A#1 Model Construction Agreement w Fed Provisions.pdf

PDF 990 KB Posted

Attached to
PKAA, Bobcat LaPorte Uravan NRD Project
Solicitation number
DQ1 PKAA 2026000430 2
Issued by
Morgan County, Colorado

About this file

This is a Model Construction Agreement document issued by the State of Colorado Department of Natural Resources with federal provisions for construction projects. The agreement establishes the standard contractual framework for construction work performed for the State, incorporating general conditions, special provisions, and federal compliance requirements. The contract structure requires a Notice to Proceed before work commences and establishes performance timelines measured in calendar days from the effective date, which is defined as the date of approval and signature by the Colorado State Controller or designee. The contractor must secure all required licenses, permits, and authorizations prior to the effective date and maintain them throughout the contract term. Work must be performed in accordance with professional standards of care and skill, with the contractor responsible for furnishing all labor, materials, and services necessary for complete project execution within the specified performance timeline. The contractor agrees that timely completion is an essential contract feature, and failure to complete within the allowed timeframe constitutes a material breach entitling the State to collect liquidated damages as specified in the bid documents.

Payment under the contract is limited to the maximum contract amount specified in the project summary table and is contingent upon the continuing availability of appropriated state or federal funds. The State is prohibited from making commitments beyond the current state fiscal year, and any payments beyond the current fiscal year remain contingent on future appropriations and fund availability. If federal funds constitute all or part of the contract funding, payment is contingent upon continued federal funding availability. The contractor must obtain and maintain comprehensive insurance coverage including workers' compensation, commercial general liability ($1,000,000 each occurrence), automobile liability ($1,000,000 combined single limit), and pollution liability ($1,000,000 each occurrence). The State is named as an additional insured on all liability policies, and all coverage must be primary and non-contributory. The contract incorporates federal provisions required by 2 CFR 200 and the Bipartisan Infrastructure Law, including Buy America requirements mandating that all iron, steel, manufactured products, and construction materials be produced in the United States unless a waiver is approved. The Buy Clean Colorado Act requirements apply to eligible materials, requiring environmental product declarations demonstrating compliance with maximum global warming potential limits. Colorado law governs contract interpretation and enforcement, with exclusive venue in Denver. The contractor must comply with all applicable federal and state laws, including those related to discrimination, unfair employment practices, and software piracy prohibition, and must indemnify the State against claims arising from contractor negligence, confidential information disclosure, intellectual property infringement, or accessibility non-compliance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MODEL

DNR Sept. 2025

STATE OF COLORADO CONSTRUCTION CONTRACT

PROJECT SUMMARY TABLE

State Agency Department of Natural Resources Division Name, (“Division Acronym”)

Contractor Insert Contractor's Full Legal Name, including "Inc.", "LLC", etc...

Address

Assistance Listing Number Insert ALN (if applicable)

Contract Maximum Amount Total for All State Fiscal Years: $

Contract Number Insert Solicitation Number Insert CMS Number Insert CORE Number

Performance Time # Days Calendar Days

OR

Expiration Date Month Day, Year

Project Name and Purpose

SIGNATURE PAGE

THE PARTIES HERETO HAVE EXECUTED THIS CONTRACT

Each person signing this Contract represents and warrants that he or she is duly authorized to execute this Contract and to bind the Party authorizing his or her signature

CONTRACTOR

Insert Contractor's Full Legal Name, including "Inc.", "LLC", etc...

Signature:___________________________

Printed Name:________________________

Title: ______________________________

Date:_______________________________

STATE OF COLORADO

Jared S. Polis, Governor

Colorado Department of Natural Resources Dan Gibbs, Executive Director

Division Name

Signature:____________________________

Printed Name:________________________

Title: ______________________________

Date: ______________________________

In accordance with §24-30-202 C.R.S., this Contract is not valid until signed and dated below by the State Controller or an authorized delegate.

STATE CONTROLLER

Robert Jaros, CPA, MBA, JD

Signature: ________________________________

Printed Name: _____________________________

Title: ___________________________________

Effective Date: _________________________

1. PARTIES

This Contract is entered into by and between Contractor named above and on the Signature Page for this Contract (the “Contractor”), and the State of Colorado acting by and through the State agency named above and on the Project Summary Table for this Contract (the “State” or “DRMS”). Contractor and the State agree to the terms and conditions in this Contract.

2. TERM AND EFFECTIVE DATE

a. The Effective Date for this Contract is the date on which this Contract is approved and signed by the Colorado State Controller or designee, as shown on the Signature Page for this Contract.

b. This Contract shall not be valid or enforceable until the Effective Date.

The State shall not be bound by any provision of this Contract before the Effective Date, and shall have no obligation to pay Contractor for any work performed or expense incurred before the Effective Date or after the expiration or earlier termination of this Contract.

c. Contractor’s performance under this Contract will not begin until the issuance of the Notice to Proceed as specified in the General Conditions (the “GCs”).

d. The State is entering into this Contract to serve the public interest of the State of Colorado as determined by its Governor, General Assembly, or Courts. If this Contract ceases to further the public interest of the State, the State, in its discretion, may terminate this Contract in whole or in part.

3. AUTHORITY

Authority for the State to enter into this Contract exists in 34-33-133 C.R.S.

The Contractor was selected under the procurement code, 24-103-204 C.R.S.

4. CONTRACT DOCUMENTS

The General Conditions and the Contract Documents described therein are all incorporated by reference and made a part of this Contract.

In the event of a conflict or inconsistency between this Contract and any Exhibit or attachment, such conflict or inconsistency shall be resolved by reference to the documents in the following order of priority

1. Exhibit __, Federal Provisions

2. The Colorado Special Provisions included in Section 9 of this agreement

3. The provisions of the other sections of the main body of this Contract.

4. General Conditions for Construction

a. Documents incorporated in the General Conditions for Construction are subject to the Order of Precedence established in the General Conditions.

5. Exhibit __, Maximum Acceptable Global Warming Potential Limits

6. Exhibit __, EPD Submittal & Sign-Off

5. CONTRACTOR PERFORMANCE

a. Contractor shall perform its obligations under this Contract in accordance with the professional standards of care, skill and diligence in Contractor’s industry, trade, or profession to the satisfaction of the State and its Project Manager in strict accordance with the provisions of the Contract Documents.

b. The Contractor shall furnish all the work, labor, and materials and perform all the work required for the complete and prompt execution of everything described or shown in, or reasonably implied from the Contract Documents above described project.

c. The Contractor shall complete the entire project within the Performance Time as shown in the Project Summary Table. The Contractor shall begin work within the time specified in the Notice to Proceed or ten days from the Notice to Proceed if a time is not specified and to prosecute the work with due diligence to completion. The Contractor agrees that the completion of the project within the Performance Time is an essential feature of this Contract and agrees to proceed with due diligence, taking all precautions and making all necessary arrangements to ensure the completion of the work within the prescribed time.

d. The Contractor agrees that failure to complete the work within the time allowed shall be considered as a breach of the Contract and entitle the State to collect liquidated damages for delay in completion, in accordance with the bid documents.

6. PAYMENT

The State shall pay the Contractor an amount not to exceed the Contract Maximum Amount specified in the Project Summary Table for performance of this Contract, subject to any additions or deductions as provided in the Contract Documents. Payments under this Contract are subject to the terms and conditions outlined in the General Conditions.

The State is prohibited by law from making commitments beyond the term of the current State Fiscal Year. Payment to Contractor beyond the current State Fiscal Year is contingent on the appropriation and continuing availability of Contract Funds in any subsequent year (as provided in the Colorado Special Provisions). If federal funds or funds from any other non-State funds constitute all or some of the Contract Funds, the State’s obligation to pay Contractor shall be contingent upon such non-State funding continuing to be made available for payment. Payments to be made pursuant to this Contract shall be made only from Contract Funds, and the State’s liability for such payments shall be limited to the amount remaining of such Contract Funds. If State, federal, or other funds are not appropriated, or otherwise become unavailable to fund this Contract, the State may, upon written notice, terminate this Contract, in whole or in part, without incurring further liability. The State shall, however, remain obligated to pay for Services and Goods that are delivered and accepted prior to the effective date of notice of termination, and this termination shall otherwise be treated as if this Contract were terminated in the public interest as contemplated in § 2.d above.

Funding under this Contract may be provided via a funding source that, at the time of Effective Date, is not currently valid through the maximum potential term of this Contract. All payments beyond the currently valid funding end date are contingent upon the State receiving additional anticipated and budgeted appropriated or nonappropriated funding. Should the State not receive such appropriated or nonappropriated funding and also be unable to substitute valid replacement funding, which is not anticipated, the State will notify the Contractor that it has not received additional and necessary appropriated or nonappropriated funding. If Contractor is unsure if funding has been received for any period, Contractor should verify the availability of funding with the State prior to performing any Work for that period as the State shall not be liable for, and shall not make any payment to Contractor for, any Work performed during a period for which it has not received sufficient appropriated or nonappropriated funding, regardless of whether Contractor has performed Work during that period.

7. INSURANCE

Contractor shall obtain and maintain, and ensure that each Subcontractor shall obtain and maintain, insurance as specified in this section at all times during the term of this Contract. All insurance policies required by this Contract shall be issued by insurance companies as approved by the State.

A. Workers’ Compensation

Workers’ compensation insurance as required by state statute, and employers’ liability insurance covering all Contractor or Subcontractor employees acting within the course and scope of their employment.

B. General Liability

Commercial general liability insurance covering premises operations, fire damage, independent contractors, products and completed operations, blanket contractual liability, personal injury, and advertising liability with minimum limits as follows:

i. $1,000,000 each occurrence;

ii. $1,000,000 general aggregate;

iii. $1,000,000 products and completed operations aggregate; and

iv. $50,000 any one fire.

C. Automobile Liability

Automobile liability insurance covering any auto (including owned, hired and non-owned autos) with a minimum limit of $1,000,000 each accident combined single limit.

D. Pollution Liability Insurance Pollution liability policy with minimum limits of $1,000,000 each occurrence and $2,000,000 Annual Aggregate covering any environmental damage caused by the contractor or subcontractor during the Work with the State included as an additionally insured party.

E. Additional Insured

The State shall be named as additional insured on all commercial general liability policies (construction contracts require additional insured coverage for completed operations) required of Contractor and Subcontractors.

F. Primacy of Coverage

Coverage required of Contractor and each Subcontractor shall be primary and noncontributory over any insurance or self-insurance program carried by Contractor or the State.

