A6. PWS_Appendix E MESP.pdf
PDF 149 KB Posted
- Attached to
- Integrated Solid Waste Management
- Solicitation number
- FA461026Q0030
About this file
This is a Mission-Essential Contractor Services Plan template for Integrated Solid Waste Services (ISWS) at Vandenberg Space Force Base, California, managed by the 30th Civil Engineer Squadron. The plan was developed in accordance with DFARS Clause 252.237-7023 for continuation of essential contractor services during periods of crisis.
The plan requires contractors to identify provisions for acquiring essential personnel and resources to maintain operations for up to 30 days or until normal operations resume, address challenges associated with extended events such as pandemics occurring in repeated waves, manage time lapse between initiating acquisition of personnel and their availability on-site, establish procedures for identifying and training personnel capable of relocating to alternate facilities or working remotely, create alert and notification procedures for mobilizing essential personnel, and develop communication approaches regarding employee roles and responsibilities during crises. The mission-essential services identified in the pricing table include: Municipal Solid Waste and Food Waste Collection (12 months), Recyclable Collection (12 months), Unscheduled Collection Service/Special Events (156 hours), Roll Off Container Delivery with Off-Base Hauling (386 each), Tipping Fees (12 months), Roll Off Rental Non-Use Fee (16 each), and Roll Off Rental Overweight Fee (19 each). All services will be priced at current contract rates at the time of plan activation, with these prices serving as the basis for any equitable adjustments. The contractor must utilize its internal Quality Control Plan during performance and will continue services until notified by the Contracting Officer to cease. This attachment remains in effect following contract award, with only the solicitation number changing to the contract number in the footer.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Integrated Solid Waste_RFI.pdf | ||
| Combo RFQ_SolidWaste_v3.pdf | ||
| A7. Pricing Schedule_v2.xlsx | XLSX spreadsheet | |
| Combo RFQ_SolidWaste_v2.pdf | ||
| A2. PWS_Appendix A_Collection Schedules.xlsx | XLSX spreadsheet | |
| A7. Pricing Schedule.xlsx | XLSX spreadsheet | |
| A1. PWS_Integrated Solid Waste Mgmt.pdf | ||
| A4. PWS_Appendix C_Environmental Compliance.pdf | ||
| A8. SCA WD_2015-5647 Rev27_20260513.pdf | ||
| Combo RFQ_SolidWaste.pdf | ||
| A9. Clauses and Provisions_FA461026Q0030.pdf | ||
| A10. Technical Questionnaire.docx | DOCX document | |
| A3. PWS_Appendix B_Historical Solid Waste Tonnage.pdf | ||
| A5. PWS_Appendix D DAF KtCompass.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
MISSION-ESSENTIAL CONTRACTOR
SERVICES PLAN
FOR
INTEGRATED SOLID WASTE SERVICES (ISWS)
Note: Upon contract award the vendor shall be required to resubmit this form with the ensuing
Contract Number in the footer. No altercations to the information provided to this Solicitation attachment will be permitted apart from changing the Solicitation number to the Contract number in the footer. This attachment will remain in the ensuing contract award.
Vandenberg Space Force Base (VSFB), CA
30th Civil Engineer Squadron (30 CES)
7 August 2026
Attachment-9 Mission Essential Services for
FA9301-26-Q-0030
CUI
1. INTRODUCTION
This Mission-Essential Contractor Services Plan has been developed in accordance with DFARS
Clause 252.237-7023 — Continuation of Essential Contractor Services. It addresses how
____________________ will continue providing the integrated solid waste services (ISWS) identified in the solicitation during periods of crisis, upon notification by the Contracting Officer
(CO) to activate the plan.
2. OBJECTIVE
In support of 30 CES, the objective is to provide mission essential ISWS within the boundaries of Vandenberg SFB (VSFB), CA during a crisis. The essential contractor services are identified below and will be performed at the prices in the contract at the time the Plan is activated.
3. CONTRACTOR PROCEDURES
The Contractor must address and answer the following elements within this Plan:
a. Identify provisions made for the acquisition of essential personnel and resources, if necessary, for continuity of operations for up to 30 days or until normal operations can be resumed;
b. How you will address challenges associated with maintaining essential contractor services during an extended event, such as a pandemic that occurs in repeated waves;
c. How you will address time lapse associated with the initiation of the acquisition of essential personnel and resources and their actual availability on site;
d. How you will address components, processes, and requirements for the identification, training, and preparedness of personnel who are capable of relocating to alternate facilities or performing work from home;
e. How you will establish an alert and notification procedure for mobilizing identified
“essential contractor service” personnel; and
f. The approach you will use for communicating expectations to contractor employees regarding their roles and responsibilities during a crisis.
4. PRICING
The mission essential ISWS are identified in Table 1 below and will be paid at the prices in the contract at the time the Plan is activated. The prices will also be used as the basis for any equitable adjustments resulting from the activation of the Plan.
Table 1: Mission-Essential Contractor Services
CUI
CLIN Description of Service Qty Unit Unit
Price
Total
Price
X002 Municipal Solid Waste and
Food Waste Collection
12 Months Current price
Current price
X003 Recyclable Collection 12 Months Current price
Current price
X010 Unschedueled Collection
Service/Special Events
156 Hours Current price
Current price
X011 Roll Off Container Delivery with Off-Base Hauling
386 EA Current price
Current price
X015 Tipping Fees 12 Months Current price
Current price
X019 Roll Off Rental Non-Use Fee 16 EA Current price
Current price
X020 Roll Off Rental Overweight Fee 19 EA Current price
Current price
5. QUALITY CONTROL PLAN (QCP)
The contractor shall utilize its own internal QCP during the performance of this Plan.
6. DEACTIVATION OF PLAN
The contractor shall perform the mission-essential contractor services during a crisis until notified by the CO to cease performance of the Plan.
SIGNATURE & INFORMATION SECTION
Contractor Point of Contact:
Date:
Electronic Signature:
Or Wet Signature:
File details come from the government source that posted it. Updated .