ACM REPORT HP57.pdf
PDF 71 KB Posted
- Solicitation number
- N40085-26-R-9047
About this file
This is an Asbestos Inspection Report for Building HP57 (a Barracks Equivalent Quarters facility) at MCB Camp Lejeune, dated May 19, 2021. The building, constructed in 1976, has been assigned a hazard ranking of 3/GREEN with identified asbestos-containing materials (ACM) remaining in the structure.
The report identifies two categories of non-friable ACM currently present: roofing sealant (black) located in the attic/previous roof perimeter and parapet flashings (2,672 SF, identified March 11, 2010) and vapor barrier material under hard tiles at shower pans in mechanical rooms (160 SF, identified March 11, 2010 and reconfirmed October 31, 2019). Extensive sampling conducted between June 2006 and October 2019 tested numerous building materials including floor tiles, ceiling tiles, vinyl base, pipe insulation, caulking, drywall, and tar paper; the majority tested negative for asbestos, while samples of roofing sealant and vapor barrier confirmed the presence of chrysotile asbestos at low percentages (3% and 9% respectively in specific samples). The report emphasizes that intact, undisturbed ACM does not constitute a significant health hazard and mandates that personnel avoid disturbance or damage to these materials. Building occupants must report any damage, dust, or debris to the Asbestos Program Manager at 910-451-5837, and ACM will undergo periodic inspections to monitor condition changes. Camp Lejeune maintains a copy of the complete survey for the building.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASBESTOS INSPECTION REPORT of:
Building # HP57
MCB CAMP LEJEUNE
Wednesday, May 19, 2021
Print Date
Wednesday, May 19, 2021 Page 1 of 10Print Date:
INSPECTION SUMMAR
BLDG #:
OCCUPANT:
YEAR BUILT:
BUILDING COMMENTS:
HP57
BEQ
HAZ RANK 3/GREEN [AH OCT2019]
ROOFING SEALANT AND TAR PAPER
OCT2019
NO CHANGES
JUL2016
ACM REMAINS
NOV2013
PVS. ACM REMAINS, NO CHANGES
MAR2010
PVS. SAMPLED MATERIALS CONFIRMED NON ACM, ADDL SAMPLING, ACM INCLUDES:
ROOFING SEALANT, BLACK
TAR PAPER, BLACK
VAPOR BARRIER, SHOWER PANS
INSPECT JUN06
NO ASBESTOS CONTAINING MATERIALS WERE IDENTIFIED.
ASBESTOS MANAGER: 910-451-5837
Friable ACM(s) identified
Non-friable ACM(s) identified
NOTICE: The following asbestos-containing materials have been identified in this structure. Refer to survey findings for additional information or contact the Asbestos Program Manager. Please note ACM that is intact and undisturbed is not considered a significant health hazard to building occupants.
DESCRIPTION LOCATION Date Quantity
DESCRIPTION LOCATION Date Quantity
No friable ACM records found in database
NOTIFICATION OF ACM IN BUILDING
ROOFING SEALANT, BLACK 2,672 SFATTIC/ PREVIOUS ROOF; PERIMETER
AND PARAPET FLASHINGS
3/11/2010
VAPOR BARRIER 160 SFUNDER HARD TILES AT SHOWER PANS
(ACCESSIBLE ONLY IN MECHANICAL
ROOMS), PRESUMED ALL SHOWERS
3/11/2010
VAPOR BARRIER 160 SFUNDER HARD TILES AT SHOWER PANS
(ACCESSIBLE ONLY IN MECHANICAL
ROOMS), PRESUMED ALL SHOWERS
10/31/2019
Wednesday, May 19, 2021 Page 2 of 10Print Date:
Tested Non ACM or REMOVED Materials
DESCRIPTION LOCATION Date
ROOFING SEALANT, BLACK 2,672 SFATTIC/ PREVIOUS ROOF; PERIMETER
AND PARAPET FLASHINGS
10/31/2019
VAPOR BARRIER 160 SFUNDER HARD TILES AT SHOWER PANS
(ACCESSIBLE ONLY IN MECHANICAL
ROOMS), PRESUMED ALL SHOWERS
11/5/2013
ROOFING SEALANT, BLACK 2,672 SFATTIC/ PREVIOUS ROOF; PERIMETER
AND PARAPET FLASHINGS
11/5/2013
VAPOR BARRIER 160 SFUNDER HARD TILES AT SHOWER PANS
(ACCESSIBLE ONLY IN MECHANICAL
ROOMS), PRESUMED ALL SHOWERS
7/20/2016
ROOFING SEALANT, BLACK 2,672 SFATTIC/ PREVIOUS ROOF; PERIMETER
AND PARAPET FLASHINGS
7/20/2016
12" TAN FLOOR TILE AND ADHESIVE CENTRAL LOUNGES 6/28/2006
PIPE INSULATION SEALANT CENTRAL AREA LAUNDRYS 6/28/2006
MISCELLANEOUS SEALANT CENTRAL LAUNDRIES AT PIPE
PENETRATIONS/ PATCHING
6/28/2006
12" TAN FLOOR TILE AND ADHESIVE DORM ROOMS THROUGHOUT
(PRIMARY TILE, SUPERCEEDED BY
HM01)
6/28/2006
DRYWALL AND JOINT MATERIAL DORM ROOMS THROUGHOUT 6/28/2006
2'x2' CEILING TILE, CENTRAL LOUNGES 6/28/2006
EXTERIOR CAULKING, THROUGHOUT BUILDING 6/28/2006
TEXTURED CEILING MATERIAL DORM ROOMS THROUGHOUT, ON
CONCRETE
6/28/2006
MISCELLANEOUS SEALANT MECHANICAL ROOM PIPE
PENETRATIONS THROUGH BLOCK
WALLS
6/28/2006
BROWN VINYL BASE AND ADHESIVE, 4" CENTRAL LOUNGES AND HALLS 6/28/2006
BROWN VINYL BASE AND ADHESIVE, 4" DORM ROOMS THROUGHOUT 6/28/2006
MISCELLANEOUS SEALANT MECHANICAL ROOM AND CENTRAL
PIPE CHASE DUCTS
6/28/2006
PIPE INSULATION MECHANICAL ROOM SUPPLY AND
RETURN LINES
6/28/2006
LAGGING PAPER ON FIBERGLASS CENTRAL PIPE CHASES 3/11/2010
RESIDUAL MASTIC FIRST FLOOR CENTER HALLWAY 3/11/2010
FIBERGLASS INSULATION SEALANT PIPE CHASES AND MECHANICAL
ROOMS
3/11/2010
INTERIOR CAULKING, ATTIC/ PREVIOUS ROOF; PERIMETER
PARAPET WALL BASE
3/11/2010
Wednesday, May 19, 2021 Page 3 of 10Print Date:
ACM only presents a health hazard when asbestos fibers are airborne and inhaled.
Avoid disturbance which will release fibers. The presence of asbestos does not constitute a health hazard.
HEALTH ASPECTS:
Do not disturb or cause damage to ACM. Do not sand, grind or abrade materials or cause damage with any type of equipment.
CONDITIONS TO AVOID:
Report any damage, dust or debris that may come from ACM or suspect ACM, or any change in the condition of materials, or accidental disturbance to the Asbestos
Program Manager.
REPORTS OF DAMAGE:
Corrective action initiated to minimize fiber release and protect personnel. RESPONSE ACTION:
ACM will be inspected periodically to evaluate any changes in condition.INSPECTION:
The Camp Lejeune Asbestos Program Manager maintains a copy of the survey for the building.
