Addendum 1 Attachment C Sheet C1 Revised 11122025~1.pdf

PDF 1 MB Posted

Attached to
ITB South Slough Entrance Improvement Project
Solicitation number
S-DASOBO-00014838
Issued by
Coos County, Oregon

About this file

Site Plan Summary: South Slough Entrance Improvements Project

This document is a Site Plan (Sheet C1) prepared by CivilWest Engineering for the Oregon Department of State Lands' South Slough Entrance Improvements Project, a federally-funded infrastructure initiative at 61907 Seven Devils Road, Charleston, Oregon. The plan illustrates comprehensive site development improvements including the construction of a new paved parking area with Level II EV charger stations, new light poles with security cameras, a visitor center turn-around drive and bus parking area, gravel surfacing with 4-inch and 12-inch depths in designated areas, new split-rail cedar fencing, stormwater management infrastructure (swales, outfall piping, and energy dissipators), a new painted crosswalk, and Seven Devils Road widening with a new left turn lane. The site plan also depicts existing features to be protected including pump houses, wells, mailboxes, fences, power poles, and utility lines. The project design date is November 13, 2025, with the plan scale at 1-inch equals 80 feet, and the file designation indicates revision updates as of November 22, 2025.

The site plan includes critical construction directives requiring contractors to contact "One Call" for utility locates prior to excavation, maintain all existing features in place or restore them to pre-construction condition if disturbed, assume full responsibility for damage caused by construction operations, ensure all traveled walkways remain safe and useable at the end of each work day, and maintain continuous site access throughout construction. The plan references multiple detail sheets (C11, C12, C17, D1, D3, and D4) for additional specifications and incorporates clear vision triangle requirements per Coos County Code. The project engineer is registered Professional Engineer Sean Loyd (PE #89522, renewal date December 31, 2026), and the engineering firm, CivilWest, is located in Coos Bay, Oregon.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E

T

E

E T E

T

T

T

E

E

NO

PAR

KIN

G

N1 SITE PLAN

C1

61869 SEVEN DEVILS RD

MAP NO: 26S14W26

OWNER: LEE, CHARLES F

SE

VE

N D

EV

IL

S R

D

EX.

PUMP

HOUSE

EX.

WELL

PARKING LOT

LIGHT POLE

WITH SECURITY

CAMERA, TYP.

LEVEL II EV

CHARGER

STATIONS

NEW LIGHT

POLES

TYP EX.

LIGHT

POLE

NEW LIT

BOLLARD,

TYP.

EXISTING ELECTRICAL

AND COMMUNICATIONS

LINES

NEW STORMWATER

SWALE

SEE

GRAVEL

PATHWAY

5' WIDTH

SEE

NEW PAINTED

CROSSWALK

STRIPING, TYP

NEW GRAVEL

PARKING SPACES

NEW GATE,

ENTRANCE SIGN,

& SECURITY

CAMERA

SEVEN DEVILS

ROAD WIDENING &

NEW LEFT TURN

LANE

SEE

NEW PAVED

PARKING AREA

STORMWATER

OUTFALL PIPING

AND ENERGY

DISSIPATOR

STORMWATER ENERGY

DISSIPATOR

CULVERT WITH

ENERGY

DISSIPATOR

C11

NEW SPLIT

RAIL CEDAR

FENCING

C17

NEW ASPHALT

SECTION

SEE

D1

D1

SHEET NOTES:

1. CONTRACTOR SHALL CONTACT "ONE CALL" FOR UTILITY LOCATES PRIOR TO THE START OF ANY

EXCAVATION.

2. EXISTING MAILBOXES, FENCES, POWER POLES, GUY WIRES, AND OTHER MISCELLANEOUS FEATURES MAY BE IN CLOSE PROXIMITY TO THE IMPROVEMENTS SHOWN IN THESE DRAWINGS. CONTRACTOR

SHALL PROTECT THESE FEATURES IN PLACE (UNLESS NOTED OTHERWISE) OR REPAIR TO

PRE-CONSTRUCTION CONDITION IF DISTURBED DURING CONSTRUCTION.

3. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY AND ALL DAMAGE DUE TO THE CONTRACTOR'S

OPERATIONS.

4. ALL TRAVELED WALKWAYS SHALL BE SAFE AND USEABLE AT THE END OF EACH WORK DAY AS

DIRECTED BY THE ENGINEER.

5. ACCESS SHALL BE MAINTAINED AT ALL TIMES

NEW ASPHALT

SECTION

SEE

D1

CLEAR VISION

TRIANGLE PER COOS

COUNTY CODE

NEW

GRAVEL

SURFACING

4" DEPTH

10' WIDTH

GRAVEL PULL

OUT AREA

12" DEPTH

NEW STORMWATER

SWALES

SEE

C12

VISITOR CENTER

TURN AROUND

DRIVE AND BUS

PARKING

D at e Sh ee t N o.

D

AT

E:

/1 3/

F

IL

E:

S:

\2

M is c Pr iv at e En gi ne er in g W or k\

-3

S ta te o f O re go n

- S ou th S lo ug h En tra nc e an d R oa dw ay Im pr ov em en ts \0

D es ig n Se rv ic es \C

AD

\2

4-

D

ES

IG

N

Q ua nt ity

V er ifi ca tio n.

dw g

R

EV

D

AT

E

D

ES

C R

IP

TI

O N

BY

D

ES

IG

N

ED

B

Y:

D

R

AW

N B

Y:

C

H

EC

KE

D

B Y:

PR

O

JE

C

T N

O

PR

EP

AR

ED

B Y:

C oo s Ba y, O re go n

E St re et w w w .c iv ilw es t.c om

1-

6-

R

EG I N

E

N

11, S

PE

89522PE

OREGON

E

0SEAN D A L LOYD

RENEWS: 12/31/26

REG

ISTERED PROFESS IONAL

E N

C1

SO

U

TH

S

LO

U

G H

E N

TR

AN

C E

AN

D

R O

AD

W

AY

IM

PR

O

VE

M

EN

TS

O R

EG

O

N D

EP

T.

O F

ST

AT

E

LA

N D

S

BD

/S

D L

BD

/S

D L

SD

L/

W D

-3

SI

TE

P

LA

N

AUGUST 2025

SE

VE

N

D

EV

IL

S

R D

, C H

AR

LE

ST

O

N , O

R

REPLACE EX.

SECURITY

CAMERA

NEW WHEEL

STOPS, TYP

SEE

D3

NEW

GRAVEL

SURFACING

12" DEPTH

10.0'

5.0'

TYP

/1 3/

AD

D

IT

IO

N

AL

D

IM

EN

SI

O N

S

S

D L

6.0'

AutoCAD SHX Text

%%U PLAN SCALE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1"=80'

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FINAL PLANS

Sheets and Views
C1

File details come from the government source that posted it. Updated .