A06_SPECS_KERR_GULCH_CLEARING_AND_GRUBBING.pdf
PDF 117 KB Posted
- Attached to
- BLM-CO RGFO KERR GULCH CATTLEGUARD REPLACEMENT
- Solicitation number
- 140L1725Q0040
About this file
This document is a technical specification section (02231) for Clearing and Grubbing work. The section details requirements for preparing a construction site by removing vegetation, trees, stumps, roots, and other surface debris. Key specifications include: clearing involves felling and cutting trees and surface vegetation into sections for disposal, while grubbing involves removing below-surface stumps and roots larger than 3 inches in diameter. The project prohibits burning of slash and requires protecting existing vegetation outside the work limits from damage. No salvage is anticipated, and any cleared brush or limbs may be scattered in surrounding vegetated areas. The work will be considered incidental to the overall contract and will not be separately measured or directly paid, with costs to be included in other bid line items.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLEARING AND GRUBBING
02231 - 1
SECTION 02231
CLEARING AND GRUBBING
PART 1: GENERAL
1.1 SUMMARY
A. Section Includes: Clearing of vegetation, and grubbing of stumps, roots, and debris; and other incidental work related to preparing the site for later use.
1.2 DEFINITIONS
A. Clearing: Clearing shall consist of the felling, trimming, and cutting of obstructions such as trees into sections and the satisfactory disposal of the trees and other surface vegetation designated for removal.
B. Grubbing: Grubbing shall consist of the removal and disposal of below-surface stumps, roots larger than 3-inches in diameter.
1.3 PROJECT/SITE CONDITIONS
A. Burning of Slash: Shall not be permitted.
B. Landscape Preservation: Protect vegetation outside the work limits from injury.
Existing trees and shrubs shall not be disturbed or damaged.
PART 2: PRODUCTS
(There are no applicable requirements.)
PART 3: EXECUTION
3.1 CLEARING
A. Requirements: Clear trees, stumps, roots, brush, and other vegetation in areas to be graded or fall within the footprint of the proposed work. Limbs and branches that interfere with the proposed work shall be cut and removed as needed to prevent breaking of the limbs during construction.
3.2 SALVAGE
A. Trees and Limbs: No salvage is anticipated in this project. Any cleared brush or limbs may be scattered in the surrounding vegetated area.
PART 4: MEASUREMENT AND PAYMENT
4.1 METHOD OF MEASUREMENT
A. Units: The work described in this section will not be measured for payment.
4.2 BASIS OF PAYMENT
A. Payment: No direct payment for the work described under this section will be made.
Consideration for this item shall be included in the bid price for other items of the Contract.
END OF SECTION