This is Addendum 1 to a Construction Items Bid Schedule for the City of Brookhaven's Briarwood Park Improvements project (23-104). The project involves comprehensive park redevelopment including preconstruction and site staking, clearing and demolition of existing structures across two designated areas, grading and drainage system installation, erosion control measures, site utilities including water line installation, and construction of new parking areas and roadways. The scope encompasses construction of segmented block walls, refurbishment and new installation of pavilions, tennis seating areas, community garden development with raised beds and perimeter fencing, concrete trails including a pervious concrete system, a 10' by 100' aluminum-bronze Gator Bridge with abutments and wing walls, concrete stairs, site furnishings including benches and trash receptacles, and site lighting and electrical work. The bid schedule details specific quantities for all line items, with references to corresponding construction documents and specifications. The pre-bid conference is scheduled for Thursday, June 29, 2023, at 10:00 a.m. EST at Briarwood Park Rec Center. Questions must be submitted by Monday, July 10, 2023, at 4:00 p.m. EST through the Bonfire portal. Bids are due Thursday, July 20, 2023, at 2:30 p.m. EST via the online Bonfire portal and will be opened via Zoom.

The bid schedule shows a subtotal of $1,250.00 with all line items containing zero unit costs and zero total costs, indicating this is a lump sum bid format where contractors must provide their own pricing. The schedule includes deductible alternates for specific items including drainage systems, segmented block walls, and pavilions. The document references numerous allowance items for contingencies such as excavation and removal of unsatisfactory soil, geotechnical borings, and various trail wall options. Bond requirements are listed at zero percent, and general conditions including phasing costs are not itemized within the construction items list, suggesting these costs will be incorporated separately as project management fees. The project encompasses approximately 160,000 square feet of site area requiring comprehensive final cleanup and as-built documentation upon completion.

