A00811-608460.pdf
PDF 1001 KB Posted
- Attached to
- 608460 HADLEY FAP No. NHP(BRR-ON)-003S(813)X Bridge Replacement, H-01-005, Bay Road (Route 47) ove
- Solicitation number
- BD-25-1030-0H100-0H002-116001
- Issued by
- Hampshire County, Massachusetts
About this file
The document is a Watering Log template issued by the Massachusetts Department of Transportation (MassDOT) Highway Division for tracking plant watering activities on a specific project (Proposal No. 608460-130088). The log is designed to document and track watering schedules for newly planted vegetation, with specific requirements that trees receive a minimum of 10 gallons per watering and shrubs a minimum of 5 gallons. Contractors are instructed to maintain separate logs for areas with different watering schedules and to note any instances where scheduled watering is not performed due to rainfall, including the date and amount of rain.
The log requires weekly submission to the MassDOT Engineer and includes spaces for documenting the date of watering, landscape contractor initials, prime contractor initials, and any additional notes. The template is structured to allow detailed tracking of watering activities across different planting locations, with provisions for attaching planting plans as necessary. The form emphasizes systematic documentation and accountability in maintaining newly planted vegetation, ensuring proper care and establishment of landscaping on transportation project sites.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A00844-608460.pdf | ||
| HADLEY-608460-130088-A-1.pdf | ||
| A00828-608460.pdf | ||
| A00820-608460.pdf | ||
| A00841-608460.pdf | ||
| 608460 - Bid Tabulations.pdf | ||
| 608460 - Notice to Contractors.pdf | ||
| A00804-608460.pdf | ||
| A00819-608460.pdf | ||
| HADLEY-608460-130088-A-2.pdf | ||
| A00834-608460.pdf | ||
| 608460 Bid Items.txt | TXT text file | |
| A00801-608460~1.pdf | ||
| Link to Bid Opening 9-3-2025~2.pdf | ||
| A00826-608460.pdf | ||
| BIDS OPENED - Wednesday - September 3-2025.pdf | ||
| A00802-608460.pdf | ||
| A00846-608460.pdf | ||
| A00810-608460.pdf | ||
| A00831-608460.pdf | ||
| 608460 - Updated Plan Holders List.pdf | ||
| A00875-608460.pdf | ||
| A00808-608460.pdf | ||
| A00818-608460.pdf | ||
| 608460 - Plan Holders List~1.pdf | ||
| A00829-608460.pdf |
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Massachusetts Department Of Transportation Highway Division
A00811 - 1
DOCUMENT A00811
WATERING LOG
for
MassDOT Plantings
Proposal No. 608460-130088
W at er in g L og fo r M as sD
O T
P la nt in gs
Se pa ra te lo gs sh al l b e ke pt to tr ac k ar ea s o r pl an ts w ith d iff er en t w at er in g sc he du le s.
T re es sh al l r ec ei ve a m in im um o f 1 ga llo ns w ith e ac h w at er in g an d sh ru bs a m in im um o f 5 g al lo ns
Pr ov id e no te th at if w at er in g is n ot p er fo rm ed a s s ch ed ul ed d ue to r ai n.
R ec or d da te o f r ai nf al l a nd a m ou nt
D at e W at er ed
La nd sc ap e C on tra ct or
In iti al
Pr im e C on tra
D at e W at er ed
La nd sc ap e C on tra im e C on tra
Ea ch w ee k, fo llo w in g w at er in g, L og sh al l b e su bm itt ed to th e
M as sD O
T En gi ne er
6/ /2
Pr oj ec t D es cr ip tio n:
Co nt ra ct
N o:
oj ec t N o:
Pl an t L oc at io ns /s
(A tt ac h pl an tin g pl an /s a s ne ce ss ar y)
N ot es
Massachusetts Department Of Transportation Highway Division
A00811 - 2
Proposal No. 608460-130088
| Project Description: |
| ContractNo: |
| ProjectNo: |
| Plant Locationss Attach planting plans as necessary: |
| Notes: |
| date watered1: |
| LandscapeContractorInitial1: |
| PrimeContractorInitial1: |
| date watered2: |
| LandscapeContractorInitial2: |
| PrimeContractorInitial2: |
| date watered3: |
| LandscapeContractorInitial3: |
| PrimeContractorInitial3: |
| date watered4: |
| LandscapeContractorInitial4: |
| PrimeContractorInitial4: |
| date watered5: |
| LandscapeContractorInitial5: |
| PrimeContractorInitial5: |
| date watered6: |
| LandscapeContractorInitial6: |
| PrimeContractorInitial6: |
| date watered7: |
| LandscapeContractorInitial7: |
| PrimeContractorInitial7: |
| date watered8: |
| LandscapeContractorInitial8: |
| PrimeContractorInitial8: |
| date watered9: |
| LandscapeContractorInitial9: |
| PrimeContractorInitial9: |
| date watered10: |
| LandscapeContractorInitial10: |
| PrimeContractorInitial10: |
| date watered11: |
| LandscapeContractorInitial11: |
| PrimeContractorInitial11: |
| date watered12: |
| LandscapeContractorInitial12: |
| PrimeContractorInitial12: |
| date watered13: |
| LandscapeContractorInitial13: |
| PrimeContractorInitial13: |
| date watered14: |
| LandscapeContractorInitial14: |
| PrimeContractorInitial14: |
| date watered15: |
| LandscapeContractorInitial15: |
| PrimeContractorInitial15: |
| date watered16: |
| LandscapeContractorInitial16: |
| PrimeContractorInitial16: |
| date watered17: |
| LandscapeContractorInitial17: |
| PrimeContractorInitial17: |
| date watered18: |
| LandscapeContractorInitial18: |
| PrimeContractorInitial18: |
| date watered19: |
| LandscapeContractorInitial19: |
| PrimeContractorInitial19: |
| date watered20: |
| LandscapeContractorInitial20: |
| PrimeContractorInitial20: |
| date watered21: |
| LandscapeContractorInitial21: |
| PrimeContractorInitial21: |
| date watered22: |
| LandscapeContractorInitial22: |
| PrimeContractorInitial22: |
| date watered23: |
| LandscapeContractorInitial23: |
| PrimeContractorInitial23: |
| date watered24: |
| LandscapeContractorInitial24: |
| PrimeContractorInitial24: |
| date watered25: |
| LandscapeContractorInitial25: |
| PrimeContractorInitial25: |
| date watered26: |
| LandscapeContractorInitial26: |
File details come from the government source that posted it. Updated .