A6-_Contract_Price_Schedule.xlsx

XLSX spreadsheet 11 KB Posted

Attached to
CANE - REHABILITATE THE EXTERIOR OF THE
Solicitation number
140P5326R0011
Issued by

About this file

This is a Price Schedule template for the Camp Nelson National Monument Fee Church Exterior Rehabilitation project. The document outlines 14 line items plus one option for construction services, including disconnect/reconnect services, building lifting, demolition and new concrete foundation work, structural reinforcement of walls and roof, cupola reinforcement, wood siding and trim repairs, new brick chimneys, roof and gutter installation, door and window work, and painting. The schedule is organized to capture Total Material Cost, Total Labor Cost, Total Equipment Cost, Total Direct Costs, and Total NET Costs for each line item, with all entries currently showing zero values, indicating this is a blank template awaiting cost proposals from contractors.

The related solicitation (140P5326R0011) is a Firm-Fixed Price Construction contract issued by the Department of the Interior National Park Service Southeast Region for the rehabilitation of the exterior of Fee Memorial Church, a 1912-constructed historic building eligible for National Register listing. The project scope addresses concrete foundation issues, wood frame superstructure concerns, rainwater management, wall shear capacity reinforcement, cupola reinforcement, and insect damage repair, with a 180-day period of performance from Notice to Proceed. This is a 100% Small Business set-aside with a $45 million ceiling, NAICS Code 236220, with proposals due by June 30, 2026 at 5:00 PM EDT via email to Ashley_Warcewicz@ios.doi.gov. A mandatory site visit is scheduled for June 18, 2026 at 10:00 AM EDT in Nicholasville, Kentucky, with the question cut-off on June 22, 2026 at Noon EDT.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Camp Nelson National MonumentProposed By:
Fee Church Exterior Rehabilitation - Price ScheduleDate:
Item No.DescriptionTotal Material CostTotal Labor CostTotal Equipment CostTotal Direct CostsTotal NET Costs
1Disconnect and Reconnect Services$ - 0
2Building Lifting$ - 0
3Demolition of Concrete Foundation and Stairs$ - 0
4New Concrete Foundation and Stairs$ - 0
5Structural Reinforcement of Walls and Roof and Repair Damaged Wood Stuctural Members$ - 0
6Reinforcement of the Cupola and Repair Damaged Wood Structural Members$ - 0
7Wood Siding Repairs and New Wood Siding$ - 0
8New Brick Chimneys (non-operable)$ - 0
9Wood Trim Repairs and New Wood Trim$ - 0
10New Eaves and Fascia$ - 0
11New Roof, Gutters, and Downspout$ - 0
12New Exterior Doors and Repairs to Existing Interior Door$ - 0
13Protection of Windows$ - 0
14Paint Structure$ - 0
Option 1Window Repairs$ - 0
Subtotal Direct Construction Costs$ - 0$ - 0$ - 0$ - 0$ - 0