A5 ITB S-63500-00013826 John Day Watershed District Office Imp.pdf

PDF 204 KB Posted

Attached to
John Day Watershed District Office Improvement
Solicitation number
S-63500-00013826
Issued by
Gilliam County, Oregon

About this file

This document is Addendum #5 for Invitation to Bid (ITB) S-63500-00013826 for the John Day Watershed District Office Improvement project by the Oregon Department of Fish and Wildlife (ODFW), Engineering Project #21-033. The addendum, dated October 23, 2025, modifies the original bid documents with numerous specification updates and clarifications across multiple sections, including roofing, plumbing, landscaping, glazing, solar panel installation, and other technical specifications. The document includes detailed responses to 65 questions raised during a mandatory pre-bid conference held on September 23, 2025, addressing technical details, material specifications, installation requirements, and potential product substitutions.

The addendum introduces several key changes, such as modifying the thermoplastic membrane roofing specifications to require an 80 mil minimum thickness, adding detailed requirements for photovoltaic array mounting, updating landscape restoration soil requirements, and providing clarifications on various building materials and installation methods. Substitution requests for products like Oldcastle Building Envelope Series 3000 Thermal Multiplane, Northwest Precast LLC, and Potter Signal IPA 4000V were approved. The document maintains the original bid closing date and emphasizes that bidders must acknowledge the addendum's material changes through the specified form. No changes were made to the overall project funding or contract terms.

View the file

Other files

File Type Posted
Attachment B-2 101425 SPECIFICATIONS John Day Watershed New Shop Building 4.pdf PDF
Attachment B-1 093025 SPECIFICATIONS John Day Watershed District Office Improvement.pdf PDF
Attachment B-1 SPECIFICATIONS John Day Watershed District Office Imp.pdf PDF
PreBid Attendee list ITB S-63500-00013826 John Day Office .pdf PDF
Attachment B-1 091925 SPECIFICATIONS John Day Watershed District Office Imp 3.pdf PDF
A1 ITB S-63500-00013826 John Day Watershed District Office Improvement.pdf PDF
Attachment C-2 092525 John Day Watershed New Shop Building 3.pdf PDF
VALUE LINE SOLE SOURCE PUBLIC NOTICE~1.pdf PDF
Clarification ITB S-63500-00013826 John Day Watershed DO 102825.pdf PDF
A4 ITB S-63500-00013826 John Day Watershed Office Improvement.pdf PDF
Attachment C-1 091825 PLANS John Day Watershed District Office 3 .pdf PDF
NITA ITB S-63500-00013826 John Day Watershed District Office Improvements.pdf PDF
Attachment B-2 100325 SPECIFICATIONS John Day Watershed New Shop Building 3.pdf PDF
Attachment C-1 100325 PLANS John Day Watershed District Office Imp 5.pdf PDF
ITB S-63500-00013826 John Day Watershed District Office Improvement.pdf PDF
Attachment A form A-2 Pricing Form 102225.pdf PDF
Preliminary Bid Tabulation ITB S-63500-00013826 John Day WD Office Imp.pdf PDF
Attachment C-2 100625 PLANS John Day Watershed New Shop Building.pdf PDF
A1-Attachment B-2 091025 SPECIFICATIONS John Day Watershed District Office Imp.pdf PDF
Attachment B-2 102425 SPECIFICATIONS John Day Watershed New Shop Building 6.pdf PDF
A3 ITB S-63500-00013826 John Day Watershed District Office Imp.pdf PDF
Attachment B-1 102425 SPECIFICATIONS John Day Watershed District Office Improvement6 .pdf PDF
Attachment B-2 SPECIFICATIONS John Day Watershed District Office Imp.pdf PDF
A2 ITB S-63500-00013826 John Day Watershed District Office Improvement.pdf PDF
Attachment C-2 PLANS John Day Watershed District Office Imp.pdf PDF
A6 ITB S-63500-00013826 John Day Watershed District Office Imp.pdf PDF
Attachment C-1 PLANS John Day Watershed District Office Imp.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM #5

ITB S-63500-00013826

John Day Watershed District Office Improvement

Engineering Project # 21-033

October 23, 2025

This addendum modifies the Invitation to Bid (ITB) document(s) for work only to the extent indicated herein. All other areas not specifically mentioned or affected by this addendum shall remain in full force.

This addendum shall be added as a part of the original ITB document(s) and shall become part of the work required.

Deleted language is shown within [brackets and strikethrough]. New language is shown in Bold and Underlined.

ADDENDUM

1. ATTACHMENT B-1 093025 SPECIFICATIONS John Day Watershed District Office Improvement shall be removed in its entirety and replaced with ATTACHMENT B-1 100325 SPECIFICATIONS John Day Watershed District Office Improvement dated October 3, 2025 and contains the following modifications:

A. Section 07 54 00 TERMOPLASTIC MEMBRANE ROOFING-ALTERNATE shall be modified as follows:

2.3 MEMBRANE ROOFING AND ASSOCIATED MATERIALS

A. Membrane Roofing Materials:

1. TPO: Thermoplastic polyolefin (TPO) complying with ASTM D6878/D6878M, sheet contains reinforcing fabrics or scrims.

a. [45 mil, 0.045 inch (1.1 mm),] 80 mil minimum.

B. Section 07 54 00 TERMOPLASTIC MEMBRANE ROOFING-ALTERNATE shall be modified to add the following:

2.7 PV ARRAY MOUNTING

A. Mounting of photovoltaic panels shall be coordinated with solar array manufacturer.

B. Products shall be approved for use with specified TPO membrane roof manufacturer:

1. Solar SkyRack Mount; www.solarskyrack.com

2. Anchor Products U-Anchor 2400 or 3400; www.anchorp.com

3. OMG PowerGrip Plus or OMG PowerGrip Universal 7 w/ OMG Supplied CCM

Flashing; www.omgroofing.com

4. Or approved equivalent.

a. Any approved equivalent shall be first approved by the manufacturer of the photovoltaic panels and the manufacturer of the TPO roofing membrane.

C. System shall be delegated design. Provide shop drawings for review.

http://www.solarskyrack.com/ http://www.anchorp.com/ http://www.omgroofing.com/

ADDENDUM #5 ITB S-63500-00013826 2

C. Section 22 00 00 PLUMBING shall be modified as follows:

Remove 2.2 FIXTURE SCHEDULE in its entirety and replace it with the following:

2.2 FIXTURE SCHEDULE

A. See drawings for fixture schedule.

D. Section 32 93 00 PLANTS shall be modified as follows:

2.6 ACCESSORIES

A. [Stakes: Softwood lumber pointed end.] RESERVE B. [Cable, Wire, Eye Bolts and Turnbuckles: Non-corrosive, of sufficient strength to withstand windpressure and resulting movement of plant life.] RESERVE C. Root barrier: Recyclable black injection molded panels 0.8 inches wall thickness in modules 24 inches long and 18 [24] inches deep.

E. Section 09 21 00 GYPSUM BOARD 2.1 MATERIALS D. Interior Trim shall be removed in its entirety and replaces with:

2.1 MATERIALS

D. Interior Trim: ASTM C 1047.

1. Material: Galvanized or aluminum-coated steel sheet or rolled zinc.

2. Shapes:

a. Corner bead.

b. LC-Bead: J-shaped; exposed long flange receives joint compound.

c. L-Bead: L-shaped; exposed long flange receives joint compound.

d. U-Bead: J-shaped; exposed short flange does not receive joint compound.

e. Expansion (control) joint.

F. Section 09 21 00 GYPSUM BOARD shall be modified as follows:

1.2 SUBMITTALS

[D. Provide Texture samples of “Orange Peel” and Knock-down” finish for approval.]

G. Section 08 80 00 GLAZING shall be modified as follows:

2.5 GLAZING UNITS

A. Type GL-3: Monolithic Safety Interior Vision Glazing

4. Thickness: [1/4 inch nominal] 3/8 inch, nominal

H. Section 32 12 18 SURFACE RESTORATION shall be modified as follows:

3.4 LANDSCAPE RESTORATION

A. All areas as shown on the Drawings or as required by the Owner’s Authorized

Representative [shall be restored by placement of 12 inches of topsoil, fine grading, and seed or sod placement to match existing conditions, in accordance with Standard Specification Section 01 03 0.] shall be restored by placement of 3 inches minimum of topsoil for seeded areas, 8-12 inches minimum of topsoil for shrub/perennial areas, and 12-18 inches minimum of topsoil for tree/shrub areas.

I. Section 31 23 23 FILL shall be modified as follows:

Footer: Pendleton, Oregon [04 20 00-1 Unit Masonry] 31 23 23-1 FILL

Footer: Pendleton, Oregon [04 20 00-1 Unit Masonry] 31 23 23-2 FILL

J. Section 27 15 00 COMMUNICATION HORIZONTAL CABLING shall be removed in its entirety and replaced with a revised version dated 100325.

K. Section 08 43 13 ALUMINUM-FRAMED STOREFRONTS shall be modified as follows:

1. 2.1 FRAMING FOR INSULATING GLAZING

B. Substitutions:

2. Approved equivalent products: Oldcastle building envelope series 3000 thermal Multiplane

2. 2.4 SWINGING DOORS

A. Insulated Thermal Entrances, Basis of Design:

1. Manufacturer: Kawneer

a. Approved equivalent products: Oldcastle Building Envelope Insulpour

Thermal Entrance 500 T.

L. Section 04 20 00 UNIT MASONRY shall be modified as follows:

2.3 PRECAST CONCRETE UNITS

D. MFR:

2. Northwest Precast LLC

3. Or approved equal.

M. Section 28 46 00 FIRE DETECTION AND ALARM shall be modified as follows:

1. 2.1 ACCEPTABLE MANUVACTURER

A. A Notifier Onyx fire alarm and EVAX system will be installed in this project.

1. Approved Equivalent Manufacturers

a. If using an approved equivalent manufacturer, the contractor shall be responsible for providing a complete system that is better or equivalent to the specified system below.

b. Potter Signal Fire Alarm

2. 2.2 FIRE ALARM CONTROL PANEL

A. The fire alarm control panel shall be a Notifier Onyx NFPS2-3030.

1. Approved Equivalent Manufacturers

a. Potter Signal IPA 4000V EVAC

2. ATTACHMENT C-1 091825 PLANS John Day Watershed District Office Improvement shall be removed in its entirety and replaced with ATTACHMENT C-1 100325 PLANS John Day Watershed District Office Improvement dated October 3, 2025 and contains the following modifications:

A. Sheet L2.10 SURFACE PLAN - LEGEND shall be modified as follows:

ROCK:

1. 2”-6” small local round river rock, 2-9” depth (4,600 SF)

2. 6+” large local round river rock, 2-9” depth (2,000 SF)

B. Sheet L1.10 LAYOUT PLAN – LEGEND shall be modified as follows:

1. COLORED CONCRETE: MANUFACTURER: DAVIS COLORS OR APPROVED EQUAL

2. LANDSCAPE BOULDERS: LOCALLY SOURCES BASALT OR GRANITE

C. Sheet L4.10 IRRIGATION PLAN shall be modified as follows:

1. Show the irrigation line north of the building.

2. IRRIGATION SCHEDULE

TreeDiaper Plant Hydration Ring or Approved Equal Determined by rootball size TreeDiaper® TD36R, Round Shape (for plants of ~18" rootball) Model#1036vA

ADDENDUM #5 ITB S-63500-00013826 4

D. Sheet L4.20 IRRIGATION NOTES AND DETAILS shall be modified as follows:

IRRIGATION NOTES:

16. INSTALL TREEDIAPER OR APPROVED EQUAL PER MANUFACTURER

INSTRUCTIONS, SOAK PRIOR TO INSTALLATION. FOLLOW TREEDIAPER WATERING

INSTRUCTIONS FOR UP TO TWO GROWING YEARS.

E. Sheet A8.21 OPENING DETAILS shall modify window trims on Details D1 and D2.

F. Sheet A9.70 INTERIOR CASEWORK DETAILS shall be modified as follows:

1. Detail A3 – 088000 GL Note [GLASS 1.4” CLEAR LAMINATED GLASS] GLASS GL4

2. Detail B4 – 088000 GL Note [GLASS 1.4” CLEAR LAMINATED GLASS] GLASS GL4

G. Sheet C-300 SEWER AND WATERLINE PLAN AND PROFILE shall be modified as follows:

Street Profile for SSMH1 shall have [EXIST.] removed.

H. Sheet A6.10 INTERIOR ELEVATIONS shall be modified as follows:

Detail A4 102 WAITING – S

[115200] 101500.IFP INTERACTIVE FLAT PANEL

I. Addition of Sheets EC-1.0 through EC-9.0 Erosion and Sediment Control Plan:

EC – 1.0 Cover Sheet EC – 2.0 Existing Conditions EC – 3.0 Mass Grading and Erosion Control Plan EC – 4.0 Street Utility Plan EC – 5.0 Offsite SW 37th Street EC – 6.0 Vertical Construction Plan EC – 7.0 Final Stabilization Plan EC – 8.0 Erosion Control Notes and Details EC – 9.0 Erosion Control Notes and Details

J. Sheet L1.20 LAYOUT PLAN shall be modified by adding Flagpole Model ECA30 – External Single

Halyard information.

3. ATTACHMENT B-2: 101325 SPECIFICATIONS John Day Watershed New Shop Building shall be removed in its entirety and replaced with ATTACHMENT B-2: 102025 SPECIFICATIONS John Day Watershed New Shop Building dated October 20, 2025 and contains the following modifications:

A. Section GYPSUM BOARD 09 21 00 shall be modified as follows:

1.2 CONTRACTOR SUBMITTALS

A. If Build America, Buy America requirements

B. Section 09 80 00 PROTECTIVE COATINGS shall be modified as follows:

1.2 CONTRACTOR SUBMITTALS

A. If Build America, Buy America requirements

Closing Date and Time: IS NOT CHANGED BY THIS ADDENDUM

The prospective Bidders have until Close of Business on October 28, 2025, to submit written questions or protests regarding this Addendum.

This addendum constitutes a MATERIAL CHANGE to the ITB. Its receipt by the Bidder is to be acknowledged per the Acknowledgment of Addenda located in Attachment A, Form A-1.

Addendum prepared by:

Julie L. Cone julie.l.cone@odfw.oregon.gov

END OF ADDENDUM No. 5 mailto:emailaddress@state.or.us

ADDENDUM #5 ITB S-63500-00013826 6

QUESTIONS AND ANSWERS:

Following are questions asked during the Mandatory pre-bid conference held on September 23, 2025 and received by Bidders and ODFW’s answers. The answers and clarifications provided below by ODFW are for informational purposes ONLY and DO NOT constitute a change to the terms, conditions, technical specifications or requirements of the ITB.

1. Question: Specification 01 10 00 (1.12) - 'The Contractor shall be responsible for obtaining and paying for all permits necessary to complete the Work.' Does this include SDC's, City Planning Dept. review & approval? Please specify which permits the contractor is responsbile for.

Answer: The Building Permit and the Planning Permit (Site Development) have been paid for. All other permits needed for the project are required to be obtained by the Contractor.

2. Question: Per 012200 (1.3)(A) - Alt 1 implies a deduct for a bidder designed aluminum trellis in lieu of a premanufactured trellis. But, there is no specification in the base bid to price the pre-manufactured trellis for a deduct. Please Clarify.

Answer: The manufacturers for this trellis have been addressed in a previous addendum. The bidder shall provide for a bidder designed pre-manufactured trellis, with an alternate for the removal of that scope from the project.

3. Question: Per 012200 (1.3)(A) - Alt 1 implies a deduct for a bidder designed aluminum trellis in lieu of a premanufactured trellis. But, there is no specification in the base bid to price the pre-manufactured trellis for a deduct. Please Clarify.

Answer: Closers, hinges, and kickplates are specified as part of the door hardware schedule in specification section 08 71 00 HARDWARE, 3.7 SCHEDULE.

4. Question: Specification 09 80 00 does not give direction as to where protective coatings apply, nor do the construction drawings.

Answer: For Bid Alternates 3 and 4, any protective coatings will be called for in the drawings and the specification will outline the protective coating requirements.

5. Question: Specification 09 80 00, section 1.2 (A) – specifically says that Build America, Buy America requirements are in place for this project and references attachment E-2, which cannot be located. Please clarify.

Answer: Several sections in Attachment B-2 specifications for the Shop Building did state that Build

America, Buy America Act requirements applied to the project. No Federal funds are used in this project, therefore no BABAA requirements exist for this project. The subject was clarified at the pre-bid conference and all sections were corrected and included in Addendum 3.

6. Question: Roofing bidder requires specification for the attachment of solar panels as it relates to ALT#2. Please clarify.

Answer: The attachment for ALT #2 would be bidder designed and shall be coordinated between solar panel manufacturer and roofing manufacturer. Approved BOD attachments are listed below. See addendum section for more information.

7. Question: Is there any on-site soils available for the soil needed at the seeded areas? Import soil is called out only for the shrub/tree planting/berms areas.

Answer: Much of the existing site has been prepped by others with gravel. The geotechnical report identified shallow hard basalt bedrock located throughout the site, assumption is minimal soil is available on site. See Sheet L2.10 – 3 inch minimum import soil is required for flat seeded areas represented by the dashed hatch. Seed only areas (no added soil) apply only to existing slope adjacent to HWY 395 represented by the x hatch.

8. Question: Is any soil required in the small/large rock areas?

Answer: No soil is required in those areas.

9. Question: What kind of rock is to be used for the small 2-6" rock and large 6"+ rock? Specs only specify arborist wood chips

Answer: Local round, river rock to be called out on L2.10. Please see addendum section for more information.

10. Question: Do the arborist wood chips need to be certified?

Answer: No, the wood chips do not need to be certified.

11. Question: What kind of rock are the small and large boulders made of - Granite, Basalt, other?

Answer: Locally sourced boulders most likely Basalt but Granite is acceptable. (Called out on

L1.10). Please see addendum section for more information.

12. Question: The intergal color for the onsite sidewalk is not locally available . Would need to be hauled form Redmond 3rs travel. Is there another color option?

Answer: A locally sourced option is an acceptable alternative. Submit locally available color options for Landscape Architect approval. Please see addendum section for additional

13. Question: The ROW curb is not clear, typical show curb and gutter. Note says standard curb but no

Height. Please clarify

Answer: Please see Addendum 3 for additional information.

ADDENDUM #5 ITB S-63500-00013826 8

14. Question: Does the LA have a preferred source for these snags/logs? - What is the tree/log snag tree variety - evergreen or deciduous. Contractor to purchase snags/logs, ODFW may be able to help finding a source for acquiring those elements.

Answer: No preferred source. No preferred variety – evergreen or deciduous are both acceptable.

Design team recommends coordinating with ODFW to source.

15. Question: What is the desired overall length of each tree/log snag?

Answer: See Sheet L1.10 for lengths.

16. Question: Is there any waterproofing requirement for the buried part of the tree snag?

Answer: No, see Sheet L1.50 for installation details.

17. Question: Irrigation POC - will a water meter and threaded stub-out be provided by civil/site?

Answer: Water Meter to be provided by Civil see sheet L4.10 for 1” water meter identified near SW

32nd Place. Threaded stub out to be provided by General Contractor. (Called out on L4.10).

18. Question: Can we adjust the main line sleeve that runs the full length of the parking stalls on the south side of the lot? We would like to sleeve from the bike racks to East of the building kick-out

Answer: Yes, that is an acceptable adjustment. Please see addendum section for additional information on Sheet L4.10.

19. Question: Can Drip Zone #2 be located at the end of this main line run with the shut-off valve and quick coupler to allow the drip zone to service the area with better pressure. It should still be within the 100' range of the Blue Tooth controller/communication wire maximum length.

Answer: Yes, that is an acceptable adjustment if contractor desires. Contractor to confirm in field that Bluetooth is indeed in range.

20. Question: What diameter/gallon size does the Tree Diaper Hydration Ring need to be?

Answer: Information added to Sheet L4.10. Please see addendum section for additional

21. Question: What is the duration required for hand watering or filling of the Tree Diaper rings?

Maintenance in the Irrigation Spec only require 1st year winterization and re-activation.

Answer: Install TreeDiaper per manufacturer instructions, soak prior to installation. Follow

TreeDiaper watering instructions for up to two growing seasons. See addendum section for additional information.

22. Question: Could you clarify what’s existing vs. what’s new for site concrete? Different drawings are showing different locations for new concrete.

Answer: Existing conditions are shown on Sheet C-100. With a note to the edge of existing pavement.

23 Question: Can you inquire on the depth of dimensional letter from Division 10? It's called out as fabricated stainless steel, but does not specify the depth.

Answer: ODFW Logo and Lettering on building and for monument signage shall be bidder designed. The depth many vary depending on signage design.

24. Question: I see in the Office Improvement plumbing specifications (220000) that there is a separate schedule from the one on P2.00. These schedules are contradictory, and the schedule in 220000 does not reflect what is in the drawings. Can you tell me which schedule is taking precedence for this project?

Answer: Please reference plumbing schedule in the drawings. See addendum section for additional information.

25. Question: I see that American Standard is in the schedule but is not an approved manufacturer in the specifications (Kohler is there instead). I'd just like to confirm that American Standard is approved for this project as well.

Answer: Please reference plumbing schedule in the drawings. See addendum section for additional

26. Question: Can we please get more details about the public art sculpture and how it should be placed?

Answer: The public art sculptures noted on the landscaping plan are conceptual at this time and will be provided outside of this bid, by others.

27 Question: A drywall contractor has identified a conflict: “They show Fry Reglet trims on details D1 &

D2/A8.21 at the frameless windows. Those trims are not made in widths that would fit wall type 4W3A, which is 5-7/8” thick.” Please provide an alternate detail for Fry Reglet trims.

Answer: New interior relite detail has been provided. Please see addendum section for additional

28. Question: Is the expectation for the roofing insulation to be polyiso with 1/2" sheathing on top or is the intention for it to be nail base?

Answer: Please reference Assembly type R-1 and R-2 on A0.10 for roof types that show polyiso insulation with coverboard.

29 Question: Will you allow MC cable for wiring?

Answer: No, MC cable for wiring will not be allowed.

ADDENDUM #5 ITB S-63500-00013826 10

30. Question: What is the material of the ODFW Art for the exterior signage?

Answer: The ODFW Art on C1/A4.10 is unknown at this time and will be provided outside of this bid, by others.

31. Question: Per CB-502, please confirm if the FDC sign is required to be in our scope?

Answer: Yes, ID sign is to be in scope.

32. Question: Per A1.20, Detail C2 shows a "backlit logo + lettering" - can you confirm? Power will need to be internal, inside the monument base at multiple locations if this is the case.

Answer: This is confirmed. The ODFW Logo and Lettering shall be backlit and the sign shall be bidder designed to provide the infrastructure to do so.

33. Question: Is the signage vendor picking up the lettering only, base / masonry / brickwork by others?

Answer: Complete signage design and foundation shall be delegated and designed by signage vendor. Final design shall be coordinated with Owner’s Authorized Representative.

34. Question: Per A4.10, Keynote #3 are TBD - Can you advise what material those should be?

Answer: The ODFW Art on C1/A4.10 is unknown at this time and will be provided outside of this bid, by others.

35. Question: Is there a water repellant coating on the exterior CMU?

Answer: See Addendum 4.

36. Question: Does the tree snag need to come from any particular part of the tree - top, middle or bottom of a tree?

Answer: Middle to top of tree. See sheet L1.50 for tree snag details, we want to maintain branching where possible and practical, trim to within 5’ of trunk.

37. Question: What is the length requirement for the Root barrier past center of tree each way?

Answer: The length is 5’ each way. 10’ long sections total. See sheet L1.3 detail #10 for dimensioned diagram. Please see addendum section for additional information.

38. Question: 329300 page 3 3.3A in the specs call for tree stakes, but the details/notes says to not stake the trees (Note 9 L3.30

Answer: No stakes - Drawings are correct, specs need to be updated. Please see addendum section for additional information.

39. Question: Details in the drawings are calling for Type C GWB – See A3/A5 on A9.80. This product is not called out in the 092100 specifications. Further, it is a GWB product that is typically found in UL rated assemblies, and is shown being used in non rated conditions, and does come at a premium price as opposed to Type X. Is Type C GWB required for this project?

Answer: See Addendum 3.

40. Question: The 092100 specification, under 2.1D is calling for a proprietary corner bead system at outside and inside corners. This system will add significant cost, as it calls for an Ultraflex product at both inside and outside corners. Typically, inside corners would be taped and mudded only, and a paper faced tape on outside corner bead product is much more common. Is there a specific intent to have Ultra Corner and Ultraflex used per the specification regardless of the cost impact?

Answer: A generic corner bead with paper faced tape is acceptable. Please see addendum section for additional information.

41. Question: The 092100 specification under 3.2.P references a level 4 finish. 1.2.D references Orange

Peel Texture and Knock-down finishes. Please confirm the desired level of finish for this project.

Answer: Please disregard section 1.2.D. See addendum section for additional information.

42. Question: Fiberglass windows have a glass type listed in the 085413 spec that’s different then the

GL2 type called out in 088000. Which one is intended?

Answer: Fiberglass windows shall use glass type noted in 08 54 13. Specification Section 08 80 00

2.4.C.1.a Notes “Glazing in fiberglass windows per window manufacturer”, which is noted in section 08 54 13 Fiberglass Windows

43. Question: Please confirm the GL3 glass type. Plans say 3/8” tempered. Spec says 1/4" tempered.

Service window calls for GL3 but also 1/4" laminated.

Answer: GL 3 should be 3/8” tempered. GL 4 should be (2) layers of ¼” laminated, or ½” overall.

Service window glazing shall be GL 4. See addendum section for additional information.

44. Question: There are a lot of counters in this bid but it appears that only some of them are being requested for fabrication. Can you please confirm if it is only the counters mentioned in the side bar, or if it would be all counters? Thank you!

Answer: All counters shown in drawings shall be provided.

45. Question: The plans say that there is no irrigation for the hydroseeded areas. In section 2.4 on page

32 92 19- 2 Line D it says to water the hydroseed and 32-92- 17-3 section 3.3 line F says to water it? We want to make sure that no irrigation is required in the hydroseeded areas.

Answer: Plans are calling out no permanent irrigation required for hydroseed. Spec sections are correct for initial placement of hydroseed which does require watering as described to promote germination.

ADDENDUM #5 ITB S-63500-00013826 12

46. Question: There is no erosion control plan in the bid documents.

Answer: Please see the attached Erosion and Sediment Control Drawings.

47. Question: Spec 26 30 01- 1.4.D Request this be waived. Samples: Upon request, submit samples for approval of material. Samples of panels, inverter, racking, is obsolete.

Answer: ODFW reserves the right to request samples as needed and will work with the Contractor during construction to determine if the agency will request samples of the equipment.”

48. Question: Spec 26 30 01- 1.5.A The solar panel manufacturers do not offer system engineering support.

Answer: Solar panel manufacturers provide support for the required components to make the system complete, and solar studies prior to installation are commonly performed.

49. Question: Obtaining a solar collector (panel) often do not distribute inverters, rails, etc. And are sourced from different supplier sources. Please waive, or advise who has all main materials in stock at time of purchase.

Answer: The intent is for the bidder to provide a single system and manufacturer who should be supplying all components for a complete system, and not piecing it together.

50. Question: Spec 26 30 01- 1.6.A Confirm this is to mean there is an expected 20year output on the solar panels, not on the output or workmanship. State period of workmanship is 1year.

Otherwise, no bid. Unless there is a O & M services contract to be executed, warranted output is outside most contractor insurance and excluded maintenance is cause for long term production guarantees.

Answer: This is confirmed.

51. Question: Spec 26 30 01- 1.6.B Solar installation shall not void the existing roofing manufacturer’s warranty and shall be installed by a certified roofing contractor as defined by the roofing manufacturer. This eliminates nearly all, if not all bids. Request waved.

Answer: The specification requests that the roof is not void after installation of the solar array, that the roofer is certified and can meet the installation per the manufacturer requirements.

52. Question: Spec 26 30 01- 2.2 Panels. Spec’d panels in plans is Suntech. See, mftr news.

Answer: Specification currently calls for “or approved equal.“

53. Question: Spec 26 30 01- 3.3.H UL1547-2018 Inverters at start up, require and drop down grid profile to be assigned from the pre-determined list. What “adjustments” are expected because panel, string, and inverter production is not “adjustable” but based on slope, orientation, sunlight, and other unadjustable environmental attributes.

Answer: Specification is requesting that system be optimized. System manufacturer and installer should be able optimize.

54. Question: Spec 26 31 01- 2.1.A.2 Old spec, monocrystalline for 550W sized panel are not the norm.

They are bi-facial or polycrystalline cell.

Answer: BOD is for largest cell available, no exceptions to substitution.

55. Question: Spec 26 31 01- 2.1.A.6 There is no solar panel manufactured in the US, today. Not one, some do “some” final assembly but cells are nearly exclusively from oversees. US companies fold quickly.

Answer: Contractor is to bid solar panels as if they are not BAA or BABAA compliant. ODFW will work with the Contractor that is awarded the contract to address issues like this.

56. Question: Spec 26 31 01- 2.2 This spec is 8+year old, b/c Only Suntech (issues above) and QCells are still around. We request an “or equal acceptance so not a sole-source project of non-near bankrupt company exists for better pricing to owner.

Answer: In section 2.2.A of the specification it lists at the end the option of “or approved equal”.

57. Question: Are topsoil amounts shown on L210 to total or in addition to the topsoil call out in surface restoration section 3.4: Landscape Restoration?

Answer: The soil amounts on L2.10 are the total. Detail 1 on L2.20 shows the existing site hard basalt or gravel and then building up the soil from there for each area type: seeded, shrub/perennials, tree/shrub. Please see addendum section for additional information.

58. Question: Note 2 on C-300 calls out to install a new sanitary sewer manhole, but just below in the street profile drawing the manhole is called out as existing. Can you please confirm if this is existing?

Answer: There is no existing manhole according to our survey data. The label on the profile is not correct. Please see addendum section for additional information.

59. Question: Section 10 15 00 appears to be related to the display shown in WAITING 102 “47" DISPLAY, VERTICALLY MOUNTED.” Specifications do not match equipment specified in Section 10 15 00. Please advise and include model number of intended display.

Answer: Sheet A6.10 has been updated to have correct specification reference. Specification is a performance spec, contractor shall supply display that meets specifications. See addendum section for additional information.

ADDENDUM #5 ITB S-63500-00013826 14

60. Question: Substitution Request Proposed: Oldcastle Building Envelope Series 3000 Thermal Multiplane

Answer: This substitution request has been approved. Please see addendum for additional

61. Question: Substitution Request Proposed: Oldcastle Building Envelope WS-500TC Thermal

Composite Entrance

62. Question: Substitution Request Proposed: Northwest Precast LLC

63. Question: Substitution Request Proposed: Potter Signal IPA 4000V

64. Question: Solar spec. 26 30 01 1.6.B. is unlikely. A metal roofing contractor that does entire solar system. Never met one.

Answer: The spec is calling for a roofing contractor to install the mounting system on the roof and to provide an approved mounting system that does not void the roof warranty.

65. Question: Attachment A, Form A-2 Pricing Form and Spec section 01 22 00 Measurement and Payment are in conflict with the General Conditions of the Contract sections E.1 Schedule of Values, section E.2 Application for Payment and Spec section 01 37 00 schedule of values. We suggest a bid form with one single number for the Base Bid and one single number for each alternate then execute Articles E.1 and E.2 of the General Conditions of the contract.

Answer: ODFW will not be changing the format of Form A-2 Pricing Form for this ITB.

A. Sheet L2.10 SURFACE PLAN - LEGEND shall be modified as follows:
ROCK:
1. 2”-6” small local round river rock, 2-9” depth (4,600 SF)
2. 6+” large local round river rock, 2-9” depth (2,000 SF)
B. Sheet L1.10 LAYOUT PLAN – LEGEND shall be modified as follows:
1. COLORED CONCRETE: MANUFACTURER: DAVIS COLORS OR APPROVED EQUAL
2. LANDSCAPE BOULDERS: LOCALLY SOURCES BASALT OR GRANITE
C. Sheet L4.10 IRRIGATION PLAN shall be modified as follows:
1. Show the irrigation line north of the building.
2. IRRIGATION SCHEDULE
TreeDiaper Plant Hydration Ring or Approved Equal
Determined by rootball size
TreeDiaper® TD36R, Round Shape
(for plants of ~18" rootball) Model#1036vA
D. Sheet L4.20 IRRIGATION NOTES AND DETAILS shall be modified as follows:
IRRIGATION NOTES:
16. INSTALL TREEDIAPER OR APPROVED EQUAL PER MANUFACTURER INSTRUCTIONS, SOAK PRIOR TO INSTALLATION. FOLLOW TREEDIAPER WATERING INSTRUCTIONS FOR UP TO TWO GROWING YEARS.
E. Sheet A8.21 OPENING DETAILS shall modify window trims on Details D1 and D2.
F. Sheet A9.70 INTERIOR CASEWORK DETAILS shall be modified as follows:
1. Detail A3 – 088000 GL Note [GLASS 1.4” CLEAR LAMINATED GLASS] GLASS GL4
2. Detail B4 – 088000 GL Note [GLASS 1.4” CLEAR LAMINATED GLASS] GLASS GL4
G. Sheet C-300 SEWER AND WATERLINE PLAN AND PROFILE shall be modified as follows:
Street Profile for SSMH1 shall have [EXIST.] removed.
H. Sheet A6.10 INTERIOR ELEVATIONS shall be modified as follows:
Detail A4 102 WAITING – S
[115200] 101500.IFP INTERACTIVE FLAT PANEL
I. Addition of Sheets EC-1.0 through EC-9.0 Erosion and Sediment Control Plan:
EC – 1.0 Cover Sheet
EC – 2.0 Existing Conditions
EC – 3.0 Mass Grading and Erosion Control Plan
EC – 4.0 Street Utility Plan
EC – 5.0 Offsite SW 37th Street
EC – 6.0 Vertical Construction Plan
EC – 7.0 Final Stabilization Plan
EC – 8.0 Erosion Control Notes and Details
EC – 9.0 Erosion Control Notes and Details
J. Sheet L1.20 LAYOUT PLAN shall be modified by adding Flagpole Model ECA30 – External Single Halyard information.
3. ATTACHMENT B-2: 101325 SPECIFICATIONS John Day Watershed New Shop Building shall be removed in its entirety and replaced with ATTACHMENT B-2: 102025 SPECIFICATIONS John Day Watershed New Shop Building dated October 20, 2025 and contains the followi...
A. Section GYPSUM BOARD 09 21 00 shall be modified as follows:
1.2 CONTRACTOR SUBMITTALS
A. If Build America, Buy America requirements
B. Section 09 80 00 PROTECTIVE COATINGS shall be modified as follows:
1.2 CONTRACTOR SUBMITTALS
A. If Build America, Buy America requirements
Closing Date and Time: IS NOT CHANGED BY THIS ADDENDUM
The prospective Bidders have until Close of Business on October 28, 2025, to submit written questions or protests regarding this Addendum.
Answer: The attachment for ALT #2 would be bidder designed and shall be coordinated between solar panel manufacturer and roofing manufacturer. Approved BOD attachments are listed below. See addendum section for more information.
Answer: Much of the existing site has been prepped by others with gravel. The geotechnical report identified shallow hard basalt bedrock located throughout the site, assumption is minimal soil is available on site. See Sheet L2.10 – 3 inch minimum imp...
Answer: Local round, river rock to be called out on L2.10. Please see addendum section for more information.
Answer: Locally sourced boulders most likely Basalt but Granite is acceptable. (Called out on L1.10). Please see addendum section for more information.
Answer: A locally sourced option is an acceptable alternative. Submit locally available color options for Landscape Architect approval. Please see addendum section for additional information.
Answer: Yes, that is an acceptable adjustment. Please see addendum section for additional information on Sheet L4.10.
Answer: Install TreeDiaper per manufacturer instructions, soak prior to installation. Follow TreeDiaper watering instructions for up to two growing seasons. See addendum section for additional information.
Answer: Please reference plumbing schedule in the drawings. See addendum section for additional information.
Answer: Please reference plumbing schedule in the drawings. See addendum section for additional information.
Answer: New interior relite detail has been provided. Please see addendum section for additional information.
Answer: The length is 5’ each way. 10’ long sections total. See sheet L1.3 detail #10 for dimensioned diagram. Please see addendum section for additional information.
Answer: No stakes - Drawings are correct, specs need to be updated. Please see addendum section for additional information.
Answer: Fiberglass windows shall use glass type noted in 08 54 13. Specification Section 08 80 00 2.4.C.1.a Notes “Glazing in fiberglass windows per window manufacturer”, which is noted in section 08 54 13 Fiberglass Windows
Answer: GL 3 should be 3/8” tempered. GL 4 should be (2) layers of ¼” laminated, or ½” overall. Service window glazing shall be GL 4. See addendum section for additional information.
Answer: Plans are calling out no permanent irrigation required for hydroseed. Spec sections are correct for initial placement of hydroseed which does require watering as described to promote germination.
Answer: The intent is for the bidder to provide a single system and manufacturer who should be supplying all components for a complete system, and not piecing it together.
Answer: Specification currently calls for “or approved equal.“
Answer: Specification is requesting that system be optimized. System manufacturer and installer should be able optimize.
Answer: The soil amounts on L2.10 are the total. Detail 1 on L2.20 shows the existing site hard basalt or gravel and then building up the soil from there for each area type: seeded, shrub/perennials, tree/shrub. Please see addendum section for addi...
Answer: There is no existing manhole according to our survey data. The label on the profile is not correct. Please see addendum section for additional information.

File details come from the government source that posted it. Updated .