RECORDKEEPING:
CAMP LEJEUNE Asbestos Program Manager: Phone: (910) 451-5837
EXTERIOR CAULKING, BRICK WALL EXPANSION JOINTS 3/11/2010
CONCRETE EXPANSION JOINT MATERIAL FIRST FLOOR BRICK/ CONCRETE SLAB
JOINT PERIMETER
3/11/2010
ROOFING MATERIAL, ATTIC/ ROOF, MAIN COVERING
RESIDUAL
3/11/2010
TAR PAPER, BLACK ATTIC/ ROOF, PREVIOUS ROOFING
VAPOR BARRIER THROUGHOUT
3/11/2010
ELECTRICAL WRAPPED WIRING NORTHEAST EXTERIOR GROUND AT
DITCH
3/11/2010
EXTERIOR CAULKING, METAL WINDOWS 3/11/2010
TAR PAPER, BLACK ATTIC/ ROOF, PREVIOUS ROOFING
VAPOR BARRIER THROUGHOUT
10/31/2019
MISCELLANEOUS SEALANT MECHANICAL ROOM AND CENTRAL
PIPE CHASE DUCTS
10/31/2019
12" TAN FLOOR TILE AND ADHESIVE CENTRAL LOUNGES AND OFFICE
AREAS, DORM ROOMS THROUGHOUT
3/11/2010
TEXTURED CEILING MATERIAL DORM ROOMS THROUGHOUT, ON
CONCRETE
3/11/2010
DRYWALL AND JOINT MATERIAL DORM ROOMS THROUGHOUT 3/11/2010
MISCELLANEOUS SEALANT MECHANICAL ROOM AND CENTRAL
PIPE CHASE DUCTS
3/11/2010
MISCELLANEOUS SEALANT MECHANICAL ROOM AND CENTRAL
PIPE CHASE DUCTS
7/20/2016
Wednesday, May 19, 2021 Page 4 of 10Print Date:
SAMPLES COLLECTED
Sample Sample
Date
HA Sample Location Chr
Amo
Oth
Description
HP57-01-01 6/28/200601 1ST FL LOUNGE 0 0 012" TAN FLOOR TILE
AND ADHESIVE
w/ WHITE
HP57-01-02 6/28/200601 1ST FL LOUNGE 0 0 012" TAN FLOOR TILE
AND ADHESIVE
w/ WHITE
HP57-01-10 3/11/201001 1ST FL CNTR OFFICE 0 0 012" TAN FLOOR TILE
AND ADHESIVE
w/ WHITE
HP57-01-11 3/11/201001 1ST FL WEST WING, SOUTH
CNTR RM
0 0 012" TAN FLOOR TILE
AND ADHESIVE
w/ WHITE
HP57-01-11tem 3/11/201001 1ST FL WEST WING, SOUTH
CNTR
0 0 012" TAN FLOOR TILE
AND ADHESIVE
w/ WHITE
HP57-01-12 3/11/201001 1ST FL EAST WING, NW RM 0 0 012" TAN FLOOR TILE
AND ADHESIVE
w/ WHITE
HP57-01-13 3/11/201001 1ST FL EAST WING, NE RM 0 0 012" TAN FLOOR TILE
AND ADHESIVE
w/ WHITE
HP57-01-14 3/11/201001 2ND FL EAST WING, NE RM 0 0 012" TAN FLOOR TILE
AND ADHESIVE
w/ WHITE
HP57-01-14tem 3/11/201001 2ND FL EAST WING, NE RM 0 0 012" TAN FLOOR TILE
AND ADHESIVE
w/ WHITE
HP57-01-15 3/11/201001 2ND FL WEST WING, NE RM 0 0 012" TAN FLOOR TILE
AND ADHESIVE
w/ WHITE
HP57-01-16 3/11/201001 2ND FL EAST WING, SE RM 0 0 012" TAN FLOOR TILE
AND ADHESIVE
w/ WHITE
HP57-01-17 3/11/201001 3RD FL CNTR LOUNGE 0 0 012" TAN FLOOR TILE
AND ADHESIVE
w/ WHITE
HP57-01-18 3/11/201001 3RD FL WEST WING, NE RM 0 0 012" TAN FLOOR TILE
AND ADHESIVE
w/ WHITE
HP57-01-18tem 3/11/201001 3RD FL WEST WING, NE RM 0 0 012" TAN FLOOR TILE
AND ADHESIVE
w/ WHITE
HP57-01-19 3/11/201001 3RD FL WEST WING, SE RM 0 0 012" TAN FLOOR TILE
AND ADHESIVE
w/ WHITE
HP57-01-20 3/11/201001 3RD FL EAST WING, SE RM 0 0 012" TAN FLOOR TILE
AND ADHESIVE
w/ WHITE
HP57-02-01 6/28/200602 1ST FL LOUNGE 0 0 02'x2' CEILING TILE, HP57-02-02 6/28/200602 1ST FL LOUNGE 0 0 02'x2' CEILING TILE, Wednesday, May 19, 2021 Page 5 of 10Print Date:
HA Sample Location Chr
Amo
Oth
Description
HP57-03-01 6/28/200603 1ST FL LOUNGE 0 0 0BROWN VINYL BASE
AND ADHESIVE, 4"
HP57-03-02 6/28/200603 3RD FL LOUNGE 0 0 0BROWN VINYL BASE
AND ADHESIVE, 4"
HP57-04-01 6/28/200604 1ST FL LAUNDRY 0 0 0PIPE INSULATION
SEALANT
WHITE
HP57-04-02 6/28/200604 2ND FL LAUNDRY 0 0 0PIPE INSULATION
SEALANT
WHITE
HP57-05-01 6/28/200605 1ST FL LAUNDRY 0 0 0MISCELLANEOUS
SEALANT
GREEN
HP57-05-02 6/28/200605 1ST FL LAUNDRY 0 0 0MISCELLANEOUS
SEALANT
GREEN
HP57-06-01 6/28/200606 1ST FL NORTH CNTR ROOM 0 0 0EXTERIOR CAULKING, GRAY
HP57-06-02 6/28/200606 2ND FL NORTH CNTR ROOM 0 0 0EXTERIOR CAULKING, GRAY
HP57-07-01 6/28/200607 1ST FL EAST WING, NW RM
0 0 0TEXTURED CEILING
MATERIAL
HP57-07-02 6/28/200607 1ST FL WEST WING, NW
RM 122
0 0 0TEXTURED CEILING
MATERIAL
HP57-07-03 6/28/200607 2ND FL EAST WING, SW RM
0 0 0TEXTURED CEILING
MATERIAL
HP57-07-04 6/28/200607 2ND FL WEST WING, SE RM
0 0 0TEXTURED CEILING
MATERIAL
HP57-07-05 6/28/200607 3RD FL WEST WING, SE
RM328
0 0 0TEXTURED CEILING
MATERIAL
HP57-07-06 6/28/200607 3RD FL EAST WING, SE RM
0 0 0TEXTURED CEILING
MATERIAL
HP57-07-07 6/28/200607 3RD FL EAST WING, SOUTH
CNTR RM 317
0 0 0TEXTURED CEILING
MATERIAL
HP57-07-10 3/11/201007 1ST FL CNTR HALL 0 0 0TEXTURED CEILING
MATERIAL
HP57-07-11 3/11/201007 1ST FL WEST WING, SE RM 0 0 0TEXTURED CEILING
MATERIAL
HP57-07-12 3/11/201007 1ST FL EAST WING, SW RM 0 0 0TEXTURED CEILING
MATERIAL
HP57-07-13 3/11/201007 1ST FL EAST WING, NORTH
CNTR RM
0 0 0TEXTURED CEILING
MATERIAL
Wednesday, May 19, 2021 Page 6 of 10Print Date:
HA Sample Location Chr
Amo
Oth
Description
HP57-07-14 3/11/201007 2ND FL EAST WING, NE RM 0 0 0TEXTURED CEILING
MATERIAL
HP57-07-15 3/11/201007 2ND FL WEST WING, NE RM 0 0 0TEXTURED CEILING
MATERIAL
HP57-07-16 3/11/201007 2ND FL EAST WING, SE RM 0 0 0TEXTURED CEILING
MATERIAL
HP57-07-17 3/11/201007 3RD FL WEST WING, NE RM 0 0 0TEXTURED CEILING
MATERIAL
HP57-07-18 3/11/201007 3RD FL WEST WING, SE RM 0 0 0TEXTURED CEILING
MATERIAL
HP57-07-19 3/11/201007 3RD FL EAST WING, SE RM 0 0 0TEXTURED CEILING
MATERIAL
HP57-08-01 6/28/200608 1ST FL EAST WING, NW RM
0 0 0DRYWALL AND JOINT
MATERIAL
HP57-08-02 6/28/200608 1ST FL WEST WING, WEST
WING, NW RM 122
0 0 0DRYWALL AND JOINT
MATERIAL
HP57-08-03 6/28/200608 2ND FL EAST WING, SW RM
0 0 0DRYWALL AND JOINT
MATERIAL
HP57-08-04 6/28/200608 2ND FL WEST WING, SE RM
0 0 0DRYWALL AND JOINT
MATERIAL
HP57-08-05 6/28/200608 3RD FL WEST WING, SE RM
0 0 0DRYWALL AND JOINT
MATERIAL
HP57-08-10 3/11/201008 1ST FL WEST WING, SOUTH
CNTR RM
.1 .1 .1DRYWALL AND JOINT
MATERIAL
HP57-08-11 3/11/201008 1ST FL WEST WING, SE RM 0 0 0DRYWALL AND JOINT
MATERIAL
HP57-08-12 3/11/201008 1ST FL EAST WING, SW RM 0 0 0DRYWALL AND JOINT
MATERIAL
HP57-08-13 3/11/201008 1ST FL WEST WING, NE RM 0 0 0DRYWALL AND JOINT
MATERIAL
HP57-08-14 3/11/201008 2ND FL EAST WING, NE RM 0 0 0DRYWALL AND JOINT
MATERIAL
HP57-08-15 3/11/201008 2ND FL WEST WING, NE RM 0 0 0DRYWALL AND JOINT
MATERIAL
HP57-08-17 3/11/201008 3RD FL WEST WING, NE RM 0 0 0DRYWALL AND JOINT
MATERIAL
HP57-08-18 3/11/201008 3RD FL WEST WING, SOUTH
CNTR RM
0 0 0DRYWALL AND JOINT
MATERIAL
Wednesday, May 19, 2021 Page 7 of 10Print Date:
HA Sample Location Chr
Amo
Oth
Description
HP57-08-19 3/11/201008 3RD FL WEST WING, SE RM 0 0 0DRYWALL AND JOINT
MATERIAL
HP57-08-20 3/11/201008 3RD FL EAST WING, SE RM 0 0 0DRYWALL AND JOINT
MATERIAL
HP57-09-01 6/28/200609 1ST FL EAST WING, NW RM
0 0 012" TAN FLOOR TILE
AND ADHESIVE
w/WHITE
HP57-09-02 6/28/200609 1ST FL WEST WING, NW
RM122
0 0 012" TAN FLOOR TILE
AND ADHESIVE
w/WHITE
HP57-10-02 6/28/200610 1ST FL WEST WING, NW
RM 122
0 0 0BROWN VINYL BASE
AND ADHESIVE, 4"
HP57-11-01 6/28/200611 1ST FL MECH RM 1 0 0 0MISCELLANEOUS
SEALANT
RED
HP57-11-02 6/28/200611 2ND FL MECH RM 4 0 0 0MISCELLANEOUS
SEALANT
RED
HP57-11-10 3/11/201011 1ST FL WEST MECH RM,
SOUTH
0 0 0MISCELLANEOUS
SEALANT
RED
HP57-11-11 3/11/201011 2ND FL WEST MECH RM,
SOUTH
0 0 0MISCELLANEOUS
SEALANT
RED
HP57-11-12 3/11/201011 3RD FL WEST MECH RM,
SOUTH
0 0 0MISCELLANEOUS
SEALANT
RED
HP57-11-30 7/20/201611 ATTIC, CNTR DUCT WEST 0 0 0MISCELLANEOUS
SEALANT
RED
HP57-11-40 7/20/201611 ATTIC, CNTR DUCT WEST 0 0 0MISCELLANEOUS
SEALANT
RED
HP57-12-01 6/28/200612 1ST FL MECH RM 1 0 0 0PIPE INSULATION FIBERGLASS
HP57-12-02 6/28/200612 2ND FL MECH RM 2 0 0 0PIPE INSULATION FIBERGLASS
HP57-13-01 6/28/200613 2ND FL MECH RM #3 0 0 0MISCELLANEOUS
SEALANT
RED
HP57-13-02 6/28/200613 3RD FL MECH RM #5 0 0 0MISCELLANEOUS
SEALANT
RED
HP57-20-10 3/11/201020 1ST FL WEST CHASE, EAST
END
0 0 0LAGGING PAPER ON
FIBERGLASS
HP57-20-11 3/11/201020 2ND FL WEST CHASE, EAST
END
0 0 0LAGGING PAPER ON
