A00811-613642.pdf
PDF 957 KB Posted
- Attached to
- 613642 RAYNHAM-TAUNTON FAP No. HPP/STP-0035(073)X Bridge Replacement, R-02-003=T-01-004 (3M4), Sou
- Solicitation number
- BD-27-1030-0H100-0H002-132498
- Issued by
- Massachusetts
About this file
This document is a Watering Log form issued by the Massachusetts Department of Transportation (MassDOT) Highway Division for use in Proposal No. 613642-136413 (Contract No. A00811). The form is designed to track watering activities for MassDOT plantings at specific project locations. The document establishes minimum watering requirements: trees must receive a minimum of 10 gallons per watering event, and shrubs must receive a minimum of 5 gallons per watering event. Separate logs are required for areas or plants with different watering schedules. The form provides space for 26 watering entries, with each entry requiring documentation of the date watered, landscape contractor initials, and prime contractor initials. Weekly submission of the completed log to the MassDOT Engineer is required following each watering event.
The form includes provisions for recording rainfall events and amounts when watering is not performed as scheduled due to rain conditions. The document contains fields for project description, contract number, project number, plant locations, and associated planting plans. No specific pricing terms, set-asides, incumbents, or funding information is contained within this administrative tracking document. The log serves as a compliance and record-keeping tool to ensure contractual watering obligations are met and documented throughout the planting maintenance period.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A00802-613642.pdf | ||
| A00810-613642.pdf | ||
| A00875-613642.pdf | ||
| A00882-613642.pdf | ||
| A00801-613642.pdf | ||
| A00841-613642.pdf | ||
| A00831-613642.pdf | ||
| A00813-613642.pdf | ||
| A00881-613642.pdf | ||
| A00812-613642.pdf | ||
| A00844-613642.pdf | ||
| A00820-613642.pdf | ||
| A00842-613642.pdf | ||
| A00808-613642.pdf | ||
| A00840-613642.pdf | ||
| A00860-613642.pdf | ||
| A00815-613642.pdf | ||
| A00814-613642.pdf | ||
| A00861-613642.pdf | ||
| 613642 - Notice to Contractors.pdf | ||
| 613642 Bid Items List.txt | TXT text file |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Massachusetts Department Of Transportation Highway Division
A00811 - 1
DOCUMENT A00811
WATERING LOG
for
MassDOT Plantings
Proposal No. 613642-136413
W at er in g L og fo r M as sD
O T
P la nt in gs
Se pa ra te lo gs sh al l b e ke pt to tr ac k ar ea s o r pl an ts w ith d iff er en t w at er in g sc he du le s.
T re es sh al l r ec ei ve a m in im um o f 1 ga llo ns w ith e ac h w at er in g an d sh ru bs a m in im um o f 5 g al lo ns
Pr ov id e no te th at if w at er in g is n ot p er fo rm ed a s s ch ed ul ed d ue to r ai n.
R ec or d da te o f r ai nf al l a nd a m ou nt
D at e W at er ed
La nd sc ap e C on tra ct or
In iti al
Pr im e C on tra
D at e W at er ed
La nd sc ap e C on tra im e C on tra
Ea ch w ee k, fo llo w in g w at er in g, L og sh al l b e su bm itt ed to th e
M as sD O
T En gi ne er
6/ /2
Pr oj ec t D es cr ip tio n:
Co nt ra ct
N o:
oj ec t N o:
Pl an t L oc at io ns /s
(A tt ac h pl an tin g pl an /s a s ne ce ss ar y)
N ot es
Massachusetts Department Of Transportation Highway Division
A00811 - 2
Proposal No. 613642-136413
A00811 Watering Log 06-15-2018 1
| Project Description: |
| ContractNo: |
| ProjectNo: |
| Plant Locationss Attach planting plans as necessary: |
| Notes: |
| date watered1: |
| LandscapeContractorInitial1: |
| PrimeContractorInitial1: |
| date watered2: |
| LandscapeContractorInitial2: |
| PrimeContractorInitial2: |
| date watered3: |
| LandscapeContractorInitial3: |
| PrimeContractorInitial3: |
| date watered4: |
| LandscapeContractorInitial4: |
| PrimeContractorInitial4: |
| date watered5: |
| LandscapeContractorInitial5: |
| PrimeContractorInitial5: |
| date watered6: |
| LandscapeContractorInitial6: |
| PrimeContractorInitial6: |
| date watered7: |
| LandscapeContractorInitial7: |
| PrimeContractorInitial7: |
| date watered8: |
| LandscapeContractorInitial8: |
| PrimeContractorInitial8: |
| date watered9: |
| LandscapeContractorInitial9: |
| PrimeContractorInitial9: |
| date watered10: |
| LandscapeContractorInitial10: |
| PrimeContractorInitial10: |
| date watered11: |
| LandscapeContractorInitial11: |
| PrimeContractorInitial11: |
| date watered12: |
| LandscapeContractorInitial12: |
| PrimeContractorInitial12: |
| date watered13: |
| LandscapeContractorInitial13: |
| PrimeContractorInitial13: |
| date watered14: |
| LandscapeContractorInitial14: |
| PrimeContractorInitial14: |
| date watered15: |
| LandscapeContractorInitial15: |
| PrimeContractorInitial15: |
| date watered16: |
| LandscapeContractorInitial16: |
| PrimeContractorInitial16: |
| date watered17: |
| LandscapeContractorInitial17: |
| PrimeContractorInitial17: |
| date watered18: |
| LandscapeContractorInitial18: |
| PrimeContractorInitial18: |
| date watered19: |
| LandscapeContractorInitial19: |
| PrimeContractorInitial19: |
| date watered20: |
| LandscapeContractorInitial20: |
| PrimeContractorInitial20: |
| date watered21: |
| LandscapeContractorInitial21: |
| PrimeContractorInitial21: |
| date watered22: |
| LandscapeContractorInitial22: |
| PrimeContractorInitial22: |
| date watered23: |
| LandscapeContractorInitial23: |
| PrimeContractorInitial23: |
| date watered24: |
| LandscapeContractorInitial24: |
| PrimeContractorInitial24: |
| date watered25: |
| LandscapeContractorInitial25: |
| PrimeContractorInitial25: |
| date watered26: |
| LandscapeContractorInitial26: |
File details come from the government source that posted it. Updated .