A00844-613642.pdf
PDF 971 KB Posted
- Attached to
- 613642 RAYNHAM-TAUNTON FAP No. HPP/STP-0035(073)X Bridge Replacement, R-02-003=T-01-004 (3M4), Sou
- Solicitation number
- BD-27-1030-0H100-0H002-132498
- Issued by
- Massachusetts
About this file
This is a Bridge Replacement Project file for the Commonwealth of Massachusetts, specifically the Raynham-Taunton FAP No. HPP/STP-0035(073)X project (R-02-003=T-01-004, 3M4). The project involves the replacement of a bridge structure and is identified as a state and local contract opportunity. Prospective bidders are explicitly instructed not to use COMMBUYS to submit bids on this project, indicating that an alternative bidding process or platform has been designated for this solicitation.
The file serves as official project documentation for the bridge replacement initiative, which falls under the Massachusetts Department of Transportation's capital improvement program. Additional project specifications, scope of work details, scheduling requirements, and bid submission procedures are contained within the associated project documentation. Interested contractors should obtain complete bid documents and instructions directly from the designated project contact or procurement office rather than through the standard COMMBUYS system used for other Massachusetts state contracts.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A00802-613642.pdf | ||
| A00810-613642.pdf | ||
| A00875-613642.pdf | ||
| A00882-613642.pdf | ||
| A00801-613642.pdf | ||
| A00841-613642.pdf | ||
| A00831-613642.pdf | ||
| A00813-613642.pdf | ||
| A00881-613642.pdf | ||
| A00812-613642.pdf | ||
| A00811-613642.pdf | ||
| A00820-613642.pdf | ||
| A00842-613642.pdf | ||
| A00808-613642.pdf | ||
| A00840-613642.pdf | ||
| A00860-613642.pdf | ||
| A00815-613642.pdf | ||
| A00814-613642.pdf | ||
| A00861-613642.pdf | ||
| 613642 - Notice to Contractors.pdf | ||
| 613642 Bid Items List.txt | TXT text file |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Massachusetts Department Of Transportation Highway Division Proposal No. 613642-136413
A00844 - 1
DOCUMENT A00844
U.S. FISH AND WILDLIFE SERVICE
NLAA CONCURRENCE VERIFICATION LETTER
Massachusetts Department Of Transportation Highway Division Proposal No. 613642-136413
A00844 - 2
THIS PAGE IS INTENTIONALLY LEFT BLANK
12/18/2025 17:10:42 UTC
United States Department of the Interior
FISH AND WILDLIFE SERVICE
New England Ecological Services Field Office 70 Commercial Street, Suite 300
Concord, NH 3301-5094 Phone: (603) 223-2541 Fax: (603) 223-0104
In Reply Refer To:
Project code: 2026-0024808 Project Name: 613642- RAYNHAM- TAUNTON- BRIDGE REPLACEMENT, R-02-003, SOUTH STREET EAST OVER THE TAUNTON RIVER
Subject: Not Likely to Adversely Affect Concurrence verification letter for the '613642-
RAYNHAM- TAUNTON- BRIDGE REPLACEMENT, R-02-003, SOUTH STREET
EAST OVER THE TAUNTON RIVER' project under the December 13, 2024, FHWA, FRA, FTA Programmatic Biological Opinion for Transportation Projects within the Range of the Indiana Bat, Northern Long-eared Bat, and Tricolored Bat.
To whom it may concern:
This letter records the determination of effects to federally listed (or proposed) bat species anticipated to result from the 613642- RAYNHAM- TAUNTON- BRIDGE REPLACEMENT, R-02-003, SOUTH STREET EAST OVER THE TAUNTON RIVER (the Project). This determination is based upon information you entered into the assisted determination key (Dkey) associated with the above referenced Programmatic Biological Opinion/Conference Opinion (PBO/PCO) in the U.S. Fish and Wildlife Service’s (Service) Information for Planning and Consultation (IPaC) system on the date listed above to verify that the Project may rely on the concurrence provided in the PBO/PCO to satisfy requirements under section 7(a)(2) of the Endangered Species Act of 1973 (ESA) (16 USC 1536), as amended.
Ensuring Accurate Determinations When Using IPaC:
The Service developed the IPaC system and this Dkey in accordance with the ESA and based on the PBO/PCO. All information submitted by the project proponent into IPaC must accurately represent the full scope and details of the Project.
Failure to accurately represent or implement the Project as detailed in the Dkey invalidates this letter. Answers to certain questions in the Dkey commit the project proponent to implementation of conservation measures that must be followed for the ESA determinations to remain valid. Carefully review this letter, your ESA requirements are NOT yet complete.
Determinations:
Proposal No. 613642 - 136413
A00844 - 3
Based on the information you provided (Project Description shown below), you have determined that the Project is within the scope and adheres to the criteria of the PBO/PCO, including the adoption of applicable avoidance and minimization measures. Based on your IPaC submission and the PBO/PCO, the Project is consistent with the following effect determinations:
Species Listing Status Determination Northern Long-eared Bat (Myotis septentrionalis) Endangered NLAA Tricolored Bat (Perimyotis subflavus) Proposed
Endangered
NLAA
The tricolored bat is proposed for listing as endangered under the ESA, but not yet listed. For actions that may affect a proposed species, agencies cannot consult, but they can confer under the authority of section 7(a)(4) of the ESA. Such conferences can follow the procedures for a consultation and be adopted as such if the proposed species is listed. Should the tricolored bat be listed, agencies must review projects that are not yet complete, or projects with ongoing effects within the tricolored bat range that previously received a no effect or not likely to adversely affect (NLAA) determination from the key to confirm that the determination is still accurate.
The Service has 14 calendar days to notify the lead Federal action agency or designated non-federal representative if we determine that the Project does not meet the criteria for a NLAA determination under the PBO/PCO. If the Service does not notify the lead Federal action agency or designated non-federal representative within that timeframe, you may proceed with the Project under the terms of the NLAA concurrence provided in the PBO/PCO. This verification period allows Service Field Offices to apply local knowledge to implementation of the PBO, as we may identify a small subset of actions having impacts that were unanticipated. In such instances, Service Field Offices may request additional information that is necessary to verify inclusion of the proposed action under the PBO/PCO.
If the Project is modified, or new information reveals that it may affect the Indiana bat, northern long-eared bat, or tricolored bat in a manner or to an extent not considered in the PBO/PCO, further review to conclude the requirements of ESA section 7(a)(2) may be required.
For Proposed Actions that include bridge/culvert or structure removal, replacement, and/or maintenance activities:
If your initial bridge, culvert, or structure assessment failed to detect Indiana bat, northern long-eared bat, or tricolored bat use or occupancy, yet bats are later detected prior to, or during construction, promptly notify the local Service Field Office within 2 working days of the discovery. In addition, please document whether incidental take occurred, and if so, the type (i.e.
kill or harm) and amount (i.e. number of individuals) and submit documentation to the local Service Field Office within 5 working days from the completion of the bridge, culvert, or structure construction (use Appendix E - Post Assessment Discovery of Bats at Bridge/Culvert or Structure Form in the User’s Guide). In these instances, potential incidental take of Indiana bats, northern long-eared bats, or tricolored bats may be exempted provided that the take is reported to
Proposal No. 613642 - 136413
A00844 - 4 https://www.fws.gov/media/users-guide-range-wide-programmatic-consultation-indiana-bat-and-northern-long-eared-bat the Service. In these instances, potential incidental take of Indiana bats, northern long-eared bats, or tricolored bats may be exempted provided that the take is reported to the Service.
If the Project may affect any other federally listed or proposed species and/or designated critical habitat, additional consultation between the lead Federal action agency and this Service Field Office is required for those species/designated critical habitat. If the Project has the potential to take bald or golden eagles, additional coordination with the Service under the Bald and Golden Eagle Protection Act may also be required. In either of these circumstances, please advise the lead Federal action agency to contact this Service Field Office
The following species may occur in your project area and are not covered by this determination:
Monarch Butterfly Danaus plexippus Proposed Threatened Plymouth Redbelly Turtle = Plymouth Redbelly Cooter Pseudemys rubriventris bangsi Endangered
A00844 - 5
PROJECT DESCRIPTION
The following project name and description was collected in IPaC as part of the endangered species review process.
NAME
613642- RAYNHAM- TAUNTON- BRIDGE REPLACEMENT, R-02-003, SOUTH
STREET EAST OVER THE TAUNTON RIVER
DESCRIPTION
RAYNHAM- TAUNTON- BRIDGE REPLACEMENT, R-02-003=T-01-004 (3M4), SOUTH
STREET EAST OVER THE TAUNTON RIVER
The proposed project consists of replacing the bridge deck, increasing safety, and improving operations of the roadway. The proposed design relocates the existing bridge sidewalk from the east to the west side of the bridge to connect to an existing sidewalk on the southwest approach. A 5-foot shoulder for a bike lane in the northbound direction improves safety by providing dedicated space for cyclists, separating them from vehicular traffic. This separation reduces the risk of conflicts between cyclists and vehicles.
Monarch Butterfly: Proposed Threatened Species only. The project action will not jeopardize the continued existence of the proposed species.
A00844 - 6
The approximate location of the project can be viewed in Google Maps: https:// www.google.com/maps/@41.88630155,-71.03005054127355,14z
Proposal No. 613642 - 136413
A00844 - 7 https://www.google.com/maps/@41.88630155,-71.03005054127355,14z https://www.google.com/maps/@41.88630155,-71.03005054127355,14z
1.
2.
3.
4.
5.
6.
7.
DETERMINATION KEY RESULT
Based on your answers provided, this project(s) may affect, but is not likely to adversely affect the Indiana bat, northern long-eared bat or tricolored bat, therefore, consultation with the U.S.
Fish and Wildlife Service pursuant to Section 7(a)(2) of the Endangered Species Act of 1973 (ESA) (87 Stat. 884, as amended 16 U.S.C. 1531 et seq.) is required. However, also based on your answers provided, this project may rely on the concurrence provided in the Programmatic Biological Opinion/Conference Opinion for Transportation Projects in the Range of the Indiana bat, northern long-eared bat, and tricolored bat, dated December 13, 2024.
QUALIFICATION INTERVIEW
Which Federal Agency is the lead federal agency the action?
A) Federal Highway Administration (FHWA) Does the Action Area intersect the species list area of the Northern long-eared bat?
Automatically answered Yes Does the Action Area intersect the species list area of the tricolored Bat (TCB)?
Automatically answered Yes [Semantic] Is any portion of the action area within a 0.5 mile radius of an entrance/opening to any known NLEB or TCB hibernacula?
Note: The map queried for this question contains proprietary information and cannot be displayed. If you need additional information, please contact the Field Office listed in the letterhead of this letter.
Automatically answered No Does your project's activities include raising the road profile above the tree canopy in documented habitat for the Indiana bat, NLEB, or TCB?
Note: For the definition of documented habitat, refer to Appendix A: https://www.fws.gov/media/users-guide-range-wide-programmatic-consultation-indiana-bat-and-northern-long-eared-bat
No Is your project located within a karst area?
No Will the project include bridge, culvert, or structure removal, replacement, and/or alteration activities?
Note: For definitions of bridge, culvert, and structure, refer to Appendix A: https:// www.fws.gov/media/users-guide-range-wide-programmatic-consultation-indiana-bat-and-northern-long-eared-bat.
Yes
Proposal No. 613642 - 136413
A00844 - 8 https://www.fws.gov/media/users-guide-range-wide-programmatic-consultation-indiana-bat-and-northern-long-eared-bat https://www.fws.gov/media/users-guide-range-wide-programmatic-consultation-indiana-bat-and-northern-long-eared-bat https://www.fws.gov/media/users-guide-range-wide-programmatic-consultation-indiana-bat-and-northern-long-eared-bat https://www.fws.gov/media/users-guide-range-wide-programmatic-consultation-indiana-bat-and-northern-long-eared-bat https://www.fws.gov/media/users-guide-range-wide-programmatic-consultation-indiana-bat-and-northern-long-eared-bat
8.
9.
10.
11.
12.
13.
14.
Do your project’s activities involve tree removal/trimming, temporary lighting, new/ additional permanent lighting, ground disturbance, percussives that involves noise/ vibration above existing background levels, vibrations, or slash pile burning?
Yes Is there suitable summer habitat for the Indiana bat, NLEB, or TCB within the project action area?
Note: See the Service's summer survey guidance for current definitions of suitable habitat [https://www.fws.gov/ midwest/endangered/mammals/inba/inbasummersurveyguidance.html].
Yes Have P/A surveys for the Indiana bat, NLEB, or TCB been conducted within the suitable summer habitat located within your project action area? This refers to mist-netting or acoustic surveys, not bridge assessments.
Note: See the Service's survey guidance https://www.fws.gov/midwest/endangered/ mammals/inba/inbasummersurveyguidance.html Yes
SUBMITTED DOCUMENTS
Raynham_613642_memo_20251027.pdf https://ipac.ecosphere.fws.gov/project/
A3767GZ2FBHULEJFUCBVE3PERE/
projectDocuments/173932326
Did the P/A surveys detect Indiana bats, NLEBs, or TCBs?
Note: If Indiana bats, NLEBs, or TCBs are detected, the action area is considered documented habitat.
No Did the local Service Field Office verify that this P/A survey can be used to determine Indiana bat, NLEB, and TCB are not likely to be present within the suitable summer habitat located within your project area?
Yes Will the project include bridge removal, replacement, and/or alteration activities?
Yes Has a Bridge Bat Assessment been conducted within the last 24 months to determine if the bridge is being used by the Indiana bat, NLEB, or TCB? If yes, upload assessment.
Note: Refer to the Service’s current survey guidance for acceptable assessment practices and validity timeframe of bridge/culvert and structure bat assessments: https://www.fws.gov/library/collections/range-wide-indiana-bat-and-northern-long-eared-bat-survey-guidelines.
Yes
SUBMITTED DOCUMENTS
Raynham_613642_memo_20251027.pdf https://ipac.ecosphere.fws.gov/project/
A3767GZ2FBHULEJFUCBVE3PERE/
projectDocuments/173932326
Proposal No. 613642 - 136413
A00844 - 9 https://www.fws.gov/midwest/endangered/mammals/inba/inbasummersurveyguidance.html https://www.fws.gov/midwest/endangered/mammals/inba/inbasummersurveyguidance.html https://www.fws.gov/midwest/endangered/mammals/inba/inbasummersurveyguidance.html https://www.fws.gov/midwest/endangered/mammals/inba/inbasummersurveyguidance.html https://ipac.ecosphere.fws.gov/project/A3767GZ2FBHULEJFUCBVE3PERE/projectDocuments/173932326 https://ipac.ecosphere.fws.gov/project/A3767GZ2FBHULEJFUCBVE3PERE/projectDocuments/173932326 https://ipac.ecosphere.fws.gov/project/A3767GZ2FBHULEJFUCBVE3PERE/projectDocuments/173932326 https://ipac.ecosphere.fws.gov/project/A3767GZ2FBHULEJFUCBVE3PERE/projectDocuments/173932326 https://www.fws.gov/library/collections/range-wide-indiana-bat-and-northern-long-eared-bat-survey-guidelines https://www.fws.gov/library/collections/range-wide-indiana-bat-and-northern-long-eared-bat-survey-guidelines https://ipac.ecosphere.fws.gov/project/A3767GZ2FBHULEJFUCBVE3PERE/projectDocuments/173932326 https://ipac.ecosphere.fws.gov/project/A3767GZ2FBHULEJFUCBVE3PERE/projectDocuments/173932326 https://ipac.ecosphere.fws.gov/project/A3767GZ2FBHULEJFUCBVE3PERE/projectDocuments/173932326 https://ipac.ecosphere.fws.gov/project/A3767GZ2FBHULEJFUCBVE3PERE/projectDocuments/173932326
15.
16.
17.
18.
19.
1.
2.
3.
Please select one of the following results of the Bridge Bat Assessment:
c) Indicates the absence of Indiana bats, NLEBs, or TCBs roosting in/under the bridge (no bats, guano, etc.)?
Does the project include culvert removal, replacement, and/or alteration activities?
No Does the project include structure removal, replacement, and/or alteration activities?
No Does the Action Area intersect the species list area of the tricolored Bat (TCB)?
Automatically answered Yes Does the Action Area intersect the species list area of the northern long-eared bat (NLEB)?
Automatically answered Yes
PROJECT QUESTIONNAIRE
Have you made a No Effect determinations for all other species included on the FWS IPaC generated species list?
Yes Have you made a May Affect determination for any other species on the FWS IPaC generated list?
No Please enter the date of the bridge assessment.
6/2/2025
AVOIDANCE AND MINIMIZATION MEASURES (AMMS)
This determination key result includes the commitment to implement the following Avoidance and Minimization Measures (AMMs):
GAMM1
Ensure all operators, employees, and contractors working in areas of Indiana bat, NLEB, or TCB suitable habitat are aware of all Transportation Agency environmental commitments, including all applicable AMMs.
A00844 - 10
DETERMINATION KEY DESCRIPTION: FHWA, FRA, FTA
PROGRAMMATIC CONSULTATION FOR TRANSPORTATION
PROJECTS AFFECTING IBAT, NLEB, OR TCB
This key was last updated in IPaC on September 11, 2025. Keys are subject to periodic revision.
This decision key is intended for projects/activities funded or authorized by the Federal Highway Administration (FHWA), Federal Railroad Administration (FRA), and/or Federal Transit Administration (FTA), which may require consultation with the U.S. Fish and Wildlife Service (Service) under Section 7 of the Endangered Species Act (ESA) and may affect the federally listed endangered Indiana bat (Myotis sodalis), northern long-eared bat (Myotis septentrionalis), and/or federally proposed endangered tricolored bat (Perimyotis subflavus).
This decision key should only be used to verify project applicability with the Service’s Programmatic Biological Opinion/Conference Opinion for Transportation Projects in the Range of the Indiana bat, northern long-eared bat, and tricolored bat, dated December 13, 2024. The programmatic consultation limited transportation activities that may affect the covered bat species and addresses situations that are both likely and not likely to adversely affect the covered bat species. This decision key will assist in identifying the effect of a specific project/activity and the applicability of the programmatic consultation. The programmatic consultation is not intended to cover all types of transportation actions. Activities outside the scope of the programmatic consultation, or that may affect ESA-listed species other than the Indiana bat, northern long-eared bat, or tricolored bat, or their designated critical habitat, may require additional ESA Section 7 consultation.
A00844 - 11
IPAC USER CONTACT INFORMATION
Agency: Massachusetts Department of Transportation Name: Stephanie Barton Address: 10 Park Plaza City: Boston State: MA Zip: 02116 Email stephanie.g.barton@dot.state.ma.us Phone: 8572623378
A00844 - 12
| A00844-1 USFWS NLAA Letter |
| A00844-2 USFWS NLAA Letter |
| United States Department of the Interior |
| FISH AND WILDLIFE SERVICE |
| Project description |
| Name |
| Description |
| Determination key result |
| Qualification interview |
| Submitted Documents |
| Submitted Documents |
| Project questionnaire |
| Avoidance and minimization measures (AMMs) |
| GAMM1 |
| Determination Key description: FHWA, FRA, FTA Programmatic Consultation for Transportation Projects affecting IBAT, NLEB, or TCB |
| IPaC User Contact Information |
File details come from the government source that posted it. Updated .