FIBERGLASS
HP57-20-12 3/11/201020 3RD FL WEST CHASE, EAST
END
0 0 0LAGGING PAPER ON
FIBERGLASS
Wednesday, May 19, 2021 Page 8 of 10Print Date:
HA Sample Location Chr
Amo
Oth
Description
HP57-21-10 3/11/201021 1ST FL CNTR HALL NORTH 0 0 0RESIDUAL MASTIC BLACK
HP57-22-10 3/11/201022 1ST FL WEST END 0 0 0EXTERIOR CAULKING, GRAY
HP57-22-11 3/11/201022 2ND FL EAST END 0 0 0EXTERIOR CAULKING, GRAY
HP57-22-12 3/11/201022 3RD FL WEST END 0 0 0EXTERIOR CAULKING, GRAY
HP57-23-10 3/11/201023 1ST FL WEST END, CNTR 0 0 0CONCRETE EXPANSION
JOINT MATERIAL
BLACK
HP57-24-00ri13 11/5/201324 N/A 9 9 9VAPOR BARRIER BLACK
HP57-24-00ri16 7/20/201624 N/A 9 9 9VAPOR BARRIER BLACK
HP57-24-00ri19 10/31/201924 N/A 9 9 9VAPOR BARRIER BLACK
HP57-24-10 3/11/201024 1ST FL WEST WING, SOUTH
CNTR MECH RM
3 0 0VAPOR BARRIER BLACK
HP57-24-11 3/11/201024 2ND FL WEST WING, SOUTH
CNTR MECH RM
0 0 0VAPOR BARRIER BLACK
HP57-24-12 3/11/201024 3RD FL WEST WING, SOUTH
CNTR MECH RM
0 0 0VAPOR BARRIER BLACK
HP57-25-10 3/11/201025 1ST FL WEST WING, SE RM 0 0 0EXTERIOR CAULKING, GRAY
HP57-25-11 3/11/201025 2ND FL EAST WING, NE RM 0 0 0EXTERIOR CAULKING, GRAY
HP57-25-12 3/11/201025 3RD FL WEST WING, NE RM 0 0 0EXTERIOR CAULKING, GRAY
HP57-26-10 3/11/201026 3RD FL CNTR CHASE WEST 0 0 0FIBERGLASS
INSULATION SEALANT
WHITE
HP57-27-00ri13 11/5/201327 N/A 9 9 9ROOFING SEALANT, BLACK
HP57-27-00ri16 7/20/201627 N/A 9 9 9ROOFING SEALANT, BLACK
HP57-27-00ri19 10/31/201927 N/A 9 9 9ROOFING SEALANT, BLACK
HP57-27-10 3/11/201027 ATTIC/ ROOF, WEST END 3 0 0ROOFING SEALANT,
BLACK
HP57-27-11 3/11/201027 ATTIC/ ROOF, EAST END 3 0 0ROOFING SEALANT,
BLACK
HP57-28-10 3/11/201028 ATTIC/ ROOF, WEST END 0 0 0INTERIOR CAULKING, WHITE
Wednesday, May 19, 2021 Page 9 of 10Print Date:
HA Sample Location Chr
Amo
Oth
Description
HP57-28-11 3/11/201028 ATTIC/ ROOF, EAST END 0 0 0INTERIOR CAULKING, WHITE
HP57-29-10 3/11/201029 ATTIC/ ROOF, WEST END 0 0 0ROOFING MATERIAL, BLACK
HP57-29-11 3/11/201029 ATTIC/ ROOF, EAST END 0 0 0ROOFING MATERIAL, BLACK
HP57-30-10 3/11/201030 ATTIC/ ROOF, WEST END 0 0 0TAR PAPER, BLACK
HP57-30-11 3/11/201030 ATTIC/ ROOF, EAST END 0 0 0TAR PAPER, BLACK
HP57-30-40 10/31/201930 ATTIC, WEST CNTR [as
HP57-41-40]
0 0 0TAR PAPER, BLACK
HP57-41-40 10/31/201930 SEE HP57-30-40 0 0 0TAR PAPER, BLACK
HP57-31-10 3/11/201031 NE EXT. GROUND 0 0 0ELECTRICAL
WRAPPED WIRING
BLACK
Wednesday, May 19, 2021 Page 10 of 10Print Date:
File details come from the government source that posted it. Updated .