Text of this file

Sheet1

CCity of Brookhaven Briarwood Park - CONSTRUCTION ITEMS BID SCHEDULE4/17/23
#Construction ItemsQuantityUnitContractorUnitTotalNotes
1Preconstruction and Site StakingSee sheets C300 & 301
AMobilization1Sum$ - 0$ - 0Not over 1% of subtotal
BStaking site1Job$ - 0$ - 0See specs & sheets C300 & 1
CPrepare Permitting schedule - Allowance1job1$ 250.00$ 250.00See specs & Exhibit 7
DUtility Locator1Sum$ - 0$ - 0See Specs Section 02100
EPrepare Traffic control and Phasing plan1Job$ - 0$ - 0See specs & Exhibit 10
FSecurity Fence - old chain link1job$ - 0$ - 0See Specs Section 02100
GCoordination with Tree Care Co. Allowance1job1$ 500.00$ 500.00See Exhibit B of ITB
HCoordination with Geotech Co. Allowance1job1$ 500.00$ 500.00See Exhibit B of ITB
2Clearing & Demolition1job$ - 0$ - 0See sheets C200 & C202
ATree protection fence3,615lf$ - 0$ - 0See sheets C203 & C204
BTree removal18trees$ - 0$ - 0See sheet C202 & C203
CDemolition Area ASee sheet C200
1. Protect items outside LOC1job$ - 0$ - 0See Specs Section 02060
2. Protect underground utilities1job$ - 0$ - 0See Specs Section 02060
3. Remove curb & gutter60lf$ - 0$ - 0See sheets C200 & C201
a. saw cut asphalt road38lf$ - 0$ - 0See sheet C200
4. Demolish & remove sidewalk2,000SF$ - 0$ - 0See sheet C200
5. Collect & salvage wheel stops20Ea$ - 0$ - 0See sheet C200
6. Remove sign and post3Ea$ - 0$ - 0See sheet C200
7. Relocate site boulders - Allow12Ea$ - 0$ - 0See sheet C200
8. Remove all site debris with LOD1job$ - 0$ - 0See sheet C200
9. Cut and remove water line1Job$ - 0$ - 0See sheet C200
10. Remove fire hydrant1job$ - 0$ - 0See sheet C200
11. Coordinate removal of power lines1job$ - 0$ - 0by Georgia Power
12. Demolish & remove asphalt39,380SF$ - 0$ - 0See sheets C200 & C201
13. Remove 1" PVC water Line280 LFjob$ - 0$ - 0At garden
14. Remove Irrigation Controller1Ea$ - 0$ - 0At Garden
15. Remove bike rack1Ea$ - 0$ - 0At Garden
DDemolition Area BSee Sheet C201
1. Protect items outside LOC1job$ - 0$ - 0See Sheet C201
2. Protect underground utilities1job$ - 0$ - 0See Sheet C201
3. Remove curb & gutter575lf$ - 0$ - 0See Sheet C201
a. saw cut road34lf$ - 0$ - 0See Sheet C201
4. Demolish & remove sidewalk575SF$ - 0$ - 0See Sheet C201
5. Demolish & remove storm pipe & structure35lf$ - 0$ - 0See Sheet C201
6. Remove sign and post7Ea$ - 0$ - 0See Sheet C201
7. Remove & Salvage arbors to reinstall2Ea$ - 0$ - 0See Sheet C201
8. Demolish & remove garden fence & beds1job$ - 0$ - 0See Sheet C201
9. Demolish existing headwall1Ea$ - 0$ - 0See Sheet C201
10. Remove all site debris with LOD1job$ - 0$ - 0See Sheet C201
11. Demolish & remove existing pavilion1job$ - 0$ - 0by Georgia Power
12. Demolish & remove asphalt17,600SF$ - 0$ - 0See Sheet C201
3Grading and Drainage
AGrading Site1job$ - 0$ - 0See sheets C400 & 401
1. Remove existing rock dam @ basin A1job$ - 0$ - 0See sheet C200
2. Build new dam @ basin A1job$ - 0$ - 0See sheet C400
a. Include coordination for soil boring1jobInclude in item A2
3. 4' chain-link fence around detention basin560lf$ - 0$ - 0Sim. Detail 1/21
a. 4' double gate1set$ - 0$ - 0See sheet C400
4. Grade out Basin C9,000SF$ - 0$ - 0See sheet C400
5. Tree root protection4Trees$ - 0$ - 0See detail 1/37
BDrainage Area A -CompleteSee Sheet C400
1. Drop inlet box2Ea$ - 0$ - 0See detail 1/14
2. Pedestal inlet3Ea$ - 0$ - 0See detail 3/14
3. Headwall1Ea$ - 0$ - 0See detail 4/14
4. Underground Detention system - complete376lf$ - 0$ - 0See Sheet #16
5. Gravel fill for underground detention100CY$ - 0$ - 0See Specs Section 02630
6. Coordinate w manufacturer for shop drawing1job$ - 0$ - 0See Section 01340
7. RCP 24"56lf$ - 0$ - 0See Section 02630
8. RCP 18"289lf$ - 0$ - 0See Section 02630
9. Crushed gravel trench240lf$ - 0$ - 0See detail 6/C403
10. Bio retention basins - complete2,460SF$ - 0$ - 0See detail 5/C403
11. Rip Rap3CY$ - 0$ - 0See Section 02630
CDrainage Area B -CompleteSee Sheet C401
1.Water Quality unit - complete1Ea$ - 0$ - 0See sheet C403
2. Pedestal inlet4Ea$ - 0$ - 0See detail 1 & 3/14
3. End wall1Ea$ - 0$ - 0See detail 4/14
5. HDPE 18"81lf$ - 0$ - 0See Section 02630
6. HDPE 12"95lf$ - 0$ - 0See Section 02630
4Erosion Control:1job$ - 0$ - 0See sheets C701 thru C709
AInitial Phase - Complete1job$ - 0$ - 0See sheet C702
BIntermediate Phase - Complete1job$ - 0$ - 0See sheet C703
CFinal Phase - Complete1job$ - 0$ - 0See sheet C704
DConstruction entrance2Ea$ - 0$ - 0See detail C705 /45
EErosion grassing8,350SF$ - 0$ - 0See Spec Section 02125
5Site Utilities;See sheet C500
AWater Fee - request city to pay1EaCity to pay direct
B3/4" line tap1job$ - 0$ - 0See sheet 17
C3/4" water line140lf$ - 0$ - 0See sheet 17
DRe install existing fire hydrant1job$ - 0$ - 0See sheet 17 detail 4/18
EFH connection lines20job$ - 0$ - 0See sheet 17
FSpare sleeves256lf$ - 0$ - 0See detail 14/19 & Sheet 17
GRepair existing water fountain1job$ - 0$ - 0on site inspection
HDrinking fountain @ garden1Ea$ - 0$ - 0See detail 1/22
IMeter, box, valve, backflow preventer1cost$ - 0$ - 0See sheet 17
JSite Hose Bid system - Complete5Ea$ - 0$ - 0See sheet 17 Detail 5/18
kInstall 3/4" PVC water line275Ea$ - 0$ - 0See detail 1/22
lInstall 1 RPP in insulated Hotbox1Ea$ - 0$ - 0See sheet 17
mRelocate Concrete Utility Vault - Coordinate1Job$ - 0$ - 0Work done by utility co.
Paid directly by City
6DumpsterSee sheet 21
A6" Concrete slab and approach pad960SF$ - 0$ - 0See detail 2/19
BEnclosure - 8' chain link fence48LF$ - 0$ - 0See detail 5/36
CDouble Gates - chain link - double 6' gate = 12'2sets$ - 0$ - 0See detail 6/36
DFixed bollards10Ea$ - 0$ - 0See detail 9/21
EShop Drawing - Fence and gates to fit1job$ - 0$ - 0See Section 01340
7New Parking & Road Realignment
AAsphalt parking lot40,500SF$ - 0$ - 0See detail 6/19
BAsphalt roadway 24'270lf$ - 0$ - 0See detail 6/19
CCurb and gutter - match existing950Ea$ - 0$ - 0See detail 7/19
DWheel stops72Ea$ - 0$ - 0See detail 13/19
EIntegral concrete curb522lf$ - 0$ - 0See detail 9/19
F5' Sidewalk 225 lf1,125SF$ - 0$ - 0See detail 12/19
GHandicap stripes2sets$ - 0$ - 0See detail 8/20
HPaint HC Symbols3Ea$ - 0$ - 0See detail 7/20
IReset HC Signs3Ea$ - 0$ - 0See detail 6/20
JReset EV parking signs2Ea$ - 0$ - 0See detail 8/20 & Sheet 17
K6' Sidewalk 725 lf4,650SF$ - 0$ - 0See detail 12/19
LRemovable bollards5Ea$ - 0$ - 0See detail 8/22
8Segmented Block WallSee sheet C609 # 23 & #39
AWall A 67 lf Parking - see alternates161ff$ - 0$ - 0See detail 4/C618 & sheet 39
BWall B 76 lf at steps - see alternates182ff$ - 0$ - 0See detail 3/C618 & sheet 39
CWall C 80 lf culvert extension - see alternates280ff$ - 0$ - 0See detail 2/C618 & sheet 39
DWall D 84 lf Culvert315ff$ - 0$ - 0See detail 1/C618
E42" Guardrail74lf$ - 0$ - 0See detail 6/C615
FShop drawings for wall D5Ea$ - 0$ - 0See Section 01340
GComplete city building permit for wall D1job$ - 0$ - 0See Exhibit B of ITB

