This is an Asbestos Inspection Report for Building HP55 at Marine Corps Base Camp Lejeune, dated May 19, 2021.

Building HP55 is a barracks and enlisted quarters (BEQ) facility constructed in 1976 with a hazard ranking of 0/BLUE, indicating no asbestos-containing materials (ACM) were identified during the initial inspection. The report states that no asbestos was identified and no further action is required. However, the document includes notification of ACM previously identified in the structure, with samples collected on June 28, 2006. The historical ACM materials identified include 12-inch tan and white floor tiles with adhesive, 2x2-foot ceiling tiles, base cove/mastic in hallways and dorm rooms, wallboard, piping insulation in mechanical and laundry rooms, window caulking on the deck, miscellaneous sealants, and textured ceiling material, all located across various building areas including lounge areas, dorm rooms, hallways, mechanical rooms, and laundry rooms. Laboratory testing of 22 samples collected in 2006 showed zero percent composition of chrysotile, amosite, and other asbestos fibers across all materials tested. The report specifies that ACM intact and undisturbed does not present a significant health hazard; however, disturbance must be avoided to prevent fiber release. Building occupants should report any damage, dust, or debris to the Asbestos Program Manager at (910) 451-5837. Periodic inspections of ACM will continue to evaluate condition changes, with records maintained by the Camp Lejeune Asbestos Program Manager.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASBESTOS INSPECTION REPORT of:

Building # HP55

MCB CAMP LEJEUNE

Wednesday, May 19, 2021

Print Date

Wednesday, May 19, 2021 Page 1 of 5Print Date:

INSPECTION SUMMAR

BLDG #:

OCCUPANT:

YEAR BUILT:

BUILDING COMMENTS:

HP55

BEQ

HP55 HAZARD RANKING 0/ BLUE; NO ACM IDENTIFIED [AH JUN06]

NO ASBESTOS WAS IDENTIFIED DURING THE INITIAL ASBESTOS INSPECTION.NO FURTHER ACTION REQUIRED

ASBESTOS MANAGER: 910-451-5837

Friable ACM(s) identified

Non-friable ACM(s) identified

Tested Non ACM or REMOVED Materials

DESCRIPTION LOCATION Date

ACM only presents a health hazard when asbestos fibers are airborne and inhaled.

Avoid disturbance which will release fibers. The presence of asbestos does not constitute a health hazard.

HEALTH ASPECTS:

NOTICE: The following asbestos-containing materials have been identified in this structure. Refer to survey findings for additional information or contact the Asbestos Program Manager. Please note ACM that is intact and undisturbed is not considered a significant health hazard to building occupants.

DESCRIPTION LOCATION Date Quantity

DESCRIPTION LOCATION Date Quantity

No friable ACM records found in database

No non friable ACM records found in database

NOTIFICATION OF ACM IN BUILDING

12" TAN FLOOR TILE AND ADHESIVE LOUNGE AREA 6/28/2006

2'x2' CEILING TILE, LOUNGE AREA 6/28/2006

BASE COVE/MASTIC, HALLWAY 6/28/2006

BASE COVE/MASTIC, DORM ROOMS 6/28/2006

WALLBOARD DORM ROOMS 6/28/2006

PIPING INSULATION ON MECHANICAL ROOM 6/28/2006

12" WHITE FLOOR TILE AND ADHESIVE DORM ROOMS 6/28/2006

WINDOW CAULKING DECK 6/28/2006

MISCELLANEOUS SEALANT MECHANICAL ROOM 6/28/2006

TEXTURED CEILING MATERIAL DORM ROOMS 6/28/2006

PIPE INSULATION LAUNDRY ROOMS 6/28/2006

Wednesday, May 19, 2021 Page 2 of 5Print Date:

ACM only presents a health hazard when asbestos fibers are airborne and inhaled.

Avoid disturbance which will release fibers. The presence of asbestos does not constitute a health hazard.

Do not disturb or cause damage to ACM. Do not sand, grind or abrade materials or cause damage with any type of equipment.

CONDITIONS TO AVOID:

Report any damage, dust or debris that may come from ACM or suspect ACM, or any change in the condition of materials, or accidental disturbance to the Asbestos

Program Manager.

