A6. PWS_Appendix E MESP.pdf

PDF 149 KB Posted

Attached to
Integrated Solid Waste Management
Solicitation number
FA461026Q0030
Issued by

About this file

This is a Mission-Essential Contractor Services Plan template for Integrated Solid Waste Services (ISWS) at Vandenberg Space Force Base, California, managed by the 30th Civil Engineer Squadron. The plan was developed in accordance with DFARS Clause 252.237-7023 for continuation of essential contractor services during periods of crisis.

The plan requires contractors to identify provisions for acquiring essential personnel and resources to maintain operations for up to 30 days or until normal operations resume, address challenges associated with extended events such as pandemics occurring in repeated waves, manage time lapse between initiating acquisition of personnel and their availability on-site, establish procedures for identifying and training personnel capable of relocating to alternate facilities or working remotely, create alert and notification procedures for mobilizing essential personnel, and develop communication approaches regarding employee roles and responsibilities during crises. The mission-essential services identified in the pricing table include: Municipal Solid Waste and Food Waste Collection (12 months), Recyclable Collection (12 months), Unscheduled Collection Service/Special Events (156 hours), Roll Off Container Delivery with Off-Base Hauling (386 each), Tipping Fees (12 months), Roll Off Rental Non-Use Fee (16 each), and Roll Off Rental Overweight Fee (19 each). All services will be priced at current contract rates at the time of plan activation, with these prices serving as the basis for any equitable adjustments. The contractor must utilize its internal Quality Control Plan during performance and will continue services until notified by the Contracting Officer to cease. This attachment remains in effect following contract award, with only the solicitation number changing to the contract number in the footer.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI

MISSION-ESSENTIAL CONTRACTOR

SERVICES PLAN

FOR

INTEGRATED SOLID WASTE SERVICES (ISWS)

Note: Upon contract award the vendor shall be required to resubmit this form with the ensuing

Contract Number in the footer. No altercations to the information provided to this Solicitation attachment will be permitted apart from changing the Solicitation number to the Contract number in the footer. This attachment will remain in the ensuing contract award.

Vandenberg Space Force Base (VSFB), CA

30th Civil Engineer Squadron (30 CES)

7 August 2026

Attachment-9 Mission Essential Services for

FA9301-26-Q-0030

CUI

1. INTRODUCTION

This Mission-Essential Contractor Services Plan has been developed in accordance with DFARS

Clause 252.237-7023 — Continuation of Essential Contractor Services. It addresses how

____________________ will continue providing the integrated solid waste services (ISWS) identified in the solicitation during periods of crisis, upon notification by the Contracting Officer

(CO) to activate the plan.

2. OBJECTIVE

In support of 30 CES, the objective is to provide mission essential ISWS within the boundaries of Vandenberg SFB (VSFB), CA during a crisis. The essential contractor services are identified below and will be performed at the prices in the contract at the time the Plan is activated.

3. CONTRACTOR PROCEDURES

The Contractor must address and answer the following elements within this Plan:

a. Identify provisions made for the acquisition of essential personnel and resources, if necessary, for continuity of operations for up to 30 days or until normal operations can be resumed;

b. How you will address challenges associated with maintaining essential contractor services during an extended event, such as a pandemic that occurs in repeated waves;

c. How you will address time lapse associated with the initiation of the acquisition of essential personnel and resources and their actual availability on site;

d. How you will address components, processes, and requirements for the identification, training, and preparedness of personnel who are capable of relocating to alternate facilities or performing work from home;

e. How you will establish an alert and notification procedure for mobilizing identified

“essential contractor service” personnel; and

f. The approach you will use for communicating expectations to contractor employees regarding their roles and responsibilities during a crisis.

4. PRICING

The mission essential ISWS are identified in Table 1 below and will be paid at the prices in the contract at the time the Plan is activated. The prices will also be used as the basis for any equitable adjustments resulting from the activation of the Plan.

Table 1: Mission-Essential Contractor Services

CUI

CLIN Description of Service Qty Unit Unit

Price

Total

Price

X002 Municipal Solid Waste and

Food Waste Collection

12 Months Current price

Current price

X003 Recyclable Collection 12 Months Current price

Current price

X010 Unschedueled Collection

Service/Special Events

156 Hours Current price

Current price

X011 Roll Off Container Delivery with Off-Base Hauling

386 EA Current price

Current price

X015 Tipping Fees 12 Months Current price

Current price

X019 Roll Off Rental Non-Use Fee 16 EA Current price

Current price

X020 Roll Off Rental Overweight Fee 19 EA Current price

Current price

5. QUALITY CONTROL PLAN (QCP)

The contractor shall utilize its own internal QCP during the performance of this Plan.

6. DEACTIVATION OF PLAN

The contractor shall perform the mission-essential contractor services during a crisis until notified by the CO to cease performance of the Plan.

SIGNATURE & INFORMATION SECTION

Contractor Point of Contact:

Date:

Electronic Signature:

Or Wet Signature:

File details come from the government source that posted it. Updated .