9 Refurbish Old Pavilion- Omitted from Bid NIC NIC See detail 1/36

10Tennis Seating AreaSee Sheet 35
ASidewalk 5' x 210'1,050SF$ - 0$ - 0See detail 1/19
BWood Seat & wall 3 TIERS 40' EA120lf$ - 0$ - 0See detail 2/35
CWood steps 5 ea @ 4'20lf$ - 0$ - 0See detail 3/35
DGranite Screenings 2" thick surface400SF$ - 0$ - 0See detail 2/35
11Tennis Pavilion # 1 Poligon1Ea$ - 0$ - 0See Poligon sheet C604
AConcrete slab200SF$ - 0$ - 0See detail 2/24
1. Pavilion Erection1job1$ - 0$ - 0See detail 2/24
BSurface mount metal Post footings8Ea$ - 0$ - 0See detail 4/25
CGranite column base 30" ht8Ea$ - 0$ - 0See detail 1/25
D5' concrete sidewalk 70 lf350sf$ - 0$ - 0See detail 1/19
ERepair existing water fountain1job$ - 0$ - 0examine on site
FInstall hose bib with slab on fountain line1job$ - 0$ - 0See Sheet 17 & 18
GShop drawings on Pavilion #11Set$ - 0$ - 0See Section 01340
HFire Extinguisher1Ea$ - 0$ - 0See detail 4/24
IComplete city building permit1Ea$ - 0$ - 0See Exhibit B of ITB
JPoligon Warranty1Ea$ - 0$ - 0See Poligon PO.
12New Entrance Sign
AStone -Wall 6' x 12' granite on both sides12lf$ - 0$ - 0See detail 2/36
BAttach Park Sign1Ea$ - 0$ - 0Sign provided by owner
13Tennis Parking
AAsphalt paving1,600SF$ - 0$ - 0See detail 9/19
BConcrete curb and gutter220LF$ - 0$ - 0See detail7/19
CCurb Cut 6'1job$ - 0$ - 0See detail 6/37
DTruncated domes1set$ - 0$ - 0See detail 10/34
EMill existing asphalt roadway15,000SF$ - 0$ - 0See detail 5/19
1. Topping asphalt roadway15,000SF$ - 0$ - 0See detail 5/19
14Pavilion # 2 Poligon (Community Garden)1Ea$ - 0$ - 0Poligon Sheet C604, #23
AConcrete slab200SF$ - 0$ - 0See detail 2/24
1. Pavilion Erection1job1$ - 0$ - 0See detail 2/24
BSurface mount metal post footings8Ea$ - 0$ - 0See detail 4/25
C30" Granite column base8Ea$ - 0$ - 0See detail 1/25
DCeiling fan and electrical outlet -Complete1Job$ - 0$ - 0See detail 3/24
EFire Extinguisher1Ea$ - 0$ - 0See detail 4/24
FShop drawings on Pavilion #21Set$ - 0$ - 0See Section 01340
GComplete city building permit1Ea$ - 0$ - 0See Exhibit B of ITB
HPoligon Warranty1Ea$ - 0$ - 0See Poligon PO.
15Sidewalk on Briarwood Way
A5' concrete walk 105 '525SF$ - 0$ - 0See detail 9/19
BConcrete curb - Match existing105LF$ - 0$ - 0See detail7/19
16Concrete Pervious Trail (Community Garden)See Sheet 33
A8' wide pervious concrete trail 265' x 82,120SF$ - 0$ - 0See detail 12/19
B6' wide pervious concrete trail 175 lf1,050SF$ - 0$ - 0See detail 12/19
C10' wide heavy duty concrete trail 120'1,200SF$ - 0$ - 0See detail 2/19
DRemovable bollard3Ea$ - 0$ - 0See detail 9/22
17Community GardenSee sheet C614
Awood Gate A 2 - 2.75' each2Ea$ - 0$ - 0Customize from Fence detail
BGarden Boxes 4' x 10' x 18" ht.21Ea$ - 0$ - 0See detail 3/36
1. HC Garden Box 4' x 10' x 3' Ht1Ea$ - 0$ - 0Sim. to detail 3/36
2. Soil mix for boxes52CY$ - 0$ - 0See section 02921
CPerimeter Fence 5' Ht228lf$ - 0$ - 0See detail 2 / 33
DPerimeter Flower Bed 18" Ht192lf$ - 0$ - 0See detail 3 / 33
EGarden walking surface - aged HW mulch2,120SF$ - 0$ - 0See detail 5 /33
1. Textile fabric over walking surface2,120SF$ - 0$ - 0See Detail 6/37
FPotting shed structure 10' x 20'200SF$ - 0$ - 0See detail 5/ 33
1. Granite Screenings Surface200SF$ - 0$ - 0See detail 5/ 33
2. Wood Bench top16lf$ - 0$ - 0See detail 4/ 33
3. Fire Extinguisher1ea$ - 0$ - 0On potting shed post
4. Pickup Potting Shed city building permit1ea$ - 0$ - 0At City Hall.
GWood Gate B 2 - 2.75' each2Ea$ - 0$ - 0Customize from Fence detail
HReconstruct Arbors X & Y2Ea$ - 0$ - 0See detail 1/ 33 - location
IInstall salvaged birdhouse (garden)1Ea$ - 0$ - 0labor only

18 Crushed slate trail 6' wide - 500 lf 3,000 SF $ - 0 $ - 0 See detail 3/37

19Bridge West Access and Concrete TrailSee Detail 1/32
AClear pathway and prune limbs - access1Job$ - 0$ - 0See Spec Section 02112
BTextile fabric over ground 10' x 150' access1,500SF$ - 0$ - 0See detail 6/37
CGravel protection course 3" x 10' x 150' access14CY$ - 0$ - 0See detail 1/32
DCleanup debris after bridge construction1,500SF$ - 0$ - 0See Section 02975
EStructural base course 8' x 150' 3" thick15CY$ - 0$ - 0See detail 12/19
F8' Pervious concrete trail @ 150'1,200SF$ - 0$ - 0See detail 12/19
GAdd soil and mulch along edges130SF$ - 0$ - 0See detail 1/19
G5' Concrete sidewalk on street - match existing130SF$ - 0$ - 0See detail 1/19
HConcrete curb - match existing24lf$ - 0$ - 0See detail 7/19
20Gator Bridge -10' x 100' Aluminum - bronze100LF$ - 0$ - 0See sheets C610 & C611
AFreight FOB - by Gator Bridge1Job1$ - 0$ - 0See Specs Section 01640
1. Shop Drawings - by Gator Bridge1Set$ - 0$ - 0See Specs Section 01640
B10' Lumberock Deck -installation1,000job$ - 0$ - 0Part of Gator Bridge materials
CConcrete Abutments2Ea$ - 0$ - 0See Sheet C612
DWing Walls -( East 12' West 12' )24lf$ - 0$ - 0See detail 1/29
EGuardrails18lf$ - 0$ - 0See detail 6/34
FHelical Piers - foundation drawings by cont.Prepare shop drawings
1. Helical Piers - Vertical - 8 per abut. 50' long16Ea$ - 0$ - 0See details 2 & 3/29
2. Helical Piers - Horizontal 2 per abut. 30' long4Ea$ - 0$ - 0See sheets 29 & 30
GBridge Installation complete1Job$ - 0$ - 0See Specs Section 05552
HComplete City building permit1job$ - 0$ - 0See Exhibit B of ITB
I10 yr. Warranty on Bridge - Gator1job$ - 0$ - 0See Specifications
21Concrete Stairs 6' wide w cheek wall10Ea$ - 0$ - 0See sheet C607
AHandrail on steps50lf$ - 0$ - 0See detail 1/26
B6' wide pervious concrete trail 270 lf1,620SF$ - 0$ - 0See detail 12/19
CBench @ beginning of trail1Ea$ - 0$ - 0See detail 8/22
22Bridge East AccessSee detail 2/32
AGrade in pathway400SF$ - 0$ - 0See Section 02200
Btextile fabric over ground 10' x 40'400SF$ - 0$ - 0See detail 6/37
CGravel support course 3" x 10' x 40'4CY$ - 0$ - 0See detail 1/32
DCleanup to remove gravel and fabric400SF$ - 0$ - 0See Section 02975
23Site Furnishings
ABench5Ea$ - 0$ - 0See detail 8/22
BSwinging bench2Ea$ - 0$ - 0See detail 4/34
CPicnic table8Ea$ - 0$ - 0See detail 6/22
DTrash receptacle4Ea$ - 0$ - 0See detail 7/22
ETrach /Recycle receptacle4Ea$ - 0$ - 0See detail 7/22
FBike Rack - @ swimming pool1Ea$ - 0$ - 0See detail 9/22
GBench concrete pad 4 x 8 = 36 sf5Ea$ - 0$ - 0See detail 3/22
HSwinging bench concrete pad 5' x 12 = 60 sf'2Ea$ - 0$ - 0See detail 4/34
ITrash receptacle concrete pad @ 4 x 4 = 16 Sf ea4Ea$ - 0$ - 0See detail 2/22
JTrash /Recycle concrete pad @ 4 x 4 = 16 Sf ea4Ea$ - 0$ - 0See detail 4/22
KBike Rack - concrete pad @ 8 x 12 = 96 sf ea.96sf$ - 0$ - 0See detail 9/22
24Site Signage
AStop sign1Ea$ - 0$ - 0See detail 5/20
BReinstall park rules sign1JOB$ - 0$ - 0Sim. detail 1/20
CYield sign3Ea$ - 0$ - 0Sim. detail 5/20
DReinstall dog station1job$ - 0$ - 0Labor only
25Landscape - Plant List Exhibit K ITBSee sheet L100 Sheet 50
ASite Planting Schedule1job$ - 0$ - 0Transfer from Plant Schedule
BBioretention Planting1job$ - 0$ - 0Transfer from Plant Schedule
26Site Lighting & Electrical - See Exbibit K ITBSee sheets 52 to 59
AParking lot lighting - see Fixture schedule1job$ - 0$ - 0Sheets 53 to 55
BDuplex receptacles for garden - Complete1job$ - 0$ - 0See sheets E101 to E104
CRelocate EV charges - complete2EaSee sheet 55
DATT conduit installation1job$ - 0$ - 0See sheet ATT-01 sheet 52
27Final Cleanup - SITE160,000sf$ - 0$ - 0See Section 02975
AAs-built drawings1job1$ - 0$ - 0See Exhibit B of ITB
28Allowance ItemsSee Section 01220
AExcavation & removal of unsatisfactory soil200CY200$ - 0$ - 0See Section 02200
BExcavation & removal of mass rock to subgrade100CY100$ - 0$ - 0See Section 02200
CExcavation & removal of trench rock to subgrade100CY100$ - 0$ - 0See Section 02200
DRefill void with satisfactory soil200CY200$ - 0$ - 0See Section 02200
ERefill void with GAB200CY200$ - 0$ - 0See Section 02200
FRefill void with #57 stone or surge stone200CY200$ - 0$ - 0See Section 02200
G18" silt sock - Sd1-Ns500lf500$ - 0$ - 0See Erosion Control sheets
HDouble silt fence300lf300$ - 0$ - 0See Erosion Control sheets
Ihand dig double silt fence trench Sd1-S300lf300$ - 0$ - 0Labor only
JSilt Fence and 18" silt sock combination300lf300$ - 0$ - 0See Addendum #1 Detail
KWooden trail walls - uphill100lf5$ - 0$ - 0See detail 5/34
LWooden trail walls - downhill200LF150$ - 0$ - 0See detail 4/36
MHelical Piers100lf100$ - 0$ - 0See sheets 31 & 32
NGeotechnical borings Deep 70'2Ea2$ - 0$ - 0See Section 05663
Shallow 10'6Ea6$ - 0$ - 0See sheets 31 & 32
OMetal Guardrail 6' sections 10 each60LF60$ - 0$ - 0See detail 6/34
29Additional Items identified by the ContractorSee Exhibit K of ITB
A$ - 0$ - 0
B$ - 0$ - 0
C$ - 0$ - 0
Sub - Total$ 1,250.00
Bond- 0%$ - 0$ - 0All costs not in items list
General Conditions including Phasing- 0%$ - 0$ - 0All costs not in items list

