A02 TE09_HISTORICAL-MAJOR-REPAIR_20210312.xlsx
XLSX spreadsheet 60 KB Posted
- Solicitation number
- W91QVN22R0030
About this file
This document contains a historical record of major repair orders for unaccompanied personnel housing and senior leader quarters at USAG Humphreys in South Korea. Between March 2020 and January 2021, 78 repair orders were issued totaling over $321 million. The repairs included replacing chillers, boilers, pumps, generators, air handling units and other HVAC equipment. Interior repairs like painting, plumbing and flooring were also included. The file lists each order date, number, delivery date, item description, quantity, unit and amount. It also provides a building list with details on 98 housing structures like floor area, number of floors, year built, number of personnel and applicable contract option years.
This federal contract opportunity is a solicitation for preventive maintenance, on-call repair services, and repair of unaccompanied personnel housing and senior leader quarters at USAG Humphreys. The solicitation number is W91QVN22R0030 and is issued by the Department of the Army Materiel Command Army Contracting Command. The opportunity involves providing maintenance and repairs for 98 buildings totaling over 7 million square feet used for housing at USAG Humphreys. The response date is not specified but the requirement is for ongoing preventive maintenance and on-call repair services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 3 DDC-Diagram.pdf | ||
| A21 Amedment W91QVN-22-R-0030-A0003.pdf | ||
| A02 PWS TMC Final V4 as of 9 Feb 2022.docx | DOCX document | |
| A02 TE06_EQUIPMENT-LIST Revised.xlsx | XLSX spreadsheet | |
| A21 Amendment W91QVN-22-R-0030-0002.pdf | ||
| A21 Amendment W91QVN-22-R-0030-0001.pdf | ||
| A02 PWS TMC Final V4 as of 21 Dec 2021.docx | DOCX document | |
| A02 TE06_EQUIPMENT-LIST_20210312.xlsx | XLSX spreadsheet | |
| A02 TE07_HISTORICAL-CALL-LIST-BARRACKS_20210312.xlsx | XLSX spreadsheet | |
| A02 TE04_GENERATOR-LIST_201210312.docx | DOCX document | |
| A02 TE02_PM-TASK-LIST_201210312.pdf | ||
| Attachment 1 Property Management System Procedures.docx | DOCX document | |
| A02 TE05_DRYER-LIST_20210312.xlsx | XLSX spreadsheet | |
| Attachment 2 Performance Assessment Questionnaire.pdf | ||
| A02 TE01_FACILITY-LIST_20210321.xlsx | XLSX spreadsheet | |
| A02 TE08_HISTORICAL-CALL-LIST-KEY_20210312.xlsx | XLSX spreadsheet | |
| RFP W91QVN-22-R-0030.pdf | ||
| A02 TE03_PEST-CONTROL-STANDARD_20210524.docx | DOCX document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DPW Task Order
| TE-09 Historical Major Repair List for Barracks | |||||||
| As of 12 Mar 21 | |||||||
| NO | ORDER DATE | ORDER NUMBER | DELIVERY DATE | ITEM DESCRIPTION | QTY | UNIT | AMOUNT |
| 1 | 11/Mar/20 | OO-2003-01 | 09/May/20 | Est#008, Replacement of disconnector, and Safety Switch, and circulation pump on roof top, S-6500 | 1 | EA | ₩10,077,390 |
| 2 | 19/Mar/20 | OO-2003-02 | 09/May/20 | Est#010, Replacement of EXPANSION TANK in S2017 Mechanical room | 1 | EA | ₩2,714,300 |
| 3 | 23/Mar/20 | OO-2003-03 | 15/May/20 | Est#011, Replacement of EXPENSION TANK in S-6004 Mechanical room | 1 | EA | ₩2,807,271 |
| 4 | 01/Apr/20 | OO-2004-01 | 30/Apr/20 | Est#016, Electric door locks reset, coding, card key issues & operation test in S-1131. | 1 | EA | ₩4,052,664 |
| 5 | 27/Apr/20 | OO-2004-02 | 29/May/20 | Est#024, Repair Heat pump outdoor unit in P-12412 | 1 | Job | ₩4,332,018 |
| 6 | 07/May/20 | OO-2005-01 | 06/Jun/20 | Est#025, Repair emergency generator at S-12410. | 1 | EA | ₩2,750,200 |
| 7 | 14/May/20 | OO-2005-02 | 05/Jun/20 | Est#009, Replace AHU fan coil and Gate valve in S-2098. | 1 | EA | ₩4,023,150 |
| 8 | 14/May/20 | OO-2005-03 | 05/Jun/20 | Est#018, Replace smart server for DDC in P-6120. | 1 | EA | ₩2,500,000 |
| 9 | 19/May/20 | OO-2005-04 | 18/Jun/20 | Est#007, Testing of ventilation system and putting flyers in rooms( 18 Bldgs, 5,436 Rms) | 1 | EA | ₩3,812,670 |
| 10 | 22/May/20 | OO-2005-05 | 21/Jun/20 | Est#026, Replace chiller pump at S-2061 | 1 | EA | ₩2,992,978 |
| 11 | 22/May/20 | OO-2005-06 | 21/Jun/20 | Est#027, Replace display & fan motor in chiller at P-2015 | 1 | EA | ₩2,620,901 |
| 12 | 22/May/20 | OO-2005-07 | 21/Jun/20 | Eat#015, Replace compressor in chiller at S-6701 | 1 | EA | ₩10,428,975 |
| 13 | 26/May/20 | OO-2005-08 | 25/Jun/20 | Est#060, Replace main baseboards in chiller at S-1131, 1132 | 1 | EA | ₩3,982,764 |
| 14 | 29/May/20 | OO-2005-09 | 28/Jun/20 | Est#017, Replace wood fire door on in laundry room on 8F, S-6006. | 1 | EA | ₩2,450,691 |
| 15 | 29/May/20 | OO-2005-10 | 28/Jun/20 | Est#055, Repair emergency genreator at S-1291. | 1 | EA | ₩5,032,200 |
| 16 | 29/May/20 | OO-2005-11 | 28/Jun/20 | Est#057, Repair emergency generator at S-2097. | 1 | EA | ₩4,642,200 |
| 17 | 11/Jun/20 | OO-2006-01 | 10/Jul/20 | Est#034, Replace hot water boiler in S-2015. | 1 | Job | ₩11,097,800 |
| 18 | 18/Jun/20 | OO-2006-02 | 17/Jul/20 | Est#058, Repair emergency generator at S-1056. | 1 | Job | ₩2,770,200 |
| 19 | 18/Jun/20 | OO-2006-03 | 17/Jul/20 | Est#012, Replace booster pump in S-6002 | 1 | Job | ₩2,240,409 |
| 20 | 18/Jun/20 | OO-2006-04 | 17/Jul/20 | Est#044, Replace patrs in RTU (#1,3,7,8) at SP-6321 | 1 | Job | ₩5,475,700 |
| 21 | 26/Jun/20 | OO-2006-05 | 25/Jul/20 | Est#071, Replace magnetic contactor in cooling tower at P-6120. | 1 | Job | ₩7,179,880 |
| 22 | 06/Jul/20 | OO-2007-01 | 05/Aug/20 | Est#006, Repainting of wall in P-6120, (1F). | 1 | Job | ₩7,257,000 |
| 23 | 06/Jul/20 | OO-2007-02 | 05/Aug/20 | Est#077, Repaing of stairs in P-6400. | 1 | Job | ₩4,503,600 |
| 25 | 20/Jul/20 | OO-2007-04 | 19/Aug/20 | Est#089, Repair CRAC unit in P-12410. | 1 | Job | ₩7,935,800 |
| 26 | 27/Jul/20 | OO-2007-05 | 26/Aug/20 | Est#054, Replace chiller pipes at S-1290, 1292. | 1 | Job | ₩3,975,400 |
| 27 | 29/Jul/20 | OO-2007-06 | 28/Aug/20 | Est#108, Repair walk-in freezer in S-2097 | 1 | Job | ₩9,947,800 |
| 28 | 27/Jul/20 | OO-2007-07 | 26/Aug/20 | Est#074, Repainting wall & ceiling in 7Rms of S-574. | 1 | Job | ₩7,917,161 |
| 29 | 28/Jul/20 | OO-2007-08 | 27/Aug/20 | Est#094, Repair dry cooler in P-6500. | 1 | Job | ₩7,635,000 |
| 30 | 20/Aug/20 | OO‐2008‐01 | 20/Sep/20 | Est#099, Replace Hot Water Boiler, B‐12410 | 1 | Job | ₩6,838,200 |
| 31 | 31/Aug/20 | OO-2008-02 | 30/Sep/20 | Est#111, Replace HVAC Drive W/ Bypass EMB2 Type, B#6004 | 1 | Job | ₩3,552,650 |
| 32 | 07/Sep/20 | OO-2009-01 | 30/Sep/20 | Est#100, Replace AC in B#1056 | 1 | Job | ₩2,717,657 |
| 33 | 07/Sep/20 | OO-2009-02 | 07/Oct/20 | Est#114, Replace Pump in CRAC, B6500 | 1 | Job | ₩5,223,480 |
| 34 | 08/Sep/20 | OO-2009-03 | 30/Nov/20 | Est#053, Replace Magnetic Starter, B6701 | 1 | Job | ₩2,229,690 |
| 35 | 10/Sep/20 | OO-2009-04 | 10/Nov/20 | Est#073, Replace Exhaust Fan motor, B574 | 1 | Job | ₩4,415,485 |
| 36 | 15/Oct/20 | OO-2010-01 | 31/Dec/20 | Est#129, Replacement of Senior Swing Motor Gearbox in Main Door | 1 | Job | ₩2,473,944 |
| 37 | 15/Oct/20 | OO-2010-02 | 20/Nov/20 | Est#119, Install of Waterproofing Sheet in P6500 Rooftop | 1 | Job | ₩2,648,600 |
| 38 | 15/Oct/20 | OO-2010-03 | 15/Mar/21 | Est#122, Replacement of FAN in AHU-3 at P6400 | 1 | Job | ₩10,163,608 |
| 39 | 15/Oct/20 | OO-2010-04 | 10/Nov/20 | Est#117, Replacement of two AC in Laundry room at P574 | 1 | Job | ₩4,071,548 |
| 40 | 21/Oct/20 | OO-2010-05 | 30/Nov/20 | Est#106, Replacements of Valve controller & Operator Terminal in P6001 | 1 | Job | ₩4,986,550 |
| 41 | 21/Oct/20 | OO-2010-06 | 30/Nov/20 | Est#072, Replacements of Sink Heater in P1291 | 1 | Job | ₩2,535,456 |
| 42 | 03/Nov/20 | OO-2011-01 | 04/Dec/20 | Est#137, Replacement Gypsum board in B12410 | 1 | Job | ₩2,446,785 |
| 43 | 03/Nov/20 | OO-2011-02 | 05/Feb/21 | Est#083, Replace IParts in ERU-2 at P6705 | 1 | Job | ₩1,845,800 |
| 44 | 04/Nov/20 | OO-2011-03 | 31/Jan/21 | Est#088, Replace Parts in Generator in P6002 | 1 | Job | ₩2,028,000 |
| 45 | 04/Nov/20 | OO-2011-04 | 04/Jan/21 | Est#098, Replace Exhaust Fan motor in P573 | 1 | Job | ₩4,415,485 |
| 46 | 04/Nov/20 | OO-2011-05 | 31/Dec/20 | Est#005, Repair Fire Damage in B#6322 | 1 | Job | ₩2,374,144 |
| 47 | 16/Nov/20 | OO-2011-06 | 16/Dec/20 | Est#086, Replace Part in generator in P6821 | 1 | Job | ₩2,268,000 |
| 48 | 27/Nov/20 | OO-2011-07 | 26/Jan/21 | Est#092, Replace Fan Motor in Chiller in B#754 | 1 | Job | ₩2,889,622 |
| 49 | 07/Dec/20 | OO-2012-01 | 14/Feb/21 | Est#147, Replace Circulation Pump in P6320 | 1 | Job | ₩3,186,064 |
| 50 | 11/Dec/20 | OO-2012-02 | 05/Jan/21 | Est#116, Replace Two AC in B573 | 1 | Job | ₩4,100,398 |
| 51 | 16/Dec/20 | OO-2012-03 | 23/Jan/21 | Est#138, Replace Fan in AHU (ERU-3), B6120 | 1 | Job | ₩4,782,979 |
| 52 | 30/Dec/20 | OO-2012-04 | 15/Feb/21 | Est#31, Replace Parts in Dish Washer at P6702 | 1 | Job | ₩1,807,058 |
| 53 | 30/Dec/20 | OO-2012-05 | 28/Feb/21 | Esr#105, Replace Sink Heater in P2097 | 1 | Job | ₩2,474,755 |
| 54 | 30/Dec/20 | OO-2012-06 | 15/Feb/21 | Est#120, Repair of Dishwasher in P6702 | 1 | Job | ₩7,709,608 |
| 55 | 30/Dec/20 | OO-2012-07 | 31/Jan/21 | Est#109, Removal of Carpet and Install of VCT in P731 | 1 | Job | ₩4,808,966 |
| 56 | 04/Jan/21 | OO-2101-01 | 05/Feb/21 | Est#160, Replace of AHU Coil in P577 | 1 | Job | ₩2,527,650 |
| 57 | 12/Jan/21 | OO-2101-02 | 28/Feb/21 | Replacement of Drinking Water Fountain in 4 Buildings (P1292,1294, 12001,12002-17 EA) | 1 | Job | ₩3,913,199 |
| 58 | 13/Jan/21 | OO-2101-03 | 03/Feb/21 | Est#168, Repair LG System A/C, R819, B6151 | 1 | Job | ₩2,891,000 |
| 59 | 13/Jan/21 | OO-2101-04 | 21/Feb/21 | Est#171, Repair LG System A/C, R423, B6827 | 1 | Job | ₩2,388,000 |
| 60 | 14/Jan/21 | OO-2101-05 | 05/Mar/21 | Est#162, Replacef GAUGES in oil tank at P6006 | 1 | Job | ₩3,526,408 |
| 61 | 15/Jan/21 | OO-2101-06 | 05/Feb/21 | Est#174, Repair LG System A/C, R519, B6154 | 1 | Job | ₩2,414,000 |
| 62 | 19/Jan/21 | OO-2101-07 | 10/Feb/21 | Est#172, Repair LG System A/C,R213,B12200-Rm213 | 1 | Job | ₩2,468,000 |
| 63 | 20/Jan/21 | OO-2101-08 | 06/Mar/21 | Est#155, Replacements of Circulation Pump in P6323 | 1 | Job | ₩3,186,064 |
| 64 | 20/Jan/21 | OO-2101-09 | 15/Apr/21 | Est#169, Replacements of Circulation Pump in P2098 | 1 | Job | ₩3,765,912 |
| 65 | 20/Jan/21 | OO-2101-10 | 14/Feb/21 | Est#173, Repair LG System AC R327, B6154 | 1 | Job | ₩2,414,000 |
| 66 | 25/Jan/21 | OO-2101-11 | 10/Feb/21 | Est#141, Repair LG System AC R411, B12203 | 1 | Job | ₩2,728,008 |
| 67 | 25/Jan/21 | OO-2101-12 | 19/Feb/21 | Est#175, Repair LG System AC R421, B6824 | 1 | Job | ₩3,881,000 |
| 68 | 26/Jan/21 | OO-2101-13 | 12/Mar/21 | Est#161, Replace Circulation Pump,B6705 | 1 | Job | ₩2,987,578 |
| 69 | 02/Feb/21 | OO-2102-01 | 23/Feb/21 | Est#178, Repair LG System AC , R#412, B6821-Rm412 | 1 | Job | ₩2,388,000 |
| 70 | 02/Feb/21 | OO-2102-02 | 11/Mar/21 | Est#177, Replace Circulation Pump in B2017 | 1 | Job | ₩3,680,676 |
| 71 | 03/Feb/21 | OO-2102-03 | 28/Feb/21 | Est#179, Repair LG System AC, R#921, B6830 | 1 | Job | ₩2,388,000 |
| 72 | 03/Feb/21 | OO-2102-04 | 28/Feb/21 | Est#180, Repair LG System AC, R#818, B6154 | 1 | Job | ₩2,388,000 |
| 73 | 22/Feb/21 | OO-2102-05 | 06/Mar/21 | Est#167, Interior Paint for 18 Rms, B6002 | 1 | Job | ₩4,300,463 |
| 74 | 26/Feb/21 | OO-2102-06 | 31/Mar/21 | Est#082, Replace wood fire door, 2nd fl, B574 | 1 | Job | ₩3,136,424 |
| 75 | 03/Mar/21 | OO-2103-01 | 26/Mar/21 | Est#181, Repair LG system AC in P12200 | 1 | Job | ₩2,388,000 |
| 76 | 04/Mar/21 | OO-2103-02 | 09/Apr/21 | Est#163, Interior Repaint 22 Room in P1057 | 1 | Job | ₩8,463,595 |
| 77 | 05/Mar/21 | OO-2103-03 | 09/Apr/21 | Est#165, Interior Repaint 10 Room in P1294 | 1 | Job | ₩3,931,380 |
| 78 | 05/Mar/21 | OO-2103-04 | 09/Apr/21 | Est#164, Interior Repaint 7 Room in P2061 | 1 | Job | ₩2,907,734 |
| Total Amount | ₩321,213,745 |
Building List
| UPH / SLQ Building list | |||||||||
| 1. UPH Building list | |||||||||
| Bldg # | Utilization | Floor Area | |||||||
| (SF) | # of | ||||||||
| Floor | Built Year | # of PN | |||||||
| (or unit) | Applicable | ||||||||
| Option Year | Effective | ||||||||
| Date | Remark | ||||||||
| 360 | UPH | 64,369 | 4 | 1991 | 152 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 362 | UPH | 7,994 | 2 | 1979 | 19 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 363 | UPH | 7,994 | 2 | 1979 | 19 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 364 | UPH | 7,994 | 2 | 1979 | 19 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 365 | UPH | 7,994 | 2 | 1979 | 19 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 366 | UPH | 7,994 | 2 | 1979 | 19 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 367 | UPH | 7,994 | 2 | 1979 | 19 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 371 | UPH | 54,131 | 4 | 1998 | 200 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 571 | UPH | 50,369 | 4 | 2001 | 232 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 573 | UPH | 43,847 | 4 | 2001 | 200 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 574 | UPH | 43,847 | 4 | 2001 | 200 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 577 | UPH | 50,185 | 4 | 2002 | 232 | Base Year | 16"-"Jan"-"20 | 20F0148 | |
| 725 | UPH | 43,847 | 4 | 2001 | 200 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 726 | UPH | 30,969 | 3 | 1973 | 70 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 738 | UPH | 116,400 | 9 | 2016. 3 | 302 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 739 | UPH | 116,400 | 9 | 2016. 3 | 302 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 740 | UPH | 116,400 | 9 | 2016. 3 | 302 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 1057 | UPH | 43,847 | 4 | 1999 | 98 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 1131 | UPH | 35,225 | 3 | 1972 | 67 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 1132 | UPH | 35,225 | 3 | 1972 | 67 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 1133 | UPH | 32,144 | 3 | 1977 | 60 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 1201 | UPH | 51,708 | 6 | 2006 | 204 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 1290 | UPH | 51,708 | 6 | 2006 | 204 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 1292 | UPH | 53,849 | 4 | 2006 | 232 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 1294 | UPH | 37,488 | 4 | 2002 | 100 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 2014 | UPH | 43,847 | 4 | 2003 | 100 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 2015 | UPH | 53,849 | 4 | 2004 | 232 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 2017 | UPH | 131,352 | 8 | 2007 | 464 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 2061 | UPH | 131,352 | 8 | 2009 | 464 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 2096 | UPH | 124,532 | 8 | 2009 | 464 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 2098 | UPH | 126,415 | 9 | 2011 | 302 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 6001 | UPH | 126,415 | 9 | 2011 | 302 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 6002 | UPH | 126,415 | 9 | 2011 | 302 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 6003 | UPH | 126,415 | 9 | 2011 | 302 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 6004 | UPH | 126,415 | 9 | 2011 | 302 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 6005 | UPH | 126,415 | 9 | 2011 | 302 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 6006 | UPH | 126,415 | 9 | 2015. 2 | 302 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 6320 | UPH | 126,415 | 9 | 2015. 3 | 302 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 6322 | UPH | 126,415 | 9 | 2015. 3 | 302 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 6323 | UPH | 126,415 | 9 | 2015. 3 | 302 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 6324 | UPH | 126,415 | 9 | 2015. 3 | 302 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 6325 | UPH | 126,415 | 9 | 2015. 3 | 302 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 6326 | UPH | 126,415 | 9 | 2015. 9 | 302 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 6701 | UPH | 126,415 | 9 | 2015. 6 | 302 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 6703 | UPH | 126,415 | 9 | 2015. 6 | 302 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 6704 | UPH | 126,415 | 9 | 2015. 9 | 302 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 6705 | UPH | 126,415 | 9 | 2015. 9 | 302 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 6706 | UPH | 126,415 | 9 | 2015. 6 | 302 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 6707 | UPH | 126,415 | 9 | 2015. 6 | 302 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 6708 | UPH | 116,923 | 9 | 2018 | 302 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 6900 | UPH | 116,923 | 9 | 2018 | 302 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 6904 | UPH | 116,923 | 9 | 2016. 10 | 302 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 6907 | UPH | 116,923 | 9 | 2016. 10 | 302 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 6910 | UPH | 116,923 | 9 | 2016. 10 | 302 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 6915 | UPH | 116,923 | 9 | 2018 | 302 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 6918 | UPH | 95,380 | 6 | 2008 | 348 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 12001 | UPH | 95,380 | 6 | 2008 | 348 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 12002 | UPH | 38,275 | 3 | 2001 | 48 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 6390 | UPH | 94,970 | 6 | 2007 | 96 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 6391 | UPH | 47,161 | 4 | 1989 | 39 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 6392 | UPH | 47,161 | 4 | 1989 | 39 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 369 | Mechanical R | 47,161 | 4 | 1989 | 39 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 737 | Mechanical R | 101,097 | 6 | 2018 | 96 | Base Year | 16"-"Jan"-"20 | 20F0148 | |
| 204 | SLQ | 158,020 | 9 | 2017 | 144 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 731 | SLQ | 158,020 | 9 | 2017 | 144 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 753 | SLQ | 154,864 | 9 | 2017 | 144 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 754 | SLQ | 154,864 | 9 | 2017 | 144 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 755 | SLQ | 154,864 | 9 | 2017 | 144 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 1770 | SLQ | 154,864 | 9 | 2017 | 144 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 6151 | SLQ | 104,174 | 6 | 2017 | 96 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 6154 | SLQ | 104,174 | 6 | 2017 | 96 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 6821 | SLQ | 104,174 | 6 | 2017 | 96 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 6824 | SLQ | 104,174 | 6 | 2017 | 96 | Base Year | 01"-"Jan"-"20 | 19F0708 | |
| 6827 | SLQ | 126,415 | 9 | 2019 | 302 | Base Year | 16"-"Mar"-"20 | 20F0210 | |
| 6830 | SLQ | 126,415 | 9 | 2019 | 302 | Base Year | 16"-"Mar"-"20 | 20F0210 | |
| 12200 | SLQ | 126,415 | 9 | 2019 | 302 | Base Year | 16"-"Mar"-"20 | 20F0210 | |
| 12203 | SLQ | 35,225 | 9 | 1972 | 302 | Base Year | 16"-"Mar"-"20 | 20F0210 | |
| 12206 | SLQ | ||||||||
| 12209 | SLQ | ||||||||
| 1291 | DFACs | ||||||||
| 2097 | DFACs | ||||||||
| 6008 | DFACs | ||||||||
| 6321 | DFACs | ||||||||
| 6702 | DFACs | ||||||||
| 1056 | Critical | ||||||||
| 3033 | Critical | ||||||||
| 6105 | Critical | ||||||||
| 6120 | Critical | ||||||||
| 6145 | Critical | ||||||||
| 6150 | Critical | ||||||||
| 6315 | Critical | ||||||||
| 6400 | Critical | ||||||||
| 6500 | Critical | ||||||||
| 7300 | Critical | ||||||||
| 12400 | Critical | ||||||||
| 12401 | Critical | ||||||||
| 12410 | Critical | ||||||||
| 12412 | Critical |
SUM 98 Building 7,041,524 16,321
File details come from the government source that posted it. Updated .