G. Cancellation

The above insurance policies shall include provisions preventing cancellation or non-renewal, except for cancellation based on non-payment of premiums, without at least 30 days prior notice to Contractor, and Contractor shall forward such notice to the State in accordance with §14 within seven days of Contractor’s receipt of such notice.

H. Subrogation Waiver

Except with respect to Professional Liability Insurance, all insurance policies secured or maintained by Contractor or its Subcontractors in relation to this Contract shall include clauses stating that each carrier shall waive all rights of recovery under subrogation or otherwise against Contractor or the State, its agencies, institutions, organizations, officers, agents, employees, and volunteers.

I. Public Entities

If Contractor is a “public entity” within the meaning of the Colorado Governmental Immunity Act, §§24-10-101, et seq., C.R.S. (the “GIA”), Contractor shall maintain, in lieu of the liability insurance requirements stated above, at all times during the term of this Contract such liability insurance, by commercial policy or self-insurance, as is necessary to meet its liabilities under the GIA. If a Subcontractor is a public entity within the meaning of the GIA, Contractor shall ensure that the Subcontractor maintains at all times during the terms of this Contract, in lieu of the liability insurance requirements stated above, such liability insurance, by commercial policy or self-insurance, as is necessary to meet the Subcontractor’s obligations under the GIA.

J. Certificates

Contractor shall provide to the State certificates evidencing Contractor’s insurance coverage required in this Contract within seven Business Days following the Effective Date. Contractor shall provide to the State certificates evidencing Subcontractor insurance coverage required under this Contract within seven Business Days following the Effective Date, except that, if Contractor’s subcontract is not in effect as of the Effective Date, Contractor shall provide to the State certificates showing Subcontractor insurance coverage required under this Contract within seven Business Days following Contractor’s execution of the subcontract. No later than 15 days before the expiration date of Contractor’s or any Subcontractor’s coverage, Contractor shall deliver to the State certificates of insurance evidencing renewals of coverage. At any other time during the term of this Contract, upon request by the State, Contractor shall, within seven Business Days following the request by the State, supply to the State evidence satisfactory to the State of compliance with the provisions of this section.

8. GENERAL PROVISIONS

a. Assignment

Contractor’s rights and obligations under this Contract are personal and may not be transferred or assigned without the prior, written consent of the State. Any attempt at assignment or transfer without such consent shall be void. Any assignment or transfer of Contractor’s rights and obligations approved by the State shall be subject to the provisions of this Contract.

b. Subcontracts

Contractor shall not enter into any subcontract in connection with its obligations under this Contract without the prior, written approval of the State. Contractor shall submit to the State a copy of each such subcontract upon request by the State. All subcontracts entered into by Contractor in connection with this Contract shall comply with all applicable federal and state laws and regulations, shall provide that they are governed by the laws of the State of Colorado, and shall be subject to all provisions of this Contract.

c. Binding Effect Except as otherwise provided in the General Conditions, all provisions of this Contract, including the benefits and burdens, shall extend to and be binding upon the Parties’ respective successors and assigns.

d. Authority

Each Party represents and warrants to the other that the execution and delivery of this Contract and the performance of such Party’s obligations have been duly authorized.

e. Captions and References The captions and headings in this Contract are for convenience of reference only, and shall not be used to interpret, define, or limit its provisions. All references in this Contract to sections (whether spelled out or using the § symbol), subsections, exhibits or other attachments, are references to sections, subsections, exhibits or other attachments contained herein or incorporated as a part hereof, unless otherwise noted.

f. Counterparts This Contract may be executed in multiple, identical, original counterparts, each of which shall be deemed to be an original, but all of which, taken together, shall constitute one and the same agreement.

g. Entire Understanding This Contract represents the complete integration of all understandings between the Parties related to the project, and all prior representations and understandings related to the project, oral or written, are merged into this Contract. Prior or contemporaneous additions, deletions, or other changes to this Contract shall not have any force or effect whatsoever, unless embodied herein.

h. Digital Signatures

If any signatory signs this Contract using a digital signature in accordance with the Colorado State Controller Contract, Grant and Purchase Order Policies regarding the use of digital signatures issued under the State Fiscal Rules, then any agreement or consent to use digital signatures within the electronic system through which that signatory signed shall be incorporated into this Contract by reference.

i. Modification Except as otherwise provided in this Contract, any modification to this Contract shall only be effective if agreed to in a formal amendment to this Contract, properly executed and approved in accordance with applicable Colorado State law and State Fiscal Rules. Modifications permitted under this Contract, other than contract amendments, shall conform to the policies issued by the Colorado State Controller.

j. Statutes, Regulations, Fiscal Rules, and Other Authority Any reference in this Contract to a statute, regulation, State Fiscal Rule, fiscal policy or other authority shall be interpreted to refer to such authority then current, as may have been changed or amended since the Effective Date of this Contract.

k. External Terms and Conditions

Notwithstanding anything to the contrary herein, the State shall not be subject to any provision included in any terms, conditions, or agreements appearing on Contractor’s or a Subcontractor’s website or any provision incorporated into any click-through or online agreements related to the Work unless that provision is specifically incorporated by reference into this Contract.

l. Severability The invalidity or unenforceability of any provision of this Contract shall not affect the validity or enforceability of any other provision of this Contract, which shall remain in full force and effect, provided that the Parties can continue to perform their obligations under this Contract in accordance with the intent of the Contract.

m. Survival of Certain Contract Terms Any provision of this Contract that imposes an obligation on a Party after termination or expiration of the Contract shall survive the termination or expiration of the Contract and shall be enforceable by the other Party.

n. Third Party Beneficiaries Except for the Parties’ respective successors and assigns described in this §8, this Contract does not and is not intended to confer any rights or remedies upon any person or entity other than the Parties. Enforcement of this Contract and all rights and obligations hereunder are reserved solely to the Parties. Any services or benefits which third parties receive as a result of this Contract are incidental to the Contract, and do not create any rights for such third parties.

o. Waiver A Party’s failure or delay in exercising any right, power, or privilege under this Contract, whether explicit or by lack of enforcement, shall not operate as a waiver, nor shall any single or partial exercise of any right, power, or privilege preclude any other or further exercise of such right, power, or privilege.

p. CORA Disclosure

To the extent not prohibited by federal law, this Contract and the performance measures and standards required under §24-106-107, C.R.S., if any, are subject to public release through the CORA.

q. Licenses, Permits, and Other Authorizations

Contractor shall secure, prior to the Effective Date, and maintain at all times during the term of this Contract, at its sole expense, all licenses, certifications, permits, and other authorizations required to perform its obligations under this Contract, and shall ensure that all employees, agents and Subcontractors secure and maintain at all times during the term of their employment, agency or subcontract, all license, certifications, permits and other authorizations required to perform their obligations in relation to this Contract.

r. Indemnification

i. General Indemnification

Contractor shall indemnify, save, hold harmless, and assume liability on behalf of the State, its officers, employees, agents and assignees (the “Indemnified Parties”), against any and all costs, expenses, claims, damages, liabilities, court awards and other amounts (including attorneys’ fees and related costs) incurred by any of the Indemnified Parties in relation to any act or omission by Contractor, or its employees, agents, Subcontractors, or assignees in connection with this Contract.

ii. Confidential Information Indemnification

Disclosure or use of State Confidential Information by Contractor in violation of §8 may be cause for legal action by third parties against Contractor, the State, or their respective agents. Contractor shall indemnify, save, hold harmless, and assume liability on behalf of the Indemnified Parties, against any and all claims, damages, liabilities, losses, costs, expenses (including attorneys’ fees and costs) incurred by the State in relation to any act or omission by Contractor, or its employees, agents, assigns, or Subcontractors in violation of §8.

iii. Intellectual Property Indemnification

Contractor shall indemnify, save, hold harmless, and assume liability on behalf of the Indemnified Parties, against any and all costs, expenses, claims, damages, liabilities, and other amounts (including attorneys’ fees and costs) incurred by the Indemnified Parties in relation to any claim that any Deliverable, Good or Service, software, or Work Product provided by Contractor under this Contract (collectively, “IP Deliverables”), or the use thereof, infringes a patent, copyright, trademark, trade secret, or any other intellectual property right. Contractor’s obligations hereunder shall not extend to the combination of any IP Deliverables provided by Contractor with any other product, system, or method, unless the other product, system, or method is (a) provided by Contractor or Contractor’s subsidiaries or affiliates; (b) specified by Contractor to work with the IP Deliverables;

(c) reasonably required in order to use the IP Deliverables in its intended manner and the infringement could not have been avoided by substituting another reasonably available product, system, or method capable of performing the same function; or (d) is reasonably expected to be used in combination with the IP Deliverables.

iv. Accessibility Indemnification

Contractor shall indemnify, save, hold harmless, and assume liability on behalf of the state, its officers, employees, agents and assignees (collectively, the “Indemnified Parties”), for any and all costs, expenses, claims, damages, liabilities, court awards, attorney fees and related costs, and other amounts incurred by any of the Indemnified Parties in relation to Contractor’s noncompliance with §§24-85-101, et seq., C.R.S., or the Accessibility Standards for Individuals with a Disability as established by the Office of Information Technology pursuant to Section §24-85-103, C.R.S.

State employees are considered third parties for the purposes of this section.

s. Accessibility

i. Contractor shall comply with the Accessibility Standards for Individuals with a Disability, as adopted by the Office of Information Technology pursuant to §24-85-103 C.R.S

ii. The State may require that the Contractor’s compliance with the Accessibility Standards for Individuals with a Disability adopted by the Office of Information Technology pursuant to §24-85-103 C.R.S. is determined and tested by a qualified third party selected by the State.

The State may ask the Contractor to review the selection of the third party. Contractor shall be responsible for all costs associated with the third-party vendor’s assessment. If Contractor is not in compliance as determined by the third-party vendor, at the State’s request and at the State’s direction, Contractor shall promptly take all necessary actions to come into compliance using a State-approved vendor, at no additional cost to the State.

9. COLORADO SPECIAL PROVISIONS (COLORADO FISCAL RULE 3-3)

These Special Provisions apply to all contracts except where noted in italics.

A. STATUTORY APPROVAL. §24-30-202(1), C.R.S.

This Contract shall not be valid until it has been approved by the Colorado State Controller or designee. If this Contract is for a Major Information Technology Project, as defined in §24-37.5-102(2.6), then this Contract shall not be valid until it has been approved by the State’s Chief Information Officer or designee.

B. FUND AVAILABILITY. §24-30-202(5.5), C.R.S.

Financial obligations of the State payable after the current State Fiscal Year are contingent upon funds for that purpose being appropriated, budgeted, and otherwise made available.

C. GOVERNMENTAL IMMUNITY.

Liability for claims for injuries to persons or property arising from the negligence of the State, its departments, boards, commissions committees, bureaus, offices, employees and officials shall be controlled and limited by the provisions of the Colorado Governmental Immunity Act, §24-10-101, et seq., C.R.S.; the Federal Tort Claims Act, 28 U.S.C. Pt. VI, Ch. 171 and 28 U.S.C. 1346(b), and the State’s risk management statutes, §§24-30-1501, et seq. C.R.S. No term or condition of this Contract shall be construed or interpreted as a waiver, express or implied, of any of the immunities, rights, benefits, protections, or other provisions, contained in these statutes.

D. INDEPENDENT CONTRACTOR.

Contractor shall perform its duties hereunder as an independent contractor and not as an employee. Neither Contractor nor any agent or employee of Contractor shall be deemed to be an agent or employee of the State.

Contractor shall not have authorization, express or implied, to bind the State to any agreement, liability or understanding, except as expressly set forth herein. Contractor and its employees and agents are not entitled to unemployment insurance or workers compensation benefits through the State and the State shall not pay for or otherwise provide such coverage for Contractor or any of its agents or employees. Contractor shall pay when due all applicable employment taxes and income taxes and local head taxes incurred pursuant to this Contract. Contractor shall (i) provide and keep in force workers' compensation and unemployment compensation insurance in the amounts required by law, (ii) provide proof thereof when requested by the State, and (iii) be solely responsible for its acts and those of its employees and agents.

E. COMPLIANCE WITH LAW.

Contractor shall comply with all applicable federal and State laws, rules, and regulations in effect or hereafter established, including, without limitation, laws applicable to discrimination and unfair employment practices.

F. CHOICE OF LAW, JURISDICTION, AND VENUE.

Colorado law, and rules and regulations issued pursuant thereto, shall be applied in the interpretation, execution, and enforcement of this Contract.

Any provision included or incorporated herein by reference which conflicts with said laws, rules, and regulations shall be null and void. All suits or actions related to this Contract shall be filed and proceedings held in the State of Colorado and exclusive venue shall be in the City and County of Denver.

G. PROHIBITED TERMS.

Any term included in this Contract that requires the State to indemnify or hold Contractor harmless; requires the State to agree to binding arbitration;

limits Contractor’s liability for damages resulting from death, bodily injury, or damage to tangible property; or that conflicts with this provision in any way shall be void ab initio. Nothing in this Contract shall be construed as a waiver of any provision of §24-106-109 C.R.S.

H. SOFTWARE PIRACY PROHIBITION.

State or other public funds payable under this Contract shall not be used for the acquisition, operation, or maintenance of computer software in violation of federal copyright laws or applicable licensing restrictions. Contractor hereby certifies and warrants that, during the term of this Contract and any extensions, Contractor has and shall maintain in place appropriate systems and controls to prevent such improper use of public funds. If the State determines that Contractor is in violation of this provision, the State may exercise any remedy available at law or in equity or under this Contract, including, without limitation, immediate termination of this Contract and any remedy consistent with federal copyright laws or applicable licensing restrictions.

I. EMPLOYEE FINANCIAL INTEREST/CONFLICT OF INTEREST. §§24-18-201 and 24- 50-507, C.R.S.

The signatories aver that to their knowledge, no employee of the State has any personal or beneficial interest whatsoever in the service or property described in this Contract. Contractor has no interest and shall not acquire any interest, direct or indirect, that would conflict in any manner or degree with the performance of Contractor’s services and Contractor shall not employ any person having such known interests.

J. VENDOR OFFSET AND ERRONEOUS PAYMENTS. §§24-30-202(1) and 24-30- 202.4, C.R.S.

[Not applicable to intergovernmental agreements] Subject to §24-30- 202.4(3.5), C.R.S., the State Controller may withhold payment under the State’s vendor offset intercept system for debts owed to State agencies for:

(i) unpaid child support debts or child support arrearages; (ii) unpaid balances of tax, accrued interest, or other charges specified in §§39-21-101, et seq., C.R.S.; (iii) unpaid loans due to the Student Loan Division of the Department of Higher Education; (iv) amounts required to be paid to the Unemployment Compensation Fund; and (v) other unpaid debts owing to the State as a result of final agency determination or judicial action. The State may also recover, at the State’s discretion, payments made to Contractor in error for any reason, including, but not limited to, overpayments or improper payments, and unexpended or excess funds received by Contractor by deduction from subsequent payments under this Contract, deduction from any payment due under any other contracts, grants or agreements between the State and Contractor, or by any other appropriate method for collecting debts owed to the State.

10. FEDERAL FUNDING AND REGULATIONS

a. All or a portion of this Contract may be funded by federally provided funds. This Contract is subject to and contingent upon the continuing availability of federal funds for the purposes hereof.

b. The Contractor shall comply with all applicable federal statutes, regulations, policies, guidelines, OMB Circulars and other requirements, including as they relate to the application, acceptance and use of federal funds for this federally assisted Project including, but not limited to, Office of Management and Budget Circular 2CFR200 and 32 CFR section 33.26, including Exhibit __, Federal Provisions, which is attached to this Contract.

c. Build America, Buy America Note: This clause is effective as of January 13, 2023. For more information on DOI’s approved waiver, see:

https://www.doi.gov/grants/BuyAmerica/GeneralApplicabilityWaivers.

i. As required by Section 70914 of the Bipartisan Infrastructure Law (also known as the Infrastructure Investment and Jobs Act), P.L.

117-58, on or after May 14, 2022, none of the funds under a federal award that are part of Federal financial assistance program for infrastructure may be obligated for a project unless all of the iron, steel, manufactured products, and construction materials used in the project are produced in the United States, unless subject to an approved waiver. The requirements of this section must be included in all subawards, including all contracts and purchase orders for work or products under this program.

Recipients of an award of Federal financial assistance are hereby notified that none of the funds provided under this award may be used for a project for infrastructure unless:

1. All iron and steel used in the project are produced in the United States--this means all manufacturing processes, from the initial melting stage through the application of coatings, occurred in the United States;

2. All manufactured products used in the project are produced in the United States —this means the manufactured product was manufactured in the United States; and the cost of the components of the manufactured product that are mined, produced, or manufactured in the United States is greater than 55 percent of the total cost of all components of the manufactured product, unless another standard for determining the minimum amount of domestic content of the manufactured product has been established under applicable law or regulation; and

3. All construction materials are manufactured in the United States—this means that all manufacturing processes for the construction material occurred in the United States.

ii. The Buy America preference only applies to articles, materials, and supplies that are consumed in, incorporated into, or affixed to an infrastructure project. As such, it does not apply to tools, equipment, and supplies, such as temporary scaffolding, brought to the construction site and removed at or before the completion of the infrastructure project. Nor does a Buy America preference apply to equipment and furnishings, such as movable chairs, desks, and portable computer equipment, that are used at or within the finished infrastructure project, but are not an integral part of the structure or permanently affixed to the infrastructure project.

For further information on the Buy America preference, please visit https://www.doi.gov/grants/BuyAmerica.

Additional information can also be found at the White House Made in America Office website:

https://www.commerce.gov/oam/build-america-buy-america.

iii. Waivers

When necessary, recipients may apply for, and the Department of the Interior (DOI) may grant a waiver from these requirements, subject to review by the Made in America Office or other appropriate office within DOI. The DOI may waive the application of the domestic content procurement preference in any case in which it is determined that one of the below circumstances applies:

1. Non-availability Waiver: the types of iron, steel, manufactured products, or construction materials are not produced in the United States in sufficient and reasonably available quantities or of a satisfactory quality;

2. Unreasonable Cost Waiver: the inclusion of iron, steel, manufactured products, or construction materials produced in the United States will increase the cost of the overall project by more than 25 percent; or

3. Public Interest Waiver: applying the domestic content procurement preference would be inconsistent with the public interest.

There may be instances where an award qualifies, in whole or in part, for an existing DOI general applicability waiver as described at:

https://www.doi.gov/grants/BuyAmerica/GeneralApplicabilityWai vers.

If the specific financial assistance agreement, infrastructure project, or non-domestic materials meets the criteria of an existing general applicability waiver within the limitations defined within the waiver, the recipient is not required to request a separate waiver for non-domestic materials. If a general applicability waiver does not already apply, and a recipient believes that one of the above circumstances applies to an award, a request to waive the application of the domestic content procurement preference may be submitted to the financial assistance awarding officer in writing. Waiver requests shall include the below information. The waiver shall not include any Privacy Act information, sensitive data, or proprietary information within their waiver request. Waiver requests will be posted to https://www.doi.gov/grants/buyamerica and are subject to public comment periods of no less than 15 days. Waiver requests will also be reviewed by the Made in America Office.

1. Type of waiver requested (non-availability, unreasonable cost, or public interest).

2. Requesting entity and Unique Entity Identifier (UEI) submitting the request.

3. Department of Interior Bureau or Office who issued the award.

4. Federal financial assistance listing name and number (reference block 2 on DOI Notice of Award).

5. Financial assistance title of project (reference block 8 on DOI Notice of Award).

6. Federal Award Identification Number (FAIN).

7. Federal funding amount (reference block 11.m. on DO Notice of Award).

8. Total cost of Infrastructure expenditures (includes federal and non-federal funds to the extent known).

9. Infrastructure project description(s) and location(s) (to the extent known).

10. List of iron or steel item(s), manufactured goods, and construction material(s) the recipient seeks to waive from Buy America requirements. Include the name, cost, countries of origin (if known), and relevant PSC or NAICS code for each.

11. A certification that the recipient made a good faith effort to solicit bids for domestic products supported by terms included in requests for proposals, contracts, and nonproprietary communications with the prime contractor.

12. A statement of waiver justification, including a description of efforts made (e.g., market research, industry outreach) by the recipient, in an attempt to avoid the need for a waiver. Such a justification may cite, if applicable, the absence of any Buy America-compliant bids received in response to a solicitation.

13. Anticipated impact if no waiver is issued. Approved waivers will be posted at https://www.doi.gov/grants/BuyAmerica/ApprovedWaivers;

recipients requesting a waiver will be notified of their waiver request determination by an awarding officer.

Questions pertaining to waivers should be directed to the financial assistance awarding officer.

iv. Definitions

1. “Construction materials” includes an article, material, or supply that is or consists primarily of:

• non-ferrous metals;

• plastic and polymer-based products (including polyvinylchloride, composite building materials, and polymers used in fiber optic cables);

• glass (including optic glass);

• lumber; or

• drywall.

2. “Construction Materials” does not include cement and cementitious materials, aggregates such as stone, sand, or gravel, or aggregate binding agents or additives.

3. “Domestic content procurement preference’’ means all iron and steel used in the project are produced in the United States; the manufactured products used in the project are produced in the United States; or the construction materials used in the project are produced in the United States.

4. “Infrastructure” includes, at a minimum, the structures, facilities, and equipment for, in the United States, roads, highways, and bridges; public transportation; dams, ports, harbors, and other maritime facilities; intercity passenger and freight railroads; freight and intermodal facilities; airports;

water systems, including drinking water and wastewater systems; electrical transmission facilities and systems; utilities;

broadband infrastructure; and buildings and real property.

Infrastructure includes facilities that generate, transport, and distribute energy.

5. ‘‘Project’’ means the construction, alteration, maintenance, or repair of infrastructure in the United States.

11. BUY CLEAN COLORADO ACT (§24-92-117 CRS and §24-92-118 CRS)

a. The Buy Clean Colorado (BCCO) Act is focused on reducing embodied carbon emissions of state Public Projects by means of Eligible Material selection. Through design optimization and responsible selection of materials, the reduction of Embodied Carbon emissions from building materials can be accomplished. The BCCO Act requires the Office of the State Architect (OSA) to establish a maximum acceptable Global Warming Potential (GWP) limit for each category of Eligible Materials, which include: asphalt and asphalt mixtures, cement and concrete mixtures, glass, post-tension steel, reinforcing steel, structural steel, and wood structural elements.

b. During Eligible Material procurement, the Contractor shall work with material suppliers to collect compliant Environmental Product Declarations (EPDs) for all permanently installed Eligible Materials. Only third-party verified EPDs will be accepted. The Contractor shall furnish EPDs to the State prior to the installation of an Eligible Material. The EPD must show that the Eligible Material is within the established GWP limits applicable to this Contract, attached as Exhibit __. The State shall verify the installation of Eligible Materials.

c. If an EPD is unavailable, the Contractor shall notify the State, and with prior State approval, the Contractor may install an alternative Eligible Material with an EPD. The State may direct the Contractor to work with the State’s designated architect / engineer to determine alternative products with EPDs. If an Eligible Material that meets the maximum acceptable GWP limit for a category of Eligible Materials is not reasonably priced or is not available to the contractor on a reasonable basis, the Contractor shall submit to the State a Construction-Phase Waiver form in the template provided by OSA as Form EE-5.30 and in consideration of the EPD Exemption Justifications published by OSA as Form EE-5.31, both of which are available at <https://osa.colorado.gov/energy-environment/buy-clean-colorado-act>.

d. For Eligible Materials sourced over 100 miles (160 km) outside of the project site, the Contractor shall record and report information relating to the transportation of the Eligible Materials. The Contractor shall record the weight of the cargo (lbs. or kg), the type of vehicle used for transporting the Eligible Materials, and the total distance traveled (miles or km) or the zip codes of the distributor and project site. Contractors shall report this information to the Principal Representative for each transport of eligible materials.

e. The Contractor shall certify compliance with its obligations related to BCCO by completing the “EPD Construction Submittal” and “Transportation” tabs of the EPD Submittal & Sign-Off Report, which is attached to the Contract as Exhibit __.

f. Capitalized terms used in this section of the Contract shall be construed and interpreted in accordance with the “Important Definitions” section of the OSA BCCO Act website <https://osa.colorado.gov/energy-environment/buy-clean-colorado-act>

Model

Contract Federal Provisions Page 1 of 7 Version 12.2024

Exhibit ____, CONTRACT Federal Provisions

1. Applicability of Provisions.

A. The Contract or Purchase Order to which these Federal Provisions are attached has been funded, in whole or in part, with an Award of Federal funds. In the event of a conflict between the provisions of these Federal Provisions, the Special Provisions, the body of the

Contract or Purchase Order, or any attachments or exhibits incorporated into and made a part of the Contract or Purchase Order, the provisions of these Federal Provisions shall control.

2. Compliance.

A. Contractor shall comply with all applicable provisions of the Transparency Act, all applicable provisions of the Uniform Guidance, and the regulations issued pursuant thereto, including but not limited to these federal Provisions. Any revisions to such provisions or regulations shall automatically become a part of these Federal Provisions, without the necessity of either party executing any further instrument. The State of Colorado may provide written notification to Contractor of such revisions, but such notice shall not be a condition precedent to the effectiveness of such revisions.

3. System for Award Management (SAM) and UNIQUE ENTITY ID Requirements.

A. SAM. Contractor shall maintain the currency of its information in SAM until the Contractor submits the final financial report required under the Award or receives final payment, whichever is later. Contractor shall review and update SAM information at least annually after the initial registration, and more frequently if required by changes in its information.

B. Unique Entity ID. Contractor shall provide its Unique Entity ID to its Recipient, and shall update Contractor’s information at http://www.sam.gov at least annually after the initial registration, and more frequently if required by changes in Contractor’s information.

4. Contract Provisions Required by Uniform Guidance Appendix II to Part 200.

Contract Federal Provisions Page 2 of 7 Version 12.2024

A. Contracts for more than the simplified acquisition threshold, which is the inflation adjusted amount determined by the Civilian Agency Acquisition Council and the Defense

Acquisition Regulations Council (Councils) as authorized by 41 U.S.C. 1908, must address administrative, contractual, or legal remedies in instances where contractors violate or breach contract terms, and provide for such sanctions and penalties as appropriate. The simplified acquisitions threshold is $250,000

B. All contracts in excess of $10,000 must address termination for cause and for convenience by the non-Federal entity including the manner by which it will be effected and the basis for settlement.

C. Equal Employment Opportunity. Except as otherwise provided under 41 CFR Part 60, all contracts that meet the definition of “federally assisted construction contract” in 41 CFR

Part 60-1.3 must include the equal opportunity clause provided under 41 CFR 60-1.4(b), in accordance with Executive Order 11246, “Equal Employment Opportunity” (30 FR 12319, 12935, 3 CFR Part, 1964-1965 Comp., p. 339), as amended by Executive Order 11375, “Amending Executive Order 11246 relating to Equal Employment Opportunity,” and implementing regulations at 41 CFR Part 60, “Office of federal Contract Compliance

Programs, Equal Employment Opportunity, Department of Labor.”

Contract Federal Provisions Page 3 of 7 Version 12.2024

D. Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by non-Federal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C.

3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 CFR

Part 5, “Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction”). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. The non-Federal entity must place a copy of the current prevailing wage determination issued by the Department of Labor in each solicitation. The decision to award a contract or subcontract must be conditioned upon the acceptance of the wage determination. The non-Federal entity must report all suspected or reported violations to the Federal awarding agency. The contracts must also include a provision for compliance with the Copeland “Anti-Kickback” Act (40 U.S.C. 3145), as supplemented by Department of Labor regulations (29 CFR Part 3, “Contractors and

Subcontractors on Public Building or Public Work Financed in Whole or in Part by Loans or Grants from the United States”). The Act provides that each contractor or subrecipient must be prohibited from inducing, by any means, any person employed in the construction, completion, or repair of public work, to give up any part of the compensation to which he or she is otherwise entitled. The non-Federal entity must report all suspected or reported violations to the Federal awarding agency.

Contract Federal Provisions Page 4 of 7 Version 12.2024

E. Contract Work Hours and Safety Standards Act (40 U.S.C. 3701-3708). Where applicable, all contracts awarded by the non-Federal entity in excess of $100,000 that involve the employment of mechanics or laborers must include a provision for compliance with 40 U.S.C. 3702 and 3704, as supplemented by Department of Labor regulations (29

CFR Part 5). Under 40 U.S.C. 3702 of the Act, each contractor must be required to compute the wages of every mechanic and laborer on the basis of a standard work week of 40 hours.

Work in excess of the standard work week is permissible provided that the worker is compensated at a rate of not less than one and a half times the basic rate of pay for all hours worked in excess of 40 hours in the work week. The requirements of 40 U.S.C. 3704 are applicable to construction work and provide that no laborer or mechanic must be required to work in surroundings or under working conditions which are unsanitary, hazardous or dangerous. These requirements do not apply to the purchases of supplies or materials or articles ordinarily available on the open market, or contracts for transportation or transmission of intelligence.

F. Rights to Inventions Made Under a Contract or Agreement. If the Federal award meets the definition of “funding agreement” under 37 CFR § 401.2 (a) and the recipient or subrecipient wishes to enter into a contract with a small business firm or nonprofit organization regarding the substitution of parties, assignment or performance of experimental, developmental, or research work under that “funding agreement,” the recipient or subrecipient must comply with the requirements of 37 CFR Part 401, “Rights to

Inventions Made by Nonprofit Organizations and Small Business Firms Under Government

Grants, Contracts and Cooperative Agreements,” and any implementing regulations issued by the awarding agency.

G. Clean Air Act (42 U.S.C. 7401-7671q.) and the federal Water Pollution Control Act

(33 U.S.C. 1251-1387), as amended - Contracts and subgrants of amounts in excess of

$150,000 must contain a provision that requires the non-Federal award to agree to comply with all applicable standards, orders or regulations issued pursuant to the Clean Air Act (42

U.S.C. 7401-7671q) and the Federal Water Pollution Control Act as amended (33 U.S.C.

1251-1387). Violations must be reported to the Federal awarding agency and the Regional

Office of the Environmental Protection Agency (EPA).

Contract Federal Provisions Page 5 of 7 Version 12.2024

H. Debarment and Suspension (Executive Orders 12549 and 12689) - A contract award (see

2 CFR 180.220) must not be made to parties listed on the government wide exclusions in the System for Award Management (SAM), in accordance with the OMB guidelines at 2

CFR 180 that implement Executive Orders 12549 (3 CFR part 1986 Comp., p. 189) and

12689 (3 CFR part 1989 Comp., p. 235), “Debarment and Suspension.” SAM Exclusions contains the names of parties debarred, suspended, or otherwise excluded by agencies, as well as parties declared ineligible under statutory or regulatory authority other than

Executive Order 12549.

I. Byrd Anti-Lobbying Amendment (31 U.S.C. 1352) - Contractors that apply or bid for an award exceeding $100,000 must file the required certification. Each tier certifies to the tier above that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence…