This is a Price Schedule template for the Camp Nelson National Monument Fee Church Exterior Rehabilitation project. The document outlines 14 line items plus one option for construction services, including disconnect/reconnect services, building lifting, demolition and new concrete foundation work, structural reinforcement of walls and roof, cupola reinforcement, wood siding and trim repairs, new brick chimneys, roof and gutter installation, door and window work, and painting. The schedule is organized to capture Total Material Cost, Total Labor Cost, Total Equipment Cost, Total Direct Costs, and Total NET Costs for each line item, with all entries currently showing zero values, indicating this is a blank template awaiting cost proposals from contractors.
The related solicitation (140P5326R0011) is a Firm-Fixed Price Construction contract issued by the Department of the Interior National Park Service Southeast Region for the rehabilitation of the exterior of Fee Memorial Church, a 1912-constructed historic building eligible for National Register listing. The project scope addresses concrete foundation issues, wood frame superstructure concerns, rainwater management, wall shear capacity reinforcement, cupola reinforcement, and insect damage repair, with a 180-day period of performance from Notice to Proceed. This is a 100% Small Business set-aside with a $45 million ceiling, NAICS Code 236220, with proposals due by June 30, 2026 at 5:00 PM EDT via email to Ashley_Warcewicz@ios.doi.gov. A mandatory site visit is scheduled for June 18, 2026 at 10:00 AM EDT in Nicholasville, Kentucky, with the question cut-off on June 22, 2026 at Noon EDT.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Camp Nelson National Monument | Proposed By: |
| Fee Church Exterior Rehabilitation - Price Schedule | Date: |
| Item No. | Description | Total Material Cost | Total Labor Cost | Total Equipment Cost | Total Direct Costs | Total NET Costs |
| 1 | Disconnect and Reconnect Services | $ - 0 | ||||
| 2 | Building Lifting | $ - 0 | ||||
| 3 | Demolition of Concrete Foundation and Stairs | $ - 0 | ||||
| 4 | New Concrete Foundation and Stairs | $ - 0 | ||||
| 5 | Structural Reinforcement of Walls and Roof and Repair Damaged Wood Stuctural Members | $ - 0 | ||||
| 6 | Reinforcement of the Cupola and Repair Damaged Wood Structural Members | $ - 0 | ||||
| 7 | Wood Siding Repairs and New Wood Siding | $ - 0 | ||||
| 8 | New Brick Chimneys (non-operable) | $ - 0 | ||||
| 9 | Wood Trim Repairs and New Wood Trim | $ - 0 | ||||
| 10 | New Eaves and Fascia | $ - 0 | ||||
| 11 | New Roof, Gutters, and Downspout | $ - 0 | ||||
| 12 | New Exterior Doors and Repairs to Existing Interior Door | $ - 0 | ||||
| 13 | Protection of Windows | $ - 0 | ||||
| 14 | Paint Structure | $ - 0 | ||||
| Option 1 | Window Repairs | $ - 0 | ||||
| Subtotal Direct Construction Costs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |