Addendum 1 Attachment C Sheet C13 Revised 11122025~1.pdf

PDF 798 KB Posted

Attached to
ITB South Slough Entrance Improvement Project
Solicitation number
S-DASOBO-00014838
Issued by
Coos County, Oregon

About this file

This is an Addendum 1 technical attachment to the South Slough Entrance Improvements Project invitation to bid issued by the Oregon Department of State Lands. The document comprises a Lighting & Electrical Plan (Sheet C13) for the upper section of the project located at 61907 Seven Devils Road, Charleston, Oregon. The plan specifies installation of electrical infrastructure including a Duragate solar power package for gate openers, fiber optic line installation from the gate to a server room utilizing existing conduit and pull boxes, and security camera infrastructure featuring a Sun Surveillance Solstice Kit to power and mount an Avigilon H6A Bullet IP security camera connected to the fiber line. The plan was revised on November 12, 2025, and prepared by Civil West Engineering Services, with design verification dated August 2025 and final plan status as of the revision date.

The plan establishes critical contractor responsibilities and compliance requirements, including mandatory contact with "One Call" for utility locates prior to excavation, protection of existing infrastructure such as mailboxes, fences, power poles, and guy wires, maintenance of safe and useable walkways at the end of each work day, continuous access maintenance, and compliance with the most current National Electrical Code (NEC) electrical requirements. All electrical work must meet current NEC standards, and contractors bear full responsibility for any damage resulting from their operations. The document references related sheets (D13, D12, D14, and C14) for comprehensive project details including the lower section lighting plan and security camera installation specifications.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E

T

E

T

N

1 LIGHTING & ELECTRICAL PLAN - UPPER

C13

SHEET NOTES:

1. CONTRACTOR SHALL CONTACT "ONE CALL" FOR UTILITY LOCATES PRIOR TO THE START OF ANY EXCAVATION.

2. EXISTING MAILBOXES, FENCES, POWER POLES, GUY WIRES, AND OTHER MISCELLANEOUS FEATURES MAY BE IN CLOSE

PROXIMITY TO THE IMPROVEMENTS SHOWN IN THESE DRAWINGS. CONTRACTOR SHALL PROTECT THESE FEATURES IN PLACE (UNLESS NOTED OTHERWISE) OR REPAIR TO PRE-CONSTRUCTION CONDITION IF DISTURBED DURING

CONSTRUCTION.

3. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY AND ALL DAMAGE DUE TO THE CONTRACTOR'S OPERATIONS.

4. ALL TRAVELED WALKWAYS SHALL BE SAFE AND USEABLE AT THE END OF EACH WORK DAY AS DIRECTED BY THE ENGINEER.

5. ACCESS SHALL BE MAINTAINED AT ALL TIMES

6. ALL ELECTRICAL WORK SHALL MEET THE MOST CURRENT NEC ELECTRICAL REQUIREMENTS.

DURAGATE SPKG12/120 SOLAR

PACKAGE TO POWER GATE

OPENERS

SEE

D13

SE

VE

N D

EV

IL

S R

D

NEW GATE,

ENTRANCE SIGN,

& SECURITY

CAMERA

SEE SHEET C14

FOR LOWER

SECTION

SUN SURVEILLANCE SOLSTICE

KIT TO POWER AND MOUNT

AVIGILON H6A BULLET IP

SECURITY CAMERA

CONNECT TO FIBER LINE

SEE

D12

D14

D at e Sh ee t N o.

D

AT

E:

/1 2/

F

IL

E:

S:

\2

M is c Pr iv at e En gi ne er in g W or k\

-3

S ta te o f O re go n

- S ou th S lo ug h En tra nc e an d R oa dw ay Im pr ov em en ts \0

D es ig n Se rv ic es \C

AD

\2

4-

D

ES

IG

N

Q ua nt ity

V er ifi ca tio n.

dw g

R

EV

D

AT

E

D

ES

C R

IP

TI

O N

BY

D

ES

IG

N

ED

B

Y:

D

R

AW

N B

Y:

C

H

EC

KE

D

B Y:

PR

O

JE

C

T N

O

PR

EP

AR

ED

B Y:

C oo s Ba y, O re go n

E St re et w w w .c iv ilw es t.c om

1-

6-

R

EG I N

E

N

11, S

PE

89522PE

OREGON

E

0SEAN D A L LOYD

RENEWS: 12/31/26

REG

ISTERED PROFESS IONAL

E N

C13

SO

U

TH

S

LO

U

G H

E N

TR

AN

C E

AN

D

R O

AD

W

AY

IM

PR

O

VE

M

EN

TS

O R

EG

O

N D

EP

T.

O F

ST

AT

E

LA

N D

S

BD

/S

D L

BD

/S

D L

SD

L/

W D

-3

LI

G

H

TI

N G

E

LE

C

TR

IC

A L

PL

A

N

U

PP

ER

AUGUST 2025

SE

VE

N

D

EV

IL

S

R D

, C H

AR

LE

ST

O

N , O

R

INSTALL FIBER OPTIC LINE IN

EXISTING CONDUIT FROM GATE

TO SERVER ROOM. UTILIZE

EXISTING PULL BOXES

INSTALL 17" x 13" PULL BOX

/1 2/

AD

D

ED

N

O

TA

TI

O

N F

O R

P U

LL

B

O X

S D

L

AutoCAD SHX Text

%%U PLAN SCALE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1"=40'

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FINAL PLANS

Sheets and Views
C13

File details come from the government source that posted it. Updated .