TOTAL PROJECT BID $ 1,250.00 Lump Sum Bid

DEDUCT ALTERNATES - ALL in BASE BID QTY UNIT Contractor Unit $ Deduct $

3CDrainage Area B -See Sheet C401
1.Water Quality unit1Ea$ - 0$ - 0See detail C/403
2. Pedestal inlet4Ea$ - 0$ - 0See details 1 & 3/14
3. End wall1Ea$ - 0$ - 0See detail 4/14
5. HDPE 18"81lf$ - 0$ - 0See Section 02630
6. HDPE 12"95lf$ - 0$ - 0See Section 02630
TOTAL ITEM$ - 0
8Segmented Block Wall
AWall A 67 lf Parking161ff$ - 0$ - 0See detail 4/39
BWall B 76 lf at steps182ff$ - 0$ - 0See detail 3/39
CWall C 80 lf culvert extension280ff$ - 0$ - 0See detail 2/39
DAdd back grading option wo walls1job$ - 0$ - 0See Sheet 400
TOTAL ITEM$ - 0
11Pavilion # 1 Poligon (Tennis Area)1Ea$ - 0$ - 0See Poligon Sheet C604
AConcrete slab200SF$ - 0$ - 0See detail 2/24
BSurface mount metal Post footings8Ea$ - 0$ - 0See detail 4/25
C30# Column stone base8Ea$ - 0$ - 0See detail 1/25
D5' concrete sidewalk 70 lf350SF$ - 0$ - 0See detail 12/19
DFire Extinguisher1Ea$ - 0$ - 0See detail 4/24
FShop drawings on Pavilion #21Set$ - 0$ - 0See Section 01340
GComplete city building permit1Ea$ - 0$ - 0See Exhibit B of ITB
HPoligon Warranty1Ea$ - 0$ - 0See Poligon PO.
TOTAL ITEM$ - 0
13Tennis Seating Area
ASidewalk 5' x 210'1,050SF$ - 0$ - 0See detail 1/35 C616
BSeating walls110lf$ - 0$ - 0See detail 2/35
CWooden steps 6 ea @ 4'20lf$ - 0$ - 0See detail 3/35
DGranite Screenings 2" thick400SF$ - 0$ - 0See detail 1/35
TOTAL ITEM$ - 0
14Pavilion # 2 Poligon (Community Garden)1EA$ - 0$ - 0See Poligon sheet C604
AConcrete slab200SF$ - 0$ - 0See detail 2/24
BSurface mount Post footings8Ea$ - 0$ - 0See detail 4/25
C3-" Granite Column stone base8Ea$ - 0$ - 0See detail 1/25
DCeiling fan and electrical1Job$ - 0$ - 0See detail 3/24
EFire Extinguisher1Ea$ - 0$ - 0See detail 4/24
FShop drawings on Pavilion #21Set$ - 0$ - 0See Section 01340
GComplete city building permit1Ea$ - 0$ - 0See Exhibit B of ITB
HPoligon Warranty1Ea$ - 0$ - 0See Poligon PO.
TOTAL ITEM$ - 0

20 I Bridge 10 year Warranty 1 Ea $ - 0 $ - 0 See Gator Quote

TOTAL DEDUCTS $ - 0

Other files

File Type Posted
Award Information —
Bid Submissions —
Addendum 2 —
specs —
documentation —
23-104 —
RFP 23-104 Addendum #1 —
Award Information —
Workers Comp. RFP —
RCSS Turf-Track RFP —
Turf Addendum 1 —
Award Information —
Award Information —
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .