A9_Technical_Acceptability_Template.docx
DOCX document 34 KB Posted
- Attached to
- CANE - REHABILITATE THE EXTERIOR OF THE
- Solicitation number
- 140P5326R0011
About this file
This is a Technical Acceptability Template that offerors must complete and submit with their quotation for RFQ No. 140P5326R0011, a small business set-aside solicitation for the rehabilitation of Fee Memorial Church at Camp Nelson National Monument in Jessamine County, Kentucky. Award will be made on a Lowest Price Technically Acceptable (LPTA) basis with no tradeoffs, and any quotation missing required entries will be deemed technically unacceptable and ineligible for award.
The template requires offerors to provide: (1) company information including legal name, UEI, CAGE code, and primary point of contact; (2) documentation of at least two completed projects within the past five years relevant to historic wood restoration, masonry veneer, wood shingle roofs, sheet metal flashing/trim (Sections 04 26 13, 06 01 20, 06 40 13, 07 31 29, 07 62 00, 07 62 13) or building lifting, foundation replacement, and excavation support (Sections 03 30 00 and 31 50 00), including customer/owner information, location, scope, timing evidence, contract/PO numbers, and points of contact; (3) identification of any key subcontractors and their roles; (4) a compliance checklist confirming the offeror's ability to perform deconstruction/demolition, work near public areas while protecting resources, debris removal and disposal, material salvaging and storage, structure lifting, historic repairs, documentation of work, material selection, landscape protection, and specification of Class B fire-retardant wood shingle roofing materials; and (5) certification by an authorized representative that all information is accurate and the proposal complies with the Statement of Work and specifications. The solicitation closes June 30, 2026 at 5:00 PM EDT, with questions due by June 22, 2026 at noon EDT, and a site visit scheduled for June 18, 2026.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 9 — LPTA TECHNICAL ACCEPTABILITY TEMPLATE Project Name: CANE - Rehab Fee Church Park Location: Camp Nelson National Monument, Jessamine County, KY
RFQ No.: 140P5326R0011
INSTRUCTIONS (READ FIRST):
Offeror shall complete and submit this template with its quotation. To be rated Technically Acceptable (PASS), the quotation must include all required entries below. Omission of any required entry will result in Technically Unacceptable (FAIL) and ineligibility for award. The Government will make award on a Lowest Price Technically Acceptable (LPTA) basis; no tradeoffs. Evaluation will be on the basis established in the solicitation.
1) Offeror Information (Required) Legal name: Click or tap here to enter text.
UEI (if applicable):Click or tap here to enter text.
CAGE (if applicable): Click or tap here to enter text.
Primary POC (name/title): Click or tap here to enter text.
Email / Phone: Click or tap here to enter text.
2) Relevant Experience (PASS/FAIL) — At least two (2) completed projects within last five (5) years Each project must be relevant to A. Historic wood restoration, masonry veneer, wood shingle roofs, and sheet metal flashing/trim similar to Sections 04 26 13, 06 01 20, 06 40 13, 07 31 29, 07 62 00, 07 62 13.
B. Projects with building lifting, foundation replacement, and excavation support comparable to Sections 03 30 00 and 31 50 00.
Complete all fields:
Project 1 Customer/Owner: Click or tap here to enter text.
Location (city/state): Click or tap here to enter text.
Relevance (check):
☐ Historic Wood Restoration, masonry veneer, wood shingle roofs, and sheet metal flashing/trim ☐ Building lifting/Foundation replacement ☐ Both ☐ Other (explain):Click or tap here to enter text.
Brief scope (1–3 sentences):
Timing evidence (required):
☐ Month/Year–Month/Year ☐ Year completed; Enter: Click or tap here to enter text.
Contract/PO No. (if applicable): Click or tap here to enter text.
POC name/title + email/phone: Click or tap here to enter text.
Project 2 Customer/Owner: Click or tap here to enter text.
Location (city/state): Click or tap here to enter text.
Relevance (check):
☐ Historic Wood Restoration, masonry veneer, wood shingle roofs, and sheet metal flashing/trim ☐ Building lifting/Foundation replacement ☐ Other (explain): Click or tap here to enter text.
Brief scope (1–3 sentences):
Timing evidence (required):
☐ Month/Year–Month/Year ☐ Year completed; Enter: Click or tap here to enter text.
Contract/PO No. (if applicable): Click or tap here to enter text.
POC name/title + email/phone: Click or tap here to enter text.
3) Key Subcontractor Identification (PASS/FAIL) — As applicable Will specialized work be subcontracted ? ☐Yes ☐ No If yes, identify subcontractor(s) and role(s):
Subcontractor name: Click or tap here to enter text.
Trade/role: Click or tap here to enter text.
City/state + phone/email: Click or tap here to enter text.
(Repeat as needed.)
4) SOW/Specs Compliance Checklist (PASS/FAIL) Mark one box per row (no blanks). Notes optional.
| Minimum requirement (from SOW/specs) |
| Comply |
| Does Not Comply |
| Notes |
| Deconstruction and demolition of features as indicated is Section 3 of scope of work. | ||
| ☐ | ☐ | Click or tap here to enter text. |
| Working in close vicinity to active public-use areas while protecting natural and cultural resources. | ||
| ☐ | ☐ | Click or tap here to enter text. |
| Removal and legal disposal of demolition/construction debris. | ||
| ☐ | ☐ | Click or tap here to enter text. |
| Deconstruction, salvaging of material, stockpiling and storage of identified material for re-use as specified in the scope of work. | ||
| ☐ | ☐ | Click or tap here to enter text. |
| Lifting of existing structure to execute foundational repair or replacement. | ||
| ☐ | ☐ | Click or tap here to enter text. |
| Perform period correct repairs to maintain historic character of recognized historic structures. | ||
| ☐ | ☐ | Click or tap here to enter text. |
| Maintain and provide documentation of specific repairs and replacements, cataloguing exact areas repaired, replaced, and materials used. | ||
| ☐ | ☐ | Click or tap here to enter text. |
| Select appropriate in-kind materials for replacement of valuable historic fabric. | ||
| ☐ | ☐ | Click or tap here to enter text. |
| Work within an historic landscape and protect and avoid disturbance of significant features. | ||
| ☐ | ☐ | Click or tap here to enter text. |
| Confirm Roofing Materials are Class B factory impregnated/pressure treated fire retardant wood shingles | ||
| ☐ | ☐ | Click or tap here to enter text. |
Period of Performance:
The offeror acknowledges the period of performance of 180 days from NTP. The offeror has identified below any known or anticipated schedule constraints, material lead times, or other factors that could affect meeting this period of performance.
Known or anticipated delays/constraints: ☐N/A Click or tap here to enter text.
5) Offeror Certification (Required) Authorized representative name/title: Click or tap here to enter text.
Signature: _______________________________________________ Date: Click or tap to enter a date.
By signing above, the offeror certifies that the information provided in this template is accurate and that the offeror’s proposal fully complies with the Statement of Work and specifications for this contract.
File details come from the government source that posted it. Updated .