This is Addendum 1 to a solicitation issued by the Department of Environmental Protection (DEP) for the Preston Rail Trail Railroad Tie Reclamation Project (ARFQ DEP20*051). The project requires vendors to remove and dispose of approximately 8,500 railroad ties from piles along an old railroad grade at a specified location. The scope of work includes cleaning up waste railroad ties and hauling them directly to an approved disposal facility, Meadowfill Landfill in Bridgeport, West Virginia, without excavating ties or removing earth. The project must be completed within 30 days from issuance of the purchase order. The addendum modifies specifications to clarify equipment requirements, disposal location, and project parameters, and includes responses to ten vendor questions regarding equipment specifications, metal segregation, disposal costs, load minimums, tie dimensions, billing methodology, project timeline, and bidding requirements.
Compensation is calculated on a unit price basis for actual work performed, with charges assessed per direct mile from the project site to the approved disposal facility, including return mileage if multiple trips are required. The vendor must use a truck and trailer with a combined volume of 107 cubic yards or greater. Disposal fees are to be paid by DEP, and vendors must submit all disposal weigh tickets with the final invoice. Vendors are required to submit a bid for all line items listed in the solicitation, including small excavators, large excavators, and skidsteer/tractor equipment, with $0 bids acceptable for equipment not being utilized. All vendors must acknowledge receipt of this and all other addenda by submitting an Addendum Acknowledgement form with their bid to avoid disqualification.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AGENCY SOLICITATION NUMBER – ARFQ ______________
Addendum Number: ____
The Purpose of this addendum is to modify the solicitation identified as (“Agency Solicitation”) to reflect the change(s) identified and described below.
Applicable Addendum Category:
[ ] Modify bid opening date and time
[ ] Modify specification of product or service being sought
[ ] Attachment of vendor questions and responses
[ ] Attachment of pre-bid sign-in sheet
[ ] Correction of error
[ ] Other
Description of Modification to Solicitation:
This Addendum issued to publish and distribute the attached documentation to the vendor community.
Additional Documentation: Documentation related to this Addendum (if any) has been included herewith as Attachment A and is specifically incorporated herein by reference.
Terms and Conditions:
1. All provision of the Agency Solicitation and other addenda not modified herein shall remain in full force and effect.
2. Vendor should acknowledge receipt of all addenda issued for this Agency Solicitation by completing an Addendum Acknowledgement, a copy of which is included herewith. Failure to acknowledge addenda may result in bid disqualification. The addendum acknowledgement should be submitted with the bid to expedite document processing.
Preston Rail Trail Railroad Tie Reclamation Project
ARFQ DEP20*051
Modification to the Specifications
1. Modify section 3.1 to read as follows:
The Vendor shall provide all services to properly clean up the waste railroad ties at the location described above. All railroad ties (Approximately 8,500 railroad ties) within the prescribed boundaries will be removed from the site and hauled directly to an approved disposal facility. The ties are in piles along the old railroad grade. This contract does not include any excavation of ties. No earth shall be removed prior to approval of the project manager. Only vegetation which directly affects the project will be removed. Waste disposal fees are not part of this contract and will be paid by the DEP.
2. Modify section 3.1.3.1.4 to read as follows:
This item shall include a truck and trailer with a combined volume of 107 cubic yards and greater, driver, fuel, and all associated operating costs. To be charged per direct mile from the project site to approved facility. If multiple trips are required, it shall include direct return mileage from the disposal facility back to the project site
3. Modify section 3.1.4.2 to read as follows:
All Waste from this must be taken to Meadowfill Landfill, located in Bridgeport WV.
This is an 82 miles round trip from the site and the Landfill is open Monday thru Friday 7am to 4pm. The vendor shall include all disposal weigh tickets with the final invoice, upon completion of the project.
Preston Rail Trail Railroad Tie Reclamation Project
ARFQ DEP20*051
Questions and Answers
Q1). 181 cubic yards is too large for the combined column of the truck and trailer. Can this amount be smaller?
A1). Yes, please see the attached modification to the specifications for details.
Q2). Does the vendor need to segregate the metal?
A2). The contractor does not have to segregate metal.
Q3). Can disposal cost be paid by DEP?
A3). Yes, please see the attached modification to the specifications for details.
Q4). Is there a minimum tonnage per load?
A4). No, there is not a minimum tonnage per load.
Q5). Are all of the railroad ties 9’ long?
A5). No, switch and siding ties are longer, but most of the ties will be 9’.
Q6). Can the DEP change mileage to tonnage?
A6). No, the billable line item will be mileage.
Q7). What is the timeframe for project?
A7). The project must be completed 30 days from issuance of the purchase order.
Q8). Can the vendor keep the ties?
A8). No, per section 3.1 of the specifications, all railroad ties (Approximately 8,500 railroad ties) within the prescribed boundaries will be removed from the site and hauled directly to an approved disposal facility.
Q9). Will there be an addendum to reflect the questions?
A9). Yes
Q10). Are you paying by the unit price based on the numbers provided?
A10). Yes, we are paying unit price based on actual work performed.
Q11). Solicitation DEP2000000051 has a listing for 3 styles of equipment, small excavator, large excavator, and skidsteer/tractor. Do I need to insert a price for each item, or do I bid only the equipment that I believe will be needed?
A11). A bid is required for all line items. If you are not charging for a piece of equipment, you would enter a $0 bid.
| AGENCY SOLICITATION NUMBER ARFQ: DEP2000000051 |
| Addendum Number: 1 |
| Check Box1: Off |
| Check Box2: Yes |
| Check Box3: Yes |
| Check Box4: Yes |
| Check Box5: Off |
| Check Box6: Off |
| Text7: |
| Text8: |
| Text9: |