1.0 1/4" = 1'-0"
B FOUNDATION PLAN CABINS 4-6
FOUNDATION PLAN PROVIDED FOR INFORMATION ONLY.
WORK WAS PREVIOUSLY COMPLETED BY OTHERS.
FOUNDATION PLAN PROVIDED FOR INFORMATION ONLY.
WORK WAS PREVIOUSLY COMPLETED BY OTHERS.
S1.0 1/4" = 1'-0"
D FLOOR FRAMING PLAN CABINS 4-6
FLOOR SHEATHING PER
PLAN
JOISTS PER PLAN
PT BEAM PER PLAN
STUD WALL PER
PLAN
SIMPSON 'LB210' TOP
FLANGE HANGER EACH END
OFFSET BEAM TO
FLUSH WITH
EXTERIOR FINISH
P E
N E
T R
A T
IO
N
M
IN
S C
R E
W
LAG SCREW PER
SHEARWALL
SCHEDULE
FLOOR SHEATHING PER
PLAN
BLOCKING AT 4'-0" O.C.
IN FIRST JOIST BAY
PT BEAM PER PLAN
STUD WALL PER
PLAN
SIMPSON 'HUS' FACE
MOUNT HANGER EACH END
OFFSET BEAM TO
FLUSH WITH
EXTERIOR FINISH
JOIST PER PLAN
P E
N E
T R
A T
IO
N
M
IN
S C
R E
W
LAG SCREW PER
SHEARWALL
SCHEDULE
0'-0"
GRADE
-1'-0"
T.O.F.
SIMPSON COLUMN CAP PER
16" DIA CONCRETE PIER
WITH (4) #5 VERTICAL
BARS WITH 4" HOOK
3" CLR
3" CLR
FOOTING SIZE AND
REINFORCING PER
SCHEDULE
ROUGHEN SURFACE
OR POUR MONOLITHIC
(3) #3 TIES AT TOP
BALANCE AT 12" O.C.
C L R
A S
R E
Q 'D
PLAN VIEWS (AS OCCURS PER FOUNDATION PLANS)
A A
PROVIDE SIMPSON
'CCQM' POST CAP
PROVIDE SIMPSON
'ECCLQM' POST CAP
PROVIDE SIMPSON
'CCTQM' POST CAP
PROVIDE SIMPSON
'CCCQM' POST CAP
3" COMPACTED CRUSHED
ROCK BELOW FOOTING
PT BEAM PER PLAN
0'-0"
GRADE
-1'-0"
T.O.F.
STUD WALL PER PLAN
BEAM PER PLAN
PT BEAM PER PLAN
2x DECKING
BLOCKING AS REQUIRED
AT STUD WALL
EXISTING CONCRETE
STEM WALL AND
FOOTING BY OTHERS
STUD WALL PER PLAN
2x DECKING
PT BEAM PER PLAN
2x10 LEDGER WITH (2)
SIMPSON 'SDS' SCREWS
AT 12" O.C.
JOISTS PER PLAN
AS REQ'D
PER ARCH
2x6 TOP RAIL. ROUTER
EXPOSED EDGES 1/2" AND
SAND SMOOTH
2x4 HORIZONTAL RAILS
WITH SIMPSON 'APLH24'
HANGERS EACH END
SIMPSON 'A34' EACH END
OF TOP AND BOTTOM RAIL
POSTS PER PLAN
PAINT AND FINISH RAILING
PER ARCH
2x6 BOTTOM RAIL
P E
R A
R C
H
2x2 VERTICAL PICKETS AT 5" O.C.
WITH 2 1/2" STAINLESS STEEL
WOOD SCREW INTO TOP AND
BOTTOM RAIL
PER CIVIL
T.O.PAVING
AS REQ'D
T.O.F.
FOOTING SIZE AND
REINFORCING PER
SCHEDULE
POST PER PLAN
PROVIDE SIMPSON 'APW66Z'
WITH 1/2" DIA x 3" EMBED
SCREW ANCHORWOOD DECKING
ASPHALT PAVING
BLOCKING PER
S3.1
M
IN
2x10 PT LEDGER WITH 1/2" DIA x 3" EMBED AT
24" O.C. STAGGERED
(2) #4 HORIZONTAL AT TOP
EXISTING CONCRETE
STEM WALL AND
FOOTING BY OTHERS
PER CIVIL
T.O.PAVING
AS REQ'D
T.O.F.
POST PER PLAN
PROVIDE SIMPSON 'APW66Z'
WITH 1/2" DIA x 3" EMBED
SCREW ANCHOR
WOOD DECKING
ASPHALT PAVING
PT BEAM PER PLAN
M
IN
SIMPSON
'MBHU5.50/9.25' BEAM
HANGER
EXISTING CONCRETE
STEM WALL AND
FOOTING BY OTHERS
EXISTING FOOTING AND
STEM WALL BY OTHERS
WOOD DECKING, NOTCH
AROUND POST AS REQUIRED
P.T. 4x6 SILL PLATE, RIP AS REQUIRED, WITH 1/2" DIA x 4" EMBED
EPOXY ANCHORS AT 32" O.C.
2x10 RIM JOIST, RIP AS REQUIRED
PT BEAM PER PLAN,
NOTCH AT SILL
PLATE AS REQUIRED
POST PER PLAN
PROVIDE SIMPSON 'BC60' POST
BASE WITH 1/2" DIA x 4" LAG SCREW
SIMPSON 'A34' CLIP,
EACH SIDE OF BEAM
EXISTING FOOTING AND
STEM WALL BY OTHERS
WOOD DECKING
P.T. 4x6 SILL PLATE, RIP AS
REQUIRED, WITH
1/2" DIA x 4" EMBED EPOXY
ANCHORS AT 32" O.C.
2x10 RIM JOIST, RIP AS REQUIREDJOIST PER PLAN
.2
.2
10116
36857
S T
A F
F H
O U
S
IN
G P
R O
J E
C T
C A
B
IN
B U
IL
D
IN
G
P L A
N S
N E
H A
L E
M B
A Y
S T
A T
E P
A R
K
B J P
P A R K
SO
N
E G
O R S T A T E
O R E G O N
P A R K S
A N D
R E C R E A
TI
O N
D E P A R
TM
E N T
D E S
IG
N E D
B Y
A P P R O V E D
B Y
C H E C K E D
B Y
D R A W N
B Y
D A T E
R E V
IS
IO
N
D A T E
B Y
SHEET:
OPRIS#: CONTRACT #:
.1
.2
C
A B
IN
V
E B
J P
.2
.2
O P
R D
C O
M M
E N
T S
B J P
.3
.2
O P
R D
C O
M M
E N
T S
R J S
.1
.2
D
B
J P
B J P
J J E
B J P
J J E
/3 /2
S3.1
D E T A
IL
S
S3.1 1" = 1'-0"
4 FLOOR FRAMING DETAIL
S3.1 1" = 1'-0"
5 FLOOR FRAMING DETAIL
S3.1 1" = 1'-0"
1 PIER FOOTING AT BEAM
S3.1 1" = 1'-0"
6 FLOOR FRAMING DETAIL
S3.1 1" = 1'-0"
7 FLOOR FRAMING DETAIL
S3.1 1 1/2" = 1'-0"
8 WOOD RAILING DETAIL
S3.1 1" = 1'-0"
2 RETAINING WALL SECTION
S3.1 1" = 1'-0"
3 RETAINING WALL SECTION
S3.1 1" = 1'-0"
10 RETAINING WALL SECTION
S3.1 1" = 1'-0"
9 RETAINING WALL SECTION
PIER FOOTING DETAIL PROVIDED FOR INFORMATION ONLY.
WORK WAS PREVIOUSLY COMPLETED BY OTHERS.