Attachment No. 1 Piping Asbestos Survey.pdf

PDF 4 MB Posted

Attached to
Z1DA--667-26-111 CON Abate Central Chase & Replace Fire Main
Solicitation number
36C25626R0047
Issued by

About this file

This document is a 2018 reinspection report for piping asbestos at the Overton Brooks VA Medical Center in Shreveport, Louisiana, presented through architectural drawings and site maps prepared by Environmental Consulting, LLC (Altec Job Number SA03947).

The report documents plumbing piping asbestos sample locations and homogeneous areas across multiple floors of Building 1, including the sub-basement, basement (Wing BE-A), first floor (Wing 1W-A), fourth floor (Wing 4W), fifth floor (Wing 5W), sixth floor (Wing 6W), seventh floor (Wing 7W), and eighth floor (Wing 8W). Sample testing results are marked as positive (+) or negative (-) for asbestos-containing building materials (ACBM), with additional notation for previously abated materials and samples found negative by point counting method. The drawings identify specific piping types including cold water, hot water, hot water return, heating water supply, and cooling water supply systems. Numerous notes throughout the drawings document prior abatement activities dating from 2007 to 2018, performed by various contractors including Gill Industries, Ltd., ARC Abatement 1, Ltd., and Abatement Services, Inc. Several locations identify damaged ACM piping with designated removal priorities ranging from 1 to 5. The comprehensive mapping enables facility management to track asbestos locations, monitor abatement progress, and prioritize future remediation efforts throughout the medical center's infrastructure.

View the file

Other files

File Type Posted
36C25626R0047 0003.pdf PDF
36C25626R0047 0002.docx DOCX document
Attachment No. 3 WD LA20260031.pdf PDF
36C25626R0047 0002.pdf PDF
Attachment No. 2 Pre-bid Conference Sign-in Sheet.pdf PDF
36C25626R0047 0001.pdf PDF
36C25626R0047 EXHIBIT B.docx DOCX document
Abate Chase - FY26 - IFC Specs - Updated.pdf PDF
Abate Central Chase - 13 - ICRA.pdf PDF
36C25626R0047 EXHIBIT F.docx DOCX document
Abate Central Chase - 14 - Class II Precautions.pdf PDF
36C25626R0047 EXHIBIT C.docx DOCX document
36C25626R0047 EXHIBIT E.docx DOCX document
36C25626R0047 EXHIBIT A.docx DOCX document
36C25626R0047 EXHIBIT D.docx DOCX document
Abate Chase - FY26 - Final Drawings.pdf PDF
36C25626R0047.pdf PDF
Abate Central Chase - 1- SOW.pdf PDF
Abate Central Chase - 8 - CRA.pdf PDF
WD LA20260031 01022026.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

( - ) VARIO2-078

( - ) 233-3

( - ) 233-4

( + ) VARIO2-085

( - ) 233-6

( - ) 233-5

COLUMN 142

COLUMN 136

( - ) 097T ( - ) 098T

( + ) VARIO2-060

( + ) VARIO2-050

( + ) VARIO2-082

( + ) VARIO2-084

( + ) VARIO2-060

( + ) VARIO2-050

( + ) VARIO2-082

( + ) 069T

( + ) 070T

OB-13-081-001

VA-15-043-001VA-15-043-003

VA-15-043-002

OB-15-208-007

OB-15-208-008

OB-15-208-009

OB-15-208-010

OB-15-208-011

OB-15-208-012

OB-15-208-006

OB-15-208-004

OB-15-208-005

OB-15-208-001

OB-15-208-002

OB-15-208-003

Plumbing Piping Asbestos Sample Locations

Building 1 - Sub-Basement

Scale: 1" = 25'

Overton Brooks VA Medical Center

Shreveport, Louisiana

Page: 1 OF 1

KEY PLAN

ENVIRONMENTAL CONSULTING, LLC

Overton Brooks V.A. Medical Center - 2018 Reinspection Plumbing Piping Asbestos Sample Locations - Building 1 - Sub-Basement

L:\Drawings\VA Hospitals\Overton Brooks VA Medical Center\2018 R\2018 Asbestos Reinspection\Bldg 1\AP\B1-SB-APP.dwg

File Name: L:\Dwgs\OBVA\18Rein\Bldg1\APP.dwg

Drawn By: LW

Date: 11/16/18

PIPING LEGEND

ASBESTOS LEGEND

POSITIVE FOR ACBM

NEGATIVE FOR ACBM

ACBM PREVIOUSLY ABATED

FOUND NEGATIVE FOR ACBM

BY POINT COUNTING METHOD

CW = COLD WATER

HW = HOT WATER

HWR = HOT WATER RETURN

HWS = HEATING WATER SUPPLY

CWS = COOLING WATER SUPPLY

PLUMBING CHASE (TYP.)

CONVECTOR

VERTICAL STEAM

METAL PANELS W/ ROCK WOOL LAYED

ON TOP DIDN'T PULL PANEL OR PAINT*

Altec Job Number: SA03947

DAMAGED - ACM JOINT REMOVAL PRIORITY: 5

NOTE: PIPING ABATED PER OWNER.

(DATE & ABATEMENT COMPANY UNKNOWN)

NOTE: PIPING ABATED PER OWNER.

(DATE & ABATEMENT COMPANY UNKNOWN)

NOTE: PIPING IN HALLWAY ABATED PER OWNER.

(APRIL 2012 - GILL INDUSTRIES LTD.)

NOTE: PIPING ABATED.

(APRIL 2012 - GILL INDUSTRIES LTD.)

NOTE: PIPING ABATED.

(MAY 2012 - ARC ABATEMENT 1, LTD.)

NOTE: PIPING ABATED.

(FEBRUARY 2011 - GILL INDUSTRIES, LTD.)

NOTE: PIPING ABATED.

(SEPTEMBER 2011 - GILL INDUSTRIES, LTD.)

NOTE: PIPING ABATED PER OWNER.

(NOV 2008 - ABATEMENT COMPANY UNKNOWN)

NOTE: PIPING ABATED PER OWNER.

(2012 - ABATEMENT COMPANY UNKNOWN)

NOTE: 18 LIN FT OF PIPING ABATED.

(MARCH 2013 - ABATEMENT SERVICES, INC.)

NOTE: TWO DAMAGED 6" ELBOWS ABATED.

(MARCH 2013 - ABATEMENT SERVICES, INC.)

NOTE: 2 ROWS OF PIPING ABATED.

(APRIL 2014 - ABATEMENT SERVICES, INC.)

NOTE: PIPING ABATED.

(APRIL 2014 - ABATEMENT SERVICES, INC.)

NOTE: REMAINDER OF PIPING IN ROOMS S-B-4 & S-B-4B ABATED.

(MARCH 2015 - ABATEMENT SERVICES, INC.)

NOTE: PIPING ABATED.

(JANUARY 2015 - ARC ABATEMENT 1, LTD)

NOTE: PIPING ABATED.

(JANUARY 2015 - ARC ABATEMENT 1, LTD.)

NOTE: PIPING ABATED.

(JANUARY 2015 - ARC ABATEMENT 1, LTD.)

NOTE: PIPING ABATED.

(JANUARY 2015 - ARC ABATEMENT 1, LTD.)

NOTE: PIPING ABATED.

(JANUARY 2015 - ARC ABATEMENT 1, LTD.)

NOTE: PIPING ABATED.

(MAY 2012 - ARC ABATEMENT 1, LTD.)

Plumbing Piping Asbestos Homogeneous Areas

Building 1 - Sub-Basement

Scale: 1" = 20'

Overton Brooks VA Medical Center

Shreveport, Louisiana

Page: 1 OF 1

KEY PLAN

ENVIRONMENTAL CONSULTING, LLC

Overton Brooks V.A. Medical Center - 2018 Reinspection Piping Asbestos Homogeneous Areas - Building 1 - Sub-Basement

L:\Drawings\VA Hospitals\Overton Brooks VA Medical Center\2018 R\2018 Asbestos Reinspection\Bldg 1\HP\B1-SB-HP.dwg

HOMOGENEOUS AREAS

HMA-1-SB-PIPING

ABATED PIPING

ABATED PIPING

File Name: L:\Dwgs\OBVA\18Rein\Bldg1\HP.dwg

Drawn By: DAC

Date: XX/XX/XX

NOTE: PIPING ABATED.

(JULY 2010 - GILL INDUSTRIES)

NOTE: PIPING ABATED.

(AUGUST 2011 - GILL INDUSTRIES, LTD.)

NOTE: PIPING ABATED PER OWNER.

(DECEMBER 2009 - ABATEMENT COMPANY UNKNOWN)

NOTE: PIPING ABATED PER OWNER.

(AUGUST 2011 - ABATEMENT COMPANY UNKNOWN)

NOTE: PIPING ABATED PER OWNER.

(DATE & ABATEMENT COMPANY UNKNOWN)

NOTE: PIPING ABATED.

(FEBRUARY 2010 - GILL INDUSTRIES, LTD.)

NOTE: PIPING ABATED PER OWNER.

(DATE & ABATEMENT COMPANY UNKNOWN)

NOTE: PIPING ABATED PER OWNER.

(DECEMBER 2007 - ABATEMENT COMPANY UNKNOWN)

NOTE: PIPING ABATED IN CEILING.

(SEPTEMBER 2017 - ABATEMENT SERVICES, INC.)

NOTE: PIPING ABATED DURING 2017

MANAGEMENT PLAN UPDATES & REMOVED FROM

HMA-1-BE-A-PIPING AS OF 2018 REINSPECTION.

(NOVEMBER 2017 - ABATEMENT SERVICES, INC.)

NOTE: PIPING ABATED DURING 2018

MANAGEMENT PLAN UPDATES & REMOVED FROM

HMA-1-BE-A-PIPING AS OF 2018 REINSPECTION.

(MARCH 2018 - ABATEMENT SERVICES, INC.)

Piping Asbestos Homogeneous Areas Building 1 - Basement

Scale: 1" = 20'

Overton Brooks VA Medical Center

Shreveport, Louisiana

Page: 2 OF 4

ENVIRONMENTAL CONSULTING, LLC

Overton Brooks V.A. Medical Center - 2018 Reinspection Piping Asbestos Homogeneous Areas - Basement - Wing BE-A

KEY PLAN

L:\Drawings\VA Hospitals\Overton Brooks VA Medical Center\2018 R\2018 Asbestos Reinspection\Bldg 1\HP\B1-B-HP.dwg

HOMOGENEOUS AREAS

HMA-1-BE-A-PIPING

ABATED PIPING

AREA UPDATED AS OF

2018 REINSPECTION

ABATED AREA

File Name: L:\Dwgs\OBVA\18Rein\Bldg1\HP.dwg

Drawn By: LW

Date: 11/16/18

( + ) 240-5

( + ) 240-7 ( + ) 240-6

( + ) 242-1

( + ) 015T ( + ) 016T

( - ) 014T

( + ) 012T ( + ) 013T

( + ) 011T

( + ) 010T

( - ) 002T ( - ) 003T

( + ) 001T LAYER 1

( + ) 001T LAYER 2

( - ) 001T LAYER 3

( + ) 004T ( + ) 005T ( + ) 006T

( - ) 007T

( - ) 008T

( + ) 009T LAYER 1

( - ) 009T LAYER 2

Piping Asbestos Sample Locations

Building 1 - First Floor

Scale: 1" = 20'

Overton Brooks VA Medical Center

Shreveport, Louisiana

Page: 2 OF 4

ENVIRONMENTAL CONSULTING, LLC

Overton Brooks V.A. Medical Center - 2018 Reinspection Piping Asbestos Sample Locations - First Floor - Wing 1W-A

KEY PLAN

L:\Drawings\VA Hospitals\Overton Brooks VA Medical Center\2018 R\2018 Asbestos Reinspection\Bldg 1\AP\B1-1-AP.dwg

File Name: L:\Dwgs\OBVA\18Rein\Bldg1\AP.dwg

Drawn By: LW

Date: 11/16/18

PIPING LEGEND

ASBESTOS LEGEND

POSITIVE FOR ACBM

NEGATIVE FOR ACBM

ACBM PREVIOUSLY ABATED

FOUND NEGATIVE FOR ACBM

BY POINT COUNTING METHOD

CW = COLD WATER

HW = HOT WATER

HWR = HOT WATER RETURN

HWS = HEATING WATER SUPPLY

CWS = COOLING WATER SUPPLY

PLUMBING CHASE (TYP.)

CONVECTOR

VERTICAL STEAM

METAL PANELS W/ ROCK WOOL LAYED

ON TOP DIDN'T PULL PANEL OR PAINT*

DAMAGED - ACM PIPING

REMOVAL PRIORITY: 3

NOTE: PIPING ABATED PER OWNER.

(DATE & ABATEMENT COMPANY UNKNOWN)

DAMAGED - ACM PIPING

REMOVAL PRIORITY: 5

NOTE: PIPING ABATED.

(MARCH 2011 - GILL INDUSTRIES, LTD.)

DAMAGED - ACM PIPING

REMOVAL PRIORITY: 4

DAMAGED - ACM PIPING

REMOVAL PRIORITY: 5

DAMAGED - ACM PIPING

REMOVAL PRIORITY: 1

DAMAGED - ACM PIPING

REMOVAL PRIORITY: 3

DAMAGED - ACM PIPING

REMOVAL PRIORITY: 5

NOTE: PIPING ABATED.

(AUGUST 2016 - ABATEMENT

SERVICES, INC.)

NOTE: PIPING ABATED

(SEPTEMBER 2016 - ABATEMENT SERVICES, INC.)

Piping Asbestos Homogeneous Areas Building 1 - First Floor

Scale: 1" = 20'

Overton Brooks VA Medical Center

Shreveport, Louisiana

Page: 2 OF 4

ENVIRONMENTAL CONSULTING, LLC

Overton Brooks V.A. Medical Center - 2018 Reinspection Piping Asbestos Homogeneous Areas - First Floor - Wing 1W-A

KEY PLAN

L:\Drawings\VA Hospitals\Overton Brooks VA Medical Center\2018 R\2018 Asbestos Reinspection\Bldg 1\HP\B1-1-HP.dwg

HOMOGENEOUS AREAS

HMA-1-1W-A-PIPING

ABATED PIPING

File Name: L:\Dwgs\OBVA\18Rein\Bldg1\HP.dwg

Drawn By: LW

Date: 11/16/18

File details come from the government source that posted it. Updated .