This document is a 2018 reinspection report for piping asbestos at the Overton Brooks VA Medical Center in Shreveport, Louisiana, presented through architectural drawings and site maps prepared by Environmental Consulting, LLC (Altec Job Number SA03947).
The report documents plumbing piping asbestos sample locations and homogeneous areas across multiple floors of Building 1, including the sub-basement, basement (Wing BE-A), first floor (Wing 1W-A), fourth floor (Wing 4W), fifth floor (Wing 5W), sixth floor (Wing 6W), seventh floor (Wing 7W), and eighth floor (Wing 8W). Sample testing results are marked as positive (+) or negative (-) for asbestos-containing building materials (ACBM), with additional notation for previously abated materials and samples found negative by point counting method. The drawings identify specific piping types including cold water, hot water, hot water return, heating water supply, and cooling water supply systems. Numerous notes throughout the drawings document prior abatement activities dating from 2007 to 2018, performed by various contractors including Gill Industries, Ltd., ARC Abatement 1, Ltd., and Abatement Services, Inc. Several locations identify damaged ACM piping with designated removal priorities ranging from 1 to 5. The comprehensive mapping enables facility management to track asbestos locations, monitor abatement progress, and prioritize future remediation efforts throughout the medical center's infrastructure.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25626R0047 0003.pdf | ||
| 36C25626R0047 0002.docx | DOCX document | |
| Attachment No. 3 WD LA20260031.pdf | ||
| 36C25626R0047 0002.pdf | ||
| Attachment No. 2 Pre-bid Conference Sign-in Sheet.pdf | ||
| 36C25626R0047 0001.pdf | ||
| 36C25626R0047 EXHIBIT B.docx | DOCX document | |
| Abate Chase - FY26 - IFC Specs - Updated.pdf | ||
| Abate Central Chase - 13 - ICRA.pdf | ||
| 36C25626R0047 EXHIBIT F.docx | DOCX document | |
| Abate Central Chase - 14 - Class II Precautions.pdf | ||
| 36C25626R0047 EXHIBIT C.docx | DOCX document | |
| 36C25626R0047 EXHIBIT E.docx | DOCX document | |
| 36C25626R0047 EXHIBIT A.docx | DOCX document | |
| 36C25626R0047 EXHIBIT D.docx | DOCX document | |
| Abate Chase - FY26 - Final Drawings.pdf | ||
| 36C25626R0047.pdf | ||
| Abate Central Chase - 1- SOW.pdf | ||
| Abate Central Chase - 8 - CRA.pdf | ||
| WD LA20260031 01022026.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
( - ) VARIO2-078
( - ) 233-3
( - ) 233-4
( + ) VARIO2-085
( - ) 233-6
( - ) 233-5
COLUMN 142
COLUMN 136
( - ) 097T ( - ) 098T
( + ) VARIO2-060
( + ) VARIO2-050
( + ) VARIO2-082
( + ) VARIO2-084
( + ) VARIO2-060
( + ) VARIO2-050
( + ) VARIO2-082
( + ) 069T
( + ) 070T
OB-13-081-001
VA-15-043-001VA-15-043-003
VA-15-043-002
OB-15-208-007
OB-15-208-008
OB-15-208-009
OB-15-208-010
OB-15-208-011
OB-15-208-012
OB-15-208-006
OB-15-208-004
OB-15-208-005
OB-15-208-001
OB-15-208-002
OB-15-208-003
Plumbing Piping Asbestos Sample Locations
Building 1 - Sub-Basement
Scale: 1" = 25'
Overton Brooks VA Medical Center
Shreveport, Louisiana
Page: 1 OF 1
KEY PLAN
ENVIRONMENTAL CONSULTING, LLC
Overton Brooks V.A. Medical Center - 2018 Reinspection Plumbing Piping Asbestos Sample Locations - Building 1 - Sub-Basement
L:\Drawings\VA Hospitals\Overton Brooks VA Medical Center\2018 R\2018 Asbestos Reinspection\Bldg 1\AP\B1-SB-APP.dwg
File Name: L:\Dwgs\OBVA\18Rein\Bldg1\APP.dwg
Drawn By: LW
Date: 11/16/18
PIPING LEGEND
ASBESTOS LEGEND
POSITIVE FOR ACBM
NEGATIVE FOR ACBM
ACBM PREVIOUSLY ABATED
FOUND NEGATIVE FOR ACBM
BY POINT COUNTING METHOD
CW = COLD WATER
HW = HOT WATER
HWR = HOT WATER RETURN
HWS = HEATING WATER SUPPLY
CWS = COOLING WATER SUPPLY
PLUMBING CHASE (TYP.)
CONVECTOR
VERTICAL STEAM
METAL PANELS W/ ROCK WOOL LAYED
ON TOP DIDN'T PULL PANEL OR PAINT*
Altec Job Number: SA03947
DAMAGED - ACM JOINT REMOVAL PRIORITY: 5
NOTE: PIPING ABATED PER OWNER.
(DATE & ABATEMENT COMPANY UNKNOWN)
NOTE: PIPING ABATED PER OWNER.
(DATE & ABATEMENT COMPANY UNKNOWN)
NOTE: PIPING IN HALLWAY ABATED PER OWNER.
(APRIL 2012 - GILL INDUSTRIES LTD.)
NOTE: PIPING ABATED.
(APRIL 2012 - GILL INDUSTRIES LTD.)
NOTE: PIPING ABATED.
(MAY 2012 - ARC ABATEMENT 1, LTD.)
NOTE: PIPING ABATED.
(FEBRUARY 2011 - GILL INDUSTRIES, LTD.)
NOTE: PIPING ABATED.
(SEPTEMBER 2011 - GILL INDUSTRIES, LTD.)
NOTE: PIPING ABATED PER OWNER.
(NOV 2008 - ABATEMENT COMPANY UNKNOWN)
NOTE: PIPING ABATED PER OWNER.
(2012 - ABATEMENT COMPANY UNKNOWN)
NOTE: 18 LIN FT OF PIPING ABATED.
(MARCH 2013 - ABATEMENT SERVICES, INC.)
NOTE: TWO DAMAGED 6" ELBOWS ABATED.
(MARCH 2013 - ABATEMENT SERVICES, INC.)
NOTE: 2 ROWS OF PIPING ABATED.
(APRIL 2014 - ABATEMENT SERVICES, INC.)
NOTE: PIPING ABATED.
(APRIL 2014 - ABATEMENT SERVICES, INC.)
NOTE: REMAINDER OF PIPING IN ROOMS S-B-4 & S-B-4B ABATED.
(MARCH 2015 - ABATEMENT SERVICES, INC.)
NOTE: PIPING ABATED.
(JANUARY 2015 - ARC ABATEMENT 1, LTD)
NOTE: PIPING ABATED.
(JANUARY 2015 - ARC ABATEMENT 1, LTD.)
NOTE: PIPING ABATED.
(JANUARY 2015 - ARC ABATEMENT 1, LTD.)
NOTE: PIPING ABATED.
(JANUARY 2015 - ARC ABATEMENT 1, LTD.)
NOTE: PIPING ABATED.
(JANUARY 2015 - ARC ABATEMENT 1, LTD.)
NOTE: PIPING ABATED.
(MAY 2012 - ARC ABATEMENT 1, LTD.)
Plumbing Piping Asbestos Homogeneous Areas
Building 1 - Sub-Basement
Scale: 1" = 20'
Overton Brooks VA Medical Center
Shreveport, Louisiana
Page: 1 OF 1
KEY PLAN
ENVIRONMENTAL CONSULTING, LLC
Overton Brooks V.A. Medical Center - 2018 Reinspection Piping Asbestos Homogeneous Areas - Building 1 - Sub-Basement
L:\Drawings\VA Hospitals\Overton Brooks VA Medical Center\2018 R\2018 Asbestos Reinspection\Bldg 1\HP\B1-SB-HP.dwg
HOMOGENEOUS AREAS
HMA-1-SB-PIPING
ABATED PIPING
ABATED PIPING
File Name: L:\Dwgs\OBVA\18Rein\Bldg1\HP.dwg
Drawn By: DAC
Date: XX/XX/XX
NOTE: PIPING ABATED.
(JULY 2010 - GILL INDUSTRIES)
NOTE: PIPING ABATED.
(AUGUST 2011 - GILL INDUSTRIES, LTD.)
NOTE: PIPING ABATED PER OWNER.
(DECEMBER 2009 - ABATEMENT COMPANY UNKNOWN)
NOTE: PIPING ABATED PER OWNER.
(AUGUST 2011 - ABATEMENT COMPANY UNKNOWN)
NOTE: PIPING ABATED PER OWNER.
(DATE & ABATEMENT COMPANY UNKNOWN)
NOTE: PIPING ABATED.
(FEBRUARY 2010 - GILL INDUSTRIES, LTD.)
NOTE: PIPING ABATED PER OWNER.
(DATE & ABATEMENT COMPANY UNKNOWN)
NOTE: PIPING ABATED PER OWNER.
(DECEMBER 2007 - ABATEMENT COMPANY UNKNOWN)
NOTE: PIPING ABATED IN CEILING.
(SEPTEMBER 2017 - ABATEMENT SERVICES, INC.)
NOTE: PIPING ABATED DURING 2017
MANAGEMENT PLAN UPDATES & REMOVED FROM
HMA-1-BE-A-PIPING AS OF 2018 REINSPECTION.
(NOVEMBER 2017 - ABATEMENT SERVICES, INC.)
NOTE: PIPING ABATED DURING 2018
MANAGEMENT PLAN UPDATES & REMOVED FROM
HMA-1-BE-A-PIPING AS OF 2018 REINSPECTION.
(MARCH 2018 - ABATEMENT SERVICES, INC.)
Piping Asbestos Homogeneous Areas Building 1 - Basement
Scale: 1" = 20'
Overton Brooks VA Medical Center
Shreveport, Louisiana
Page: 2 OF 4
ENVIRONMENTAL CONSULTING, LLC
Overton Brooks V.A. Medical Center - 2018 Reinspection Piping Asbestos Homogeneous Areas - Basement - Wing BE-A
KEY PLAN
L:\Drawings\VA Hospitals\Overton Brooks VA Medical Center\2018 R\2018 Asbestos Reinspection\Bldg 1\HP\B1-B-HP.dwg
HOMOGENEOUS AREAS
HMA-1-BE-A-PIPING
ABATED PIPING
AREA UPDATED AS OF
2018 REINSPECTION
ABATED AREA
File Name: L:\Dwgs\OBVA\18Rein\Bldg1\HP.dwg
Drawn By: LW
Date: 11/16/18
( + ) 240-5
( + ) 240-7 ( + ) 240-6
( + ) 242-1
( + ) 015T ( + ) 016T
( - ) 014T
( + ) 012T ( + ) 013T
( + ) 011T
( + ) 010T
( - ) 002T ( - ) 003T
( + ) 001T LAYER 1
( + ) 001T LAYER 2
( - ) 001T LAYER 3
( + ) 004T ( + ) 005T ( + ) 006T
( - ) 007T
( - ) 008T
( + ) 009T LAYER 1
( - ) 009T LAYER 2
Piping Asbestos Sample Locations
Building 1 - First Floor
Scale: 1" = 20'
Overton Brooks VA Medical Center
Shreveport, Louisiana
Page: 2 OF 4
ENVIRONMENTAL CONSULTING, LLC
Overton Brooks V.A. Medical Center - 2018 Reinspection Piping Asbestos Sample Locations - First Floor - Wing 1W-A
KEY PLAN
L:\Drawings\VA Hospitals\Overton Brooks VA Medical Center\2018 R\2018 Asbestos Reinspection\Bldg 1\AP\B1-1-AP.dwg
File Name: L:\Dwgs\OBVA\18Rein\Bldg1\AP.dwg
Drawn By: LW
Date: 11/16/18
PIPING LEGEND
ASBESTOS LEGEND
POSITIVE FOR ACBM
NEGATIVE FOR ACBM
ACBM PREVIOUSLY ABATED
FOUND NEGATIVE FOR ACBM
BY POINT COUNTING METHOD
CW = COLD WATER
HW = HOT WATER
HWR = HOT WATER RETURN
HWS = HEATING WATER SUPPLY
CWS = COOLING WATER SUPPLY
PLUMBING CHASE (TYP.)
CONVECTOR
VERTICAL STEAM
METAL PANELS W/ ROCK WOOL LAYED
ON TOP DIDN'T PULL PANEL OR PAINT*
DAMAGED - ACM PIPING
REMOVAL PRIORITY: 3
NOTE: PIPING ABATED PER OWNER.
(DATE & ABATEMENT COMPANY UNKNOWN)
DAMAGED - ACM PIPING
REMOVAL PRIORITY: 5
NOTE: PIPING ABATED.
(MARCH 2011 - GILL INDUSTRIES, LTD.)
DAMAGED - ACM PIPING
REMOVAL PRIORITY: 4
DAMAGED - ACM PIPING
REMOVAL PRIORITY: 5
DAMAGED - ACM PIPING
REMOVAL PRIORITY: 1
DAMAGED - ACM PIPING
REMOVAL PRIORITY: 3
DAMAGED - ACM PIPING
REMOVAL PRIORITY: 5
NOTE: PIPING ABATED.
(AUGUST 2016 - ABATEMENT
SERVICES, INC.)
NOTE: PIPING ABATED
(SEPTEMBER 2016 - ABATEMENT SERVICES, INC.)
Piping Asbestos Homogeneous Areas Building 1 - First Floor
Scale: 1" = 20'
Overton Brooks VA Medical Center
Shreveport, Louisiana
Page: 2 OF 4
ENVIRONMENTAL CONSULTING, LLC
Overton Brooks V.A. Medical Center - 2018 Reinspection Piping Asbestos Homogeneous Areas - First Floor - Wing 1W-A
KEY PLAN
L:\Drawings\VA Hospitals\Overton Brooks VA Medical Center\2018 R\2018 Asbestos Reinspection\Bldg 1\HP\B1-1-HP.dwg
HOMOGENEOUS AREAS
HMA-1-1W-A-PIPING
ABATED PIPING
File Name: L:\Dwgs\OBVA\18Rein\Bldg1\HP.dwg
Drawn By: LW
Date: 11/16/18
File details come from the government source that posted it. Updated .