608460 - Bid Tabulations.pdf
PDF 965 KB Posted
- Attached to
- 608460 HADLEY FAP No. NHP(BRR-ON)-003S(813)X Bridge Replacement, H-01-005, Bay Road (Route 47) ove
- Solicitation number
- BD-25-1030-0H100-0H002-116001
- Issued by
- Hampshire County, Massachusetts
About this file
The document is a bid tabulation from the Massachusetts Department of Transportation (MassDOT) Highway Division for a bridge replacement project in Hadley, Massachusetts. The project involves replacing Bridge No. H-01-005 on Bay Road (Route 47) over the Fort River, with bids opened on September 3, 2025. The contract number is 130088, and the project is located in District 2. The bid tabulation includes detailed line items for various construction activities such as clearing, excavation, concrete work, pipe installation, traffic management, environmental protection, and landscaping.
Five contractors submitted bids: Northern Construction Service LLC, MIG Corporation, Tully Construction Corp, E T & L Corp, and New England Infrastructure Inc. The total bid amounts ranged from approximately $6.8 million to $9.4 million, with the Office Estimate initially set at $6.2 million. Key high-value items include bridge structure construction, temporary walkway structure, control of water, steel pile installation, and various excavation and earthwork activities. The bid includes comprehensive provisions for environmental mitigation, traffic management, and site restoration, reflecting the complex nature of a bridge replacement project in an environmentally sensitive area.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A00844-608460.pdf | ||
| HADLEY-608460-130088-A-1.pdf | ||
| A00828-608460.pdf | ||
| A00820-608460.pdf | ||
| A00841-608460.pdf | ||
| 608460 - Notice to Contractors.pdf | ||
| A00804-608460.pdf | ||
| A00819-608460.pdf | ||
| HADLEY-608460-130088-A-2.pdf | ||
| A00834-608460.pdf | ||
| 608460 Bid Items.txt | TXT text file | |
| A00801-608460~1.pdf | ||
| Link to Bid Opening 9-3-2025~2.pdf | ||
| A00826-608460.pdf | ||
| BIDS OPENED - Wednesday - September 3-2025.pdf | ||
| A00802-608460.pdf | ||
| A00846-608460.pdf | ||
| A00810-608460.pdf | ||
| A00831-608460.pdf | ||
| 608460 - Updated Plan Holders List.pdf | ||
| A00875-608460.pdf | ||
| A00808-608460.pdf | ||
| A00818-608460.pdf | ||
| A00811-608460.pdf | ||
| 608460 - Plan Holders List~1.pdf | ||
| A00829-608460.pdf |
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Prelims Unit
Bid Tabulations
Project # : 608460 Bids Open Date : 03 Sep 2025 Location : HADLEY Contract # : 130088 District : 2 Description : HADLEY- BRIDGE REPLACEMENT, H-01-005, BAY ROAD (ROUTE 47) OVER THE FORT RIVER
Office Estimate NORTHERN CONSTRUCTION SERVICE LLC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
101. 1.000 A CLEARING AND GRUBBING $50,000.00 $50,000.00 $45,000.00 $45,000.00
102.1 250.000 FT TREE TRIMMING $17.50 $4,375.00 $15.00 $3,750.00
102.3 16.000 HR HERBICIDE TREATMENT OF INVASIVE PLANTS $800.00 $12,800.00 $700.00 $11,200.00
102.33 16.000 HR INVASIVE PLANT MANAGEMENT STRATEGY $275.00 $4,400.00 $250.00 $4,000.00
102.511 10.000 EA TREE PROTECTION - ARMORING AND PRUNING $500.00 $5,000.00 $300.00 $3,000.00
102.521 145.000 FT TREE AND PLANT PROTECTION FENCE $30.00 $4,350.00 $13.00 $1,885.00
114.1 1.000 LS DEMOLITION OF SUPERSTRUCTURE OF BRIDGE
NO. H-01-005
$340,000.00 $340,000.00 $300,000.00 $300,000.00
120. 150.000 CY EARTH EXCAVATION $50.00 $7,500.00 $55.00 $8,250.00
121. 3.000 CY CLASS A ROCK EXCAVATION $125.00 $375.00 $180.00 $540.00
127.1 15.000 CY REINFORCED CONCRETE EXCAVATION $700.00 $10,500.00 $450.00 $6,750.00
127.51 81.000 EA TIMBER PILE - REMOVED AND DISCARDED $200.00 $16,200.00 $1,100.00 $89,100.00
140. 515.000 CY BRIDGE EXCAVATION $60.00 $30,900.00 $80.00 $41,200.00
141.1 10.000 CY TEST PIT FOR EXPLORATION $130.00 $1,300.00 $250.00 $2,500.00
142. 100.000 CY CLASS B TRENCH EXCAVATION $45.00 $4,500.00 $45.00 $4,500.00
143. 1,500.000 CY CHANNEL EXCAVATION $95.00 $142,500.00 $75.00 $112,500.00
144. 155.000 CY CLASS B ROCK EXCAVATION $190.00 $29,450.00 $180.00 $27,900.00
146. 2.000 EA DRAINAGE STRUCTURE REMOVED $750.00 $1,500.00 $2,500.00 $5,000.00
150. 740.000 CY ORDINARY BORROW $55.00 $40,700.00 $32.00 $23,680.00
151. 590.000 CY GRAVEL BORROW $55.00 $32,450.00 $80.00 $47,200.00
151.1 235.000 CY GRAVEL BORROW FOR BRIDGE FOUNDATION $60.00 $14,100.00 $90.00 $21,150.00
151.2 150.000 CY GRAVEL BORROW FOR BACKFILLING STRUCTURES
AND PIPES
$65.00 $9,750.00 $80.00 $12,000.00
154. 80.000 CY SAND BORROW $75.00 $6,000.00 $65.00 $5,200.00
156. 495.000 TON CRUSHED STONE $60.00 $29,700.00 $75.00 $37,125.00
170. 2,050.000 SY FINE GRADING AND COMPACTING - SUBGRADE
AREA
$8.00 $16,400.00 $6.00 $12,300.00
180.01 1.000 LS ENVIRONMENTAL HEALTH AND SAFETY PROGRAM $14,700.00 $14,700.00 $3,500.00 $3,500.00
180.02 350.000 HR PERSONAL PROTECTION LEVEL C UPGRADE $10.00 $3,500.00 $15.00 $5,250.00
CMS105 - Report Date: 9/3/2025 2:46 PM Page 1 of 18
Project # : 608460 Bids Open Date : 03 Sep 2025 Location : HADLEY Contract # : 130088 District : 2 Description : HADLEY- BRIDGE REPLACEMENT, H-01-005, BAY ROAD (ROUTE 47) OVER THE FORT RIVER
Office Estimate NORTHERN CONSTRUCTION SERVICE LLC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
180.03 150.000 HR LICENSED SITE PROFESSIONAL SERVICES $150.00 $22,500.00 $115.00 $17,250.00
181.11 95.000 TON DISPOSAL OF UNREGULATED SOIL $60.00 $5,700.00 $55.00 $5,225.00
181.12 175.000 TON DISPOSAL OF REGULATED SOIL - IN-STATE
FACILITY
$100.00 $17,500.00 $85.00 $14,875.00
181.13 690.000 TON DISPOSAL OF REGULATED SOIL - OUT-OF-STATE
FACILITY
$170.00 $117,300.00 $90.00 $62,100.00
181.14 45.000 TON DISPOSAL OF HAZARDOUS WASTE $500.00 $22,500.00 $550.00 $24,750.00
182.1 1.000 LS INSPECTION AND TESTING FOR ASBESTOS $6,000.00 $6,000.00 $4,500.00 $4,500.00
182.2 100.000 FT REMOVAL OF ASBESTOS $100.00 $10,000.00 $175.00 $17,500.00
183.1 500.000 GAL TREATMENT OF CONTAMINATED GROUNDWATER $5.00 $2,500.00 $10.00 $5,000.00
183.2 500.000 LB DISPOSAL OF GRANULAR ACTIVATED CARBON $20.00 $10,000.00 $3.50 $1,750.00
184.1 85.000 TON DISPOSAL OF TREATED WOOD PRODUCTS $575.00 $48,875.00 $340.00 $28,900.00
201. 2.000 EA CATCH BASIN $5,000.00 $10,000.00 $5,200.00 $10,400.00
202. 1.000 EA MANHOLE $5,000.00 $5,000.00 $5,700.00 $5,700.00
208. 1.000 EA DROP INLET, TYPE C $5,000.00 $5,000.00 $5,200.00 $5,200.00
221. 1.000 EA FRAME AND COVER $1,200.00 $1,200.00 $1,450.00 $1,450.00
222.1 2.000 EA FRAME AND GRATE - MASSDOT CASCADE TYPE $1,200.00 $2,400.00 $1,500.00 $3,000.00
222.2 1.000 EA FRAME AND GRATE - MASSDOT DROP INLET $1,200.00 $1,200.00 $1,325.00 $1,325.00
223.1 2.000 EA FRAME AND GRATE (OR COVER) REMOVED AND
STACKED
$125.00 $250.00 $215.00 $430.00
227.3 3.000 CY REMOVAL OF DRAINAGE STRUCTURE SEDIMENT $350.00 $1,050.00 $230.00 $690.00
227.31 50.000 FT REMOVAL OF DRAINAGE PIPE SEDIMENT $12.00 $600.00 $25.00 $1,250.00
230.112 100.000 FT 12 INCH CORRUGATED METAL PIPE 16 GAGE $100.00 $10,000.00 $135.00 $13,500.00
241.12 100.000 FT 12 INCH REINFORCED CONCRETE PIPE CLASS III $115.00 $11,500.00 $120.00 $12,000.00
241.121 1.000 EA 12 INCH REINFORCED CONCRETE PIPE CHECK
VALVE
$5,000.00 $5,000.00 $7,500.00 $7,500.00
258. 10.000 SY STONE FOR PIPE ENDS $135.00 $1,350.00 $164.00 $1,640.00
280. 5.000 SY HOT MIX ASPHALT WATERWAY $150.00 $750.00 $900.00 $4,500.00
302.12 250.000 FT 12 INCH DUCTILE IRON WATER PIPE (RUBBER
GASKET)
$200.00 $50,000.00 $250.00 $62,500.00
CMS105 - Report Date: 9/3/2025 2:46 PM Page 2 of 18
Location : HADLEY Contract # : 130088 District : 2 Description : HADLEY- BRIDGE REPLACEMENT, H-01-005, BAY ROAD (ROUTE 47) OVER THE FORT RIVER
Office Estimate NORTHERN CONSTRUCTION SERVICE LLC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
303.12 210.000 FT 12 INCH DUCTILE IRON WATER PIPE (MECHANICAL
JOINT)
$225.00 $47,250.00 $500.00 $105,000.00
309. 2,400.000 LB DUCTILE IRON FITTINGS FOR WATER PIPE $12.00 $28,800.00 $7.75 $18,600.00
315.08 400.000 FT 8 INCH WATER MAIN REMOVED AND STACKED $30.00 $12,000.00 $90.00 $36,000.00
350.12 3.000 EA 12 INCH GATE AND GATE BOX $3,000.00 $9,000.00 $9,500.00 $28,500.00
357.08 1.000 EA 8 INCH GATE BOX $1,300.00 $1,300.00 $1,300.00 $1,300.00
357.12 2.000 EA 12 INCH GATE BOX $700.00 $1,400.00 $2,900.00 $5,800.00
371.12 2.000 EA 12 INCH COUPLING $1,500.00 $3,000.00 $1,900.00 $3,800.00
373.12 215.000 FT 12 INCH WATER PIPE INSULATION $190.00 $40,850.00 $1.00 $215.00
379.075 1.000 EA 3/4 INCH AIR RELEASE VALVE $1,000.00 $1,000.00 $4,500.00 $4,500.00
403. 2,000.000 SY RECLAIMED PAVEMENT FOR BASE COURSE
AND/OR SUB-BASE
$15.00 $30,000.00 $17.50 $35,000.00
415.2 340.000 SY PAVEMENT FINE MILLING $25.00 $8,500.00 $55.00 $18,700.00
440. 9,400.000 LB CALCIUM CHLORIDE FOR ROADWAY DUST
CONTROL
$0.50 $4,700.00 $1.00 $9,400.00
443. 6.500 MGL WATER FOR ROADWAY DUST CONTROL $75.00 $487.50 $50.00 $325.00
450.31 290.000 TON SUPERPAVE INTERMEDIATE COURSE - 12.5 (SIC -
12.5)
$300.00 $87,000.00 $225.00 $65,250.00
450.42 650.000 TON SUPERPAVE BASE COURSE - 37.5 (SBC - 37.5) $250.00 $162,500.00 $200.00 $130,000.00
450.60 210.000 TON SUPERPAVE BRIDGE SURFACE COURSE - 9.5 (SSC-
B - 9.5)
$300.00 $63,000.00 $450.00 $94,500.00
450.70 45.000 TON SUPERPAVE BRIDGE PROTECTIVE COURSE - 9.5
(SPC-B - 9.5)
$300.00 $13,500.00 $450.00 $20,250.00
451. 30.000 TON HMA FOR PATCHING $250.00 $7,500.00 $550.00 $16,500.00
452. 375.000 GAL ASPHALT EMULSION FOR TACK COAT $10.00 $3,750.00 $30.00 $11,250.00
453. 2,330.000 FT HMA JOINT SEALANT $1.00 $2,330.00 $0.35 $815.50
472. 5.000 TON TEMPORARY ASPHALT PATCHING $230.00 $1,150.00 $450.00 $2,250.00
504. 375.000 FT GRANITE CURB TYPE VA4 - STRAIGHT $100.00 $37,500.00 $60.00 $22,500.00
504.2 4.000 EA GRANITE CURB TYPE VA4 - SPLAYED END $650.00 $2,600.00 $420.00 $1,680.00
509. 75.000 FT GRANITE TRANSITION CURB FOR PEDESTRIAN
CURB RAMPS - STRAIGHT
$90.00 $6,750.00 $58.00 $4,350.00
CMS105 - Report Date: 9/3/2025 2:46 PM Page 3 of 18
Location : HADLEY Contract # : 130088 District : 2 Description : HADLEY- BRIDGE REPLACEMENT, H-01-005, BAY ROAD (ROUTE 47) OVER THE FORT RIVER
Office Estimate NORTHERN CONSTRUCTION SERVICE LLC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
514. 2.000 EA GRANITE CURB INLET - STRAIGHT $750.00 $1,500.00 $460.00 $920.00
594. 24.000 FT CURB REMOVED AND DISCARDED $10.00 $240.00 $90.00 $2,160.00
595. 1.000 EA CURB INLET REMOVED AND DISCARDED $75.00 $75.00 $1,600.00 $1,600.00
620.13 680.000 FT GUARDRAIL, TL-3 (SINGLE FACED) $35.00 $23,800.00 $32.00 $21,760.00
627.83 6.000 EA GUARDRAIL TANGENT END TREATMENT, TL-3 $5,500.00 $33,000.00 $5,050.00 $30,300.00
628.24 4.000 EA TRANSITION TO BRIDGE RAIL $6,500.00 $26,000.00 $5,125.00 $20,500.00
630.2 340.000 FT HIGHWAY GUARD REMOVED AND DISCARDED $8.50 $2,890.00 $20.00 $6,800.00
657. 650.000 FT TEMPORARY FENCE $30.00 $19,500.00 $21.00 $13,650.00
657.5 1,700.000 FT TEMPORARY FENCE REMOVED AND RESET $20.00 $34,000.00 $15.00 $25,500.00
697.1 12.000 EA SILT SACK $200.00 $2,400.00 $200.00 $2,400.00
698.31 160.000 SY GEOTEXTILE FABRIC FOR TEMPORARY SOIL
PROTECTION
$12.00 $1,920.00 $18.00 $2,880.00
701. 10.000 SY CEMENT CONCRETE SIDEWALK $85.00 $850.00 $215.00 $2,150.00
701.2 20.000 SY CEMENT CONCRETE PEDESTRIAN CURB RAMP $135.00 $2,700.00 $245.00 $4,900.00
702. 30.000 TON HOT MIX ASPHALT SIDEWALK OR DRIVEWAY $300.00 $9,000.00 $145.00 $4,350.00
715.1 2.000 EA MAIL BOX REMOVED AND RESET $350.00 $700.00 $500.00 $1,000.00
722.2 1.000 LS SCHEDULE OF OPERATIONS (TYPE B) - FIXED
PRICE $48000
$48,000.00 $48,000.00 $48,000.00 $48,000.00
740. 45.000 MO ENGINEER'S FIELD OFFICE AND EQUIPMENT (TYPE
A)
$3,000.00 $135,000.00 $3,500.00 $157,500.00
748. 1.000 LS MOBILIZATION $179,999.50 $179,999.50 $200,000.00 $200,000.00
751. 255.000 CY LOAM FOR ROADSIDES $90.00 $22,950.00 $125.00 $31,875.00
751.7 5.000 CY COMPOST BLANKET $50.00 $250.00 $200.00 $1,000.00
755.45 105.000 SY WETLAND RESTORATION $100.00 $10,500.00 $115.00 $12,075.00
756.1 1.000 LS CONSTRUCTION PERIOD POLLUTION PREVENTION
AND EROSION AND SEDIMENTATION CONTROL
PLAN
$15,000.00 $15,000.00 $5,000.00 $5,000.00
765. 1,865.000 SY SEEDING $2.00 $3,730.00 $1.80 $3,357.00
765.451 5.000 LB PART SHADE ROADSIDE MIX $260.00 $1,300.00 $300.00 $1,500.00
765.555 2.000 LB WETLAND MIX - PART SHADE $260.00 $520.00 $500.00 $1,000.00
CMS105 - Report Date: 9/3/2025 2:46 PM Page 4 of 18
Location : HADLEY Contract # : 130088 District : 2 Description : HADLEY- BRIDGE REPLACEMENT, H-01-005, BAY ROAD (ROUTE 47) OVER THE FORT RIVER
Office Estimate NORTHERN CONSTRUCTION SERVICE LLC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
765.635 1,840.000 SY NATIVE SEEDING AND ESTABLISHMENT $5.00 $9,200.00 $2.00 $3,680.00
767.121 1,430.000 FT SEDIMENT CONTROL BARRIER $8.00 $11,440.00 $5.00 $7,150.00
767.122 100.000 FT SEDIMENT BARRIER - COIR LOG $25.00 $2,500.00 $5.00 $500.00
769. 860.000 FT PAVEMENT MILLING MULCH UNDER GUARD RAIL $10.00 $8,600.00 $20.00 $17,200.00
776.523 2.000 EA MAPLE - RED 2-2.5 INCH CALIPER $800.00 $1,600.00 $875.00 $1,750.00
778.164 10.000 EA BIRCH - RIVER HERITAGE 8-10 FOOT CLUMP $600.00 $6,000.00 $875.00 $8,750.00
789.633 6.000 EA BLUEBERRY - HIGHBUSH 2-3 FEET / #3 $115.00 $690.00 $105.00 $630.00
790.631 28.000 EA DOGWOOD - REDOSIER 18-24 INCH / #1 $70.00 $1,960.00 $120.00 $3,360.00
790.719 15.000 EA DOGWOOD - SILKY 2-3 FEET / #3 $120.00 $1,800.00 $125.00 $1,875.00
791.033 23.000 EA ELDERBERRY 2-3 FEET / #2 $85.00 $1,955.00 $120.00 $2,760.00
795.013 10.000 EA VIBURNUM - ARROWWOOD 3-4 FEET / #5 $150.00 $1,500.00 $170.00 $1,700.00
795.153 20.000 EA WINTERBERRY - MALE 24-30 INCH / #3 $110.00 $2,200.00 $125.00 $2,500.00
795.189 8.000 EA WITCH HAZEL - SPRING BLOOMING 2-3 FEET / #3 $100.00 $800.00 $125.00 $1,000.00
816.71 1.000 LS PORTABLE SOLAR POWERED TRAFFIC SIGNAL
SYSTEM
$50,000.00 $50,000.00 $150,000.00 $150,000.00
851.1 150.000 DAY TRAFFIC CONES FOR TRAFFIC MANAGEMENT $125.00 $18,750.00 $50.00 $7,500.00
852. 560.000 SF SAFETY SIGNING FOR TRAFFIC MANAGEMENT $30.00 $16,800.00 $40.00 $22,400.00
853.1 9.000 EA PORTABLE BREAKAWAY BARRICADE TYPE III $200.00 $1,800.00 $150.00 $1,350.00
853.21 630.000 FT TEMPORARY BARRIER REMOVED AND RESET $25.00 $15,750.00 $14.00 $8,820.00
853.23 310.000 FT TEMPORARY BARRIER (TL-3) $75.00 $23,250.00 $85.00 $26,350.00
853.33 140.000 FT TEMPORARY BARRIER - LIMITED DEFLECTION (TL-
3)
$70.00 $9,800.00 $120.00 $16,800.00
853.403 8.000 DAY TRUCK MOUNTED ATTENUATOR $200.00 $1,600.00 $175.00 $1,400.00
853.501 2.000 EA TEMPORARY IMPACT ATTENUATOR (TL-3)
REMOVED AND RESET
$1,000.00 $2,000.00 $6,000.00 $12,000.00
853.53 2.000 EA TEMPORARY IMPACT ATTENUATOR
UNIDIRECTIONAL, NON-REDIRECTIVE (TL-3)
$5,000.00 $10,000.00 $6,000.00 $12,000.00
853.8 50.000 DAY TEMPORARY ILLUMINATION FOR WORK ZONE $115.00 $5,750.00 $130.00 $6,500.00
854.016 8,000.000 FT TEMPORARY PAVING MARKINGS - 6 INCH
(PAINTED)
$0.50 $4,000.00 $0.35 $2,800.00
CMS105 - Report Date: 9/3/2025 2:46 PM Page 5 of 18
Location : HADLEY Contract # : 130088 District : 2 Description : HADLEY- BRIDGE REPLACEMENT, H-01-005, BAY ROAD (ROUTE 47) OVER THE FORT RIVER
Office Estimate NORTHERN CONSTRUCTION SERVICE LLC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
854.1 3,320.000 SF PAVEMENT MARKING REMOVAL $3.00 $9,960.00 $2.75 $9,130.00
856. 50.000 DAY ARROW BOARD $15.00 $750.00 $15.00 $750.00
859.1 1,610.000 DAY REFLECTORIZED DRUMS WITH SEQUENTIAL
FLASHING WARNING LIGHTS
$5.00 $8,050.00 $1.25 $2,012.50
866.206 1,550.000 FT 6 INCH REFLECTORIZED WHITE LINE (POLYUREA)
(RECESSED)
$3.50 $5,425.00 $2.90 $4,495.00
867.206 1,550.000 FT 6 INCH REFLECTORIZED YELLOW LINE (POLYUREA)
(RECESSED)
$3.50 $5,425.00 $2.90 $4,495.00
874.2 2.000 EA TRAFFIC SIGN REMOVED AND RESET $250.00 $500.00 $90.00 $180.00
901. 14.000 CY 4000 PSI, 1.5 INCH, 565 CEMENT CONCRETE $1,000.00 $14,000.00 $1,100.00 $15,400.00
910. 35.000 LB STEEL REINFORCEMENT FOR STRUCTURES $12.00 $420.00 $80.00 $2,800.00
942.124 900.000 FT STEEL PILE HP 12 X 84 $200.00 $180,000.00 $210.00 $189,000.00
943.24 730.000 FT STEEL PIPE PILE 24 INCH OUTSIDE DIAMETER $300.00 $219,000.00 $380.00 $277,400.00
948.1 1.000 EA SHORT DURATION LOAD TEST $60,000.00 $60,000.00 $150,000.00 $150,000.00
948.4 5.000 EA DYNAMIC LOAD TEST PREPARATION $2,000.00 $10,000.00 $3,500.00 $17,500.00
948.41 5.000 EA DYNAMIC LOAD TEST BY CONTRACTOR $5,000.00 $25,000.00 $7,500.00 $37,500.00
948.5 26.000 EA PILE SHOES $200.00 $5,200.00 $1,200.00 $31,200.00
950.11 1,080.000 SF TEMPORARY EARTH SUPPORT SYSTEMS $200.00 $216,000.00 $145.00 $156,600.00
983.2 720.000 CY RIPRAP $250.00 $180,000.00 $105.00 $75,600.00
983.521 165.000 CY STREAMBED RESTORATION $50.00 $8,250.00 $300.00 $49,500.00
991.1 1.000 LS CONTROL OF WATER - STRUCTURE NO. H-01-005 $180,000.00 $180,000.00 $325,000.00 $325,000.00
993.5 1.000 LS TEMPORARY WALKWAY STRUCTURE $353,120.00 $353,120.00 $250,000.00 $250,000.00
995.01 1.000 LS BRIDGE STRUCTURE, BRIDGE NO. H-01-005 $2,186,500.00 $2,186,500.00 $2,492,000.00 $2,492,000.00
Total : $6,230,162.00 Total : $6,797,415.00
CMS105 - Report Date: 9/3/2025 2:46 PM Page 6 of 18
Location : HADLEY Contract # : 130088 District : 2 Description : HADLEY- BRIDGE REPLACEMENT, H-01-005, BAY ROAD (ROUTE 47) OVER THE FORT RIVER
MIG CORPORATION TULLY CONSTRUCTION CORP
Item # Quantity Units Description Unit Price Amount Unit Price Amount
101. 1.000 A CLEARING AND GRUBBING $52,500.00 $52,500.00 $40,000.00 $40,000.00
102.1 250.000 FT TREE TRIMMING $22.00 $5,500.00 $15.00 $3,750.00
102.3 16.000 HR HERBICIDE TREATMENT OF INVASIVE PLANTS $710.00 $11,360.00 $1,500.00 $24,000.00
102.33 16.000 HR INVASIVE PLANT MANAGEMENT STRATEGY $322.00 $5,152.00 $250.00 $4,000.00
102.511 10.000 EA TREE PROTECTION - ARMORING AND PRUNING $280.00 $2,800.00 $350.00 $3,500.00
102.521 145.000 FT TREE AND PLANT PROTECTION FENCE $12.00 $1,740.00 $8.00 $1,160.00
114.1 1.000 LS DEMOLITION OF SUPERSTRUCTURE OF BRIDGE
NO. H-01-005
$488,500.00 $488,500.00 $575,000.00 $575,000.00
120. 150.000 CY EARTH EXCAVATION $125.00 $18,750.00 $55.00 $8,250.00
121. 3.000 CY CLASS A ROCK EXCAVATION $165.00 $495.00 $100.00 $300.00
127.1 15.000 CY REINFORCED CONCRETE EXCAVATION $555.00 $8,325.00 $1,500.00 $22,500.00
127.51 81.000 EA TIMBER PILE - REMOVED AND DISCARDED $1,445.00 $117,045.00 $2,200.00 $178,200.00
140. 515.000 CY BRIDGE EXCAVATION $88.00 $45,320.00 $80.00 $41,200.00
141.1 10.000 CY TEST PIT FOR EXPLORATION $212.00 $2,120.00 $150.00 $1,500.00
142. 100.000 CY CLASS B TRENCH EXCAVATION $75.00 $7,500.00 $75.00 $7,500.00
143. 1,500.000 CY CHANNEL EXCAVATION $72.00 $108,000.00 $85.00 $127,500.00
144. 155.000 CY CLASS B ROCK EXCAVATION $185.00 $28,675.00 $100.00 $15,500.00
146. 2.000 EA DRAINAGE STRUCTURE REMOVED $725.00 $1,450.00 $1,500.00 $3,000.00
150. 740.000 CY ORDINARY BORROW $35.00 $25,900.00 $55.00 $40,700.00
151. 590.000 CY GRAVEL BORROW $55.00 $32,450.00 $110.00 $64,900.00
151.1 235.000 CY GRAVEL BORROW FOR BRIDGE FOUNDATION $75.00 $17,625.00 $95.00 $22,325.00
151.2 150.000 CY GRAVEL BORROW FOR BACKFILLING STRUCTURES
AND PIPES
$67.00 $10,050.00 $95.00 $14,250.00
154. 80.000 CY SAND BORROW $70.00 $5,600.00 $95.00 $7,600.00
156. 495.000 TON CRUSHED STONE $65.00 $32,175.00 $85.00 $42,075.00
170. 2,050.000 SY FINE GRADING AND COMPACTING - SUBGRADE
AREA
$6.00 $12,300.00 $9.00 $18,450.00
180.01 1.000 LS ENVIRONMENTAL HEALTH AND SAFETY PROGRAM $5,000.00 $5,000.00 $8,000.00 $8,000.00
180.02 350.000 HR PERSONAL PROTECTION LEVEL C UPGRADE $1.00 $350.00 $15.00 $5,250.00
CMS105 - Report Date: 9/3/2025 2:46 PM Page 7 of 18
Location : HADLEY Contract # : 130088 District : 2 Description : HADLEY- BRIDGE REPLACEMENT, H-01-005, BAY ROAD (ROUTE 47) OVER THE FORT RIVER
MIG CORPORATION TULLY CONSTRUCTION CORP
Item # Quantity Units Description Unit Price Amount Unit Price Amount
180.03 150.000 HR LICENSED SITE PROFESSIONAL SERVICES $210.00 $31,500.00 $175.00 $26,250.00
181.11 95.000 TON DISPOSAL OF UNREGULATED SOIL $75.00 $7,125.00 $60.00 $5,700.00
181.12 175.000 TON DISPOSAL OF REGULATED SOIL - IN-STATE
FACILITY
$105.00 $18,375.00 $100.00 $17,500.00
181.13 690.000 TON DISPOSAL OF REGULATED SOIL - OUT-OF-STATE
FACILITY
$125.00 $86,250.00 $160.00 $110,400.00
181.14 45.000 TON DISPOSAL OF HAZARDOUS WASTE $511.00 $22,995.00 $600.00 $27,000.00
182.1 1.000 LS INSPECTION AND TESTING FOR ASBESTOS $3,300.00 $3,300.00 $4,000.00 $4,000.00
182.2 100.000 FT REMOVAL OF ASBESTOS $250.00 $25,000.00 $175.00 $17,500.00
183.1 500.000 GAL TREATMENT OF CONTAMINATED GROUNDWATER $22.00 $11,000.00 $50.00 $25,000.00
183.2 500.000 LB DISPOSAL OF GRANULAR ACTIVATED CARBON $9.00 $4,500.00 $10.00 $5,000.00
184.1 85.000 TON DISPOSAL OF TREATED WOOD PRODUCTS $355.00 $30,175.00 $500.00 $42,500.00
201. 2.000 EA CATCH BASIN $4,880.00 $9,760.00 $7,000.00 $14,000.00
202. 1.000 EA MANHOLE $5,450.00 $5,450.00 $6,000.00 $6,000.00
208. 1.000 EA DROP INLET, TYPE C $4,800.00 $4,800.00 $5,000.00 $5,000.00
221. 1.000 EA FRAME AND COVER $1,330.00 $1,330.00 $1,500.00 $1,500.00
222.1 2.000 EA FRAME AND GRATE - MASSDOT CASCADE TYPE $1,450.00 $2,900.00 $1,500.00 $3,000.00
222.2 1.000 EA FRAME AND GRATE - MASSDOT DROP INLET $1,330.00 $1,330.00 $1,500.00 $1,500.00
223.1 2.000 EA FRAME AND GRATE (OR COVER) REMOVED AND
STACKED
$150.00 $300.00 $250.00 $500.00
227.3 3.000 CY REMOVAL OF DRAINAGE STRUCTURE SEDIMENT $225.00 $675.00 $450.00 $1,350.00
227.31 50.000 FT REMOVAL OF DRAINAGE PIPE SEDIMENT $15.00 $750.00 $15.00 $750.00
230.112 100.000 FT 12 INCH CORRUGATED METAL PIPE 16 GAGE $135.00 $13,500.00 $160.00 $16,000.00
241.12 100.000 FT 12 INCH REINFORCED CONCRETE PIPE CLASS III $135.00 $13,500.00 $150.00 $15,000.00
241.121 1.000 EA 12 INCH REINFORCED CONCRETE PIPE CHECK
VALVE
$6,250.00 $6,250.00 $2,000.00 $2,000.00
258. 10.000 SY STONE FOR PIPE ENDS $185.00 $1,850.00 $250.00 $2,500.00
280. 5.000 SY HOT MIX ASPHALT WATERWAY $285.00 $1,425.00 $240.00 $1,200.00
302.12 250.000 FT 12 INCH DUCTILE IRON WATER PIPE (RUBBER
GASKET)
$255.00 $63,750.00 $150.00 $37,500.00
CMS105 - Report Date: 9/3/2025 2:46 PM Page 8 of 18
Location : HADLEY Contract # : 130088 District : 2 Description : HADLEY- BRIDGE REPLACEMENT, H-01-005, BAY ROAD (ROUTE 47) OVER THE FORT RIVER
MIG CORPORATION TULLY CONSTRUCTION CORP
Item # Quantity Units Description Unit Price Amount Unit Price Amount
303.12 210.000 FT 12 INCH DUCTILE IRON WATER PIPE (MECHANICAL
JOINT)
$445.00 $93,450.00 $350.00 $73,500.00
309. 2,400.000 LB DUCTILE IRON FITTINGS FOR WATER PIPE $16.00 $38,400.00 $15.00 $36,000.00
315.08 400.000 FT 8 INCH WATER MAIN REMOVED AND STACKED $33.00 $13,200.00 $60.00 $24,000.00
350.12 3.000 EA 12 INCH GATE AND GATE BOX $6,570.00 $19,710.00 $7,000.00 $21,000.00
357.08 1.000 EA 8 INCH GATE BOX $1,100.00 $1,100.00 $1,000.00 $1,000.00
357.12 2.000 EA 12 INCH GATE BOX $1,100.00 $2,200.00 $1,200.00 $2,400.00
371.12 2.000 EA 12 INCH COUPLING $1,550.00 $3,100.00 $2,000.00 $4,000.00
373.12 215.000 FT 12 INCH WATER PIPE INSULATION $122.00 $26,230.00 $160.00 $34,400.00
379.075 1.000 EA 3/4 INCH AIR RELEASE VALVE $1,575.00 $1,575.00 $1,500.00 $1,500.00
403. 2,000.000 SY RECLAIMED PAVEMENT FOR BASE COURSE
AND/OR SUB-BASE
$8.00 $16,000.00 $15.00 $30,000.00
415.2 340.000 SY PAVEMENT FINE MILLING $45.00 $15,300.00 $72.00 $24,480.00
440. 9,400.000 LB CALCIUM CHLORIDE FOR ROADWAY DUST
CONTROL
$0.30 $2,820.00 $0.75 $7,050.00
443. 6.500 MGL WATER FOR ROADWAY DUST CONTROL $188.00 $1,222.00 $100.00 $650.00
450.31 290.000 TON SUPERPAVE INTERMEDIATE COURSE - 12.5 (SIC -
12.5)
$215.00 $62,350.00 $282.00 $81,780.00
450.42 650.000 TON SUPERPAVE BASE COURSE - 37.5 (SBC - 37.5) $175.00 $113,750.00 $222.00 $144,300.00
450.60 210.000 TON SUPERPAVE BRIDGE SURFACE COURSE - 9.5 (SSC-
B - 9.5)
$365.00 $76,650.00 $270.00 $56,700.00
450.70 45.000 TON SUPERPAVE BRIDGE PROTECTIVE COURSE - 9.5
(SPC-B - 9.5)
$365.00 $16,425.00 $378.00 $17,010.00
451. 30.000 TON HMA FOR PATCHING $355.00 $10,650.00 $400.00 $12,000.00
452. 375.000 GAL ASPHALT EMULSION FOR TACK COAT $35.00 $13,125.00 $27.00 $10,125.00
453. 2,330.000 FT HMA JOINT SEALANT $0.40 $932.00 $2.00 $4,660.00
472. 5.000 TON TEMPORARY ASPHALT PATCHING $355.00 $1,775.00 $400.00 $2,000.00
504. 375.000 FT GRANITE CURB TYPE VA4 - STRAIGHT $58.00 $21,750.00 $85.00 $31,875.00
504.2 4.000 EA GRANITE CURB TYPE VA4 - SPLAYED END $488.00 $1,952.00 $750.00 $3,000.00
509. 75.000 FT GRANITE TRANSITION CURB FOR PEDESTRIAN
CURB RAMPS - STRAIGHT
$60.00 $4,500.00 $105.00 $7,875.00
CMS105 - Report Date: 9/3/2025 2:46 PM Page 9 of 18
Location : HADLEY Contract # : 130088 District : 2 Description : HADLEY- BRIDGE REPLACEMENT, H-01-005, BAY ROAD (ROUTE 47) OVER THE FORT RIVER
MIG CORPORATION TULLY CONSTRUCTION CORP
Item # Quantity Units Description Unit Price Amount Unit Price Amount
514. 2.000 EA GRANITE CURB INLET - STRAIGHT $455.00 $910.00 $750.00 $1,500.00
594. 24.000 FT CURB REMOVED AND DISCARDED $15.00 $360.00 $20.00 $480.00
595. 1.000 EA CURB INLET REMOVED AND DISCARDED $244.00 $244.00 $200.00 $200.00
620.13 680.000 FT GUARDRAIL, TL-3 (SINGLE FACED) $35.00 $23,800.00 $36.00 $24,480.00
627.83 6.000 EA GUARDRAIL TANGENT END TREATMENT, TL-3 $5,750.00 $34,500.00 $5,800.00 $34,800.00
628.24 4.000 EA TRANSITION TO BRIDGE RAIL $6,120.00 $24,480.00 $6,000.00 $24,000.00
630.2 340.000 FT HIGHWAY GUARD REMOVED AND DISCARDED $20.00 $6,800.00 $4.00 $1,360.00
657. 650.000 FT TEMPORARY FENCE $22.00 $14,300.00 $23.00 $14,950.00
657.5 1,700.000 FT TEMPORARY FENCE REMOVED AND RESET $18.00 $30,600.00 $17.00 $28,900.00
697.1 12.000 EA SILT SACK $255.00 $3,060.00 $225.00 $2,700.00
698.31 160.000 SY GEOTEXTILE FABRIC FOR TEMPORARY SOIL
PROTECTION
$6.00 $960.00 $15.00 $2,400.00
701. 10.000 SY CEMENT CONCRETE SIDEWALK $245.00 $2,450.00 $150.00 $1,500.00
701.2 20.000 SY CEMENT CONCRETE PEDESTRIAN CURB RAMP $255.00 $5,100.00 $200.00 $4,000.00
702. 30.000 TON HOT MIX ASPHALT SIDEWALK OR DRIVEWAY $225.00 $6,750.00 $450.00 $13,500.00
715.1 2.000 EA MAIL BOX REMOVED AND RESET $475.00 $950.00 $350.00 $700.00
722.2 1.000 LS SCHEDULE OF OPERATIONS (TYPE B) - FIXED
PRICE $48000
$48,000.00 $48,000.00 $48,000.00 $48,000.00
740. 45.000 MO ENGINEER'S FIELD OFFICE AND EQUIPMENT (TYPE
A)
$3,880.00 $174,600.00 $3,200.00 $144,000.00
748. 1.000 LS MOBILIZATION $219,000.00 $219,000.00 $175,000.00 $175,000.00
751. 255.000 CY LOAM FOR ROADSIDES $105.00 $26,775.00 $120.00 $30,600.00
751.7 5.000 CY COMPOST BLANKET $370.00 $1,850.00 $250.00 $1,250.00
755.45 105.000 SY WETLAND RESTORATION $58.00 $6,090.00 $200.00 $21,000.00
756.1 1.000 LS CONSTRUCTION PERIOD POLLUTION PREVENTION
AND EROSION AND SEDIMENTATION CONTROL
PLAN
$6,250.00 $6,250.00 $25,000.00 $25,000.00
765. 1,865.000 SY SEEDING $2.50 $4,662.50 $2.00 $3,730.00
765.451 5.000 LB PART SHADE ROADSIDE MIX $510.00 $2,550.00 $350.00 $1,750.00
765.555 2.000 LB WETLAND MIX - PART SHADE $610.00 $1,220.00 $600.00 $1,200.00
CMS105 - Report Date: 9/3/2025 2:46 PM Page 10 of 18
Location : HADLEY Contract # : 130088 District : 2 Description : HADLEY- BRIDGE REPLACEMENT, H-01-005, BAY ROAD (ROUTE 47) OVER THE FORT RIVER
MIG CORPORATION TULLY CONSTRUCTION CORP
Item # Quantity Units Description Unit Price Amount Unit Price Amount
765.635 1,840.000 SY NATIVE SEEDING AND ESTABLISHMENT $4.50 $8,280.00 $2.50 $4,600.00
767.121 1,430.000 FT SEDIMENT CONTROL BARRIER $10.50 $15,015.00 $12.00 $17,160.00
767.122 100.000 FT SEDIMENT BARRIER - COIR LOG $52.00 $5,200.00 $60.00 $6,000.00
769. 860.000 FT PAVEMENT MILLING MULCH UNDER GUARD RAIL $11.00 $9,460.00 $15.00 $12,900.00
776.523 2.000 EA MAPLE - RED 2-2.5 INCH CALIPER $1,150.00 $2,300.00 $1,000.00 $2,000.00
778.164 10.000 EA BIRCH - RIVER HERITAGE 8-10 FOOT CLUMP $755.00 $7,550.00 $1,000.00 $10,000.00
789.633 6.000 EA BLUEBERRY - HIGHBUSH 2-3 FEET / #3 $115.00 $690.00 $120.00 $720.00
790.631 28.000 EA DOGWOOD - REDOSIER 18-24 INCH / #1 $95.00 $2,660.00 $135.00 $3,780.00
790.719 15.000 EA DOGWOOD - SILKY 2-3 FEET / #3 $115.00 $1,725.00 $142.00 $2,130.00
791.033 23.000 EA ELDERBERRY 2-3 FEET / #2 $95.00 $2,185.00 $136.00 $3,128.00
795.013 10.000 EA VIBURNUM - ARROWWOOD 3-4 FEET / #5 $100.00 $1,000.00 $195.00 $1,950.00
795.153 20.000 EA WINTERBERRY - MALE 24-30 INCH / #3 $120.00 $2,400.00 $142.00 $2,840.00
795.189 8.000 EA WITCH HAZEL - SPRING BLOOMING 2-3 FEET / #3 $115.00 $920.00 $145.00 $1,160.00
816.71 1.000 LS PORTABLE SOLAR POWERED TRAFFIC SIGNAL
SYSTEM
$132,500.00 $132,500.00 $125,000.00 $125,000.00
851.1 150.000 DAY TRAFFIC CONES FOR TRAFFIC MANAGEMENT $1.00 $150.00 $40.00 $6,000.00
852. 560.000 SF SAFETY SIGNING FOR TRAFFIC MANAGEMENT $33.00 $18,480.00 $45.00 $25,200.00
853.1 9.000 EA PORTABLE BREAKAWAY BARRICADE TYPE III $155.00 $1,395.00 $250.00 $2,250.00
853.21 630.000 FT TEMPORARY BARRIER REMOVED AND RESET $15.00 $9,450.00 $22.00 $13,860.00
853.23 310.000 FT TEMPORARY BARRIER (TL-3) $65.00 $20,150.00 $175.00 $54,250.00
853.33 140.000 FT TEMPORARY BARRIER - LIMITED DEFLECTION (TL-
3)
$125.00 $17,500.00 $200.00 $28,000.00
853.403 8.000 DAY TRUCK MOUNTED ATTENUATOR $155.00 $1,240.00 $400.00 $3,200.00
853.501 2.000 EA TEMPORARY IMPACT ATTENUATOR (TL-3)
REMOVED AND RESET
$1,550.00 $3,100.00 $2,000.00 $4,000.00
853.53 2.000 EA TEMPORARY IMPACT ATTENUATOR
UNIDIRECTIONAL, NON-REDIRECTIVE (TL-3)
$8,225.00 $16,450.00 $10,000.00 $20,000.00
853.8 50.000 DAY TEMPORARY ILLUMINATION FOR WORK ZONE $10.00 $500.00 $100.00 $5,000.00
854.016 8,000.000 FT TEMPORARY PAVING MARKINGS - 6 INCH
(PAINTED)
$1.35 $10,800.00 $0.50 $4,000.00
CMS105 - Report Date: 9/3/2025 2:46 PM Page 11 of 18
Location : HADLEY Contract # : 130088 District : 2 Description : HADLEY- BRIDGE REPLACEMENT, H-01-005, BAY ROAD (ROUTE 47) OVER THE FORT RIVER
MIG CORPORATION TULLY CONSTRUCTION CORP
Item # Quantity Units Description Unit Price Amount Unit Price Amount
854.1 3,320.000 SF PAVEMENT MARKING REMOVAL $2.00 $6,640.00 $3.00 $9,960.00
856. 50.000 DAY ARROW BOARD $15.00 $750.00 $25.00 $1,250.00
859.1 1,610.000 DAY REFLECTORIZED DRUMS WITH SEQUENTIAL
FLASHING WARNING LIGHTS
$5.00 $8,050.00 $7.00 $11,270.00
866.206 1,550.000 FT 6 INCH REFLECTORIZED WHITE LINE (POLYUREA)
(RECESSED)
$3.75 $5,812.50 $3.30 $5,115.00
867.206 1,550.000 FT 6 INCH REFLECTORIZED YELLOW LINE (POLYUREA)
(RECESSED)
$3.75 $5,812.50 $3.30 $5,115.00
874.2 2.000 EA TRAFFIC SIGN REMOVED AND RESET $300.00 $600.00 $350.00 $700.00
901. 14.000 CY 4000 PSI, 1.5 INCH, 565 CEMENT CONCRETE $2,225.00 $31,150.00 $1,500.00 $21,000.00
910. 35.000 LB STEEL REINFORCEMENT FOR STRUCTURES $5.00 $175.00 $50.00 $1,750.00
942.124 900.000 FT STEEL PILE HP 12 X 84 $238.00 $214,200.00 $325.00 $292,500.00
943.24 730.000 FT STEEL PIPE PILE 24 INCH OUTSIDE DIAMETER $555.00 $405,150.00 $400.00 $292,000.00
948.1 1.000 EA SHORT DURATION LOAD TEST $177,500.00 $177,500.00 $135,000.00 $135,000.00
948.4 5.000 EA DYNAMIC LOAD TEST PREPARATION $5,550.00 $27,750.00 $6,000.00 $30,000.00
948.41 5.000 EA DYNAMIC LOAD TEST BY CONTRACTOR $5,250.00 $26,250.00 $8,000.00 $40,000.00
948.5 26.000 EA PILE SHOES $800.00 $20,800.00 $725.00 $18,850.00
950.11 1,080.000 SF TEMPORARY EARTH SUPPORT SYSTEMS $85.00 $91,800.00 $185.00 $199,800.00
983.2 720.000 CY RIPRAP $168.00 $120,960.00 $120.00 $86,400.00
983.521 165.000 CY STREAMBED RESTORATION $88.00 $14,520.00 $250.00 $41,250.00
991.1 1.000 LS CONTROL OF WATER - STRUCTURE NO. H-01-005 $248,400.00 $248,400.00 $155,000.00 $155,000.00
993.5 1.000 LS TEMPORARY WALKWAY STRUCTURE $235,500.00 $235,500.00 $340,000.00 $340,000.00
995.01 1.000 LS BRIDGE STRUCTURE, BRIDGE NO. H-01-005 $2,775,750.00 $2,775,750.00 $2,550,000.00 $2,550,000.00
Total : $7,327,569.50 Total : $7,503,453.00
CMS105 - Report Date: 9/3/2025 2:46 PM Page 12 of 18
Location : HADLEY Contract # : 130088 District : 2 Description : HADLEY- BRIDGE REPLACEMENT, H-01-005, BAY ROAD (ROUTE 47) OVER THE FORT RIVER
E T & L CORP NEW ENGLAND INFRASTRUCTURE INC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
101. 1.000 A CLEARING AND GRUBBING $55,000.00 $55,000.00 $75,000.00 $75,000.00
102.1 250.000 FT TREE TRIMMING $16.00 $4,000.00 $16.00 $4,000.00
102.3 16.000 HR HERBICIDE TREATMENT OF INVASIVE PLANTS $750.00 $12,000.00 $800.00 $12,800.00
102.33 16.000 HR INVASIVE PLANT MANAGEMENT STRATEGY $340.00 $5,440.00 $350.00 $5,600.00
102.511 10.000 EA TREE PROTECTION - ARMORING AND PRUNING $425.00 $4,250.00 $600.00 $6,000.00
102.521 145.000 FT TREE AND PLANT PROTECTION FENCE $10.00 $1,450.00 $20.00 $2,900.00
114.1 1.000 LS DEMOLITION OF SUPERSTRUCTURE OF BRIDGE
NO. H-01-005
$475,000.00 $475,000.00 $420,000.00 $420,000.00
120. 150.000 CY EARTH EXCAVATION $70.00 $10,500.00 $90.00 $13,500.00
121. 3.000 CY CLASS A ROCK EXCAVATION $170.00 $510.00 $500.00 $1,500.00
127.1 15.000 CY REINFORCED CONCRETE EXCAVATION $425.00 $6,375.00 $500.00 $7,500.00
127.51 81.000 EA TIMBER PILE - REMOVED AND DISCARDED $1,150.00 $93,150.00 $1,200.00 $97,200.00
140. 515.000 CY BRIDGE EXCAVATION $98.00 $50,470.00 $90.00 $46,350.00
141.1 10.000 CY TEST PIT FOR EXPLORATION $175.00 $1,750.00 $90.00 $900.00
142. 100.000 CY CLASS B TRENCH EXCAVATION $41.00 $4,100.00 $90.00 $9,000.00
143. 1,500.000 CY CHANNEL EXCAVATION $44.00 $66,000.00 $90.00 $135,000.00
144. 155.000 CY CLASS B ROCK EXCAVATION $170.00 $26,350.00 $1.00 $155.00
146. 2.000 EA DRAINAGE STRUCTURE REMOVED $720.00 $1,440.00 $3,000.00 $6,000.00
150. 740.000 CY ORDINARY BORROW $47.00 $34,780.00 $90.00 $66,600.00
151. 590.000 CY GRAVEL BORROW $80.00 $47,200.00 $90.00 $53,100.00
151.1 235.000 CY GRAVEL BORROW FOR BRIDGE FOUNDATION $90.00 $21,150.00 $110.00 $25,850.00
151.2 150.000 CY GRAVEL BORROW FOR BACKFILLING STRUCTURES
AND PIPES
$115.00 $17,250.00 $110.00 $16,500.00
154. 80.000 CY SAND BORROW $65.00 $5,200.00 $100.00 $8,000.00
156. 495.000 TON CRUSHED STONE $62.00 $30,690.00 $70.00 $34,650.00
170. 2,050.000 SY FINE GRADING AND COMPACTING - SUBGRADE
AREA
$5.50 $11,275.00 $6.00 $12,300.00
180.01 1.000 LS ENVIRONMENTAL HEALTH AND SAFETY PROGRAM $6,000.00 $6,000.00 $15,000.00 $15,000.00
180.02 350.000 HR PERSONAL PROTECTION LEVEL C UPGRADE $5.00 $1,750.00 $5.00 $1,750.00
CMS105 - Report Date: 9/3/2025 2:46 PM Page 13 of 18
Location : HADLEY Contract # : 130088 District : 2 Description : HADLEY- BRIDGE REPLACEMENT, H-01-005, BAY ROAD (ROUTE 47) OVER THE FORT RIVER
E T & L CORP NEW ENGLAND INFRASTRUCTURE INC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
180.03 150.000 HR LICENSED SITE PROFESSIONAL SERVICES $119.00 $17,850.00 $115.00 $17,250.00
181.11 95.000 TON DISPOSAL OF UNREGULATED SOIL $91.00 $8,645.00 $1.00 $95.00
181.12 175.000 TON DISPOSAL OF REGULATED SOIL - IN-STATE
FACILITY
$112.00 $19,600.00 $1.00 $175.00
181.13 690.000 TON DISPOSAL OF REGULATED SOIL - OUT-OF-STATE
FACILITY
$154.00 $106,260.00 $120.00 $82,800.00
181.14 45.000 TON DISPOSAL OF HAZARDOUS WASTE $635.00 $28,575.00 $1.00 $45.00
182.1 1.000 LS INSPECTION AND TESTING FOR ASBESTOS $5,000.00 $5,000.00 $4,000.00 $4,000.00
182.2 100.000 FT REMOVAL OF ASBESTOS $295.00 $29,500.00 $200.00 $20,000.00
183.1 500.000 GAL TREATMENT OF CONTAMINATED GROUNDWATER $13.50 $6,750.00 $1.00 $500.00
183.2 500.000 LB DISPOSAL OF GRANULAR ACTIVATED CARBON $10.50 $5,250.00 $20.00 $10,000.00
184.1 85.000 TON DISPOSAL OF TREATED WOOD PRODUCTS $360.00 $30,600.00 $400.00 $34,000.00
201. 2.000 EA CATCH BASIN $6,000.00 $12,000.00 $6,000.00 $12,000.00
202. 1.000 EA MANHOLE $5,500.00 $5,500.00 $5,000.00 $5,000.00
208. 1.000 EA DROP INLET, TYPE C $3,600.00 $3,600.00 $5,000.00 $5,000.00
221. 1.000 EA FRAME AND COVER $1,250.00 $1,250.00 $1,100.00 $1,100.00
222.1 2.000 EA FRAME AND GRATE - MASSDOT CASCADE TYPE $1,450.00 $2,900.00 $1,200.00 $2,400.00
222.2 1.000 EA FRAME AND GRATE - MASSDOT DROP INLET $1,180.00 $1,180.00 $1,100.00 $1,100.00
223.1 2.000 EA FRAME AND GRATE (OR COVER) REMOVED AND
STACKED
$250.00 $500.00 $300.00 $600.00
227.3 3.000 CY REMOVAL OF DRAINAGE STRUCTURE SEDIMENT $700.00 $2,100.00 $800.00 $2,400.00
227.31 50.000 FT REMOVAL OF DRAINAGE PIPE SEDIMENT $37.00 $1,850.00 $60.00 $3,000.00
230.112 100.000 FT 12 INCH CORRUGATED METAL PIPE 16 GAGE $150.00 $15,000.00 $110.00 $11,000.00
241.12 100.000 FT 12 INCH REINFORCED CONCRETE PIPE CLASS III $155.00 $15,500.00 $110.00 $11,000.00
241.121 1.000 EA 12 INCH REINFORCED CONCRETE PIPE CHECK
VALVE
$6,000.00 $6,000.00 $10,000.00 $10,000.00
258. 10.000 SY STONE FOR PIPE ENDS $88.00 $880.00 $120.00 $1,200.00
280. 5.000 SY HOT MIX ASPHALT WATERWAY $238.00 $1,190.00 $250.00 $1,250.00
302.12 250.000 FT 12 INCH DUCTILE IRON WATER PIPE (RUBBER
GASKET)
$265.00 $66,250.00 $160.00 $40,000.00
CMS105 - Report Date: 9/3/2025 2:46 PM Page 14 of 18
Location : HADLEY Contract # : 130088 District : 2 Description : HADLEY- BRIDGE REPLACEMENT, H-01-005, BAY ROAD (ROUTE 47) OVER THE FORT RIVER
E T & L CORP NEW ENGLAND INFRASTRUCTURE INC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
303.12 210.000 FT 12 INCH DUCTILE IRON WATER PIPE (MECHANICAL
JOINT)
$485.00 $101,850.00 $190.00 $39,900.00
309. 2,400.000 LB DUCTILE IRON FITTINGS FOR WATER PIPE $10.00 $24,000.00 $25.00 $60,000.00
315.08 400.000 FT 8 INCH WATER MAIN REMOVED AND STACKED $80.00 $32,000.00 $50.00 $20,000.00
350.12 3.000 EA 12 INCH GATE AND GATE BOX $6,100.00 $18,300.00 $11,000.00 $33,000.00
357.08 1.000 EA 8 INCH GATE BOX $510.00 $510.00 $2,500.00 $2,500.00
357.12 2.000 EA 12 INCH GATE BOX $640.00 $1,280.00 $2,500.00 $5,000.00
371.12 2.000 EA 12 INCH COUPLING $975.00 $1,950.00 $4,000.00 $8,000.00
373.12 215.000 FT 12 INCH WATER PIPE INSULATION $68.00 $14,620.00 $300.00 $64,500.00
379.075 1.000 EA 3/4 INCH AIR RELEASE VALVE $1,150.00 $1,150.00 $1,600.00 $1,600.00
403. 2,000.000 SY RECLAIMED PAVEMENT FOR BASE COURSE
AND/OR SUB-BASE
$21.00 $42,000.00 $25.00 $50,000.00
415.2 340.000 SY PAVEMENT FINE MILLING $24.00 $8,160.00 $30.00 $10,200.00
440. 9,400.000 LB CALCIUM CHLORIDE FOR ROADWAY DUST
CONTROL
$0.50 $4,700.00 $0.10 $940.00
443. 6.500 MGL WATER FOR ROADWAY DUST CONTROL $100.00 $650.00 $50.00 $325.00
450.31 290.000 TON SUPERPAVE INTERMEDIATE COURSE - 12.5 (SIC -
12.5)
$193.00 $55,970.00 $200.00 $58,000.00
450.42 650.000 TON SUPERPAVE BASE COURSE - 37.5 (SBC - 37.5) $171.00 $111,150.00 $200.00 $130,000.00
450.60 210.000 TON SUPERPAVE BRIDGE SURFACE COURSE - 9.5 (SSC-
B - 9.5)
$390.00 $81,900.00 $400.00 $84,000.00
450.70 45.000 TON SUPERPAVE BRIDGE PROTECTIVE COURSE - 9.5
(SPC-B - 9.5)
$387.00 $17,415.00 $400.00 $18,000.00
451. 30.000 TON HMA FOR PATCHING $300.00 $9,000.00 $200.00 $6,000.00
452. 375.000 GAL ASPHALT EMULSION FOR TACK COAT $38.00 $14,250.00 $25.00 $9,375.00
453. 2,330.000 FT HMA JOINT SEALANT $0.35 $815.50 $2.00 $4,660.00
472. 5.000 TON TEMPORARY ASPHALT PATCHING $475.00 $2,375.00 $200.00 $1,000.00
504. 375.000 FT GRANITE CURB TYPE VA4 - STRAIGHT $71.00 $26,625.00 $75.00 $28,125.00
504.2 4.000 EA GRANITE CURB TYPE VA4 - SPLAYED END $568.00 $2,272.00 $700.00 $2,800.00
509. 75.000 FT GRANITE TRANSITION CURB FOR PEDESTRIAN
CURB RAMPS - STRAIGHT
$71.00 $5,325.00 $75.00 $5,625.00
CMS105 - Report Date: 9/3/2025 2:46 PM Page 15 of 18
Location : HADLEY Contract # : 130088 District : 2 Description : HADLEY- BRIDGE REPLACEMENT, H-01-005, BAY ROAD (ROUTE 47) OVER THE FORT RIVER
E T & L CORP NEW ENGLAND INFRASTRUCTURE INC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
514. 2.000 EA GRANITE CURB INLET - STRAIGHT $600.00 $1,200.00 $700.00 $1,400.00
594. 24.000 FT CURB REMOVED AND DISCARDED $12.50 $300.00 $100.00 $2,400.00
595. 1.000 EA CURB INLET REMOVED AND DISCARDED $224.00 $224.00 $2,000.00 $2,000.00
620.13 680.000 FT GUARDRAIL, TL-3 (SINGLE FACED) $33.00 $22,440.00 $35.00 $23,800.00
627.83 6.000 EA GUARDRAIL TANGENT END TREATMENT, TL-3 $5,375.00 $32,250.00 $6,000.00 $36,000.00
628.24 4.000 EA TRANSITION TO BRIDGE RAIL $5,485.00 $21,940.00 $6,000.00 $24,000.00
630.2 340.000 FT HIGHWAY GUARD REMOVED AND DISCARDED $14.50 $4,930.00 $10.00 $3,400.00
657. 650.000 FT TEMPORARY FENCE $28.00 $18,200.00 $20.00 $13,000.00
657.5 1,700.000 FT TEMPORARY FENCE REMOVED AND RESET $16.00 $27,200.00 $16.00 $27,200.00
697.1 12.000 EA SILT SACK $220.00 $2,640.00 $300.00 $3,600.00
698.31 160.000 SY GEOTEXTILE FABRIC FOR TEMPORARY SOIL
PROTECTION
$45.00 $7,200.00 $15.00 $2,400.00
701. 10.000 SY CEMENT CONCRETE SIDEWALK $275.00 $2,750.00 $400.00 $4,000.00
701.2 20.000 SY CEMENT CONCRETE PEDESTRIAN CURB RAMP $285.00 $5,700.00 $400.00 $8,000.00
702. 30.000 TON HOT MIX ASPHALT SIDEWALK OR DRIVEWAY $275.00 $8,250.00 $550.00 $16,500.00
715.1 2.000 EA MAIL BOX REMOVED AND RESET $280.00 $560.00 $400.00 $800.00
722.2 1.000 LS SCHEDULE OF OPERATIONS (TYPE B) - FIXED
PRICE $48000
$48,000.00 $48,000.00 $48,000.00 $48,000.00
740. 45.000 MO ENGINEER'S FIELD OFFICE AND EQUIPMENT (TYPE
A)
$3,600.00 $162,000.00 $3,000.00 $135,000.00
748. 1.000 LS MOBILIZATION $220,000.00 $220,000.00 $278,000.00 $278,000.00
751. 255.000 CY LOAM FOR ROADSIDES $96.00 $24,480.00 $100.00 $25,500.00
751.7 5.000 CY COMPOST BLANKET $210.00 $1,050.00 $350.00 $1,750.00
755.45 105.000 SY WETLAND RESTORATION $160.00 $16,800.00 $200.00 $21,000.00
756.1 1.000 LS CONSTRUCTION PERIOD POLLUTION PREVENTION
AND EROSION AND SEDIMENTATION CONTROL
PLAN
$12,000.00 $12,000.00 $7,500.00 $7,500.00
765. 1,865.000 SY SEEDING $2.00 $3,730.00 $2.00 $3,730.00
765.451 5.000 LB PART SHADE ROADSIDE MIX $320.00 $1,600.00 $600.00 $3,000.00
765.555 2.000 LB WETLAND MIX - PART SHADE $535.00 $1,070.00 $700.00 $1,400.00
CMS105 - Report Date: 9/3/2025 2:46 PM Page 16 of 18
Location : HADLEY Contract # : 130088 District : 2 Description : HADLEY- BRIDGE REPLACEMENT, H-01-005, BAY ROAD (ROUTE 47) OVER THE FORT RIVER
E T & L CORP NEW ENGLAND INFRASTRUCTURE INC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
765.635 1,840.000 SY NATIVE SEEDING AND ESTABLISHMENT $3.25 $5,980.00 $4.00 $7,360.00
767.121 1,430.000 FT SEDIMENT CONTROL BARRIER $16.00 $22,880.00 $10.00 $14,300.00
767.122 100.000 FT SEDIMENT BARRIER - COIR LOG $8.50 $850.00 $60.00 $6,000.00
769. 860.000 FT PAVEMENT MILLING MULCH UNDER GUARD RAIL $13.00 $11,180.00 $20.00 $17,200.00
776.523 2.000 EA MAPLE - RED 2-2.5 INCH CALIPER $935.00 $1,870.00 $1,200.00 $2,400.00
778.164 10.000 EA BIRCH - RIVER HERITAGE 8-10 FOOT CLUMP $935.00 $9,350.00 $800.00 $8,000.00
789.633 6.000 EA BLUEBERRY - HIGHBUSH 2-3 FEET / #3 $112.00 $672.00 $120.00 $720.00
790.631 28.000 EA DOGWOOD - REDOSIER 18-24 INCH / #1 $126.00 $3,528.00 $90.00 $2,520.00
790.719 15.000 EA DOGWOOD - SILKY 2-3 FEET / #3 $130.00 $1,950.00 $120.00 $1,800.00
791.033 23.000 EA ELDERBERRY 2-3 FEET / #2 $126.00 $2,898.00 $90.00 $2,070.00
795.013 10.000 EA VIBURNUM - ARROWWOOD 3-4 FEET / #5 $179.00 $1,790.00 $100.00 $1,000.00
795.153 20.000 EA WINTERBERRY - MALE 24-30 INCH / #3 $130.00 $2,600.00 $120.00 $2,400.00
795.189 8.000 EA WITCH HAZEL - SPRING BLOOMING 2-3 FEET / #3 $130.00 $1,040.00 $120.00 $960.00
816.71 1.000 LS PORTABLE SOLAR POWERED TRAFFIC SIGNAL
SYSTEM
$170,000.00 $170,000.00 $125,000.00 $125,000.00
851.1 150.000 DAY TRAFFIC CONES FOR TRAFFIC MANAGEMENT $50.00 $7,500.00 $150.00 $22,500.00
852. 560.000 SF SAFETY SIGNING FOR TRAFFIC MANAGEMENT $28.00 $15,680.00 $60.00 $33,600.00
853.1 9.000 EA PORTABLE BREAKAWAY BARRICADE TYPE III $220.00 $1,980.00 $200.00 $1,800.00
853.21 630.000 FT TEMPORARY BARRIER REMOVED AND RESET $18.00 $11,340.00 $15.00 $9,450.00
853.23 310.000 FT TEMPORARY BARRIER (TL-3) $73.00 $22,630.00 $200.00 $62,000.00
853.33 140.000 FT TEMPORARY BARRIER - LIMITED DEFLECTION (TL-
3)
$135.00 $18,900.00 $200.00 $28,000.00
853.403 8.000 DAY TRUCK MOUNTED ATTENUATOR $350.00 $2,800.00 $800.00 $6,400.00
853.501 2.000 EA TEMPORARY IMPACT ATTENUATOR (TL-3)
REMOVED AND RESET
$2,400.00 $4,800.00 $1,800.00 $3,600.00
853.53 2.000 EA TEMPORARY IMPACT ATTENUATOR
UNIDIRECTIONAL, NON-REDIRECTIVE (TL-3)
$8,000.00 $16,000.00 $9,000.00 $18,000.00
853.8 50.000 DAY TEMPORARY ILLUMINATION FOR WORK ZONE $475.00 $23,750.00 $150.00 $7,500.00
854.016 8,000.000 FT TEMPORARY PAVING MARKINGS - 6 INCH
(PAINTED)
$0.70 $5,600.00 $1.00 $8,000.00
CMS105 - Report Date: 9/3/2025 2:46 PM Page 17 of 18
Location : HADLEY Contract # : 130088 District : 2 Description : HADLEY- BRIDGE REPLACEMENT, H-01-005, BAY ROAD (ROUTE 47) OVER THE FORT RIVER
E T & L CORP NEW ENGLAND INFRASTRUCTURE INC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
854.1 3,320.000 SF PAVEMENT MARKING REMOVAL $3.00 $9,960.00 $4.00 $13,280.00
856. 50.000 DAY ARROW BOARD $17.00 $850.00 $20.00 $1,000.00
859.1 1,610.000 DAY REFLECTORIZED DRUMS WITH SEQUENTIAL
FLASHING WARNING LIGHTS
$1.75 $2,817.50 $5.00 $8,050.00
866.206 1,550.000 FT 6 INCH REFLECTORIZED WHITE LINE (POLYUREA)
(RECESSED)
$3.60 $5,580.00 $6.00 $9,300.00
867.206 1,550.000 FT 6 INCH REFLECTORIZED YELLOW LINE (POLYUREA)
(RECESSED)
$3.60 $5,580.00 $6.00 $9,300.00
874.2 2.000 EA TRAFFIC SIGN REMOVED AND RESET $150.00 $300.00 $200.00 $400.00
901. 14.000 CY 4000 PSI, 1.5 INCH, 565 CEMENT CONCRETE $725.00 $10,150.00 $1,500.00 $21,000.00
910. 35.000 LB STEEL REINFORCEMENT FOR STRUCTURES $5.00 $175.00 $50.00 $1,750.00
942.124 900.000 FT STEEL PILE HP 12 X 84 $300.00 $270,000.00 $280.00 $252,000.00
943.24 730.000 FT STEEL PIPE PILE 24 INCH OUTSIDE DIAMETER $585.00 $427,050.00 $670.00 $489,100.00
948.1 1.000 EA SHORT DURATION LOAD TEST $135,000.00 $135,000.00 $40,000.00 $40,000.00
948.4 5.000 EA DYNAMIC LOAD TEST PREPARATION $5,500.00 $27,500.00 $5,000.00 $25,000.00
948.41 5.000 EA DYNAMIC LOAD TEST BY CONTRACTOR $2,800.00 $14,000.00 $5,000.00 $25,000.00
948.5 26.000 EA PILE SHOES $600.00 $15,600.00 $2,000.00 $52,000.00
950.11 1,080.000 SF TEMPORARY EARTH SUPPORT SYSTEMS $325.00 $351,000.00 $1.00 $1,080.00
983.2 720.000 CY RIPRAP $165.00 $118,800.00 $120.00 $86,400.00
983.521 165.000 CY STREAMBED RESTORATION $180.00 $29,700.00 $140.00 $23,100.00
991.1 1.000 LS CONTROL OF WATER - STRUCTURE NO. H-01-005 $280,000.00 $280,000.00 $750,000.00 $750,000.00
993.5 1.000 LS TEMPORARY WALKWAY STRUCTURE $280,000.00 $280,000.00 $506,500.00 $506,500.00
995.01 1.000 LS BRIDGE STRUCTURE, BRIDGE NO. H-01-005 $2,735,000.00 $2,735,000.00 $4,043,160.00 $4,043,160.00
Total : $7,698,222.00 Total : $9,440,000.00
CMS105 - Report Date: 9/3/2025 2:46 PM Page 18 of 18
File details come from the government source that posted it. Updated .