A#1 Revised Bid Schedule.pdf
PDF 60 KB Posted
- Attached to
- PKAA, Bobcat LaPorte Uravan NRD Project
- Solicitation number
- DQ1 PKAA 2026000430 2
- Issued by
- Morgan County, Colorado
About this file
This is a revised bid schedule document issued by the State of Colorado Department of Natural Resources, Division of Reclamation, Mining and Safety for the PKAA Bobcat LaPorte Uravan Natural Resource Damage Project (GovTribe ID: 2026-0430), located in Montrose County approximately 18 miles north of Naturita. The project scope includes environmental remediation and mine closure work comprising mobilization/demobilization, project safety and health planning, installation of mine closures at two subsidence features using polyurethane foam backfill, installation of 150 linear feet of hydrologic controls at the Bobcat site, and repair/reconstruction of 350 linear feet of the LaPorte diversion channel. Additional non-guaranteed bid items include 40 cubic yards of rip-rap placement, revegetation of approximately 1 acre, 9 cubic yards of supplemental polyurethane foam, and geosynthetic clay liner installation. The mandatory pre-bid meeting and site inspection occurred on Tuesday, April 28, 2026, at 10:00 a.m. MT at the Naturita Sales parking area with a 45-minute drive to the project site. Written inquiries were due by Friday, May 1, 2026, at 4:00 p.m. MT, and bid submissions were due by 4:00 p.m. MT on Tuesday, May 12, 2026, with bid opening on Wednesday, May 13, 2026. Project construction is tentatively scheduled between June 1 and June 19, 2026, with an 18-calendar-day completion window including 10 days of mobilization.
The award will be made to the lowest responsive and responsible bidder. The project is funded through the Uravan NRD Fund administered by the Colorado Department of Public Health and Environment. Colorado resident bidders receive preference equivalent to that afforded to nonresident bidders' home states, and Service-Disabled Veteran-Owned Small Businesses certified by the U.S. Small Business Administration receive a 5 percent bid preference. Performance and Labor and Material Bonds are required if the bid amount exceeds $150,000, set at 100 percent of the original contract price, and five percent retainage will be withheld until satisfactory completion for projects exceeding $150,000. Comprehensive insurance requirements include Workers' Compensation, Commercial General Liability ($1,000,000 each occurrence), Automobile Liability ($1,000,000 combined single limit), Pollution Liability ($1,000,000 each occurrence and annual aggregate), and Aircraft Liability ($5,000,000 if aircraft including drones are used). The Buy Clean Colorado Act applies to eligible materials including concrete, steel, and wood, requiring Environmental Product Declarations compliant with maximum Global Warming Potential limits. A mandatory Three-Way Agreement is required between the contractor, State, and private landowner (UMETCO Minerals Corporation), with liquidated damages set at $400 per day for non-performance. All bids must be submitted electronically through Colorado Vendor Self Service (www.colorado.gov/vss), with Teresa Donaldson (teresa.donaldson@state.co.us) serving as the sole point of contact for solicitation matters.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Revised May 5, 2026 Bid Schedule Bobcat LaPorte Uravan NRD Project
DQ1 PKAA 2026-0430
Complete all pages in the spreadsheet as applicable.
Receipt of Addenda Nos.____________ is hereby acknowledged
Submit Bids via Colorado VSS at the following link:
Submitting Bids by mail or fax is not permitted.
If VSS is unavailable, please see project Special Conditions for alternative Bid Submittal method.
1 Job N/A
1 Job N/A
1 Job N/A
150 Linear Feet
350 Linear Feet
40 Cubic Yards
1 Acre
9 Cubic Yards
60 Linear Feet
Legal Business Name
Address
City, State Zip
Phone
Signer Printed Name
Title
Date http://www.colorado.gov/vss
Qty Unit Per Unit Price ($) Total Price ($)
Item 1.0 - Mobilize/Demobilize
Item 2.0 - Project Safety, Health and Environmental Action Plan Item 3.0 - Install Mine Closures (See total from page 2) Item 4.0 - Install Mine Hydrologic Controls Bobcat Item 5.0 - Repair and reconstruct LaPorte diversion channel
ADDITIONAL BID ITEMS- NOT
GUARANTEED
Item 6.0 Rip Rap for LaPorte channel
Item 7.0 Revegetation
Item 8.0 Additional PUF
Item 9.0 Geosynthetic Clay Liner
Grand Total:
Offeror Information
Signature:
The Bid shall be signed by a person authorized to bind the Offeror.
Do not amend any part of this bid schedule all pages of this bid schedule must be returned all line items must be completed.
Updated February 24, 2026.
Revised May 5, 2026 Bid Schedule Bobcat LaPorte Uravan NRD Project
DQ1 PKAA 2026-0430
May 5, 2026
Item 3.0 - Install Mine Closures:
Feature ID Feature Type Closure Method Ownership Bid Amount ($)
Total (enter here and on Bid Schedule, Item 3.0):
Do not amend any part of this bid schedule all pages of this bid schedule must be returned all line items must be completed.
2959 Subs 1 Backfill w/Polyurethane Foam (PUF) Private/UMETCO
2959 Subs 2 Backfill w/Polyurethane Foam (PUF) Private/UMETCO
Subsidence Feature Subsidence Feature