REPORTS OF DAMAGE:

Corrective action initiated to minimize fiber release and protect personnel. RESPONSE ACTION:

ACM will be inspected periodically to evaluate any changes in condition.INSPECTION:

The Camp Lejeune Asbestos Program Manager maintains a copy of the survey for the building.

RECORDKEEPING:

CAMP LEJEUNE Asbestos Program Manager: Phone: (910) 451-5837

Wednesday, May 19, 2021 Page 3 of 5Print Date:

SAMPLES COLLECTED

Sample Sample

Date

HA Sample Location Chr

Amo

Oth

Description

HP55-01-01 6/28/200601 ROOM 100 0 0 0TEXTURED CEILING

MATERIAL

HP55-01-02 6/28/200601 ROOM 110 0 0 0TEXTURED CEILING

MATERIAL

HP55-01-03 6/28/200601 ROOM 108 0 0 0TEXTURED CEILING

MATERIAL

HP55-01-04 6/28/200601 ROOM 224 0 0 0TEXTURED CEILING

MATERIAL

HP55-01-05 6/28/200601 ROOM 223 0 0 0TEXTURED CEILING

MATERIAL

HP55-01-06 6/28/200601 ROOM 327 0 0 0TEXTURED CEILING

MATERIAL

HP55-01-07 6/28/200601 ROOM 323 0 0 0TEXTURED CEILING

MATERIAL

HP55-02-01 6/28/200602 ROOM 100 0 0 012" WHITE FLOOR TILE

AND ADHESIVE

W/ BROWN

HP55-02-02 6/28/200602 ROOM 108 0 0 012" WHITE FLOOR TILE

AND ADHESIVE

W/ BROWN

HP55-02-03 6/28/200602 ROOM 224 0 0 012" WHITE FLOOR TILE

AND ADHESIVE

W/ BROWN

HP55-03-01 6/28/200603 ROOM 100 0 0 0BASE COVE/MASTIC, BROWN

HP55-03-02 6/28/200603 ROOM 108 0 0 0BASE COVE/MASTIC, BROWN

HP55-04-01 6/28/200604 ROOM 100 0 0 0WALLBOARD

HP55-04-02 6/28/200604 ROOM 108 0 0 0WALLBOARD

HP55-04-03 6/28/200604 ROOM 224 0 0 0WALLBOARD

HP55-04-04 6/28/200604 ROOM 223 0 0 0WALLBOARD

HP55-04-05 6/28/200604 ROOM 327 0 0 0WALLBOARD

HP55-05-01 6/28/200605 3RD DECK 0 0 0PIPE INSULATION

HP55-05-02 6/28/200605 1ST DECK 0 0 0PIPE INSULATION

HP55-06-01 6/28/200606 3RD FLOOR 0 0 012" TAN FLOOR TILE

AND ADHESIVE

W/ WHITE

Wednesday, May 19, 2021 Page 4 of 5Print Date:

Sample Sample

Date

HA Sample Location Chr

Amo

Oth

Description

HP55-06-02 6/28/200606 2ND FLOOR 0 0 012" TAN FLOOR TILE

AND ADHESIVE

W/ WHITE

HP55-07-01 6/28/200607 3RD FLOOR 0 0 02'x2' CEILING TILE, HP55-07-02 6/28/200607 2ND FLOOR 0 0 02'x2' CEILING TILE, HP55-08-01 6/28/200608 2ND FLOOR 0 0 0BASE COVE/MASTIC, BROWN

HP55-08-02 6/28/200608 1ST FLOOR 0 0 0BASE COVE/MASTIC, BROWN

HP55-09-01 6/28/200609 1ST DECK 0 0 0PIPING INSULATION ON SUPPLY AND RETURN

HP55-09-02 6/28/200609 2ND DECK 0 0 0PIPING INSULATION ON SUPPLY AND RETURN

HP55-10-01 6/28/200610 3RD FLOOR 0 0 0WINDOW CAULKING

HP55-10-02 6/28/200610 3RD FLOOR 0 0 0WINDOW CAULKING

HP55-11-01 6/28/200611 ROOM # 3 0 0 0MISCELLANEOUS

SEALANT

RED

HP55-11-02 6/28/200611 ROOM # 4 0 0 0MISCELLANEOUS

SEALANT

RED

Wednesday, May 19, 2021 Page 5 of 5Print Date: