A11_ KSCC 18-1525 CECC Form 3052.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
KSCC 18-1525 Construct Vehicle Barriers Federal contract opportunity
Solicitation number
FA252125B0005
Issued by
Department of the Air Force Space Command

About this file

The file is a Construction Cost Estimate Breakdown (AF Form 3052) for a construction contract at Kennedy Space Center, Florida. The solicitation (FA252125B0005) is for constructing vehicle barriers with a project value between $500,000 and $1,000,000, specifically targeting Women-Owned Small Businesses (WOSB). Key dates include a badge request due by 2 April 2025, site visit on 8 April 2025, questions due by 10 April 2025, and bids due on 29 April 2025. The Department of the Air Force Space Command is the issuing agency, and the project involves constructing vehicle barriers at PS7, VIF N/S, Cx 41. The contract is firm-fixed-price, with the government's obligation contingent on fund availability, and uses NAICS code 236220 with a size standard of $45.0 million.

The cost estimate form provides a template for contractors to break down estimated costs, including material costs, labor costs, manhours, and other direct costs. The form instructs contractors to provide detailed cost information, with columns for item description, unit of measure, quantity, unit costs, labor rates, and total costs. While the specific cost breakdown is not filled out in this document, the form is designed to allow comprehensive cost analysis for the vehicle barrier construction project at Kennedy Space Center.

View the file

Other files for this federal contract opportunity

Other files attached to KSCC 18-1525 Construct Vehicle Barriers, newest first.
File Type Posted
Abstract of Offers- FA252125B0005.pdf PDF
FL20250240_4Jul2025.pdf PDF
Solicitation Amendment - FA252125B00050008.pdf PDF
Solicitation Amendment FA252125B00050008 SF 30.pdf PDF
Solicitation Amendment - FA252125B00050007.pdf PDF
Solicitation Amendment FA252125B00050007 SF 30.pdf PDF
KSCC 18-1525 Construct Vehicle Barriers - Rev1 30 Jun.pdf PDF
Solicitation Amendment FA252125B00050006 SF 30.pdf PDF
Wage Determination PSFB_6.6.2025.pdf PDF
Solicitation Amendment - FA252125B00050006.pdf PDF
Solicitation Amendment FA252125B00050005 SF 30.pdf PDF
Solicitation Amendment - FA252125B00050005.pdf PDF
Solicitation Amendment FA252125B00050004 SF 30.pdf PDF
Solicitation Amendment - FA252125B00050004.pdf PDF
KSCC 18-1525 QA.pdf PDF
KSCC181525Pictures.pdf PDF
Solicitation Amendment - FA252125B00050003.pdf PDF
Solicitation Amendment FA252125B00050003 SF 30.pdf PDF
Site Visit Attendance Sheet.pdf PDF
Solicitation Amendment - FA252125B00050002.pdf PDF
Solicitation Amendment - FA252125B00050001.pdf PDF
A01_KSCC 18-1525 Construct Vehicle Barriers -Specs.pdf PDF
A05_HAZMAT Form.pdf PDF
A09_ Energy Management and Control Systems Standards.pdf PDF
A03_PSFB_CCSFS_KSC Wage Determination.pdf PDF
A07_Q and A Template.pdf PDF
A08_ Badge Request 45 SFS Form V13.pdf PDF
A04_Green Procurement Pgm Cert.pdf PDF
A10_ WOSB-SelfPerformanceCertificationWrksht.pdf PDF
A02_KSCC 18-1525 Construct Vehicle Barriers - Final Drawings.pdf PDF
A06_ODS Certification.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF3052

CONSTRUCTION COST ESTIMATE BREAKDOWN FA252125B0005

Attachment 11

CONTRACTOR ADDRESS

CONTRACT FORPROPOSED TOTAL CONTRACT PRICE
Contract No.ERROR:#REF!
PURCHASE REQUEST FORMPROJECT NUMBERWORK LOCATION
MATERIAL COSTLABOR COST
UNITOTHER
LINEITEMOFQUANTITYMANHOURSAVERAGETOTALDIRECTLINE
NO.MEASUREUNITTOTALMANDAYSRATECOSTSTOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

0.000.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.00
0.00
00.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.00
0.000.000.00
0.000.000.00
CECC FORM 3052PAGE 1
INSTRUCTIONS FOR COMPLETING AF FORM 3052
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient
detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples--square yards--SY, cubic yards--
CY, square feet--SF, linear feet--LF, board feet--BF, each--EA, pound--LB).
Col 3 Quantity. Constractor's estimate of quantity required in terms of unit of measure (couldmn 2). Itms and units of measure will
be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price
contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total costs (Col 5) for items listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in
column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the
contract and of significant dollar value.

Col 10 Line Total. Self-explanatory.

NOTE: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on
the last page as follows.

TOTAL MATERIAL COSTS $

TOTAL LABOR COSTS $

TOTAL OTHER DIRECT COSTS $

TOAL DIRECT COSTS $

OVERHEAD $

SUBTOTAL $

PROFIT $

TOTAL PRICE $

DATE FIRM NAME

TITLEBY
(Signature)

INSTRUCTIONS TO OFFERORS

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of
incurred and estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award
of a contract resulting from this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a
certificate of current cost or pricing data (see ASPR 3-807.3(e) and 3.807.4).
2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit
with this form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an
appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that
there be a clear understanding of
a. The existing, verifiable data
b. The judgmental factors applied in projecting from known data to the estimate, and
c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticalbe, the data will be described (with schdules as
appropriate), and made available to the contracting officer or his authorized representative on request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine,
for the purpose of verifying the cost or pricing data submitted, those books, records, documents, and other supporting data which
will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right
may be exercised in connection with any negotiations prior to contract award.
(Reverse of AF Form 3052, Jan 88)
*U.S. GOVERNMENT PRINTING OFFICE: 1988-24D-979:51319