The Addenda Report is issued by Orange County, Florida's Administrative Services Procurement Division for the Orange County Courthouse Elevator Modernization project (IFB No. Y24-747). The document details five addenda issued between February 1 and March 28, 2024, with multiple site visits scheduled for February 8-9, 2024, at the Courthouse Building C-Tower and surrounding buildings. The bid due dates were progressively revised, with the final due date set for Thursday, April 11, 2024, at 4:00 PM. Site visits required bidders to assemble at the loading dock security desk, show identification, and receive vendor badges, with parking available in the garage or streetside (for a fee).
The addenda include critical design team clarifications for specific elevators (E1-E15), specifying machine types, maintenance requirements, and operational expectations. Working hours for the modernization of Elevators E1-E6 and E9-E14 are set at 60 hours per week, Monday through Friday, from 6:00 AM to 6:00 PM. Addendum #5 provided additional context by attaching the elevator maintenance contract scope of work and linking to the Orange County Vendor Services Term Contract (Contract number Y20-134) for Elevators and Escalators Maintenance Service. The project appears to be a comprehensive elevator modernization effort with specific technical requirements and rigorous implementation guidelines.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Orange County, Florida
Administrative Svcs., Procurement Division Carrie Mathes, Procurement Division Manager
400 E South Street, Orlando, FL 32801
(407) 836-5635
ADDENDA REPORT
undefined - Orange County Courthouse Elevator Modernization
ADDENDA REPORT
IFB No. Y24-747
Orange County Courthouse Elevator Modernization
Monday, April 29, 2024
Addenda Issued:
Addendum #1 Feb 1, 2024 2:20 PM Additional Site Visits are scheduled as follows:
Thursday, February 8, 2024 Start Time: 7:30 am Meeting Location: Courthouse Building C-Tower
425 North Orange Ave Orlando, FL 32801 Please note: Bidders will assemble at Courthouse Building C-Tower loading dock Security
Desk. Bidders will check in with the Security. They will need to show their ID.
They will be given a vendor badge.
Parking will be in the parking garage or streetside parking. There is a fee to park.
Site Visit Schedule Start with Courthouse Building C-Tower 6-pack elevators, and 22nd floor.
Friday, February 9, 2024 Start Time: 7:30 am Meeting Location: Courthouse Building C-Tower
425 North Orange Ave Orlando, FL 32801 Please note: Bidders will assemble at Courthouse Building C-Tower loading dock Security
Desk. Bidders will check in with the Security. They will need to show their ID.
They will be given a vendor badge.
Parking will be in the parking garage or streetside parking. There is a fee to park.
Site Visit Schedule Start with Courthouse Building C-Tower lower level, elevators 7 and 8 Then we move to Building A elevators 16 and 17 Then We move to Building B elevators 18 and 19 And finally the Central Energy Plant elevator 24.
ADDENDA REPORT
IFB-C No. Y24-747 Orange County Courthouse Elevator Modernization
That will conclude the two-day site visit of the elevators.
Addendum #2 Feb 14, 2024 11:36 AM Revised Due Date: Thursday, March 7, 2024 4:00pm
Revised Questions Deadline: Wednesday, February 28, 2024, 5:00 PM
Addendum #3 Feb 26, 2024 4:07 PM Revised Due Date: Thursday, March 21, 2024 4:00pm
Addendum #4 Mar 19, 2024 3:48 PM Revised Due Date: Thursday, April 11, 2024 4:00pm
Attachments:
• S-0.00 - Cover Sheet
Clarifications:
• Design Team Clarification - 1
E15 Elevator- E15 is ONLY included in the elevator maintenance requirements (01 80 00) and (14 22 00
2.15 & 2.16). No work other work on E15 is required on this project.
• Design Team Clarification – 2
E1-6-Contractor must provide all necessary National Technical support onsite to ensure proper operation at all times.
• Design Team Clarification – 3
E12 - E12 shall be Gearless Machine (2.7 D requirements)
• Design Team Clarification - 4
E10 -E10 shall be Geared Machine (2.7 C requirements)
• Design Team Clarification - 5
E13 and E14-E13 & E14 shall be allowed to retain existing deflector sheaves just so long as bearings are replaced.
• Design Team Clarification - 6
E15 Elevator- While alteration work is not required for this elevator, integration into both the Remote Fire Command Panel and the Remote Elevator Management System is required.
• Design Team Clarification - 7
All Elevators-Equipment may be wireless in part or in whole.
• Design Team Clarification – 8
Working Hours- During the modernization work of Elevators E1-E6, E9-E14. The contractor must work 60 per week, Monday through Friday to expedite installation, working 6:00 am-6:00 pm.
ADDENDA REPORT
IFB-C No. Y24-747 Orange County Courthouse Elevator Modernization
Attachments:
· S-0.00 - Cover Sheet Addendum #5 Mar 28, 2024 3:37 PM
• Attached is a copy of the elevator maintenance contract scope of work.
• Link to the Orange County Vendor Services Term Contract page. Current Contract number Y20-134 Elevators and Escalators Maintenance Service o https://apps.ocfl.net/OrangeBids/Termcontracts/listtermcontract.asp?submitted=1
Attachments:
· Elevator Maintenance Contract Scope of Work 3.21.24 https://api.procurement.opengov.com/api/v1/attachments/532999 https://apps.ocfl.net/OrangeBids/Termcontracts/listtermcontract.asp?submitted=1 https://api.procurement.opengov.com/api/v1/attachments/543075
File details come from the government source that posted it. Updated .