This Addendum No. 2 to a Centralized Request for Quote (CRFQ) is issued by the West Virginia Department of Administration Purchasing Division for Williamstown Drainage Repairs construction services near Williamstown, West Virginia. The project involves providing all labor, materials, tools, expendable equipment, and services to complete drainage repairs at the Army National Guard facility. The solicitation includes multiple work items such as 102 linear feet of 18" HDPE pipe, 154 linear feet of 18" HDPE pipe, 94 linear feet of 18" HDPE pipe, 64 linear feet of 24" HDPE pipe, 273 linear feet of grouted riprap channel replacement, vegetative channel installation, and associated inlet and ditch work. The mandatory pre-bid meeting was held on August 27, 2026, at 10:00 am EST, with vendor technical questions due by September 3, 2026, at 11:00 am EST. The bid opening date and time remains September 10, 2026, at 1:30 pm EST. This addendum clarifies vendor questions and provides updated drawings, including revised inlet elevations on plan sheet C2.03, and confirms that no concrete gutter details are applicable to the project.
The addendum addresses 16 vendor technical questions regarding equipment requirements, material sourcing, specifications, and payment responsibilities. Key clarifications include confirmation that equipment and trucks do not require FAA flags, strobes, or radios; that unclassified borrow material must be priced as an off-site haul; that excess excavated dirt may be used for fill if it meets WVDOH specifications; that a material storage area will be provided on-site post-award; and that contractors are responsible for all erosion and sediment control measures, which should be made incidental to applicable pipe installation line item prices. Fence removal and temporary fencing necessitated by project work are considered incidental to associated work items with no separate payment. All vendors must acknowledge receipt of all addenda with their bids to avoid disqualification. No pricing information or funding sources are specified in this addendum document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date Printed: Sep 4, 2026 Page: 1 FORM ID: WV-PRC-CRFQ-002 2020/05
Department of Administration Purchasing Division 2019 Washington Street East Post Office Box 50130 Charleston, WV 25305-0130
State of West Virginia Centralized Request for Quote
Construction
Proc Folder: 2046656 Reason for Modification:
Doc Description: Williamstown Drainage Repairs (Construction) Addendum No. 2
Proc Type: Central Purchase Order
Date Issued Solicitation Closes Solicitation No Version
2026-09-04 2026-09-10 13:30 CRFQ 0603 ADJ2700000020 3
BID RECEIVING LOCATION
BID CLERK
DEPARTMENT OF ADMINISTRATION
PURCHASING DIVISION
2019 WASHINGTON ST E
CHARLESTON WV 25305
US
VENDOR
Vendor Customer Code:
Vendor Name :
Address :
Street :
City :
State : Country : Zip :
Principal Contact :
Vendor Contact Phone: Extension:
FOR INFORMATION CONTACT THE BUYER
David H Pauline 304-558-0067 david.h.pauline@wv.gov
Vendor Signature X FEIN# DATE
All offers subject to all terms and conditions contained in this solicitation
Date Printed: Sep 4, 2026 Page: 2 FORM ID: WV-PRC-CRFQ-002 2020/05
ADDITIONAL INFORMATION
Addendum No. 2
To provide responses to the vendor technical questions, see attached.
To provide map/drawing, see attached
The bid opening date & time remains September 10, 2026, at 1:30 pm EST.
No other changes.
INVOICE TO SHIP TO
ADJUTANT GENERALS
OFFICE
ARMY AVIATION SUPPORT
FACILITY 1
1707 COONSKIN DR 387 AVIATION DR
CHARLESTON WV WILLIAMSTOWN WV
US US
Line Comm Ln Desc Qty Unit Issue Unit Price Total Price 1 Williamstown Drainage Repairs (Construction)
Comm Code Manufacturer Specification Model #
72141205
Extended Description:
Provide and furnish all labor, materials, tools, expendable equipment and all services to complete Williamstown Drainage Repairs, near Williamstown WV per the attached specifications and documentation.
SCHEDULE OF EVENTS
Line Event Event Date 1 Mandatory Pre-bid Meeting At 10:00 am EST. 2026-08-27 2 Vendor Technical Questions Due By 11:00 am EST. 2026-09-03
SOLICITATION NUMBER: CRFQ ADJ2700000020
Addendum Number: 2
The purpose of this addendum is to modify the solicitation identified as (“ADJ2700000020”) to reflect the change(s) identified and described below.
Applicable Addendum Category:
☐ Modify bid opening date and time.
☐ Modify specifications of product or service being sought.
☒ Attachment of vendor questions and responses.
☐ Attachment of pre-bid sign-in sheet.
☐ Correction of error.
☒ Other.
Description of Modification to Solicitation:
1. To provide responses to the vendor technical questions see attached.
2. To provide map/drawing, see attached.
3. The bid opening date and time remains September 10, 2026, at 1:30 pm EST.
No other changes.
Additional Documentation: Documentation related to this Addendum (if any) has been included herewith as Attachment A and is specifically incorporated herein by reference.
Terms and Conditions:
1. All provisions of the Solicitation and other addenda not modified herein shall remain in full force and effect.
2. Vendor should acknowledge receipt of all addenda issued for this Solicitation by completing an Addendum Acknowledgment, a copy of which is included herewith. Failure to acknowledge addenda may result in bid disqualification. The addendum acknowledgement should be submitted with the bid to expedite document processing.
1. Question: Will the Equipment & Trucks working around the Apron of the Heliport be required to have FAA Flags, FAA Strobes and a FAA Radio?
Response: No.
2. Question: Item #2 Unclassified Borrow 400-CY. Is there anywhere on the property this material can be obtained? OR will it need to be Hauled in from an outside Location?
Response: The unclassified borrow should be priced as obtaining material from an offsite location and hauling it to the project site.
3. Question: Can the excess dirt generated from the Pipe Trench be used for the Fill Required?
Response: Yes as long as the material excavated meets the specified material requirements for placement of fill per WVDOH technical specs.
4. Question: Will the contractor be given a space to unload Pipe and Inlets? If so where?
Response: Yes, an area will be provided to the Contractor to unload and store materials onsite. This location will be finalized between the Owner/Contractor once award has been made.
5. Question: Is the 273 lf of ditch line removed to be replaced with a concrete channel with water stop per drawing c2.03 ? & per concrete gutter detail on drawing c3.02?
Or is it grouted rip rap per pre bid & grouted rip rap ditch detail on drawing c3.02?
Response: The 273 LF of ditch line to be removed should be replaced with a grouted riprap channel that has a water stop installed at the upstream end to prevent water from flowing underneath the grouted channel.
6. Question: Is concrete gutter detail relevant on this project?
Response: No, the concrete gutter detail can be disregarded and is not used as part of this project.
7. Question: Is pipe outlet protection detail relevant since using wing walls?
Response: We are requesting that on the outlet end of the wingwall that a riprap apron is installed to armer the ditchline of water leaving the site.
8. Question: Inlet #3-3 & 3-4 look like need revised.
Response: A revised C2.03 has been provided with updated invert elevations.
CRFQ ADJ27*20
9. Question: Who is responsible for watering seeded areas?
Response: Contractor.
10. Question: Plan Sheet C2.03 there are two notes about a Concrete Channel with Water Stop. On the Detail Sheet there is a Detail for Concrete Gutter and a Grouted RipRap Channel. Bid Item #13 is for Grouted RipRap Channel 275-LF. I dont see a Bid Item for a Concrete Gutter.
Response: Please see the response to question 5.
11. Question: Could you define Where the Concrete Gutter Starts & Stops as well as the Grouted RipRap Ditch.
Response: There is no concrete gutter on the project, see response to question 5.
The grouted riprap ditch starts at the existing inlet and continue to within 15 feet of
DI3-4.
12. Question: On Sheet C2.03, calls for a concrete ditch assuming Detail on Sheet C3.02 Concrete Gutter is what this is. There is no pay item listed for this work. Please clarify if this is actually Pay Item No. 13 – Grouted Rip-Rap Channel? Also, if there is no Concrete Gutter, does the Detail for the Cut-off Wall apply to this project?
Response: Please see response to Question 5.
13. Question: Can a quantity for Silt Fence be provided so all bidders are bidding the same?
Response: The contractor is responsible for installation and removal of e&s controls to protect sediment laden water from leaving the site. This may consist of silt fence, silt sock, inlet protection, etc. This cost should be made incidental to the linear foot price of each applicable size storm pipe. Contractor to assume silt fence or equal bmp control to run the length of each storm pipe installation.
14. Question: Is Bid Item No. 14 work shown on Sheet C2.03 near DI 3-4?
Response: Yes that is correct. All the other vegetative channels are constructed overtop of new storm pipe and the cost of that work is incidental to the storm pipe.
However the ditch that drains into DI 3-4 and then leads into the grouted riprap channel is the vegetative channel.
15. Question: Please clarify what is meant for Bid Items No. 10 and 11 concerning the Outlet Protection. Details on Sheet C3.02 appear to be for Culvert Discharge Areas, not Wingwalls.
Response: Please see response to Question 7.
16. Question: If we need to remove fencing to complete the scope of the project how will this be paid?
Response: Where existing fencing must be temporarily removed to complete adjacent work including but not limited to wingwall, storm pipe/drainage structure, or grading operations, the removal of fence fabric, shall be considered incidental to the corresponding item(s) of work and included in the unit bid for that work.
Where fencing will be impacted because of a grade change with the proposed construction the fence should be removed and at the revised grade and shall be incidental to the associated grading/structure item(s).
No separate payment will be made for fence removal, temporary fencing, reinstallation, or replacement.
g g g g g g g g g g g g g g g g g g g g g g g g g ggggggg g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g
102 LF OF 18"
HDPE PIPE
154 LF OF 18"
HDPE PIPE
94 LF OF 18"
HDPE PIPE
64 LF OF 24"
HDPE PIPE
TIE INTO EXISTING INLET
CLEAN DEBRIS FROM
INLET
RE-ESTABLISH 273 LF EXISTING DITCH
LINE. REMOVE EXISTING CONCRETE DITCH
LINING AND RESHAPE AND REPLACE WITH
A CONCRETE CHANNEL FROM INLET
BEGIN CONCRETE
DITCH LINING AND
RESHAPE AND
REPLACE WITH A
CONCRETE
CHANNEL WITH
WATER STOP (SEE
DETAIL)
RE-ESTABLISH
GRASS SWALE
(15')
RE-ESTABLISH
GRASS SWALE
(15')
EXISTING DITCH
TO REMAIN
DI 3-1
N: 316918.0627
E: 1419233.9662
RIM ELEV: 843.83
INV OUT (18") 841.33'
DI 3-2 (MOD. TYPE B)
N: 316825.3608 E: 1419185.4404
RIM ELEV: 842.82
INV IN (18") 837.10'
INV IN (18") 835.59'
INV OUT (24") 835.49'
DI 3-3
N: 316687.6572 E: 1419110.6061
RIM ELEV: 841.24
INV (18") 837.23'
INV OUT (18") 837.13'
DI 3-4
N: 316604.4066 E: 1419064.0637
RIM ELEV: 840.67
INV OUT (18") 838.17'
RE-ESTABLISH
DITCH LINE
INSTALL
CONCRETE
ANCHOR
P (304) 624-4108
600 WHITE OAKS BLVD,
P.O. BOX 940
BRIDGEPORT, WV 26330
www.thethrashergroup.com
F (304) 624-7831
T80-11652
W
IL
LI
A
M
ST
O W
N
W
VA
N G
W O
O D
C O
U N
TY
, W
ES
T
VI
R
IG
N
IA
W
ES
T
VI
R
IG
N
IA
A R
M Y
N
AT
IO
N
AL
G
U
AR
D D
R A
IN
A
G E
R
EP
A
IR
S
&2�0�
SITE PLAN
EXISTING GROUTED CHANNEL TO
BE REMOVED AND RE-INSTALLED.
AREAS ERODED AROUND FENCE
POSTS TO BE REPAIRED.
AutoCAD SHX Text
THE THRASHER GROUP INC.
AutoCAD SHX Text CAD FILE: R:\080\T80-11652.00 - WVANG - Williamstown Drainage Repairs\Drawing\T80-11652.00 Site Plan.dwg PLOT DATE/TIME: 9/4/2026 11:38 AM LAYOUT: Site Plan (4) USER: nicole priceR:\080\T80-11652.00 - WVANG - Williamstown Drainage Repairs\Drawing\T80-11652.00 Site Plan.dwg PLOT DATE/TIME: 9/4/2026 11:38 AM LAYOUT: Site Plan (4) USER: nicole price PLOT DATE/TIME: 9/4/2026 11:38 AM LAYOUT: Site Plan (4) USER: nicole price 9/4/2026 11:38 AM LAYOUT: Site Plan (4) USER: nicole price LAYOUT: Site Plan (4) USER: nicole priceSite Plan (4) USER: nicole price USER: nicole pricenicole price
AutoCAD SHX Text
AutoCAD SHX Text 20'
AutoCAD SHX Text 20'
AutoCAD SHX Text 40'
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
AutoCAD SHX Text
NMP
AutoCAD SHX Text 9/4/2026
AutoCAD SHX Text
REVISED INLET INVERTS - ADDENDUM #1
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ADDENDUM ACKNOWLEDGEMENT FORM
SOLICITATION NO.: CRFQ ADJ2700000020
Instructions: Please acknowledge receipt of all addenda issued with this solicitation by completing this addendum acknowledgment form. Check the box next to each addendum received and sign below.
Failure to acknowledge addenda may result in bid disqualification.
Acknowledgment: I hereby acknowledge receipt of the following addenda and have made the necessary revisions to my proposal, plans and/or specification, etc.
Addendum Numbers Received:
(Check the box next to each addendum received)
☒ Addendum No. 1 ☐ Addendum No. 6
☒ Addendum No. 2 ☐ Addendum No. 7
☐ Addendum No. 3 ☐ Addendum No. 8
☐ Addendum No. 4 ☐ Addendum No. 9
☐ Addendum No. 5 ☐ Addendum No. 10
I understand that failure to confirm the receipt of addenda may be cause for rejection of this bid. I further understand that that any verbal representation made or assumed to be made during any oral discussion held between Vendor’s representatives and any state personnel is not binding. Only the information issued in writing and added to the specifications by an official addendum is binding.
Company
Authorized Signature
Date
NOTE: This addendum acknowledgement should be submitted with the bid to expedite document processing.