This is an Infection Prevention & Control Construction Risk Assessment (ICRA) form for a federal healthcare facility project.
The document establishes a three-step assessment framework for the project "Abate Central Chase Replace Fire Main 667-18-111" at Overton Brooks VAMC, dated September 25, 2025. Step One classifies construction projects into four types: Type A (inspection and non-invasive activities), Type B (small-scale, short-duration activities creating minimal dust, including the project-specific activity of cutting through plaster walls in hallways), Type C (moderate to high dust generation or demolition/removal activities), and Type D (major demolition and construction requiring consecutive work shifts). Step Two identifies affected patient risk groups across four categories: Low Risk (office areas, public access areas), Medium Risk (clinical departments including cardiology, endoscopy, radiology), High Risk (emergency room, surgical units, pharmacy, sterile supply storage), and Highest Risk (immunocompromised patient care areas, operating rooms, intensive care units). Step Three applies an Infection Control Matrix that cross-references construction type with patient risk group to determine required precaution class levels (I through IV). The assessment was completed and signed by Carol Phillips, RN, CIC (Certified Infection Preventionist). This ICRA document serves as the infection control planning tool to establish protective measures based on construction scope and patient population proximity.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25626R0047 0003.pdf | ||
| 36C25626R0047 0002.docx | DOCX document | |
| Attachment No. 1 Piping Asbestos Survey.pdf | ||
| Attachment No. 2 Pre-bid Conference Sign-in Sheet.pdf | ||
| Attachment No. 3 WD LA20260031.pdf | ||
| 36C25626R0047 0002.pdf | ||
| 36C25626R0047 0001.pdf | ||
| Abate Central Chase - 13 - ICRA.pdf | ||
| 36C25626R0047 EXHIBIT B.docx | DOCX document | |
| 36C25626R0047 EXHIBIT D.docx | DOCX document | |
| 36C25626R0047 EXHIBIT C.docx | DOCX document | |
| 36C25626R0047.pdf | ||
| Abate Central Chase - 1- SOW.pdf | ||
| Abate Central Chase - 8 - CRA.pdf | ||
| WD LA20260031 01022026.pdf | ||
| Abate Chase - FY26 - Final Drawings.pdf | ||
| Abate Chase - FY26 - IFC Specs - Updated.pdf | ||
| 36C25626R0047 EXHIBIT A.docx | DOCX document | |
| 36C25626R0047 EXHIBIT E.docx | DOCX document | |
| 36C25626R0047 EXHIBIT F.docx | DOCX document |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Overton Brooks VAMC Infection Prevention & Control Construction Risk Assessment (ICRA)
Project: Abate Central Chase Replace Fire Main 667-18-111 Date: 09/25/2025 STEP ONE: CIRCLE the Type of Construction Project based on scope and expected activity (Type A-D)
TYPE
A
Inspection and Non-Invasive Activities. Includes, but is not limited to:
removal of ceiling tiles for visual inspection only, e.g., limited to 1 tile per 50 square feet painting (but not sanding) wallcovering, electrical trim work, minor plumbing, activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection.
TYPE
B
Small scale, short duration activities which create minimal dust Includes, but is not limited to:
installation of telephone and computer cabling access to chase spaces cutting of walls or ceiling where dust migration can be controlled.
Project Specific: cutting through plaster walls in hallway required
TYPE
C
Work generates a moderate/high level of dust or requires demolition/removal of any fixed building components or assemblies Includes, but is not limited to:
sanding of walls for painting or wall covering removal of floorcoverings, ceiling tiles and casework; new wall construction minor duct work or electrical work above ceilings major cabling activities any activity which cannot be completed within a single work shift.
TYPE
D
Major demolition and construction projects Includes, but is not limited to:
activities which require consecutive work shifts requires heavy demolition, removal of a complete cabling system, or excavation new construction.
STEP TWO: CIRCLE the affected Patient Risk Groups. If more than one risk group will be affected, select the higher risk group.
Low Risk Medium Risk High Risk Highest Risk
Office areas Kitchen storage area Public access, hallways, elevator Lobby
Non-clinical vacated engineering space
Cardiology Echocardiography Endoscopy Nuclear Medicine Physical Therapy Radiology/MRI Respiratory
Therapy Kitchen – food preparation area
Step Down Unit Emergency Room Laboratories (specimen) Medical Units Outpatient Surgery Pharmacy Post Anesthesia Care Unit Surgical Units Minor Procedure Rooms Sterile Supply storage/distribution
Immunocompromised patient care areas
Cardiac Cath Lab Sterile Processing Service Preparation Area Decontamination Area Intensive Care Unit Negative pressure isolation rooms Oncology Operating rooms
STEP THREE: Using the IC Matrix CIRCLE the Class of Precautions as determined by Construction Type and Patient Risk Construction Project Type
Patient Risk Group TYPE A TYPE B TYPE C TYPE D
IC
M at ri x LOW Risk Group I II II III/IV
MEDIUM Risk Group I II III IV
HIGH Risk Group I II III/IV IV
HIGHEST Risk Group II III/IV III/IV IV
X Carol Phillips
RN, CIC
STEP THREE: Using the IC Matrix CIRCLE the Class of Precautions as determined by Construction Type and Patient Risk